Core Assets Drills 11.8M of Massive Zn-Cu-Ag Sulphide at Silver Lime
Core Assets Drills 11.8M of Massive Zn-Cu-Ag Sulphide at Silver Lime
VANCOUVER, BC / ACCESSWIRE / August 7, 2024 / Core Assets Corp., ("Core Assets" or the "Company") (CSE:CC)(FSE:5RJ)(OTC.QB:CCOOF) is pleased to present an exploration update that includes visual results from diamond drill core collected from the Sulphide City Porphyry-Skarn Target and Whaleback Skarn Showing at the Silver Lime CRD-Porphyry Project (the "Silver Lime Project" or "Silver Lime"), central Blue Property (the "Blue Property"), Atlin Mining District of NW British Columbia.
Core Assets Corp.("Core Assets"或「公司」)(CSE:CC)(FSE:5RJ)(OTC.QB:CCOOF)很高興呈現探險進展報告,其中包括從銀灰色CRD-斑岩項目(「Silver Lime項目」或「Silver Lime」)的Sulphide City Porphyry-Skarn目標和Whaleback Skarn展示中收集的金剛石鑽芯的視覺結果,該項目位於英屬哥倫比亞西北部的Atlin Mining地區中央的Blue Property(「Blue Property」)
HIGHLIGHTS
亮點
2,014 metres of diamond drilling (HQ/NQ) has been completed across three (3) locations at the Silver Lime Project in 2024 (Table 2, Figure 3).
-
Drill holes SLM24-060 through 062 were planned to test the near surface and high-grade Zinc Skarn Showing at the Sulphide City - Whaleback Target (See News Release dated February 14, 2022). In 2021, channel sampling was completed over 4 locations along a north-northwest trend at Whaleback and returned 5.3 metres of 10.2% Zn, 0.29% Cu. 14g/t Ag. (CH21-02: Table 1):
SLM24-060: Intersected multiple zones of massive sulphide skarn mineralization, totalling 11.6m combined length, from surface to approximately 39 metres depth and ended in endoskarn-style alteration (Figure 2).
SLM24-061: Intersected 11.8m of continuous sphalerite-rich (Zn) massive sulphide exoskarn mineralization with chalcopyrite (Cu) and galena (Pb/Ag) from surface (Figure 1).
SLM24-062: Obliquely intersected approximately 0.5m of massive sulphide skarn mineralization as well as an intense fault zone interpreted as the feeder structure to the Whaleback Skarn system (Figure 2).
2024年在Silver Lime Project完成了2,014米的金剛石鑽探(HQ / NQ),涵蓋了三個地點(表2,圖3)。
-
2022年2月14日新聞發佈稿中提到,SLM24-060至062號鑽孔的計劃是測試Sulphide City - Whaleback Target的近地表和高品位鋅礦牀(參見新聞發佈稿)。 2021年,在Whaleback沿着北北西趨勢完成了4個位置的頻道取樣,並返回5.3米的10.2% Zn,0.29% Cu,14g / t Ag(CH21-02:表1):
SLM24-060:從表層到39米深度,交錯地穿過多條硫化物斑岩化礦物化帶,總共達1160萬長度,並以內部斑岩樣式改造結束(圖2)。
SLM24-061:在表層交錯地穿過連續的方解石富集(Zn)大型硫化物外斑岩礦化帶,含有黃銅石(Cu)和方鉛礦(Pb / Ag)(圖1),共達1180萬。
SLM24-062:斜穿過約50萬硫化物斑岩礦化帶以及被解釋爲Whaleback Skarn體系的供給結構的劇烈斷層帶(圖2)
Figure 1: A photograph of the continuous 11.8-metre interval of massive sulphide (sphalerite-pyrrhotite-pyrite+/-chalcopyrite-galena-rich) skarn mineralization in Sulphide City-Whaleback hole SLM24-061.
圖1:Sulphide City-Whaleback孔SLM24-061中11.8米連續的硫化物(方解石-一硫化物-黃鐵礦+ / -黃銅石-方鉛礦富集)斑岩礦化帶的照片。
SLM24-057: Designed to test the Sulphide City Porphyry, immediately north of the 2022 collar location. The hole encountered disseminated to locally semi-massive sphalerite-chalcopyrite-galena-bearing skarn alteration from surface to approximately 450 metres depth - marking the contact between surrounding metasedimentary country rock and the Sulphide City Mo-Cu-Porphyry (Figure 2). Hole 057 was the first hole completed this season and deviated from the intended drilling direction due to intense faulting and repetitive differences in rock competency within the contact zone.
Holes SLM24-058 and 059 were drilled northeast of the Pete's Target in a newly discovered sulphide vein system identified above the very-high chargeability anomaly (>120 mV/V). These holes intersected faulted and extremely pyritized hornfels containing generous amounts of arsenopyrite, sulphide veins and vein stockwork. These intersections resemble the veining and mineralized zones hosting high-grade Ag and Au mineralization at surface at the Amp Target - located less than 1 kilometre south-southeast of the drill site.
SLM24-063: Currently in progress and is designed to test the porphyry mineralization potential of the Sulphide City Mo-Cu porphyry at depths greater than 1,000 metres (Figure 3). A magnetic low, interpreted as a zone of strong hydrothermal alteration/magnetite destruction, extends to depth below the Gally and Sulphide City high chargeability anomalies and correlates well with the known extents of the Sulphide City Mo-Cu Porphyry.
Six (6) diamond drill holes have been completed at the Silver Lime CRD-Porphyry Project in 2024. A projected total of 3,000m of additional diamond drilling is currently underway.
SLM24-057:旨在測試2022年項鍊位置北部的Sulphide City Porphyry。 這個孔遭遇了從表層到約450米深處的普及到局部半塊狀方解石-黃銅石-閃鋅礦硫化物礦化帶,標誌着周圍變質沉積岩和Sulphide City Mo-Cu-Porphyry之間的接觸(圖2)。 由於接觸區內強烈的斷層和差異性循環岩石的影響,第057號孔本季度是第一個孔孔,與預期的鑽孔方向相偏離。
鑽孔SLM24-058和059均鑽在Pete's Target的東北方,該地區新發現了含有超高電性異常(> 120 mV / V)的硫化物脈系統,該脈系統遭遇斷層和極易與三氧化二砷和硫化物脈系統相似的片麻岩和脈石作爲含金銀礦牀的寄存帶和礦化帶。 這些區段位於鑽孔現場以南不到1公里處的Amp Target地區,該地區同樣具有高品位的Ag和Au礦化帶。
SLM24-063:目前正在進行,並旨在測試深度超過1,000米的Sulphide City Mo-Cu斑岩礦體的礦化潛力(圖3)。 一個被解釋爲強烈的熱液蝕變/磁鐵石破壞帶的磁低區在Gally和Sulphide City高充電異常下方延伸至深處,並與Sulphide City Mo-Cu Porphyry的已知範圍很好地相關。
2024年在Silver Lime CRD-Porphyry項目完成了六(6)個鑽孔。 目前正在進行300000萬的額外金剛石鑽探。
Core Assets' President & CEO Nick Rodway commented, "The 2024 drilling season has been a huge success for the Core Team. At Sulphide City we have defined the northern mineralized skarn boundary to the porphyry system and observed numerous intervals of massive Zn-Fe-(Cu-Ag-Pb) sulphide skarn mineralization and intense porphyry-style vein densities. Surface rocks and drill core assays will be released as they become available; until then, diamond drilling continues 24/7 at the Silver Lime Project."
Core Assets公司總裁兼首席執行官Nick Rodway評論道:“2024年的鑽探季對Core團隊來說是巨大的成功。 在Sulphide City,我們定義了斑岩系統的北部礦化斑岩邊界,並觀察到了多個間隙的大量的(Zn-Fe-(Cu-Ag-Pb))硫化物斑岩礦化帶和強烈的斑岩礦脈密度。 表面岩石和鑽探岩心分析結果將在成爲可用時發佈; 在那之前,Silver Lime項目的鑽探將24小時不間斷進行。
TABLE 1: 2021 CHANNEL SAMPLING RESULTS AT SULPHIDE CITY - WHALEBACK ZN-SKARN | ||||||
Channel ID |
Target |
Length (m) |
Ag (g/t) |
Cu (%) |
Pb (%) |
Zn (%) |
CH21-01 |
Sulphide City (Whaleback) |
5.15* |
11.0 |
0.21 |
0.00 |
9.49 |
including |
4.5 m of |
12.3 |
0.24 |
0.00 |
10.76 |
|
CH21-02 |
Sulphide City (Whaleback) |
5.3* |
14.4 |
0.29 |
0.01 |
10.23 |
including |
5.0 m of |
15.2 |
0.31 |
0.01 |
10.83 |
|
and |
0.5 m of |
46.3 |
0.49 |
0.04 |
11.85 |
|
CH21-03 |
Sulphide City (Whaleback) |
2.5* |
9.8 |
0.25 |
0.01 |
11.62 |
CH21-04 |
Sulphide City (Whaleback) |
2* |
10.1 |
0.23 |
0.03 |
10.94 |
表1:2021年SULPHIDE CITY - WHALEBACk ZN-SKARN頻道取樣結果 在上述表格中*表示頻道的整個長度。分析結果以長度加權平均值呈現,並且金屬回收情況未知。 | ||||||
頻道編號 |
目標 |
長度(米) |
Ag(g/t) |
銅(%) |
鉛(%) |
鋅(%) |
CH21-01 |
硫化城市(鯨背) |
5.15 * |
11.0 |
0.21 |
0.00 |
9.49 |
包括 |
450萬的 |
費用和費用 - 費用 |
0.24 |
0.00 |
10.76 |
|
CH21-02 |
硫化城市(鯨背) |
5.3* |
14.4 |
0.29 |
0.01 |
10.23 |
包括 |
500萬 |
15.2 |
0.31 |
0.01 |
10.83 |
|
和 |
50萬 |
46.3 |
0.49 |
0.04。 |
分別爲2024年3月31日和2023年12月31日的贖回價值的A類普通股股份爲$11.85每股。 |
|
CH21-03 |
硫化城市(鯨背) |
2.5* |
9.8 |
0.25 |
0.01 |
11.62 |
CH21-04 |
硫化城市(鯨背) |
2* |
10.1 |
0.23 |
0.03 |
10.94 |
Figure 2: Photographs of representative target mineralization intersected in holes SLM24-057, SLM24-060 and SLM24-061 from the Sulphide City and Whaleback targets.
圖2:硫化城市和鯨背目標孔SLM24-057,SLM24-060和SLM24-061中所遇到的有代表性的礦化物的照片。
Figure 3: Plan view geology map illustrating the 2024 diamond drilling progress at the Sulphide City Mo-Cu Porphyry, Sulphide City-Whaleback Skarn, and Gally targets at the Silver Lime CRD-Porphyry Project.
圖3:示出銀湖CRD-斑岩項目中硫化城市鉬銅斑岩、硫化城市-鯨背矽卡巖和Gally目標的2024年鑽孔進展的平面地質圖。
Table 2: 2024 Diamond Drillhole Data from the Silver Lime Project | |||||||
DDH ID |
Target |
Length (m) |
Azimuth |
Dip |
Northing |
Easting |
Elevation |
SLM24-057 |
Sulphide City |
801.25 |
115 |
-60 |
6558826 |
536666 |
1620 |
SLM24-058 |
Pete's North |
348.00 |
235 |
-65 |
6560102 |
536922 |
1440 |
SLM24-059 |
Pete's North |
561.00 |
150 |
-75 |
6560102 |
536922 |
1440 |
SLM24-060 |
Whaleback |
138.00 |
351 |
-30 |
6558486 |
536611 |
1603 |
SLM24-061 |
Whaleback |
129.85 |
344 |
-25 |
6558486 |
536611 |
1603 |
SLM24-062 |
Whaleback |
36.30 |
345 |
-40 |
6558486 |
536611 |
1603 |
SLM24-063 |
Gally/Sulphide City |
In Progress |
80 |
-80 |
6558351 |
536653 |
1628 |
表2:銀灰項目的2024年鑽井數據 | |||||||
鑽孔編號 |
目標 |
長度(米) |
方位角(度) |
傾角 |
北緯(m) |
東經(m) |
海拔高度(masl) |
SLM24-057 |
硫化城市 |
801.25 |
115 |
-60 |
6558826 |
536666 |
1620 |
SLM24-058 |
皮特北部 |
348.00 |
235 |
-65 |
6560102 |
536922 |
1440 |
SLM24-059 |
皮特北部 |
561.00 |
150 |
-75 |
6560102 |
536922 |
1440 |
SLM24-060 |
Whaleback |
138.00 |
351 |
-30 |
6558486 |
536611 |
1603 |
SLM24-061 |
Whaleback |
129.85 |
344 |
-25 |
6558486 |
536611 |
1603 |
SLM24-062 |
Whaleback |
36.30 |
345 |
-40 |
6558486 |
536611 |
1603 |
SLM24-063 |
Gally/Sulphide City |
正在進行中 |
80 |
-80 |
6558351 |
536653 |
1628 |
SAMPLING, PREPARATION & QA/QC
取樣、製備和QA/QC
All recovered drill core is transported by helicopter to the core logging facility in Atlin, BC for processing. Sample intervals are chosen to capture homogenous lithology, alteration, mineralization, and veining. In areas of poor recovery, sample sizes are modified to exceed the maximum sample interval. Drill core is typically sampled over 2-metre intervals; however, sample intervals are reduced in zones of higher visual sulphide mineralization.
所有恢復的鑽孔芯樣均通過直升機運輸到位於BC Atlin的鑽孔記錄設施中進行處理。樣品間隔是根據巖性、蝕變、礦化和脈石來選擇。在恢復較差的地區,樣品尺寸被修改以超過最大樣品間隔。通常在2米間隔內取樣,但在高可視硫化物礦化帶則減小了樣品間隔。
All core samples are submitted to Bureau Veritas (BV) Labs in Whitehorse, YT. Each sample is crushed to 70% passing 2mm, then pulverized to 85% passing 200-micron mesh. All samples then undergo a 4-Acid digestion with an ICP-MS finish for a 59-element ultra trace package (Method Code MA-250), as well as a fire assay by Pb collection with ICP-ES finish for Au, Pt, and Pd (Method code FA-330). Samples that hit upper detection limits for elements of interest on the primary multi-element method are then analyzed via a secondary 4-Acid digest with an ICP-OES finish (Method Code MA-370).
所有岩心樣品均提交到位於YT白馬市的Bureau Veritas(BV)實驗室。每個樣品都會被碾碎至2mm,然後粉碎至通過200微米篩網的85%。所有樣品均進行4酸消化,並進行ICP-MS處理以獲得59元素超微量包(方法代碼MA-250),以及採用Pb收集和ICP-ES處理的火試驗以分析Au,Pt和Pd(方法代碼FA-330)。在初級多元素方法中,對感興趣元素的上限被擊中的樣品隨後通過次級4酸消化進行分析,以ICP-OES處理(方法代碼MA-370)。
NATIONAL INSTRUMENT 43-101 DISCLOSURE
NATIONAL INSTRUMENt 43-101 DISCLOSURE
Nicholas Rodway, P.Geo, (Licence# 46541) (Permit to Practice# 100359) is President, CEO and Director of the Company, and qualified person as defined by National Instrument 43-101- Standards of Disclosure for Mineral Projects. Mr. Rodway has reviewed and approved the technical content in this release.
Nicholas Rodway,P.Geo,(許可證# 46541)(執業許可證# 100359)是該公司的總裁,首席執行官和董事,並且是National Instrument 43-101-礦產項目披露標準所定義的合格人員。 Rodway先生已審查並批准了本發佈的技術內容。
ABOUT CORE ASSETS CORP.
關於CORE ASSETS CORP.
Core Assets Corp. is a Canadian mineral exploration company focused on the acquisition and development of mineral projects in British Columbia, Canada. The Company currently holds 100% ownership in the Blue Property, which covers a land area of 114,074 hectares (~1,140 km2). The project lies within the Atlin Mining District, a well-known gold mining camp located in the unceded territory of the Taku River Tlingit First Nation and the Carcross/Tagish First Nation. The Blue Property hosts a major structural feature known as The Llewellyn Fault Zone ("LFZ"). This structure is approximately 140 km in length and runs from the Tally-Ho Shear Zone in the Yukon, south through the Blue Property to the Alaskan Panhandle Juneau Ice Sheet in the United States. Core Assets believes that the south Atlin Lake area and the LFZ has been neglected since the last major exploration campaigns in the 1980's. The LFZ plays an important role in mineralization of near surface metal occurrences across the Blue Property. The past 50 years have seen substantial advancements in the understanding of porphyry, skarn, and carbonate replacement type deposits both globally and in British Columbia's Golden Triangle. The Company has leveraged this information at the Blue Property to tailor an already proven exploration model and believes this could facilitate a major discovery. Core Assets is excited to become one of Atlin Mining District's premier explorers where its team believes there are substantial opportunities for new discoveries and development in the area.
Core Assets是一家加拿大礦業勘探公司,致力於在加拿大不列顛哥倫比亞省收購和開發礦產項目。該公司目前擁有藍色項目的100%所有權,藍色項目佔地114,074公頃(約1,140平方公里),位於Atlin礦區內,是一個著名的黃金開採營地,位於Taku河Tlingit原住民和Carcross / Tagish第一民族所未被佔領的土地上。藍色地產擁有一個主要的結構特徵,稱爲「Llewellyn斷層帶(「LFZ」)」,該結構長約140公里,從育空地區的Tally-Ho剪切帶到美國阿拉斯加潘漢德爾六月冰原一直向南通過藍色地產。Core Assets認爲,自上世紀80年代最後一次重大勘探活動以來,南部Atlin湖地區和LFZ一直被忽視。LFZ在藍色地產的近表面金屬出現中起着重要作用。過去50年,在全球及不列顛哥倫比亞省的Golden Triangle地區,對斑岩、矽卡巖和碳酸鹽置換型礦牀的認識取得了實質性進展。該公司已經在藍色地產利用這些信息來量身定製一個已經被證實的勘探模型,並認爲這可能有助於重大發現。Core Assets非常高興成爲Atlin礦區的主要勘探者之一,該公司團隊認爲該地區存在重大的新發現和開發機遇。
On Behalf of the Board of Directors
CORE ASSETS CORP.
"Nicholas Rodway"
President & CEO
Tel: 604.681.1568
董事會代表
CORE ASSETS CORP.
「Nicholas Rodway」
總裁兼首席執行官
電話:604.681.1568
Neither the Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of this release.
加拿大證券交易所及其監管服務提供者(如CSE的政策中所定義的那樣)不對本發佈的充分性或準確性承擔任何責任。
FORWARD LOOKING STATEMENTS
前瞻性聲明
Statements in this document which are not purely historical are forward-looking statements, including any statements regarding beliefs, plans, expectations, or intentions regarding the future. Forward looking statements in this news release include, but are not limited to, expectations regarding the pending core assays, including speculative inferences about potential copper, molybdenum, gold, silver, zinc, and lead grades based on preliminary visual observations from results of diamond drilling at the Silver Lime Project and the Laverdiere Project, as applicable; the Company's plans to further investigate the geometry and extent of the skarn and carbonate replacement type mineralization continuum at the Silver Lime Project through additional field work and diamond drilling and any planned or proposed program related thereto; and any other general statement regarding the Company's planned or future exploration efforts at the Blue Property. It is important to note that the Company's actual business outcomes and exploration results could differ materially from those in such forward-looking statements. Risks and uncertainties include that expectations regarding pending core assays based on preliminary visual observations from diamond drilling results at the Silver Lime Project and the Laverdiere Project, as applicable, may be found to be inaccurate; that results may indicate further exploration efforts at the Silver Lime Project and the Laverdiere Project, as applicable, as not warranted; that the Company may be unable to implement its plans to further explore at the Silver Lime Project and the Laverdiere Project, as applicable; that certain exploration methods, including the Company's proposed exploration model for the Blue Property, may be ineffective or inadequate in the circumstances; that economic, competitive, governmental, geopolitical, environmental and technological factors may affect the Company's operations, markets, products and prices; our specific plans and timing drilling, field work and other plans may change; that the Company may not have access to or be able to develop any minerals because of cost factors, type of terrain, or availability of equipment and technology; and we may also not raise sufficient funds to carry out or complete our plans. The ongoing COVID-19 pandemic, labour shortages, inflationary pressures, rising interest rates, the global financial climate and the conflict in Ukraine and surrounding regions are some additional factors that are affecting current economic conditions and increasing economic uncertainty, which may impact the Company's operating performance, financial position, and prospects. Collectively, the potential impacts of this economic environment pose risks that are currently indescribable and immeasurable. No assurance can be given that any of the events anticipated by the forward-looking statements will occur or, if they do occur, what benefits the Company will obtain from them. Readers are cautioned that forward-looking statements are not guarantees of future performance or events and, accordingly, are cautioned not to put undue reliance on forward-looking statements due to the inherent uncertainty of such statements. Additional risk factors are discussed in the section entitled "Risk Factors" in the Company's Management Discussion and Analysis for its recently completed fiscal period, which is available under the Company's SEDAR profile at . Except as required by law, the Company will not update or revise these forward-looking statements after the date of this document or to revise them to reflect the occurrence of future unanticipated events.
本文件中的陳述,這些陳述不僅僅是歷史性的陳述,同時也是前瞻性陳述,包括任何關於未來信仰、計劃、期望或意圖的陳述。本新聞稿中的前瞻性陳述包括,但不限於,關於待定巖芯化驗結果的期望,包括基於Laverdiere項目和Silver Lime項目的鑽孔結果的初步視覺觀察所構想的銅,鉬,金,銀,鋅和鉛等等的可能性;公司計劃通過進一步的野外工作和鑽探來進一步研究Silver Lime項目的矽卡巖和碳酸鹽交代礦化連續體的幾何形狀和範圍,以及任何計劃或擬議的相關程序;以及關於公司計劃或未來探索工作的任何其他一般性陳述。需要注意的是,公司的實際業務結果和勘探結果可能與前瞻性陳述中的結果有所不同。風險和不確定性包括:基於Laverdiere項目和Silver Lime項目的鑽孔結果的初步視覺觀察而期望待定巖芯化驗結果可能被證明是不準確的;結果可能表明,未進一步探索Laverdiere項目和Silver Lime項目的價值不高;公司可能無法實施在Laverdiere項目和Silver Lime項目進一步探索的計劃;某些勘探方法(包括公司針對Blue Property提出的勘探模型)可能在特定情況下是無效或不足的;經濟、競爭、政府、地緣政治、環境和技術因素可能影響公司的運營、市場、產品和價格;我們的特定鑽探計劃和時間、現場工作和其他計劃可能會發生變化;因成本因素、地形類型或設備和技術的可用性等原因,公司可能無法獲得或開發任何礦物質;我們可能不會籌集足夠的資金來實施或完成我們的計劃。當前的COVID-19大流行、勞動力短缺、價格上漲、利率上升、全球金融環境以及烏克蘭及周邊地區的衝突是一些正在影響當前經濟狀況並增加經濟不確定性的其他因素,這可能影響公司的營業績效、財務狀況和前景。總體而言,這種經濟環境的潛在影響構成了當前無法描述和衡量的風險。不能保證前瞻性陳述中預期的任何事件將發生,或者,如果它們真的發生了,公司將從中獲得任何收益。讀者應注意,前瞻性陳述並不是未來業績或事件的保證,因此,讀者不應由於這些陳述的內在不確定性而過度依賴前瞻性陳述。有關公司最近完成的財務期間的「風險因素」部分的其他風險因素,請參閱公司在SEDAR檔案中的管理討論和分析。公司將在本文件日期後更新或修訂這些前瞻性陳述,或根據未來出現的意外事件來修訂這些前瞻性陳述。 來源:Core Assets Corp。
SOURCE: Core Assets Corp.
來源:corp資產