Toronto, Ontario--(Newsfile Corp. - August 15, 2024) - Signature Resources Ltd. (TSXV: SGU) (OTCQB: SGGTF) FSE: 3S30) ("Signature" or the "Company") is pleased to announce that it has received the results from channel samples collected during the recently completed field program. During the field activities, 101 samples were collected and have been analyzed at SGS's Red Lake facilities. The results include 16 groups of channel samples from the East Base Lake, North Zone, Central Zone, West Zone and the South Zones. Each sample is one meter in length and the average results are provided in the tables below. In addition, there were also 28 grab samples from around the Lingman Lake property with grades ranging from 0.011g/t to 6.784g/t. The map below (Figure 1: Lingman Lake Compilation) provides an overview of where the majority of the samples were taken on the property and includes prior grab samples from a 2016 program (red dots) for reference.

安大略省多倫多-(新聞發佈公司-2024年8月15日)-Signature Resources Ltd. (TSXV: SGU) (OTCQB: SGGTF) FSE: 3S30)(以下簡稱「Signature」或「公司」)很高興地宣佈,該公司已收到了最近完成的野外活動期間收集的溝道樣品的結果。在野外活動期間,共收集了101個樣品,並在SGS的Red Lake設施進行了分析。結果包括來自東部貝斯湖、北部區域、中央區域、西部區域和南部區域的16組溝道樣品。每個樣品長度爲一米,並提供了下表中的平均結果。此外,還從Lingman Lake附近採集了28個掃描樣品,其品位範圍從0.011g/t到6.784g/t。下面的地圖(圖1:Lingman Lake Compilation)介紹了採樣點的分佈情況,幷包括從2016年計劃中提取的以前的掃描樣品(紅點)以供參考。


Figure 1: Lingman Lake Compilation


圖1:Lingman Lake Compilation

"Our work continues to fill in the picture of the Lingman Lake Property and was an important foundational step in helping us evaluate this area. While often viewed as mundane by the market it is critical in filling the data gaps to better understand the gold endowment of the mine area and on the regional potential. Our near-term goals are focused on delivering our initial NI 43-101 next year, but all this work is setting us up to rapidly follow that achievement with further exploration work to continue proving the potential of the Lingman Lake property. This program was conducted on a very small portion of the 32km wide greenstone belt that Signature controls. We have multiple areas identified across the Greenstone Belt that we believe have similar potential to the historical Lingman Lake mine location."

「我們的工作繼續填補Lingman Lake礦區的數據缺口,並在評估此區域方面起到重要基礎性作用。雖然市場通常認爲這種工作單調乏味,但它在填補數據缺口方面至關重要,以更好地了解礦區的黃金賦存量和區域潛力。我們的近期目標是專注於在明年發佈初步NI 43-101報告,但所有這些工作都將使我們在之後快速進行進一步的勘探工作,以繼續證明Lingman Lake項目的潛力。此次活動只涉及到Signature控制的32公里寬綠巖帶的一小部分。我們已經確定了多個位於Greenstone帶上的區域,我們認爲這些地區具有類似於歷史Lingman Lake礦區的潛力。」

- J. Dan Denbow, CFA - President, CEO and Director

- J. Dan Denbow, CFA - 總裁,首席執行官和董事

These field programs are typically overshadowed by the drilling activity but play a very important role in developing the knowledge and understanding of the property leading to better planning for future exploration activities. The Signature geology team has been working diligently to digitize all the historical data on the property and this work continues to identify areas near the historic Lingman Lake mine workings that warrant follow-up surface evaluation and present additional drill targets. This work is necessary to properly assess the property and its potential.

這些現場活動通常被鑽探活動所掩蓋,但在發展對產權的了解和認識方面起着非常重要的作用,從而更好地規劃未來的勘探活動。Signature的地質團隊一直在努力將產權上的所有歷史數據數字化,並且這項工作持續發現靠近歷史Lingman Lake礦區開採的區域,值得進行後續的地表評估並提供額外的鑽掘目標。這項工作對於正確評估財產及其潛力是必要的。

An example of the benefits of this work can be seen in the figure below (Figure 2: North Zone Samples) which shows the channel samples along the North Zone have identified mineralization that has not been previously drilled and represents a target area that can prospectively expand the known mineralization. The results of the North Zone channel samples can be seen in the table below (Table 1: NZ Channel Samples), including sample number 5 with an average gold grade of 1.95g/t over nine meters that was particularly interesting in the Monzonite-Feldspar Porphyry-Volcanic rock package where very good grades were observed. This area is just northwest of the historical Lingman Lake mine workings and 19 meters east of the dike.

這項工作的好處可以通過下圖(圖2:North Zone Samples)看到,該圖顯示了沿北區域的溝道樣品確定了尚未進行過鑽探的礦化體,並代表一個有前途的目標區域,可以擴大已知的礦化體。沿北區通道樣品的結果如下表所示(表1:NZ通道樣品),包括平均含金量爲1.95g/t的第5個樣品,長度爲9米,特別有趣的是在花崗閃長巖-長石閃長巖-火山岩包裹中觀察到了非常好的品位。該區域位於歷史Lingman Lake礦區的正西方向,距離巖牆19米。

Figure 2: North Zone Samples

圖2:North Zone Samples

Table 1: NZ Channel Samples

表1:NZ通道樣品

Channel Weighted Avg AU g/t Length (m) Max Au g/t/m Min Au g/t/m
North Zone 2 0.03 6 0.064 0.009
North Zone 3 0.61 13 1.891 0.03
North Zone 4 0.30 12 1.669 0.008
North Zone 5 1.95 9 11.516 0.009
North Zone 6 0.28 7 0.894 0.019
溝道 加權平均金品位(g/t) 長度(米) 最大Au g/t•m 最小Au g/t•m
北區2 0.03 6 0.064 0.009
北區3 0.61 13 1.891 0.03
北區4 0.30 12 1.669 0.008
北區5 1.95 9 11.516 0.009
北區6 0.28 7 0.894 0.019

A highlighted area of the work completed in the South A and B zones is shown below (Figure 3: South Zone Samples). These samples follow up on some very good grab samples from the 2016 program including the 125.28 g/t sample collected in the South Zone A area. The results from the sampling along the South Zones can be seen below (Table 2: SZ Channel Samples).

下圖是南區A和B區域完成的精選區域(圖3:南區樣品)。這些樣品符合2016年項目中一些非常好的抓取樣品,包括南A區域採集的125.28g/t樣品。沿南區取樣的結果如下(表2:SZ溝道樣品)。

Figure 3: South Zone Samples

圖3:南區樣品

Table 2: SZ Channel Samples

表2:SZ溝道樣品

Channel Weighted Avg AU g/t Length (m) Max Au g/t/m Min Au g/t/m
South Zone A 7 0.06 2 0.073 0.043
South Zone B 8 1.64 6.6 1.868 0.12
South Zone A 9 0.84 1.1

South Zone A 11 0.544 1.1

South Zone A 12 0.033 0.9

South Zone A 13 0.006 1.1

溝道 加權平均金品位(g/t) 長度(米) 最大Au g/t•m 最小Au g/t•m
南區A 7 0.06 2 0.073 0.043
南區B 8 1.64 6.6 1.868 0.12
南區A 9 0.84 1.1

南區A 11 0.544 1.1

南區A 12 0.033 0.9

南區A 13 0.006 1.1

Ten of the 16 channel samples were collected around the previously identified South and North zones as shown above but the team also undertook sampling (Table 3: Other Channel Samples) from the East Base Lake area which is on the east side of the dike near a major east-west fault. The Central Zone follows the same east-west mineralization roughly crossing through the exploration camp with the channel samples taken just east of the camp. Interesting results were obtained from the West Zone which is the western extension of the North Zone just across the diabase dike and sampling from the 11650 Zone located south of the South Zone A.

16個溝道樣品中的10個收集自如上所示的南區和北區,但團隊還進行了採樣(表3:其他渠道樣品),該採樣位於堤岸東側靠近一條重要的東-西向斷層的東部基地湖區域。中心區域沿着相同的東西向礦化大致穿過勘探營地,溝道樣品取自營地東側。西部區域的結果有意思,它是北區的西部延伸,就在輝長岩巖牆上,從南區A南邊的11650區域取樣。

Table 3: Other Channel Samples

表3:其他渠道樣品

Channel Weighted Avg AU g/t Length (m) Max Au g/t/m Min Au g/t/m
East Base Lake 1 0.63 3.0 1.858 0.018
11650 - 10 2.903 0.9

West Zone 14 2.307 0.6

Central Zone 15 0.02 0.4

Central Zone 16 0.0133 0.4

溝道 加權平均金品位(g/t) 長度(米) 最大Au g/t•m 最小Au g/t•m
東北湖基地1 0.63 3.0 1.858 0.018
11650 - 10 2.903 0.9

西區14 2.307 0.6

中區15 0.02 0.4

中區16 0.0133 0.4

While conducting the field program, in May of this year, the team also collected 28 grab samples from various parts of the property near the historical Lingman Lake mine workings. As mentioned above, the 11650 Zone is interesting in that it seems to follow the same east-west trend as the other known zones and follows a fault through the property. It is uncertain if it is a distinct zone or a splay of the South Zone A.

在今年5月進行野外調查期間,團隊還從靠近歷史Lingman湖礦區附近的物業各個部分收集了28個樣本。如上所述,11650區具有趣味性,因爲它似乎沿着其他已知區域相同的東西向趨勢,並沿礦產權通過。不確定它是一個獨特的區域還是南區A的裂紋。

South Base Lake is on the west side of the dike and to the southwest of the main exploration area, where heavily oxidized iron sulphides and sheared volcanics have been identified. It provides another area of interest that warrants follow-up work.

南部湖位於堤岸的西側,位於主要開發區域的西南部,已確定其中存在大量氧化鐵硫化物和斷層火山岩,這提供了另一個需要跟進的有趣領域。

The Contact Lake occurrence, located 2,000 meters northeast of the camp, is another area having sulphide mineralization with gold in outcrop. The occurrence is just off the compilation map (Figure 1) and has very little work done on it but continues to build the database aiding our interpretation of the regional geological features hosting gold mineralization in the Greenstone Belt. The Contact Lake occurrence is believed to be within a formational feature expressed as a magnetic linear that follows the all-important north granite-volcanic contact for an additional 5 kilometers.

Contact Lake出現在營地東北2000米處,是含有金的硫化物礦化作用的另一區域。該出現僅在編制地圖(圖1)之外,但進行了非常少的工作,但繼續構建數據庫來幫助我們解釋區域地質特徵,這些特徵主要寄存了綠巖帶中的金礦化。Contact Lake事實上是一種表現爲磁線性的成型特徵,該成型特徵沿着重要的北向花崗岩-火山岩接觸線,另行增加了5公里。

Table 4: Grab Sample Results

表4:取樣結果

Grab Sample Location AU PPM Grab Sample Location AU PPM
D00482001 South Zone A 0.378 D00482083 South Zone A* 0.006
D00482002 Central Zone 0.006 D00482084 Central Zone* 0.036
D00482003 Central Zone 0.367 D00482085 Central Zone* 0.141
D00482004 South Zone B 4.577 D00482089 South Base Lake* 1.068
D00482065 South Zone A 0.087 D00482091 South Base Lake* 0.352
D00482066 South Zone A 0.041 D00482092 South Base Lake* 0.058
D00482067 11650 1.102 D00482151 Contact Lake 0.103
D00482068 11650 0.042 D00482152 Contact Lake 1.145
D00482069 11650 0.426 D00482153 Contact Lake 0.057
D00482071 South Zone A 6.784 D00482154 Contact Lake 0.011
D00482072 South Zone A 0.156 D00482155 Contact Lake 0.015
D00482073 11650 1.039 D00482156 Contact Lake 0.011
D00482074 11650 0.054 D00482156 Contact Lake 0.114
D00482082 West Zone* 5.446 D00482156 Contact Lake 0.028
取樣 地點 黃金(PPM) 取樣 地點 黃金(PPM)
D00482001 聯繫湖 0.378 D00482083 南區A* 0.006
D00482002 Globex大版稅索賠包內 0.006 D00482084 中央區* 0.036
D00482003 Globex大版稅索賠包內 0.367 D00482085 中央區* 0.141
D00482004 南區 b 4.577 D00482089 南部基地湖* 1.068
D00482065 聯繫湖 0.087 D00482091 南基地湖* 0.352
D00482066 聯繫湖 0.041 D00482092 南部基地湖* 0.058
D00482067 11650 1.102 D00482151 瓊泉湖聯繫人 0.103
D00482068 11650 0.042 聯繫湖 瓊泉湖聯繫人 1.145
D00482069 11650 0.426 聯繫湖 瓊泉湖聯繫人 0.057
南區A 聯繫湖 6.784 聯繫湖 瓊泉湖聯繫人 0.011
南區A 聯繫湖 0.156 D00482155 瓊泉湖聯繫人 0.015
D00482073 11650 1.039 D00482156 瓊泉湖聯繫人 0.011
D00482074 11650 0.054 D00482156 瓊泉湖聯繫人 0.114
D00482082 西區* 5.446 D00482156 瓊泉湖聯繫人 0.028


*West of the Diabase Dike


*在輝長岩巖牆的西部

2024 Drill Program Update

2024年鑽探計劃更新

The 2024 drill program is advancing well with the completion of the first two holes, LM 24-01 and LM 24-02, for a total of 810 meters at the end of July. We will be delivering samples to the SGS laboratories throughout the program and we would expect to have some initial results in the next few weeks. The drill crew is back in the field and has commenced the next 30-day drill program. We remain on track to complete the planned drilling program in early November, and would expect the geological team to complete their work by mid-November.

2024年鑽探計劃進展順利,截止7月底已完成首兩口井Lm 24-01和Lm 24-02的鑽探,共810米。 後續樣品將在整個計劃期間運送到SGS實驗室,並有望在未來幾周內獲得一些初步結果。 鑽井隊伍回到現場並開始了接下來的30天的鑽探計劃。 我們將按計劃在11月初完成計劃的鑽探工作,預計地質團隊將在11月中旬完成他們的工作。

Qualified Person

資格人員

The scientific and technical content of this press release have been reviewed and approved by Mr. Walter Hanych, P. Geo, who is a Qualified Person under NI 43-101 regulations.

本新聞稿的科學技術內容已由Walter Hanych先生審查並獲得批准,他是根據NI 43-101法規的合格人員。

About Signature

關於Signature

The Lingman Lake gold property (the "Property") consists of 1,300 staked claims, four freehold fully patented claims and 14 mineral rights patented claims totaling approximately 24,761 hectares. The Property includes what has historically been referred to as the Lingman Lake Gold Mine, an underground substructure consisting of a 126.5-metre shaft, and 3-levels at depths of 46-metres, 84-metres and 122-metres. There has been over 28,000 metres of historical drilling done on the Property and four 500-pound bulk samples that averaged 19 grams per tonne of gold. In November 2023, the Ontario government energized a new 115kV high tension transmission line within 40 km of the historic Lingman Lake Mine ().

林格曼湖黃金物業("物業")包括1300個申請權利,四個自由持有完全專利權和14個礦權專利權,總面積約24761公頃。 物業包括歷史上所謂的林格曼湖金礦,它是一個地下子體,由一個126.5米的軸、46米、84米和122米深度的三層組成。 在物業上進行了超過28000米的歷史鑽探和四個500磅的批量樣品,平均含金量爲19克/噸。 2023年11月,安大略省在歷史悠久的林格曼湖礦山40公里以內啓動了一個新的115kV高壓輸電線路()。

To find out more about Signature, visit or contact:

要了解Signature的更多信息,請訪問或聯繫:

Dan Denbow

Dan Denbow

Chief Executive Officer

首席執行官

416-840-6345

416-840-6345

info@signatureresources.ca

info@signatureresources.ca

Cautionary Notes

可考慮的注意事項

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

TSX Venture交易所及其監管服務提供方(如TSX Venture Exchange的政策所定義的)對此新聞發佈的充分性或準確性不負任何責任。

This news release contains forward-looking statements which are not statements of historical fact. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, the Company's objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions and risks associated with infectious diseases, including COVID-19. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to changes in general economic and financial market conditions, failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, inability to fulfill the duty to accommodate First Nations and other indigenous peoples, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

本新聞發佈會包含前瞻性聲明,這些聲明不是歷史事實的聲明。前瞻性聲明包括描述公司未來計劃、目標或目標的估計和聲明,包括具有預測效應的詞。由於前瞻性陳述基於假設並涉及未來事件和條件,因其本質而存在固有的風險和不確定性。雖然這些聲明是基於公司目前可獲得的信息,但公司不能保證實際結果將達到管理層的預期。與前瞻性信息有關的風險、不確定性和其他因素可能導致與此類前瞻性信息表達或暗示的事件、結果、績效、前途和機遇等實際情況出現重大差異。本新聞稿中的前瞻性信息包括但不限於:公司的目標、目標或未來計劃、聲明、勘探結果、潛在礦化、礦物資源估計、勘探和礦業開發計劃、開工時間和市場狀況的估計以及與傳染病(包括COVID-19)相關的風險。可能導致實際結果與此類前瞻性信息有所不同的因素包括但不限於:一般經濟和金融市場條件的變化、未能發現礦物資源、未能將估計的礦物資源轉化爲儲量、無法完成擬議生產決策的可行性研究,冶金測試結果的初步性質,未能獲得或未能獲得所需的政府、環保或其他項目批准,政治風險,無法履行對原住民和其他土著民族的適應責任的不確定性,未來融資可用性和成本的變化,股票市場變動,通貨膨脹,匯率變動、大量商品價格波動,擬議項目開發的延遲,資本和運營成本的大幅偏離預估值以及涉及礦產勘探和開發行業的其他風險,以及在公司在SEDAR上公開的文件中提出的風險。雖然公司認爲本新聞稿中使用的前瞻性信息的假設和因素是合理的,但不應對這些信息給予過度的依賴,這些信息僅適用於本新聞發佈日期,並且不能保證這些事件將按照披露的時間表或根本不會發生。公司不承擔任何更新或修訂前瞻性信息的意向或義務,除非法律要求。

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論