share_log

Lion Copper and Gold Announces Yerington Bear Deposit Diamond Drill Results, Hole B-056A Encountered 2,376 Ft of 0.40% TCu

Lion Copper and Gold Announces Yerington Bear Deposit Diamond Drill Results, Hole B-056A Encountered 2,376 Ft of 0.40% TCu

獅子銅與黃金宣佈耶靈頓熊存入資金金剛石鑽井結果,B-056A孔遇到了2,376英尺的0.40% TCu
newsfile ·  08/21 11:58

Including 130 ft of 0.65% TCu and 138 ft of 0.62% TCu

包括130英尺0.65% TCu和138英尺0.62% TCu

Yerington, Nevada--(Newsfile Corp. - August 21, 2024) - Lion Copper and Gold Corp. (TSXV: LEO) (OTCQB: LCGMF) ("Lion CG" or the "Company") today released results from its Bear deposit 2024 exploration drilling program in the Yerington District of Nevada. As a second phase of drilling subsequent to the exploration drilling in 2023 (see Oct 27, 2023, news release), an additional US$1,500,000 (total US$4,000,000) was funded as early advance of the Stage 3 funding for exploration under the Company's agreement with Nuton LLC, a Rio Tinto venture (see December 22, 2023, new release).

內華達州耶靈頓-(Newsfile Corp. - 2024年8月21日)- 雄獅銅金公司(TSXV: LEO)(OTCQB: LCGMF)("Lion CG"或"公司")今天發佈了其位於內華達州耶靈頓區的熊礦牀2024年勘探鑽探項目的結果。這是繼2023年勘探鑽探(請參見2023年10月27日新聞發佈)之後的第二階段鑽探,根據公司與力拓創業公司(請參見2023年12月22日新聞發佈)Nuton LLC協議下的勘探第3階段資金提前的款項,額外撥款了150萬美元(總額爲400萬美元)

Bear Deposit 2024 Drilling Highlights

熊礦牀2024年鑽探亮點

  • Diamond core drill hole B-056A encountered 2,376 ft of 0.40% TCu, including 130 ft of 0.65% TCu and 138 ft of 0.62% TCu collared midway between legacy Anaconda drill holes B-014 and B-022
  • Diamond core drill hole B-055, collared 2,750 ft southwest from drill hole B-054, encountered weak copper mineralization along the far western edge of the known deposit
  • 鑽孔b-056A遇到了2,376英尺0.40% TCu,包括130英尺0.65% TCu和138英尺0.62% TCu,位於傳統美洲大蟒鑽孔b-014和b-022之間
  • 鑽孔b-055的鑽孔b-054西南2,750英尺處,遇到了已知礦牀的遠西邊緣上的弱銅礦化

B-056A is a deep, angle drill hole located along a northwest trend of elevated copper grades defined by legacy Anaconda drilling. Drill hole B-055 is coincident with a strong Induced Polarization (IP) anomaly identified during the recent IP survey completed in late 2023. B-056A returned a significant drill intercept of 0.40% TCu over 2,376 ft from a depth of 1,237 ft and ending in final two intervals of 1.150 TCu% and 0.904 TCu%. Figure 1 shows the location of Bear drill holes and Figure 2 shows a cross section through drillhole B-056A.

b-056A是一道深入的、角度的鑽孔,位於由傳統美洲大蟒鑽孔定義的高銅等級的西北趨勢上。鑽孔b-055與最近在2023年底進行的感應極化(IP)調查中確定的強IP異常一致。 b-056A返回了一個顯著的鑽探截面,0.40% TCu,在從1,237英尺深處到最後兩個間隔的1.150 TCu%和0.904 TCu%結束。圖1顯示了熊鑽孔的位置,圖2顯示了鑽孔b-056A的剖面圖。

Steven Dischler, Lion CG's CEO, states, "The thick intervals of copper mineralization encountered in our latest drilling of B-056A highlights the tremendous size and potential of the Bear deposit. The wide intercepts of copper mineralization throughout the Bear porphyry system are encouraging and continue to support our fundamental view that continued systematic exploration has potential to unlock substantial new zones of high-grade copper mineralization and further expand and upgrade the footprint of the deposit."

獅子銅金公司首席執行官史蒂文·迪施勒說:「在我們最新的b-056A鑽孔中遇到的銅礦化的厚度間隔突顯了熊礦牀的巨大規模和潛力。整個熊斑岩體系中廣泛的銅礦化截面令人鼓舞,並繼續支持我們的基本觀點,即持續系統性勘探有可能開發出大量新的高品位銅礦化區,並進一步擴大和提升礦牀的範圍。」

Bear Deposit 2024 Drilling Details

貝爾存款2024年鑽探詳細信息

Two diamond core drill holes, B-055 and B-056A were angle drilled to depths of 3,435 ft and 3,613 ft, respectively. Following the 2023 drilling, an IP/resistivity survey was completed that identified the strongest IP anomaly in the Company and Anaconda archives that is known in the Bear deposit area. B-055, drilled on the far western edge of known mineralization, was directed to intersect this very strong and thick 40 to +55 milliradian IP anomaly (see Figure 3). B-055 cut several narrow zones of weak copper mineralization within a thick 2,330 ft intercept of sulfide mineralization from a depth of 1,105 ft. The drill intercept of sulfide mineralization coincides with the IP anomaly, although the 2% sulfide is lower than predicted by the IP anomaly. The source of the IP anomaly is unconfirmed with drilling; however, this may represent the high pyrite cap of the Bear deposit and remains subject to consideration for future exploration.

將億.055和b-056A兩口金剛石岩心鑽孔,角度鑽深分別爲3,435英尺和3,613英尺。在2023年鑽探之後,完成了一項IP電法測量,發現了公司和Anaconda檔案中已知的貝爾存款區域內最強的IP異常。b-055在已知礦化帶的遠西邊緣進行鑽探,旨在穿越這個非常強壯和厚實的40至+55毫輻IP異常(見圖3)。b-055在1,105英尺深度處切割了幾個窄的弱銅礦化帶,位於2,330英尺厚的硫化物礦化截取區內。鑽探的硫化物礦化截取與IP異常相吻合,儘管2%的硫化物較IP異常預測的要低。IP異常的來源尚未通過鑽探得到確認;然而,這可能代表了貝爾存款的高硫化鐵帽,並有待將來的勘探考慮。

B-056A was drilled to test a wide spaced drilling gap along the northwest mineralization trend identified previously by Anaconda legacy and SPS 2023 drill holes. B-056A returned a significant drill intercept of 0.40% TCu over 2,376 ft from a depth of 1,237 ft. The final two intervals of B-056A ended in grades of 1.150 TCu% and 0.904 TCu%. Drill hole B-056 was abandoned at depth due to borehole collapse in high grade copper. A total of 16 sample intervals reported values between 1.01 to 2.09 TCu%. Four drill intervals, for a combined length of 23.5 ft, had no sample recovery adjacent to these high-grade intervals.

b-056A是爲了測試Anaconda的歷史信息和SPS 2023年鑽孔所確定的西北礦化趨勢上以前存在的廣泛間隔鑽探缺口。b-056A從1,237英尺深度處返回0.40%的總銅(TCu),延伸距離爲2,376英尺。b-056A的最後兩個間隔分別達到1.150%的TCu和0.904%的TCu。由於高品位銅礦的鑽孔坍塌,導致b-056被廢棄。總共有16個樣品間隔報告的值在1.01至2.09%的TCu之間。在這些高品位間隔相鄰處有四個鑽孔間隔的樣品回收情況爲零。

B-056A is the 2nd best grade-thickness intercept made to date at Bear and attests to the strength and scale of the mineralization (Table 1 and Table 2). Quartz-chalcopyrite veining is the dominant form of sulfide mineralization, with quartz vein percentages ranging from 1% to 5%. Within these zones, potassic alteration is dominant, defined by abundant secondary biotite and lesser potassium feldspar flooding. Veining typically dips 40-50° to the north northeast and correlates closely with quartz monzonite porphyry dikes also having typical 40-50° north northeast dips as determined by oriented core measurements. The presence of the large grade-thickness intercept, the potassic alteration, and quartz veining percentages are interpreted to indicate B-056A may occur near the core of the deposit. Figure 2 shows the results of B-056A in relation to previous drilling along a north-south Section 1.

b-056A是迄今爲止貝爾存款的第二好的品位-厚度截面,證明了該礦化的強度和規模(表1和表2)。石英黃銅化脈是硫化物礦化的主要形式,石英脈含量在1%至5%之間變化。在這些區域內,鉀質蝕變佔優勢,由豐富的次生黑雲母和較少的鉀長石浸染定義。石英脈通常以40-50°的北東北傾角出現,並與定向岩心測量確定的典型的40-50°北東北傾角石英單斑岩漿岩脈相吻合。大品位-厚度截面的存在、鉀質蝕變和石英脈含量被解釋爲b-056A可能出現在存款的核心附近。圖2顯示了b-056A的結果與沿南北向1號剖面的先前鑽探的關係。

The size and strength of mineralization in the Bear deposit is highly permissive for further exploration given the exceptionally large footprint of the known mineralization, multiple 1-2% TCu intervals within thick mineralized zones, and current widely spaced drilling at 500-to-1,000-foot intervals. In the central zone where B-022, B-056A, and B-006 and the highest grade-thickness values are located, exploration drill tests are compelling in locations along the west-northwest identified strike as well as up-dip and down-dip following the quartz monzonite porphyry dikes.

熊礦牀的礦化規模和強度非常適合進一步勘探,因爲已知礦化區域的面積異常龐大,厚度礦化帶中存在多個1-2%的銅含量區間,並且目前的鑽探間隔在500至1,000英尺之間。在中央區域,b-220億.056A和b-006以及最高品位-厚度值所在的地方,勘探鑽探試驗在西北西方向確定的衝擊線以及順着石英二長巖斑岩岩脈的上傾和下傾方向是具有說服力的。

Background of the Bear Deposit

熊礦牀的背景

The Bear deposit is a large and partially defined porphyry copper exploration target located primarily on private lands approximately 3 miles north of Anaconda's former Yerington open pit and 2.6 miles southeast of the MacArthur open pit, in Lyon County, Nevada. The Bear deposit was previously jointly held by The Anaconda Copper Mining Company ("Anaconda"), one of the largest copper mining companies of the 20th century, and Phelps Dodge Corporation ("Phelps Dodge", now Freeport-McMoRan). Lion CG, through its wholly owned subsidiary Singatse Peak Services, LLC ("SPS"), is the first company to consolidate the property through private land option agreements and controls a land position of approximately 2,330 acres over the Bear deposit.

熊礦牀是一個大型的、部分定義的斑岩銅勘探目標,主要位於內華達州利昂縣,距離安納康達的前YErington露天礦坑大約3英里,距離麥克阿瑟開放礦坑大約2.6英里。熊礦牀曾經由安納康達銅礦公司("安納康達")和菲爾普斯道奇公司("菲爾普斯道奇",現在的Freeport-McMoRan)共同持有。Lion CG通過其全資子公司Singatse Peak Services, LLC("SPS")是第一家通過私有土地選擇協議整合該地塊的公司,並控制了熊礦牀約2,330英畝的土地面積。

The Bear deposit was first identified by Anaconda in 1961 and has a long history of drilling development including Anaconda (1961-1967), Phelps Dodge (1969-1973), and a SPS program funded by Freeport Nevada LLC (2015-2016). Drilling by Anaconda, Phelps Dodge, and SPS all intersected zones of copper mineralization ranging from 490 ft to 2,843 ft thick (Table 1). In 2023, SPS angle drilled B-053A and B-054 northwest along the mineralization trend previously identified by Anaconda legacy drill holes (Figure 1). For additional details on the drilling background of the Bear deposit please see October 27, 2023, news release.

熊礦牀於1961年首次被安納康達發現,並經過長時間的鑽探發展,包括安納康達(1961-1967),菲爾普斯道奇(1969-1973)和由Freeport Nevada LLC資助的SPS項目(2015-2016)。安納康達、菲爾普斯道奇和SPS的鑽探都穿越了銅礦化區域,厚度在490英尺至2,843英尺之間(表1)。在2023年,SPS從Anaconda歷史鑽孔的礦化趨勢開始,向西北鑽探了b-053A和b-054(圖1)。有關熊礦牀鑽探背景的更多詳細信息,請參閱2023年10月27日的新聞發佈。

The Bear deposit has a similar regional geologic setting to other Jurassic-aged porphyry-style copper deposits in the Yerington district, including the Yerington mine, MacArthur, and Mason deposits. The Yerington mine was operated by Anaconda from 1951 through 1978, extracting 1,744,237,000 lbs. of copper.

熊礦牀具有與YErington地區的其他侏羅紀斑岩型銅礦牀相似的區域地質環境,包括YErington礦、MacArthur礦和Mason礦。YErington礦由安納康達在1951年至1978年期間運營,開採了1,744,237,000磅的銅。

The footprint of the Bear deposit extends 2.5 miles (4 km) in length in a northwest-southeast direction and 1.7 miles (2.7 km) in length in the northeast-southwest direction (Figure 1). Mineralization at the Bear is concealed under approximately 200 to 1,200 ft of post-mineral alluvial and Tertiary volcanic cover.

熊礦牀的露頭延伸了2.5英里(4公里),呈東北-西南方向延伸1.7英里(2.7公里)(圖1)。熊礦牀的礦化埋藏在大約200到1,200英尺的礦後沉積物和第三紀火山覆蓋層之下。

Results of angled drill hole B-053A, B-054, and B-056A demonstrate the structural control and orientation of the mineralized zones. The quartz monzonite porphyry dikes and associated mineralization strike roughly east-west to northwest-southeast with a northerly dip as shown in the cross-section (Figure 2). Mineralization at the Bear is interpreted to include a first pulse associated with the intrusion of quartz monzonite into the granodiorite and characterized as calc-silicate alteration along the contact of the older host rocks of granodiorite and younger quartz monzonite. A second pulse of mineralization is represented, where quartz monzonite porphyry dikes intrude into the quartz monzonite and mineralized veins formed in zones in and along the margins of the porphyry dikes. The main copper sulfide mineral is chalcopyrite, with lesser bornite which typically occur within veins and as disseminations. The zones of primary sulfide mineralization remain open in several directions where the limits of mineralization are not closed off by drilling. No zones of oxide mineralization or supergene enrichment have been identified at the Bear deposit.

傾斜鑽孔b-053A億.054和b-056A的結果顯示了礦化帶的構造控制和方向。石英正長巖斑岩脈和相關礦化帶大致呈東西向到東北-西南向走向,傾向於北方,如橫截面所示(圖2)。熊礦牀的礦化帶被解釋爲包括與石英正長巖侵入到花崗閃長巖中相關的第一個脈衝,其特徵爲與花崗閃長巖和年輕的石英正長巖的舊主巖接觸處的變質脈石化。礦化的第二個脈衝表示石英正長巖斑岩脈侵入石英正長巖並在斑岩脈的區域內和邊緣形成礦化脈石。主要的硫化銅礦物是黃銅礦,伴有較少量的硫藍銅礦,通常出現在脈石中和彌散中。在幾個方向上,原生硫化礦化帶仍然未封閉,尚未通過鑽探確定礦化的界限。在熊礦牀中尚未確定氧化礦化帶或超成因富集帶。

Quality Assurance & Control

質量保證和質量控制

All samples were collected via diamond core drilling by Alford Drilling, LLC (of no relation to Tony Alford, a director of the Company) of Elko, NV. Core samples were sawed on the Yerington Property site by Company personnel. All samples were picked up by Skyline Assayers & Laboratories ("Skyline"), Tucson, AZ and transferred for crushing, splitting, and pulverizing sample preparation. Multi-element (47 el.) analyses were completed using a multi-acid digestion and ICP OES/ICP-MS finish (Skyline's TE-5 method). Commercially prepared certified reference materials and blanks were inserted by the Company at 50-ft intervals to ensure precision of results as a quality control measure. The Company also applied a chain of custody program to confirm sample security during all stages of sample collection, shipment, and storage.

所有樣品是由內華達州埃爾科的艾爾福德鑽探公司(與該公司董事託尼·艾爾福德無關)進行金剛石岩心鑽探採集的。岩心樣品由公司人員在耶林頓物業現場鋸開。所有樣品由Skyline檢驗與實驗室("Skyline")在亞利桑那州圖森進行取樣、粉碎、分樣準備。採用多酸消化和ICP OES/ICP-MS法完成了多元素(47個元素)分析(Skyline的TE-5方法)。公司在每隔50英尺插入商業準備的認證參考物質和空白物,以確保結果的精確性作爲質量控制措施。公司還採用一套監管措施以確認樣品在採集、裝運和儲存的各個階段的安全性。

About Lion CG

關於Lion CG

Lion Copper and Gold Corp. is a Canadian-based company advancing its flagship copper assets at Yerington, Nevada through an Option to Earn-in Agreement with Nuton, a Rio Tinto venture.

Lion Copper and Gold Corp.是一家總部位於加拿大的公司,通過與Rio Tinto的創業公司Nuton簽訂的挖掘式獲得計劃在內華達州的Yerington推進旗艦銅資產。

About Nuton

關於Nuton

Nuton is an innovative venture that aims to help grow Rio Tinto's copper business. At the core of Nuton is a portfolio of proprietary copper leach related technologies and capability – a product of almost 30 years of research and development. Nuton offers the potential to economically unlock copper from primary sulfide resources through leaching, achieving market-leading recovery rates, contributing to an increase in copper production from copper bearing waste and tailings, and getting higher copper recoveries on oxide and transitional material. One of the key differentiators of Nuton is the potential to produce the world's lowest impact copper while having at least one Net Positive impact at each of our deployment sites, across our five pillars: water, energy, land, materials and society.

Nuton是一家旨在幫助發展力拓銅業務的創新創業公司。Nuton的核心是一系列專有的銅浸出相關技術和能力,是近30年研發的成果。Nuton提供了潛力通過浸出技術經濟地開採來自主要硫化物資源的銅,實現市場領先的回收率,促進來自含銅廢料和尾礦的銅產量增加,並在氧化和過渡材料上實現更高的銅回收率。Nuton的一個關鍵優勢是能夠生產世界上影響最小的銅,同時在我們每個部署地點至少產生一項淨正面影響,涵蓋我們的五大支柱:水、能源、土地、材料和社會。

On behalf of the Board of Directors,

代表董事會,

Steven Dischler, PE
Chief Executive Officer
Lion Copper and Gold Corp.

Steven Dischler,PE
首席執行官
Lion Copper and Gold Corp.

For more information please contact:

欲了解更多信息,請聯繫:Andrea Dray,MIND C.T.I. Ltd.電話:+972-4-993-6666,電子郵件:investor@mindcti.com,MIND C.T.I. LTD.(除每股數據外)收入5765成本費2787營業費用1,548。

Email: info@lioncg.com
Website:

電子郵件: info@lioncg.com
網站:

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX tsx Venture交易所及其監管服務提供商(如TSX Venture交易所的政策中所定義的那樣)不承擔此發佈的充分性或準確性的責任。

The technical information in this news release has been reviewed and approved by C. Travis Naugle, QP MMSA, Co-Chairman of Lion Copper and Gold Corp. and a qualified person as defined in NI 43-101.

本新聞發佈中的技術信息已由Lion Copper and Gold Corp.的聯合主席、合格人員C. Travis Naugle審查和批准,符合43-101號公告中定義的合格人員資格。

Certain information in this news release constitutes forward-looking statements under applicable securities laws. Any statements that are contained in this news release that are not statements of historical fact may be deemed to be forward-looking statements. Forward-Looking statements are often identified by terms such as "may", "expect", or the negative of these terms and similar expressions. Forward-Looking statements in this news release include, but are not limited to, statements with respect to the future exploration activities and anticipated results. Forward-Looking statements necessarily involve known and unknown risks, including, without limitation, risks associated with exploration activity; general economic conditions; adverse industry events; marketing costs; loss of markets; future legislative and regulatory developments; inability to access sufficient capital from internal and external sources, and/or inability to access sufficient capital on favorable terms; the ability of Lion CG to implement its business strategies; competition; currency and interest rate fluctuations and other risks.

本新聞發佈中的某些信息構成適用證券法下的前瞻性陳述。本新聞發佈中包含的非歷史事實性的任何陳述可能被視爲前瞻性陳述。前瞻性陳述常常通過「可能」、「預期」或這些術語的否定形式以及類似表述確定。本新聞發佈中的前瞻性陳述包括但不限於對未來勘探活動和預期結果的陳述。前瞻性陳述必然涉及已知和未知的風險,包括但不限於與勘探活動相關的風險;一般經濟情況;不利的行業事件;營銷成本;失去市場;未來立法和監管發展;無法從內部和外部來源獲得足夠資金或無法以有利條件獲取足夠資金;Lion CG實施其業務策略的能力;競爭;貨幣和利率波動以及其他風險。


Figure 1. Bear Plan Map Drill Hole Summary


圖1. Bear Plan地圖鑽孔摘要


Figure 2. North-South Geologic Section Looking West


圖2. 自北向南地質剖面圖(向西查看)


Figure 3. North-South IP Section Looking West


圖3. 向西的南北IP斷面圖

Table 1. Bear Deposit Drill Hole Intercepts

表格1. 熊礦露天鑽孔截取

Company Year Drill Hole Northing (UTM NAD 27) Easting (UTM NAD 27) Elevation (ft) Inclination Azimuth Total
Depth (ft)
From feet To
feet
Interval feet % TCu Interval X %TCu (GXT)
Anaconda 1961 B-01 310817.1 4320219.4 4360.1 -90° 2533 896 2,139 1,243 0.19 236
Anaconda 1962 B-02 310829.3 4320527.1 4357.3 -90° 2509.6 1,209 2,510 1,301 0.38 494
Anaconda 1962 B-03 310824.9 4320393.4 4358.4 -90° 864 Too Shallow
Anaconda 1962 B-04 310641.8 4320201.1 4355.2 -90° 557 Too Shallow
Anaconda 1963 B-05 310659.8 4320533.1 4357.3 -90° 1784.9 1,050 1,235 185 0.32 59
Anaconda 1963 B-06A 310835.9 4320682.5 4357.9 -90° 3516.2 1,590 3,288 1,698 0.39 662
Anaconda 1963 B-07 309923.9 4320588.8 4359.9 -90° 1982 Outside Mineralized Footprint
Anaconda 1963 B-08 310546.5 4320932.6 4363.9 -90° 3607.1 1,377 2,650 1,273 0.29 369
Anaconda 1963 B-09 309929.9 4320953.4 4353.0 -90° 2149 Too Shallow
Anaconda 1963 B-010 310836.7 4320925.2 4358.3 -90° 3709.3 1,736 3,392 1,656 0.38 629
Anaconda 1963 B-011 309949.8 4321404.2 4346.0 -90° 2148 Outside Mineralized Footprint/Too Shallow?
Anaconda 1963 B-012 309957.1 4321708.9 4347.4 -90° 1458 Outside Mineralized Footprint/Too Shallow?
Anaconda 1963 B-013 310840.3 4321077.6 4358.0 -90° 3680.4 1,929 3,436 1,507 0.42 633
Anaconda 1964 B-014 310850.4 4321229.8 4362.7 -90° 3650.4 1,355 3,370 2,015 0.32 645
Anaconda 1964 B-015 310065.6 4322067.0 4343.2 -90° 3166 2,163 2,458 295 0.28 83
Anaconda 1965 B-016 309980.1 4322669.5 4339.9 -90° 2096.7 Outside Mineralized Footprint
Anaconda 1964 B-017 310988.8 4320921.5 4358.9 -90° 3703.4 1,319 3,703 2,384 0.38 906
Anaconda 1965 B-018 310634.5 4319894.3 4382.9 -90° 2015.9 Outside Mineralized Footprint
Anaconda 1965 B-019 311442.8 4320678.7 4400.0 -90° 3329.3 2,510 3,329 819 0.26 213
Anaconda 1965 B-20A 312209.9 4320167.1 4366.5 -90° 2506.6 1,429 2,256 827 0.31 256
Anaconda 1966 B-021 311794.0 4320109.1 4412.0 -90° 4019 1,133 3,976 2,843 0.21 597
Anaconda 1966 B-022 311447.9 4321210.8 4422.2 -90° 4418.6 1,632 4,012 2,380 0.43 1,023
Anaconda 1966 B-023B 312241.2 4320768.7 4365.0 -90° 3059.1 1,597 2,649 1,052 0.50 526
Anaconda 1967 B-024 311445.2 4319640.1 4413.2 -90° 4793 2,781 4,211 1,430 0.30 429
Anaconda 1967 B-025 311443.7 4321054.5 4449.0 -90° 4340 1,815 3,323 1,508 0.30 452
Anaconda 1967 B-027 312830.1 4320876.1 4364.0 -90° 3833.8 Outside Mineralized Footprint
Anaconda 1967 B-028 312679.0 4319370.6 4371.0 -90° 2840 Outside Mineralized Footprint
Anaconda 1967 B-029 311558.2 4318945.3 4373.0 -90° 2743.5 937 1,514 577 0.27 156
Anaconda 1967 B-030 311878.5 4320958.8 4370.0 -90° 3177.5 No Significant Intercept
Anaconda 1967 B-031 312395.0 4320864.9 4365.0 -90° 3008 2,474 2,964 490 0.55 270
Anaconda 1967 B-032 312277.3 4320469.6 4366.0 -90° 2403 1,169 2,403 1,234 0.28 346
Anaconda 1961 MH-1 311533.7 4320162.2 4524.1 -90° 1167.1 Too Shallow
Anaconda 1961 MH 2 311403.8 4320418.8 4454.4 -90° 2374 1,802 2,374 572 0.17 97
Anaconda 1961 MH-3 311707.5 4320438.1 4510.0 -90° 102 Too Shallow
Phelps Dodge 1969 L-01 312560.6 4320386.7 4378.1 -90° 3742.2 2,800 3,470 670 0.40 268
Phelps Dodge 1969 L-02 312243.7 4319807.5 4380.6 -90° 2297 1,360 1,900 540 0.42 227
Phelps Dodge 1970 L-03 311997.8 4319561.7 4381.8 -90° 3243.5 1,277 1,893 616 0.18 111
Phelps Dodge 1970 L-04 312495.0 4319796.6 4379.0 -90° 2980 Outside Mineralized Footprint
Phelps Dodge 1970 L-05 312997.7 4320266.5 4375.0 -90° 3900 2,900 3,900 1,000 0.40 400
Phelps Dodge 1970 L-06 312511.1 4320660.0 4377.3 -90° 2983 No Significant Intercept
Phelps Dodge 1970 L-07 312500.5 4320173.6 4378.6 -90° 3249 Outside Mineralized Footprint
Phelps Dodge 1970 L-08 313478.6 4320244.7 4373.4 -90° 3004 1,660 2,290 630 0.40 252
Phelps Dodge 1973 L-12 311336.6 4318753.0 4394.7 -90° 2305 820 1,320 500 0.31 155
SPS 2016 GHH-001 310543.2 4319490.5 2017.5 -90° 2017.5 Outside Mineralized Footprint
SPS 2015 B-048 312243.5 4320761.2 4368.3 -90° 3438 1,573 2,731 1,158 0.42 486
SPS 2015 B-049 311446.2 4321445.9 4358.4 -90° 3635 1,588 2,926 1,338 0.22 294
SPS 2015 B-050 312341.5 4321073.8 4366.0 -90° 3838 2,429 2,951 522 0.36 188
SPS 2016 B-051 311798.2 4321411.0 4366.4 -90° 3878 2,191 3,675 1,484 0.26 386
SPS 2016 B-052 311881.7 4321613.0 4360.3 -90° 3468 2,081 2,748 667 0.14 93
SPS 2023 B-053A 310778.0 4321510.0 4351.0 -60° 210 3503 2,212 3,138 926 0.31 287
SPS 2023 B-054 310406.0 4321602.0 4364.0 -70° 205 3458 2,311 3359 1,048 0.26 272
SPS 2024 B-055 309644.0 4321234.0 4350.0 -60° 180 3435 Outside Mineralized Footprint
SPS 2024 B-056A 311175.0 4321411.0 4350.0 -65° 190 3613 1,237 3,613 2,376 0.40 950
公司 鑽孔 Northing (UTm NAD 27) (北偏移) Easting (UTm NAD 27) (東偏移) Elevation (ft) (海拔) 傾角 方位角(度) 總費用
深度(英尺)
從英尺
英尺
間隔英尺 % TCu Interval X %TCu (GXT)
Anaconda 1961 b-01 310817.1 4320219.4 4360.1 -90° 2024年6月30日終止的會計分析 2533 896 2,139 1,243 0.19 236
Anaconda 1962 b-02 310829.3 4320527.1 4357.3 -90° 2024年6月30日終止的會計分析 1,209 員工及相關應付款項 1,301 0.38 494
Anaconda 1962 310824.9 4320393.4 4358.4 -90° 2024年6月30日終止的會計分析 864 太淺
Anaconda 1962 b-04 310641.8 4320201.1 4355.2 -90° 2024年6月30日終止的會計分析 557 太淺
Anaconda 1963 310,659.8 4,320,533.1 4,357.3 -90° 2024年6月30日終止的會計分析 1784.9 1,050 1,235 185 0.32 59
Anaconda 1963 b-06A 310835.9 4320682.5 4357.9 -90° 2024年6月30日終止的會計分析 3516.2 1,590 3,288 1,698 0.39 662
Anaconda 1963 b-07 309923.9 4320588.8 4359.9 -90° 2024年6月30日終止的會計分析 1982 Outside Mineralized Footprint
Anaconda 1963 310546.5 4320932.6 4363.9 -90° 2024年6月30日終止的會計分析 1,377 2,650 償還可循環借貸借款的支付 0.29 369
Anaconda 1963 b-09 309929.9 4320953.4 4353.0 -90° 2024年6月30日終止的會計分析 2149 Too Shallow
Anaconda 1963 b-010 310836.7 4320925.2 4358.3 -90° 2024年6月30日終止的會計分析 1,736 3,392 1,656 0.38 629
Anaconda 1963 b-011 309,949.8 4,321,404.2 4,346.0 -90° 2024年6月30日終止的會計分析 2148 超出礦化足跡/太淺?
Anaconda 1963 b-012 309957.1 4321708.9 4347.4 -90° 2024年6月30日終止的會計分析 1458 礦化足跡之外/太淺?
Anaconda 1963 310840.3 4321077.6 4358.0 -90° 2024年6月30日終止的會計分析 3680.4 1,929 3,436 1,507 0.42 633
Anaconda 1964 310850.4 4321229.8 4362.7 -90° 2024年6月30日終止的會計分析 1,355 3,370 2015年 0.32 645
Anaconda 1964 b-015 310065.6 4322067.0 4343.2 -90° 2024年6月30日終止的會計分析 3166 2,163 2,458 295 0.28 83
Anaconda 1965 b-016 309,980.1 4322669.5 4339.9 -90° 2024年6月30日終止的會計分析 2096.7 Outside Mineralized Footprint
Anaconda 1964 b-017 310988.8 4320921.5 4358.9 -90° 2024年6月30日終止的會計分析 3703.4 1,319 3,703 2,384 0.38 906
Anaconda 1965 b-018 310634.5 4319894.3 4382.9 -90° 2024年6月30日終止的會計分析 2015.9 Outside Mineralized Footprint
Anaconda 1965 b-019 311442.8 4320678.7 4400.0 -90° 2024年6月30日終止的會計分析 3329.3 員工及相關應付款項 3,329 819 0.26 213
Anaconda 1965 312209.9 4320167.1 4366.5 -90° 2024年6月30日終止的會計分析 2506.6 1,429 2,256 827 0.31 256
Anaconda 1966 b-021 311794.0 4320109.1 4412.0 -90° 2024年6月30日終止的會計分析 4019 1,133 3,976 2,843 0.21 597
Anaconda 1966 b-022 311,447.9 4,321,210.8 4,422.2 -90° 2024年6月30日終止的會計分析 4418.6 1,632 4,012 2,380 0.43 1,023
Anaconda 1966 b-023B 312241.2 4320768.7 4365.0 -90° 2024年6月30日終止的會計分析 3059.1 1,597 2,649 1052 0.50 526
Anaconda 1967 b-024 311445.2 4319640.1 4413.2 -90° 2024年6月30日終止的會計分析 4793 2781 4,211 1,430 0.30 429
Anaconda 1967 b-025 311443.7 4321054.5 4449.0 -90° 2024年6月30日終止的會計分析 4340 1,815 3,323 1,508 0.30 452
Anaconda 1967 b-027 312830.1 4320876.1 4364.0 -90° 2024年6月30日終止的會計分析 3833.8 Outside Mineralized Footprint
Anaconda 1967 b-028 312679.0 4319370.6 4371.0 -90° 2024年6月30日終止的會計分析 2840 礦化區外
Anaconda 1967 b-029 311558.2 4318945.3 4373.0 -90° 2024年6月30日終止的會計分析 2743.5 937 1,514 577 0.27 156
Anaconda 1967 b-030 311878.5 4320958.8 4370.0 -90° 2024年6月30日終止的會計分析 3177.5 無顯著截距
Anaconda 1967 b-031 312395.0 4320864.9 4365.0 -90° 2024年6月30日終止的會計分析 3008 2,474 2,964 490 0.55 270
Anaconda 1967 b-032 312277.3 4320469.6 4366.0 負90° 2024年6月30日終止的會計分析 2403 1,169 2,403 1,234 0.28 346
Anaconda 1961 MH-1 311,533.7 4,320,162.2 4,524.1 -90° 2024年6月30日終止的會計分析 1167.1
Anaconda 1961 MH 2 311403.8 4320418.8 4454.4 -90° 2024年6月30日終止的會計分析 2374 1,802 2,374 572 0.17 97
Anaconda 1961 MH-3 311707.5 4320438.1 4510.0 -90° 2024年6月30日終止的會計分析 102 太膚淺
菲爾普斯道奇 1969 L-01 312560.6 4320386.7 4378.1 負90° 2024年6月30日終止的會計分析 3742.2 2,800 3,470 670 0.40 268
Pheleps Dodge 1969 L-02 312243.7 4319807.5 4380.6 -90° 2024年6月30日終止的會計分析 2297 1,360 1,900 540 0.42 227
菲爾普斯·道奇 1970 L-03 311997.8 4319561.7 4381.8 -90° 2024年6月30日終止的會計分析 3243.5 1,277 1,893 616 0.18 111
菲爾普斯道奇 1970 L-04 312495.0 4319796.6 4379.0 -90° 2024年6月30日終止的會計分析 2980 Outside Mineralized Footprint
Phelps Dodge 1970 L-05 312,997.7 4,320,266.5 4,375.0 -90° 2024年6月30日終止的會計分析 3900 2,900 3,900 1,000 0.40 400
菲爾普斯道奇 1970 312511.1 4320660.0 4377.3 -90° 2024年6月30日終止的會計分析 2983 未有顯著截獲
Phelps Dodge 1970 L-07 312500.5 4320173.6 4378.6 -90° 2024年6月30日終止的會計分析 3249 礦體外延區
菲爾普斯道奇 1970 313478.6 4320244.7 4373.4 -90° 2024年6月30日終止的會計分析 3004 1,660 2,290 630 0.40 252
菲爾普斯道奇 1973 L-12 311,336.6 4,318,753.0 4,394.7 -90° 2024年6月30日終止的會計分析 2305 820 1,320 500 0.31 155
SPS 2016 GHH-001 310543.2 4319490.5 2017.5 -90° 2024年6月30日終止的會計分析 2017.5 Outside Mineralized Footprint
SPS 2015 b-048 312243.5 4320761.2 4368.3 -90° 2024年6月30日終止的會計分析 3438 1,573 2,731 1,158 0.42 486
SPS 2015 b-049 311446.2 4321445.9 4358.4 -90° 2024年6月30日終止的會計分析 3635 1,588 2,926 1,338 0.22 294
SPS 2015 b-050 312341.5 4321073.8 4366.0 -90° 2024年6月30日終止的會計分析 3838 2,429 2,951 522 0.36 188
SPS 2016 b-051 311798.2 4321411.0 4366.4 -90° 2024年6月30日終止的會計分析 3878 2,191 3,675 1,484 0.26 386
SPS 2016 b-052 311,881.7 4,321,613.0 4,360.3 -90° 2024年6月30日終止的會計分析 3468 2,081 2,748 667 0.14 93
SPS 2023 b-053A 310778.0 4321510.0 4351.0 -60° 210 3503 預付款項及其他應收款 3,138 926 0.31 287
SPS 2023 b-054 310406.0 4321602.0 4364.0 -70°C 205 3458 2,311 3359 1,048 0.26 272
SPS 2024 b-055 309644.0 4321234.0 4350.0 -60° 180 3435 礦化足跡外
SPS 2024 b-056A 311175.0 4321411.0 4350.0 -65° 190 Northing 1,237 3,613 2,376 0.40 950

Table 2. Significant Drill Hole Intercepts B-055 and B-056A

Azimuth

Drill Hole Northing
(UTM NAD 27)
Easting
(UTM NAD 27)
Elevation (ft) Inclination Azimuth From feet To feet Interval
feet
%
TCu
Mineralization Type
B-055 309644.0 4321234.0 4350.0 -60° 180 1,466.0 1,481.0 15 0.19 Vein-hosted
1,693.0 1,697.0 4 0.82 Vein-hosted
2,628.0 2,636.0 8 0.81 Vein-hosted
3,272.0 3,288.0 16 0.29 Vein-hosted
B-056A 311175.0 4321411.0 4350.0 -65° 190 1,237.0 3,613.0 2376 0.40
includes 1,740.0 1,870.0 130 0.65 Vein-hosted
and 2,054.5 2,098.0 43.5 0.72 Vein-hosted
and 2,218.5 2,356.5 138 0.62 Disseminations
and 2,778.5 2,825.0 46.5 0.68 Endoskarn
and 3,163.0 3,260.0 97 0.60 Vein-hosted
and 3,418.0 3,470.0 52 0.68 Vein-hosted
and 3,603.5 3613 TD 9.5 0.94 Disseminations
鑽孔 北緯
Interval
東經
%
TCu 傾角 方位角(度) 309644.0 4321234.0 區間
-60°
%
1,466.0
1,481.0
15 0.19 脈石類型的 1,693.0 -60° 180 0.82 1,481.0 15 0.19 8
1,693.0 4 0.82 16
0.29 脈狀 8 0.81 4321411.0
4350.0 -65° 16 0.29 3,613.0
2376 0.40 includes 1,740.0 -65° 190 1237.0 脈狀賦存的 and 0.40
包括 43.5 0.72 130 12,666 2,218.5
138 2,098.0 43.5 0.72 2,778.5
46.5 2,356.5 138 0.62 3,163.0
97 0.60 46.5 0.68 3,418.0
52 0.68 97 0.60 3,603.5
9.5 0.94 52 0.68
9.5 0.94
声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論