ValOre Provides Exploration Update and Reports Initial Trado Auger and Rock Assay Results; Salvador Target, Pedra Branca PGE Project, Brazil;
ValOre Provides Exploration Update and Reports Initial Trado Auger and Rock Assay Results; Salvador Target, Pedra Branca PGE Project, Brazil;
VANCOUVER, British Columbia, Sept. 10, 2024 (GLOBE NEWSWIRE) -- ValOre Metals Corp. ("ValOre"; TSX‐V: VO; OTCQB: KVLQF; Frankfurt: KEQ0, "the Company") today provided an update on the ongoing exploration program for the Salvador target ("Salvador") at ValOre's 100%-owned Pedra Branca Platinum Group Elements ("PGE", "2PGE+Au") Project ("Pedra Branca") in northeastern Brazil.
不列顛哥倫比亞省溫哥華,2024年9月10日(GLOBE NEWSWIRE)——Valore Metals Corp.(「Valore」;TSX-V:VO;OTCQB:KVLQF;法蘭克福:KEQ0,「公司」)今天提供了Valore100%控股的Pedra Branca Platinum Group Elements(「PGE」,「2公司」)正在進行的薩爾瓦多目標(「薩爾瓦多」)勘探計劃的最新情況 PGE+AU”)巴西東北部的項目(「Pedra Branca」)。
"Our ongoing exploration program at the Salvador target has yielded encouraging results, with initial Trado and rock assays, trenching and field mapping all confirming in-situ PGE mineralization and extending the prospective Salvador PGE trend to 2 km in strike length," stated ValOre's VP of Exploration, Thiago Diniz. "Additionally, preliminary ground geophysical data shows consistent magnetic anomalies along strike, which increases our confidence that this program will set the stage for future discoveries and resource expansion drill programs at Salvador."
ValOre勘探副總裁蒂亞戈·迪尼茲表示:「我們在薩爾瓦多目標地區正在進行的勘探計劃取得了令人鼓舞的結果,初步的Trado和岩石分析、挖溝和實地測繪都證實了原地PGE礦化,並將薩爾瓦多PGE的潛在走向長度延長至2公里。」「此外,初步的地面地球物理數據顯示,走向沿線一直存在磁異常,這增強了我們的信心,即該計劃將爲薩爾瓦多的未來發現和資源擴張鑽探計劃奠定基礎。」
2024 Salvador Exploration Program Highlights
2024 年薩爾瓦多勘探計劃亮點
Salvador field exploration program is in progress, with Trado auger drilling, rock sampling and trenching confirming continuity of PGE-bearing ultramafic ("UM") rocks along trend to the north of the 2023 drill zone:
薩爾瓦多油田勘探計劃正在進行中,Trado螺旋鑽探、岩石取樣和挖溝確認了含PGE的超鎂鐵質(「UM」)岩石沿着2023年鑽探區以北的趨勢的連續性:
- PGE mineralization reported in 15 of 20 UM-bearing Trado holes;
- High-grade PGE assay results reported from outcropping chromitite:
- 11.17 grams per tonne palladium + platinum + gold ("g/t 2PGE+Au") – Sample 103792;
- Trench mapping and sampling is completed, with 108 samples sent for assay analysis;
- Ground geophysical survey field work is completed, interpretation ongoing;
- Additional field mapping, rock sampling, and Trado auger drilling following up on new ultramafic occurrences and preliminary magnetic anomalies in the north extension of the target area continues;
- Current results and new UM occurrences extend Salvador's PGE-prospective trend to a total of 2 km in strike-length;
- 在 20 個含 UM 的 Trado 鑽孔中,有 15 個報告了 PGE 礦化;
- 露出鉻鐵礦報告的高級 PGE 分析結果:
- 每噸 11.17 克鈀 + 鉑 + 金(「g/t 2pGe+AU」)— 樣品 103792;
- 溝槽測繪和採樣已完成,108個樣本送去化驗分析;
- 地面地球物理調查實地工作已經完成,解釋仍在進行中;
- 繼續對目標區域北延地區新的超鎂鐵礦點和初步磁異常進行進一步的實地測繪、岩石採樣和Trado螺旋鑽探;
- 目前的結果和新出現的Um事件將薩爾瓦多的PGE前景趨勢擴大到總打擊長度爲2千米;
See Figure 1 for a plan view of the Salvador target, and location of the 2024 exploration work; and Table 1 for a summary of the exploration totals for Trado and trenching programs.
有關薩爾瓦多目標的平面圖和2024年勘探工作的地點,請參見圖1;有關Trado和挖溝項目的勘探總量的摘要,請參見表1。
Figure 1: Salvador target plan view, with location of the 2024 exploration work activities.
圖 1:薩爾瓦多目標計劃視圖,包括 2024 年勘探工作活動的地點。
Table 1: Trado and trenching exploration totals to date.
表 1:迄今爲止的Trado和挖溝勘探總數。
Target | Activity | # Holes/Trenches | Total Meters | UM Length (m) | Total #assays |
# Assays pending |
Salvador | Trado Auger Drilling | 35 | 101 | 77 | 107 | 21 |
Salvador | Trenching | 4 | 95 | 51 | 108 | 108 |
目標 | 活動 | # 洞/戰壕 | 總米數 | Um 長度 (m) | 總計 #assays |
# 檢測 待定 |
薩爾瓦多 | Trado 螺旋鑽探 | 35 | 101 | 77 | 107 | 21 |
薩爾瓦多 | 挖溝 | 4 | 95 | 51 | 108 | 108 |
Trado auger drilling
Trado 螺旋鑽探
Trado auger drilling has intercepted ultramafic rocks in 25 of 35 Trado auger drill holes completed to date (77 m of 101 m drilled in total).
在迄今爲止完成的35個Trado螺旋鑽孔中,有25個鑽孔截獲了超鎂鐵質岩石(總共鑽了101萬個鑽孔中的7700萬)。
Trado assay results have been received for 20 UM-bearing Trado holes, with PGE mineralization reported in 15 Trado holes.
已經收到了20個含UM的Trado鑽孔的Trado分析結果,據報道,在15個Trado鑽孔中有PGE礦化作用。
Table 2: Trado auger drilling assay highlights:
表 2:Trado 螺旋鑽探分析亮點:
Target | Trado hole ID | From (m) | To (m) | Length (m) | 2PGE+Au (g/t) | Litho | 2PGE+Au Interval Summary |
Salvador | AD24MES29 | 0.0 | 2.5 | 2.5 | 0.20 | Ultramafic | 2.5 m @ 0.20 g/t 2PGE+Au |
Salvador | AD24MES30 | 0.0 | 1.6 | 1.6 | 0.14 | Ultramafic | 1.6 m @ 0.14 g/t 2PGE+Au |
Salvador | AD24MES32 | 0.0 | 6.0 | 6.0 | 0.27 | Ultramafic | 6.0 m @ 0.27 g/t 2PGE+Au |
Salvador | AD24MES33 | 0.0 | 4.0 | 4.0 | 0.48 | Ultramafic | 4.0 m @ 0.48 g/t 2PGE+Au |
Salvador | AD24MES34 | 0.0 | 2.0 | 2.0 | 0.12 | Ultramafic | 2.0 m @ 0.12 g/t 2PGE+Au |
Salvador | AD24MES37 | 0.0 | 1.7 | 1.7 | 0.99 |
Ultramafic and Chromitite |
1.7 m @ 0.99 g/t 2PGE+Au |
Salvador | AD24MES38 | 0.0 | 4.0 | 4.0 | 0.19 | Ultramafic | 4.0 m @ 0.19 g/t 2PGE+Au |
Salvador | AD24MES39 | 0.0 | 3.0 | 3.0 | 0.12 | Ultramafic | 3.0 m @ 0.12 g/t 2PGE+Au |
Salvador | AD24MES40 | 0.0 | 4.0 | 4.0 | 0.18 | Ultramafic | 4.0 m @ 0.18 g/t 2PGE+Au |
Salvador | AD24MES44 | 1.0 | 2.5 | 1.5 | 0.50 | Ultramafic | 1.5 m @ 0.50 g/t 2PGE+Au |
Salvador | AD24MES47 | 0.0 | 2.5 | 2.5 | 0.14 | Ultramafic | 2.5 m @ 0.14 g/t 2PGE+Au |
Salvador | AD24MES48 | 0.0 | 1.5 | 1.5 | 0.34 | Ultramafic | 1.5 m @ 0.34 g/t 2PGE+Au |
Salvador | AD24MES49 | 0.0 | 5.0 | 5.0 | 0.39 | Ultramafic | 5.0 m @ 0.39 g/t 2PGE+Au |
Salvador | AD24MES50 | 0.0 | 2.0 | 2.0 | 0.29 | Ultramafic | 2.0 m @ 0.29 g/t 2PGE+Au |
Salvador | AD24MES51 | 0.0 | 1.0 | 1.0 | 0.17 | Ultramafic | 1.0 m @ 0.17 g/t 2PGE+Au |
目標 | Trado 漏洞 ID | 從 (m) | 到 (m) | 長度 (m) | 2pge+Au (g/t) | Litho | 2pge+AU 間隔摘要 |
薩爾瓦多 | AD24MES29 | 0.0 | 2.5 | 2.5 | 0.20 | Ultramafic | 250萬 @ 0.20 g/t 2pge+AU |
薩爾瓦多 | AD24MES30 | 0.0 | 1.6 | 1.6 | 0.14 | Ultramafic | 160萬 @ 0.14 g/t 2pge+AU |
薩爾瓦多 | AD24MES32 | 0.0 | 6.0 | 6.0 | 0.27 | Ultramafic | 600萬 @ 0.27 g/t 2pge+AU |
薩爾瓦多 | AD24MES33 | 0.0 | 4.0 | 4.0 | 0.48 | Ultramafic | 400萬 @ 0.48 g/t 2pge+AU |
薩爾瓦多 | AD24MES34 | 0.0 | 2.0 | 2.0 | 0.12 | Ultramafic | 200萬 @ 0.12 g/t 2pge+AU |
薩爾瓦多 | AD24MES37 | 0.0 | 1.7 | 1.7 | 0.99 | Ultramafic 和 鉻鐵礦 |
170萬 @ 0.99 g/t 2pge+AU |
薩爾瓦多 | AD24MES38 | 0.0 | 4.0 | 4.0 | 0.19 | Ultramafic | 400萬 @ 0.19 g/t 2pge+AU |
薩爾瓦多 | AD24MES39 | 0.0 | 3.0 | 3.0 | 0.12 | Ultramafic | 300萬 @ 0.12 g/t 2pge+AU |
薩爾瓦多 | AD24MES40 | 0.0 | 4.0 | 4.0 | 0.18 | Ultramafic | 400萬 @ 0.18 g/t 2pge+AU |
薩爾瓦多 | AD24MES44 | 1.0 | 2.5 | 1.5 | 0.50 | Ultramafic | 150萬 @ 0.50 g/t 2pge+AU |
薩爾瓦多 | AD24MES47 | 0.0 | 2.5 | 2.5 | 0.14 | Ultramafic | 250萬 @ 0.14 g/t 2pge+AU |
薩爾瓦多 | AD24MES48 | 0.0 | 1.5 | 1.5 | 0.34 | Ultramafic | 150萬 @ 0.34 g/t 2pge+AU |
薩爾瓦多 | AD24MES49 | 0.0 | 5.0 | 5.0 | 0.39 | Ultramafic | 500萬 @ 0.39 g/t 2pge+AU |
薩爾瓦多 | AD24MES50 | 0.0 | 2.0 | 2.0 | 0.29 | Ultramafic | 200萬 @ 0.29 g/t 2pge+AU |
薩爾瓦多 | AD24MES51 | 0.0 | 1.0 | 1.0 | 0.17 | Ultramafic | 100萬 @ 0.17 g/t 2pge+AU |
Trenching
挖溝
Four trenches were excavated, totalling 95 metres ("m") in length, with all four exposing UM and UM-derived rocks, including chromitite layers in the central trenches, TR24MES06 and TR24MES07, to the north along strike from the area of 2023 Salvador drill program. Trench assays are pending.
挖掘了四條戰壕,總長 95 米(「m」),所有四條戰溝都暴露了 Um 和 Um 衍生的岩石,包括從 2023 年薩爾瓦多鑽探計劃區域向北的中央戰壕 TR24MES06 和 TR24MES07 中的鉻鐵礦層。溝槽化驗尚待進行。
See Figure 2 for trenching program photos, including chromitite and chromite-rich rocks intercepted in trenches TR24MES06 and 07.
挖溝項目照片見圖 2,包括在 TR24MES06 和 07 號溝槽中截獲的鉻鐵礦和富含鉻的岩石。
Figure 2: 2024 Salvador trenching program. Mapping and sampling of trench TR24MES06 (left), and centimetric chromitite layer (CR) within serpentinized ultramafics (UMD) and phlogopite (PHL) (right).
圖 2:2024 年薩爾瓦多挖溝計劃。TR24MES06 溝槽(左)以及蛇紋化超鎂鐵質體(UMD)和金雲母(PHL)(右)中的厘米鉻鐵礦層(CR)的測繪和採樣。
Ground geophysical survey
地面地球物理調查
50-line kilometres ("km") of ground magnetics and gamma spectrometry data have been acquired, covering the entire strike-length of the Salvador target and its extensions.
已經獲得了50線千米(「km」)的地面磁學和伽馬光譜數據,涵蓋了薩爾瓦多目標及其延伸部分的整個打擊長度。
A 3D inversion modeling and structural interpretation is in progress.
三維反演建模和結構解釋正在進行中。
Field mapping and rock sampling
實地測繪和岩石採樣
To date, 25 rock samples have been sent to SGS lab, with assay results received for 6 samples, including high-grade PGE mineralization in two chromitite occurrences located near the 2024 trench TR24MES08, and remaining 4 samples with anomalous PGE grades; Highlights:
迄今爲止,已向SGS實驗室發送了25份岩石樣本,並收到了6份樣本的化驗結果,包括位於 2024 年溝槽 TR24MES08 附近的兩處鉻鐵礦點的高品位 PGE 礦化情況,以及其餘 4 個具有異常 PGE 等級的樣品;亮點:
- 11.17 g/t 2PGE+Au – Chromitite outcrop, sample 103792;
- 6.24 g/t 2PGE+Au – Chromitite grab sample 103795.
- 11.17 g/t 2pGe+AU — 鉻鐵礦露頭,樣品 103792;
- 6.24 g/t 2pGe+AU — 鉻鐵礦採集樣品 103795。
Quality Assurance/Quality Control ("QA/QC")
質量保證/質量控制(「QA/QC」)
CLICK HERE for a summary of ValOre's policies and procedures related to QA/QC and grade interval reporting.
點擊此處查看 Valore 與 QA/QC 和成績間隔報告相關的政策和程序摘要。
Qualified Person ("QP")
合格人員(「QP」)
The technical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in NI 43-101 and reviewed and approved by Thiago Diniz, P.Geo., ValOre's QP and Vice President of Exploration.
本新聞稿中的技術信息是根據NI 43-101中規定的加拿大監管要求編制的,並由Valore的QP兼勘探副總裁Thiago Diniz、P.Geo. 審查和批准。
About ValOre Metals Corp.
Valore 金屬公司簡介
ValOre Metals Corp. (TSX‐V: VO) is a Canadian company with a team aiming to deploy capital and knowledge on projects which benefit from substantial prior investment by previous owners, existence of high-value mineralization on a large scale, and the possibility of adding tangible value through exploration and innovation.
Valore Metals Corp.(TSX-V:VO)是一家加拿大公司,其團隊旨在將資本和知識用於受益於先前所有者的大量先前投資、大規模高價值礦化的存在以及通過勘探和創新增加有形價值的可能性的項目。
ValOre's Pedra Branca Platinum Group Elements Project comprises 45 exploration licenses covering a total area of 51,096 hectares (126,260 acres) in northeastern Brazil. At Pedra Branca, 7 distinct PGE+Au deposit areas host, in aggregate, a 2022 NI 43-101 inferred resource of 2.198 Moz 2PGE+Au contained in 63.6 Mt grading 1.08 g/t 2PGE+Au. ValOre's team believes the Pedra Branca project has significant exploration discovery and resource expansion potential. (CLICK HERE to download 2022 technical report* and CLICK HERE for news release dated March 24, 2022).
Valore的Pedra Branca鉑金集團元素項目包括45份勘探許可證,總面積爲51,096公頃(126,260英畝),位於巴西東北部。在佩德拉布蘭卡,7個不同的PGE+Au礦牀區總共擁有2022年NI 43-101推斷的資源爲2.198 Moz 2pGe+Au的63.6萬噸,品位爲1.08 g/t 2pGe+Au。Valore的團隊認爲,Pedra Branca項目具有巨大的勘探發現和資源擴張潛力。(點擊這裏下載2022年技術報告*和 點擊這裏 (適用於2022年3月24日的新聞稿)。
*The 2022 Technical Report is entitled "Independent Technical Report –Mineral Resource Update on the Pedra Branca PGE Project, Ceará State, Brazil" was prepared as a National Instrument 43-101 Technical Report on behalf of ValOre Metals Corp. with an effective date of March 08, 2022. The 2022 Technical Report by Independent qualified persons, Fábio Valério (P.Geo.) and Porfirio Cabaleiro (P.Eng.), of GE21, commissioned to complete the mineral resource estimate while Chris Kaye of Mine and Quarry Engineering Services Inc. (MQes), was commissioned to review the metallurgical information. The Mineral Resource estimates were prepared in accordance with the CIM Standards, and the CIM Guidelines, using geostatistical, plus economic and mining parameters appropriate to the deposit. Mineral Resources, which are not mineral reserves, do not have demonstrated economic viability, and may be materially affected by environmental, permitting, legal, marketing, and other relevant issues. Mineral Resources are based upon a cut-off grade of 0.4 g/t PGE+Au, correlated to Pd_eq grade of 0.35 g/t, and were limited by an economic pit built in Geovia Whittle 4.3 software and following the geometric and economic parameters as disclosed in the 2022 NI 43-101 Technical Report,
*2022年技術報告的標題是 「獨立技術報告——巴西塞阿拉州佩德拉布蘭卡PGE項目的礦產資源最新情況」,由Valore Metals Corp. 作爲國家儀器43-101技術報告編寫,生效日期爲2022年3月8日。GE21的獨立合格人員法比奧·瓦萊里奧(P.Geo.)和波菲里奧·卡巴萊羅(P.Eng.)的2022年技術報告委託完成礦產資源估算,而礦業和採石工程服務公司(MQEs)的克里斯·凱則受委託審查冶金信息。礦產資源估算值是根據CiM標準和CiM指南編制的,使用了地質統計學以及適合礦牀的經濟和採礦參數。礦產資源不是礦產儲量,尚未顯示出經濟可行性,可能會受到環境、許可、法律、營銷和其他相關問題的實質性影響。礦產資源基於0.4 g/t pGE+Au的臨界品位,與0.35克/噸的PD_eq品位相關,受Geovia Whittle 4.3軟件內置的經濟礦坑的限制,並遵循2022年NI 43-101技術報告中披露的幾何和經濟參數,
On behalf of the Board of Directors,
我代表董事會,
"Jim Paterson"
「吉姆·帕特森」
James R. Paterson, Chairman and CEO
詹姆斯·帕特森,董事長兼首席執行官
ValOre Metals Corp.
ValOre 金屬公司
For further information about ValOre Metals Corp., or this news release, please visit our website at or contact Investor Relations at 604.646.4527, or by email at contact@valoremetals.com.
有關Valore Metals Corp. 或本新聞稿的更多信息,請訪問我們的網站或致電604.646.4527聯繫投資者關係部,或發送電子郵件至 contact@valoremetals.com。
ValOre Metals Corp. is a proud member of Discovery Group. For more information please visit:
Valore Metals Corp. 很榮幸成爲探索集團的成員。欲了解更多信息,請訪問:
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
多倫多證券交易所風險投資交易所及其監管服務提供商(該術語在多倫多證券交易所風險投資交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。
This news release contains "forward-looking statements" within the meaning of applicable securities laws. Although ValOre believes that the expectations reflected in its forward-looking statements are reasonable, such statements have been based on factors and assumptions concerning future events that may prove to be inaccurate. These factors and assumptions are based upon currently available information to ValOre. Such statements are subject to known and unknown risks, uncertainties and other factors that could influence actual results or events and cause actual results or events to differ materially from those stated, anticipated or implied in the forward-looking statements. A number of important factors including those set forth in other public filings could cause actual outcomes and results to differ materially from those expressed in these forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include the future operations of ValOre and economic factors. Readers are cautioned to not place undue reliance on forward-looking statements. The statements in this press release are made as of the date of this release and, except as required by applicable law, ValOre does not undertake any obligation to publicly update or to revise any of the included forward-looking statements, whether as a result of new information, future events or otherwise. ValOre undertakes no obligation to comment on analyses, expectations or statements made by third parties in respect of ValOre, or its financial or operating results or (as applicable), their securities.
本新聞稿包含適用證券法所指的 「前瞻性陳述」。儘管Valore認爲其前瞻性陳述中反映的預期是合理的,但此類陳述是基於有關未來事件的因素和假設,這些因素和假設可能不準確。這些因素和假設基於Valore目前可用的信息。此類陳述受已知和未知風險、不確定性和其他因素的影響,這些因素可能會影響實際業績或事件,並導致實際結果或事件與前瞻性陳述中陳述、預期或暗示的結果或事件存在重大差異。許多重要因素,包括其他公開文件中列出的因素,可能導致實際結果和結果與這些前瞻性陳述中表達的結果和結果存在重大差異。可能導致實際業績與前瞻性陳述存在重大差異的因素包括ValOre的未來運營和經濟因素。提醒讀者不要過分依賴前瞻性陳述。本新聞稿中的聲明自本新聞稿發佈之日起作出,除非適用法律要求,否則Valore不承擔任何義務公開更新或修改所包含的任何前瞻性陳述,無論是由於新信息、未來事件還是其他原因。Valore沒有義務對第三方就Valore或其財務或經營業績或(如適用)其證券所做的分析、預期或陳述發表評論。
Photos accompanying this announcement are available at
本公告附帶的照片可在以下網址獲得