share_log

Millbank Closes Acquisition of Blakelock Hydrogen Project

Millbank Closes Acquisition of Blakelock Hydrogen Project

Millbank完成了對Blakelock氫項目的收購
newsfile ·  09/25 09:00

Vancouver, British Columbia--(Newsfile Corp. - September 25, 2024) - Millbank Mining Corp. (TSXV: MILL) (the "Company" or "Millbank") is pleased to announce it has closed the acquisition of the Blakelock hydrogen project (the "Blakelock Project") in northern Ontario as previously announced on September 12, 2024.

溫哥華,英屬哥倫比亞--(資訊社 - 2024年9月25日) - Millbank Mining Corp. (TSXV: MILL) ("公司"或"Millbank")很高興宣佈已完成對北安大略省Blakelock氫項目("Blakelock項目")的收購,如之前於2024年9月12日宣佈的。

"Having closed the acquisition of the Blakelock Project, we are excited for the potential to explore for natural sources of hydrogen," stated Benjamin Asuncion, CEO of Millbank. "The potential for natural hydrogen to be a clean source of energy has garnered significant interest and funding from both private industry1 and governments2 around the world."

"完成了對Blakelock項目的收購,我們對探索天然氫源的潛力感到興奮,"Millbank的首席執行官本傑明·阿松西翁表示。"天然氫作爲清潔能源的潛力引起了全球私營企業和政府的重大興趣和資金支持。"

Blakelock Hydrogen Project

Blakelock氫項目

The Blakelock Project is comprised of 109 mineral claims covering an area of 2,207 hectares (22.07 km2) located in the Larder Lake Mining Division of Northern Ontario. Several forest rings or circular features have been identified on the project which are the subject of exploration for the potential to host or contain sources of natural hydrogen. In other areas, like the North Perth Basin in Western Australia, similar circular formations have been observed to seep hydrogen gas from their edges. Comparable features have also been documented in various locations around the globe3.

Blakelock項目由109個礦權組成,佔地2,207公頃(22.07平方公里),位於北安大略省Larder Lake礦業分區。項目中已經確定了幾個森林環或圓形特徵,這些特徵正在進行探索,以確定是否具有或包含天然氫源。在其他地區,如澳大利亞西部的北珀斯盆地,類似的圓形形成物從邊緣滲漏出氫氣。類似特徵也在全球各地的各個地點得到證實。

Blakelock Claim Map

Blakelock權益地圖

According to research2, there appears to be a hydrogen rich horizon within the soil/till column within and/or adjacent to forest rings in northern Ontario. The hydrogen appears to be generated during the alteration/weathering of pyrite-bearing intrusions associated with the bedrock - soil interface. Millbank's exploration strategy is to explore for hydrogen accumulations within the tree rings observed from satellites within the Blakelock property.

根據研究,北安大略北部的土壤/凍土柱中和/或毗鄰森林環內似乎存在富氫地層。這些氫似乎是在岩石牀面-土壤界面的變質/風化過程中由含鐵輝石的侵入岩生成的。Millbank的探索策略是在Blakelock財產內通過衛星觀測到的樹環內探索氫積聚。

Forest rings are peculiar circular impressions in boreal forests of northern Canada which are commonly hundreds of meters in diameter and centered on accumulations of chemically reduced substances in groundwater, overburden, or rock. The circular outlines are defined by a change in vegetation at the rims of the rings4.

森林環是北加拿大針葉林中常見的奇特的圓形凹痕,直徑通常是數百米,並集中在地下水、覆土或岩石中大量存在的化學還原物質附近。環形輪廓由環內植被變化界定。

Transaction Terms

交易條款

Under the terms of the Mining Claims Purchase Agreement (the "Acquisition Agreement"), the Company acquired a 100% interest in the Blakelock Project for consideration of C$46,000 and 200,000 common shares. The Vendors have been granted a 1.5% net smelter returns royalty (NSR) of which 0.5% can be repurchased by the Company for C$500,000. The common shares issued under the Acquisition Agreement are subject to a four-month statutory hold period in accordance with applicable securities laws.

根據《採礦權購買協議》("收購協議")的條款,公司以46,000加元和200,000股普通股收購了Blakelock項目的100%權益。供應商被授予1.5%的淨冶煉回報權益(NSR),其中0.5%可以以50萬加元回購。根據適用證券法,收購協議下發行的普通股受到爲期四個月的法定持有期限的約束。

R. Tim Henneberry, P.Geo. (BC) and a consultant to Millbank is the Qualified Person under National Instrument 43-101 who has reviewed and approved the technical content of this news release.

R. Tim Henneberry,P.Geo.(BC)是Millbank的顧問,也是根據43-101號國家儀器的合格人員,已經審查並批准了本新聞發佈內容的技術內容。

About Millbank Mining Corp.: Millbank Mining Corp. is a mineral exploration company currently focused on its Arthur Lake Copper project in British Columbia and Blakelock hydrogen project in Ontario.

有關密爾班克礦業公司:密爾班克礦業公司是一家礦產勘探公司,目前專注於位於不列顛哥倫比亞省的亞瑟湖銅項目和安大略省的布萊克洛克氫項目。

For further information, please contact:

如需更多信息,請聯繫:

Ben Asuncion
Chief Executive Officer
Millbank Mining Corp.
Tel: 604-377-1597
Email: ben@piholdings.ca

Ben Asuncion
首席執行官
Millbank Mining Corp。
電話:604-377-1597
電子郵件: ben@piholdings.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX Venture交易所和其監管服務提供商(如該交易所的政策中所定義的)均不接受此新聞稿的充分性或準確性的責任。

This news release includes certain statements and information that may constitute "forward-looking information" within the meaning of applicable Canadian securities laws. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would" or "occur". All statements in this news release, other than statements of historical facts, including statements regarding future estimates, plans, objectives, timing, assumptions or expectations of future performance are forward-looking statements and contain forward-looking information, including, but not limited to the ability of hydrogen to replace conventional fuel sources as a source of clean energy. Forward-looking statements are based on certain material assumptions and analysis made by the Company and the opinions and estimates of management as of the date of this news release, including, but not limited to the assumption that hydrogen has the ability to become a future, low cost viable energy source. These forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking statements or forward-looking information, including, but not limited to risks associated with exploration of Blakelock Project including, without limitation, risks associated with the evolving legal landscape on the exploration and extraction of hydrogen in the Province of Ontario, including the risk that the Province of Ontario may determine that the exploration and exploitation of hydrogen is not properly characterized as the exploration of and exploitation of a mineral, as well the inherent risks associated with the mining industry and the results of exploration activities and development of mineral properties, stock market volatility and capital market fluctuations, general market and industry conditions, as well as those risk factors discussed in the Company's most recently filed management's discussion & analysis.

本新聞稿包含一些聲明和信息,可能構成適用加拿大證券法中"前瞻性信息"。一般來說,前瞻性聲明和信息可通過使用"打算"或"預期"等前瞻性術語來識別,或者通過使用這些詞語和短語的變體或表明某些行動、事件或結果"可能"、"可能"、"應該"、"將"或"發生"的聲明。本新聞稿中的所有聲明,除了歷史事實的聲明之外,包括關於未來估計、計劃、目標、時間安排、假設或未來表現預期的聲明都是前瞻性聲明,幷包含前瞻性信息,其中包括,但不限於,氫氣作爲清潔能源的替代傳統燃料來源的能力。前瞻性聲明是基於公司做出的某些實質假設和分析、管理層在本新聞稿日期作出的意見和估計,包括,但不限於,氫氣有可能成爲未來、低成本可行的能源來源的假設。這些前瞻性聲明受公司已知和未知的風險、不確定性和其他因素影響,可能導致公司的實際結果、活動水平、表現或成就與此類前瞻性聲明或前瞻性信息所表達或暗示的結果大相徑庭,包括但不限於與Blakelock項目勘探相關的風險,包括但不限於與安大略省在勘探和提取氫氣方面的法律環境演變相關的風險,包括安大略省可能確定勘探和開採氫氣未能正確地被定性爲礦產的勘探和開採的風險,以及與礦業行業和礦產項目勘探活動和開發結果相關的固有風險、股市波動和資本市場波動、一般市場和行業狀況,以及公司最近提交的管理層討論和分析中討論的風險因素。

Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement or forward-looking information contained herein, except in accordance with applicable securities laws.

儘管公司管理層已嘗試確定可能導致實際結果與前瞻性陳述或前瞻性信息不同的重要因素,但可能存在其他因素導致結果未達預期、估計或意圖。不能保證此類陳述將被證明準確,因爲實際結果和未來事件可能與此類陳述中預期的有重大差異。因此,讀者不應過於依賴前瞻性陳述和前瞻性信息。讀者被告知,依賴此類信息可能不適合其他用途。公司不承諾更新此處包含的任何前瞻性陳述或前瞻性信息,除非根據適用的證券法規定。

1 Bill Gates-backed startup says a global gold rush for buried hydrogen is picking up momentum,

1位比爾·蓋茨支持的創業公司表示,全球對埋藏的氫發生了一場瘋狂的金礦熱,勢頭正增強。

2 US grants $750 million for hydrogen projects across 24 states,

2美國向24個州的氫項目撥款7500萬美元,

3 NASA Earth Observatory,

3美國宇航局地球觀測站,

4 Hamilton, S.M. and Hattori, K.H. (2008). Case History. Spontaneous potential and redox responses over a forest ring. Geophysics May 2008 Issue. Pages B67-B75

4Hamilton, S.m.和Hattori萬.H.(2008).案例研究。森林環路上的自發電位和氧化還原反應。 2008年5月地球物理學期刊。頁面B67-B75

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論