share_log

Red Pine Commences 2024-25 Drilling Program at the Wawa Gold Project

Red Pine Commences 2024-25 Drilling Program at the Wawa Gold Project

Red Pine開始在Wawa黃金項目進行2024-25年鑽探計劃
GlobeNewswire ·  11/12 06:30

TORONTO, Nov. 12, 2024 (GLOBE NEWSWIRE) -- Red Pine Exploration Inc. (TSXV: RPX, OTCQB: RDEXF) ("Red Pine" or the "Company") announces the beginning of its fully funded 25,000 metre ("m") drilling program for 2024 and 2025 at the Wawa Gold Project.

2024年11月12日,多倫多 (GLOBE NEWSWIRE) — 紅松勘探公司 (tsxv: RPX, OTCQB: RDEXF) ("紅松" 或 "公司") 宣佈在Wawa黃金項目開始爲期25,000米的全資基金25,000米 ("m") 鑽探項目,該項目覆蓋了2024年和2025年。

The primary objective of the drilling program is to extend the zones of gold mineralization in the already sizeable gold system of the Wawa Gold Project beyond the 2024 Mineral Resource Estimate ("MRE") by focusing on:

鑽探項目的主要目標是通過以下方面擴大Wawa黃金項目已相當規模的黃金礦化帶,超越2024年的礦產資源估算 ("MRE"),具體包括:

  • the down-plunge, underground potential of the Jubilee Shear where limited drilling has returned results of up to 14.87 grams per tonne ("g/t") gold over 5.20 m (core length), 8.89 g/t gold over 3.75 m (core length) and 120.88 g/t gold over 0.30 m (core length; Jubilee South)
  • the down dip potential beneath the reported pit shell for the Jubilee Shear that remains untested (Jubilee Central)
  • the northern extension of the Jubilee Shear in the Jubilee/Cooper area where recent prospecting has returned encouraging results (Jubilee North and Jubilee/Cooper)
  • the recently discovered faulted extension of the Jubilee Shear on the southern side of the Parkhill Fault (Jubilee Ext.)
  • 深究反洪愁斷裂帶的向下礦藏潛力,在受限鑽探中已獲得最高14.87克每噸 ("g/t") 黃金,核心長度520萬;8.89 g/t 黃金,核心長度375萬;120.88克/t 黃金,核心長度30萬; 北露面 (反洪愁南)
  • 測試反洪愁斷裂帶已報告露天礦坑外的向下潛在礦藏(千禧中心)
  • 測試剛成功勘察的反洪愁斷裂帶在Jubilee / Cooper地區的北部延伸,取得鼓舞人心的結果 (反洪愁北和反洪愁/庫珀)
  • 測試新發現的商山斷層的反洪愁斷裂帶延伸,位於Parkhill斷層的南側 (反洪愁延伸)

(See (Figures 1 and 2)).

(見圖表1和2)

The 2024 MRE is described in the National Instrument 43-101 Technical Report dated September 30, 2024 (with a resource effective date of August 28, 2024) entitled "National Instrument 43-101 Technical Report for the Wawa Gold Project".

2024年MRE詳述在2024年9月30日的《National Instrument 43-101 Wawa金礦項目技術報告》中(資源有效日期爲2024年8月28日)。

In each of the target areas, numerous mineralized zones are planned to be concurrently tested with the Jubilee Shear. This will include some of the more regional targets identified based on the results of the 2024 prospecting program and the reevaluation of exploration targets on the property. The Company anticipates being able to report the preliminary results of the program in Q1 2025.

在每個目標區域,計劃同時測試許多帶有礦化帶的區域,其中包括2024年勘探計劃結果和物業上勘探目標重新評估所確認的一些更加區域性的目標。公司預計在2025年第一季度能夠報告該計劃的初步結果。

Michael Michaud, President and CEO of Red Pine commented: "We are very excited to recommence exploration drilling at the Wawa Gold Project after delivering on several of our goals for 2024 including completing a successful field program with the discovery of a number of new targets, updating our geological model, increasing our mineral resource estimate by 150% within a conceptual pit shell, and raising the necessary funds for this drilling program. The drilling contractor was selected as part of a competitive tender process.

Red Pine總裁兼首席執行官Michael Michaud評論道:“我們非常高興在完成2024年的一些目標後,包括成功完成現場工作計劃、發現多個新目標、更新我們的地質模型、在概念礦坑邊界內將礦產資源估算提高了150% ,併爲這項鑽井計劃籌集了必要資金後,重新開始對Wawa金礦項目的勘探鑽探工作。鑽探承包商是通過競爭性招標程序選定的。

We believe that this well-rounded and bold exploration program, designed to show a "line of sight" to future increases to the mineral resource, will mark an important step in our plan to add value to Red Pine. As the program includes a significant portion of both extension drilling of known zones and exploration in untested areas to discover new mineralized zones, it is intended to demonstrate the potential of the property to host a significantly larger open pit and underground mineral resource. Additionally, more limited drilling will be designed to test several new conceptual targets and more regional targets discovered during the recent surface prospecting.

我們相信這個全面而大膽的勘探計劃,旨在展示對未來增加礦產資源的"前景",將成爲我們增加Red Pine價值計劃中的重要一步。由於該計劃包括對已知區域進行大量延伸鑽探以及對未經測試的區域進行勘探以發現新的含礦區,旨在展示該地產有能力容納更大規模的露天礦坑和地下礦產資源的潛力。此外,還將設計更有限的鑽探用於測試幾個新的概念目標以及在最近地表考察中發現的更多區域目標。

The results of this drilling program will dictate the next steps for the project and allow for a more formal assessment of various mining and processing scenarios."

這一鑽探計劃的結果將決定該項目的下一步,爲各種採礦和處理方案進行更正式評估提供可能。

Quality Assurance/Quality Control ("QA/QC") Measures

質量保證/質量控制("QA / QC")措施:

Drill core samples are transported in security sealed bags for preparation and analyses to Activation Laboratories Ltd. ("Actlabs") in Ancaster, Ontario. Individual samples are labelled, placed in plastic sample bags and sealed. Sample batches are then placed into durable rice bags and shipped. NQ or HQ size core (drilled previously) and NQ size core (current drill program) assays were obtained by 50-gram fire-assaying with a AA finish or by 1-kilogram screen fire assay. The 1-kilogram screen assay method is selected for samples anticipated to contain coarse gold and when the fire-assay-AA finish return results greater or equal to 2.25 g/t gold.

鑽芯樣品被運送到安大略省Ancaster的Activation Laboratories Ltd.("Actlabs")進行準備和分析,放在安全密封袋中。每個樣品都貼有標籤,放入塑料樣品袋中並加密封。然後,樣品批次被放入耐用的大米袋中並運送。之前鑽探的NQ或HQ尺寸岩心以及當前鑽探計劃的NQ尺寸岩心的檢測是通過50克火試金法進行的,採用AA表面處理或1千克篩分火試金法。當預計樣品含有粗金屬,並且火試金法-AA表面處理返回結果大於或等於2.25克/噸黃金時,會選擇1千克篩分試金法。

As part of its updated and independently reviewed QA/QC program, Red Pine inserts external gold standards (low to high grade) and blanks every 20 samples, and routinely inserts blanks immediately after samples with visible gold. Quarter core duplicates are routinely inserted to evaluate the natural variability of gold mineralization. Assay certificates are sent to at least two members of the senior management team and are directly accessible from the WebLIMS portal of Actlabs. Red Pine has also initiated third party umpire testing of approximately 5% of the primary samples assayed at Actlabs at Bureau Veritas Canada Inc. in Vancouver, British Columbia.

爲了更新並獨立審核QA/QC方案,Red Pine每20個樣本插入外部黃金標準(低到高品位)和空白樣本,通常在可見黃金的樣本之後立即插入空白樣本。季度岩心重複樣本被定期插入以評估黃金礦化的自然變異性。檢測報告將發送至至少兩名高級管理團隊成員,並可直接從Actlabs的WebLIMS門戶訪問。Red Pine還已啓動在溫哥華不列顛哥倫比亞省的Bureau Veritas Canada Inc.對Actlabs分析的主要樣本中約5%進行第三方仲裁測試。

Qualified Person

合格人士

Jean-Francois Montreuil, P.Geo. and Vice President, Exploration of Red Pine and the Qualified Person, as defined by National Instrument 43-101, has reviewed and approved the technical information contained in this news release.

Red Pine公司的勘探副總裁、P.Geo. Jean-Francois Montreuil作爲根據43-101國家規定所定義的合格人員,已審核並批准了本新聞稿中包含的技術信息。

About Red Pine Exploration Inc.

關於Red Pine Exploration Inc。

Red Pine Exploration Inc. is a gold exploration company headquartered in Toronto, Ontario, Canada. The Company's shares trade on the TSX Venture Exchange under the symbol "RPX" and on the OTCQB Markets under the symbol "RDEXF".

Red Pine Exploration Inc.是一家總部位於加拿大安大略省多倫多的黃金勘探公司。該公司的股票在TSX Venture Exchange交易,股票代碼爲"RPX",在OTCQB Markets交易,股票代碼爲"RDEXF"。

The Wawa Gold Project is in the Michipicoten Greenstone Belt of Ontario, a region that has seen major investment by several producers in the last five years. The Company's land package hosts numerous historic gold mines and is over 7000 hectares in size. Red Pine is building a strong position as a major mineral exploration and development player in the Michipicoten region.

Wawa黃金項目位於安大略省的米奇皮科滕綠巖帶,這是一個過去五年來受到幾家生產商重大投資的地區。公司的土地包覆蓋了許多歷史悠久的金礦,並且總面積超過7000公頃。Red Pine正在成爲米奇皮科滕地區重要的礦產勘探和開發參與者。

For more information about the Company, visit

有關公司的更多信息,請訪問

Or contact:

或聯繫:

Michael Michaud, President and Chief Executive Officer, at (416) 364-7024 or mmichaud@redpineexp.com

總裁兼首席執行官邁克爾·米肖 (Michael Michaud) 電話:(416) 364-7024 或電郵:mmichaud@redpineexp.com

Or

或者

Carrie Howes, Director Corporate Communications, at (416) 644-7375 or chowes@redpineexp.com

請聯絡董事Carrie Howes,電話爲(416)644-7375或電子郵件chowes@redpineexp.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX創業公司交易所及其監管服務提供者(如TSX創業公司政策所定義)均不承擔本發佈信息充分性或準確性的責任。

Cautionary Note Regarding Forward-Looking Information

關於前瞻性信息的注意事項

This news release contains statements which constitute "forward-looking information" within the meaning of applicable securities laws, including statements regarding the plans, intentions, beliefs and current expectations of the Company with respect to future business activities and operating performance.

本新聞稿包含構成適用證券法律意義下的"前瞻性信息"的聲明,包括關於公司對未來業務活動和運營績效的計劃、意圖、信仰和當前期望的聲明。

Forward-looking information is often identified by the words "may", "would", "could", "should", "will", "intend", "plan", "anticipate", "believe", "estimate", "expect" or similar expressions. Forward-looking information contained in this news release includes, but may not be limited to, statements regarding the Company's goal of extending the zones of gold mineralization beyond the 2024 MRE, the mineralized zones the Company plans to test, the Company reporting the preliminary results of the program in Q1 2025, and the program demonstrating the potential of the property to host a significantly larger open pit and underground mineral resource. Investors are cautioned that forward-looking information is not based on historical facts but instead reflects management's expectations, estimates or projections concerning future results or events based on the opinions, assumptions and estimates of management considered reasonable at the date the statements are made. Such opinions, assumptions and estimates are inherently subject to a variety of risks and uncertainties that could cause actual events or results to differ materially from those projected and undue reliance should not be placed on such information, as unknown or unpredictable factors could have material adverse effects on future results, performance or achievements. Among the key factors that could cause actual results to differ materially from those projected in the forward-looking information are: the Company's expectations in connection with the projects and exploration programs being met, the impact of general business and economic conditions, global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future conditions, fluctuating gold prices, currency exchange rates (such as the Canadian dollar versus the United States Dollar), variations in ore grade or recovery rates, changes in accounting policies, changes in the Company's mineral reserves and resources, changes in project parameters as plans continue to be refined, changes in project development, construction, production and commissioning time frames, the possibility of project cost overruns or unanticipated costs and expenses, higher prices for fuel, power, labour and other consumables contributing to higher costs and general risks of the mining industry, failure of plant, equipment or processes to operate as anticipated, unexpected changes in mine life, seasonality and weather, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, and limitations on insurance.

前瞻信息通常以"可能","將","可能","應該","將","打算","計劃","預期","相信","估計","期望"或類似表達方式來識別。本新聞稿中包含的前瞻信息可能包括但不限於,關於公司目標將黃金礦化區域延伸至2024勘探和評估報告之外、公司計劃測試的礦化區域、公司計劃在2025年第一季度報告項目的初步結果,項目展示該區域具有承載更大露天和地下礦產資源的潛力。投資者應注意,前瞻信息並非基於歷史事實,而是反映管理層對未來結果或事件的期望、估計或投影,基於管理層在發表這些聲明時認爲合理的意見、假設和估計。這些意見、假設和估計固有地受到各種可能導致實際事件或結果與預期不符的風險和不確定性的影響,不應過度依賴此類信息,因爲未知或不可預測的因素可能對未來結果、表現或成就產生重大不利影響。可能導致實際結果與前瞻信息中所預測結果不符的主要因素包括:公司與項目和勘探計劃有關的期望是否得以實現、一般業務和經濟狀況、全球流動性和信貸可用性對現金流量的時間和資產負債值以基於預期未來條件的影響、金價波動、匯率波動(如加幣與美元之間的匯率)、礦石品位或回收率的變化、會計政策的變化、公司礦產儲量和資源的變化、隨着計劃不斷完善而進行的項目參數變化、項目發展、施工、生產和投產的時間框架的變化、項目成本超支或意外成本和費用的可能性、燃料、電力、勞動力和其他消耗品價格上漲導致成本上升、礦業行業的一般風險、工廠、設備或流程未能按預期運行、礦山壽命意外變化、季節性和天氣、新礦牀開發的成本和時間、勘探活動的成功、許可時間表、政府對採礦活動的監管、環境風險、不可預期的復墾費用、所有權糾紛或主張,以及保險限制。

This information contained in this news release is qualified in its entirety by cautionary statements and risk factor disclosure contained in filings made by the Company, including the Company's financial statements and related MD&A for the years ended July 31, 2023 and July 31, 2024, and the interim financial reports and related MD&A for the periods ended January 31, 2024 and April 30, 2024, filed with the securities' regulatory authorities in certain provinces of Canada and available at .

本新聞稿中包含的信息在其整體上由公司提交的文件中的警示性聲明和風險因素披露所限制,包括公司截至2023年7月31日和2024年7月31日的財務報表及相關的管理討論與分析,以及截至2024年1月31日和2024年4月30日的中期財務報告及相關的管理討論與分析,在加拿大某些省份的證券監管機構備檔,並可在網站查閱。

Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking information prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, believed, estimated or expected. Although the Company has attempted to identify important risks, uncertainties and factors which could cause actual results to differ materially, there may be others that cause results not to be as anticipated, estimated or intended. The Company does not intend, and does not assume any obligation, to update this forward-looking information except as otherwise required by applicable law.

如果其中一個或多個這些風險或不確定性發生,或前瞻性信息的基本假設被證明不正確,則實際結果可能與擬定、計劃、預期、信賴、估計或預期的結果有所不同。儘管公司已試圖確定導致實際結果與前瞻性信息所反映的預期差異的重要風險、不確定性和可能的因素,但可能仍有其他因素導致結果不如擬定、預計或意圖的那樣。公司沒有意圖,並且不承擔任何義務,根據適用法律以外的其他方面更新此前瞻性信息。

Figure 1 - Location of Planned Diamond Drilling

圖1 - 計劃金剛石鑽探地點

Figure 2- Photograph of Surface drill at site

圖2- 現場鑽井設備照片


声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論