share_log

ST Engineering Bags $180m Metro Infrastructure Contracts in Bangkok

ST Engineering Bags $180m Metro Infrastructure Contracts in Bangkok

新科工程在曼谷獲得價值18000萬美元的地鐵製造行業合同
Singapore Business Review ·  2024/12/19 09:44

The contracts were awarded to its Urban Solutions business.

這些合同授予了其城市解決方案業務。

ST Engineering's Urban Solutions business has secured contracts worth $180m for metro infrastructure projects in Bangkok, Thailand.

St Engineering的城市解決方案業務已獲得價值1.8億美元的泰國曼谷地鐵基礎設施項目合同。

The projects involve the deployment of a communications system, Supervisory Control and Data Acquisition (SCADA) system, and AGIL Platform Screen Door (PSD) solution for the 35.9-kilometre MRT Orange Line.

這些項目涉及爲35.9公里的地鐵橙線部署通信系統、監控和數據採集(SCADA)系統以及AGIL平台屏蔽門(PSD)解決方案。

The communications system will leverage advanced networking technologies to ensure timely data transmission, facilitating efficient operations and predictive maintenance. Meanwhile, the SCADA system will enable real-time monitoring and control of metro operations.

通信系統將利用先進的網絡技術來確保及時的數據傳輸,促進高效運營和預測性維護。同時,SCADA系統將實現對地鐵運營的實時監控和控制。

ST Engineering Urban Solutions will also provide over 500 sets of full-height PSDs and more than 160 sets of half-height PSDs for the 21 underground stations and seven elevated stations on the Orange Line.

St Engineering Urban Solutions還將爲橙線上的21個地鐵站和7個高架車站提供500多套全高PSD和160多套半高PSD。

The Orange Line, which connects eastern and western Bangkok, is expected to serve approximately 400,000 daily passengers when fully operational in 2030.

連接曼谷東部和西部的橙線在2030年全面運營後,預計每天將爲約40萬名乘客提供服務。

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論