Ivanhoe Electric Reports Year-End Update on United States Exploration Programs
Ivanhoe Electric Reports Year-End Update on United States Exploration Programs
Drilling Expands the Texaco Deposit in Arizona with Intersections of Significant Enriched Mineralization
鑽探擴展了亞利桑那州的Texaco礦牀,發現了顯著富集的礦化交集
Drilling at the Hog Heaven Project Identifies a Porphyry Copper-Gold-Molybdenum System in the Battle Butte Area Associated with a Typhoon-identified Anomaly
Hog Heaven項目的鑽探在與颱風識別的異常相關的Battle Butte地區識別出一種銅-黃金-鉬的隱晶質礦牀
Drilling at the Tintic Copper-Gold-Silver Project Continues to Explore for the Source Porphyry Copper System
在Tintic銅-黃金-白銀項目的鑽探繼續探索源自礦牀的隱晶質銅系統
Typhoon and Computational Geoscience Inc. Guide Technology-led Exploration Efforts in the United States
颱風和計算地球科學公司指導美國以科技爲主導的勘探工作
Phoenix, Arizona--(Newsfile Corp. - January 6, 2025) - Ivanhoe Electric Inc. (NYSE American: IE) (TSX: IE) ("Ivanhoe Electric") Executive Chairman Robert Friedland and President and Chief Executive Officer Taylor Melvin are pleased to provide an update on the Company's exploration projects in the United States, including the Santa Cruz Copper Project in Arizona, Hog Heaven Project in Montana, and the Tintic Project in Utah.
亞利桑那州鳳凰城--(資訊公司 - 2025年1月6日)- Ivanhoe Electric Inc.(美國紐交所:IE)(TSX:IE)("Ivanhoe Electric")執行董事長Robert Friedland及總裁兼首席執行官Taylor Melvin高興地提供關於公司在美國的勘探項目的更新,包括亞利桑那州的聖克魯斯銅項目,蒙大拿州的Hog Heaven項目,以及猶他州的Tintic項目。
Mr. Melvin commented: "Our U.S. exploration team, led by Graham Boyd, successfully advanced multiple large-scale and early-stage exploration projects in 2024, while continually evaluating new opportunities. Our technology-driven exploration platform allowed our experienced team to expand the known copper mineralization at the Texaco Deposit in Arizona, discover a copper-gold-molybdenum porphyry system at Hog Heaven in Montana, and gain a better understanding of our Tintic Project in Utah. We are using the seasonal winter break in drilling to evaluate our 2024 results, review new potential projects, and prioritize our 2025 exploration plans in the U.S."
Melvin先生評論道:「我們的美國勘探團隊,由Graham Boyd領導,成功推進了2024年多個大規模和早期階段的勘探項目,同時不斷評估新的機會。我們的科技驅動勘探平台使我們經驗豐富的團隊能夠擴展亞利桑那州Texaco礦牀已知的銅礦化,發現蒙大拿州Hog Heaven的銅-黃金-鉬隱晶質系統,並更好地理解我們在猶他州的Tintic項目。我們正在利用冬季的季節性鑽探間歇期評估2024年的結果,審查新的潛在項目,並優先考慮我們在美國2025年的勘探計劃。」
Ivanhoe Electric completed approximately 34,000 meters of exploration drilling across projects in the U.S. portfolio
Ivanhoe Electric在美國投資組合的項目中完成了約34,000米的勘探鑽探
Exploration programs at Ivanhoe Electric's projects during 2024 included approximately 29,000 meters of exploration drilling at the Santa Cruz Copper Project, Hog Heaven Project, and Tintic Project, in addition to approximately 5,000 meters of drilling at earlier stage projects.
在伊萬霍電氣的項目中,2024年的勘探計劃包括了在聖克魯茲銅礦項目、霍格天堂項目和廷蒂克項目大約29,000米的勘探鑽探,以及在早期階段項目中的約5,000米鑽探。
The 2024 exploration programs were successful at extending mineralization at our Texaco Deposit and discovering our first gold-bearing porphyry copper system at Hog Heaven. Exploration drilling has paused at most sites for the winter season, allowing a natural break for interpretation of new geological, geochemical, and geophysical data to support subsequent exploration programs in 2025.
2024年的勘探計劃成功地延續了我們在泰克斯科存款的礦化,並在霍格天堂發現了我們的首個含金銅礦巖體系。大多數地點的勘探鑽探在冬季暫停,爲新地質、地球化學和地球物理數據的解釋提供了自然的間歇,以支撐2025年的後續勘探計劃。
Exploration drilling at the Santa Cruz Copper Project intersected new chalcocite-enriched mineralization at the Texaco Deposit
在聖克魯茲銅礦項目的勘探鑽探中,新發現了富含膽矽礦的礦化在泰克斯科存款的交匯處。
Exploration drilling in 2024 at the Santa Cruz Copper Project focused on the Texaco Deposit and the Southwest Exploration Area, with eight drill holes totaling approximately 8,700 meters completed (Figure 1). Both drilling campaigns were guided by previous Typhoon surveys.
2024年在聖克魯茲銅礦項目的勘探鑽探專注於泰克斯科存款和西南勘探區,完成了八個鑽孔,總計約8,700米(圖1)。這兩次鑽探活動均受到了先前臺風調查的指導。
Recent assay results from Texaco drill holes SCC-242 and SCC-248, at the same 0.80% total copper cut-off grade used for the Texaco Mineral Resource Estimate ("MRE"), confirm the presence of copper mineralization on the northeastern and northwestern edge of the Texaco Deposit (Figure 2).
來自於泰克斯科鑽孔SCC-242和SCC-248的近期測定結果,在用於泰克斯科礦產資源估算("MRE")的相同0.80%總銅切割等級下,確認了泰克斯科存款東北和西北邊緣存在銅礦化(圖2)。
- Hole SCC-242: 63.4 meters @ 1.70% total copper from 895.6 meters, including 25.7 meters @ 2.00% total copper from 897.4 meters
- 孔SCC-242:從895.6米起63.4米 @ 1.70%總銅,包括從897.4米起25.7米 @ 2.00%總銅。
- Hole SCC-248: 10.0 meters @ 1.19% total copper from 859.0 meters, and 24.0 meters @ 1.06% total copper from 877.0 meters, and 6.0 meters @ 1.71% total copper from 916.0 meters
- 孔SCC-248:從859.0米起10.0米 @ 1.19%總銅,從877.0米起24.0米 @ 1.06%總銅,以及從916.0米起6.0米 @ 1.71%總銅。
- Hole SCC-249: 35.6 meters @ 1.37% total copper from 923.4 meters, including 26.1 meters @ 1.56% total copper from 923.4 meters
- 孔SCC-249:從923.4米起35.6米 @ 1.37%總銅,包括從923.4米起26.1米 @ 1.56%總銅。
Exploration drilling in the Southwest Exploration Area included four drill holes. The Southwest Exploration Area was recognized after Ivanhoe Electric drilled an anomaly generated by Typhoon and intersected sulfide copper mineralization under cover more than one kilometer southwest of the Santa Cruz Deposit (refer to Ivanhoe Electric's November 29, 2022 news release).
西南勘探區的勘探鑽探包括四個鑽孔。西南勘探區是在艾凡霍電氣鑽探了一個由颱風產生的異常,並在聖克魯斯存款西南一公里多的掩蓋區下發現了硫化銅礦化後被認定的(請參見艾凡霍電氣2022年11月29日的新聞稿)。
Drill hole SCC-236 was completed approximately 600 meters southwest of the southernmost extent of the currently defined MRE at the Santa Cruz Copper Project. SCC-238 was collared 75 meters northeast of SCC-236. Using the Santa Cruz MRE total copper cut-off grade of 0.70%, no intercepts are reportable from drill hole SCC-236, and one intercept is reportable from SCC-238. However, below the 0.70% total copper cut-off grade, assay results confirm the presence of widespread copper mineralization (Figure 3).
鑽孔SCC-236完成於當前定義的聖克魯斯銅項目MRE最南端以南約600米處。SCC-238在SCC-236東北75米處開始鑽探。使用聖克魯斯MRE的銅含量下限爲0.70%,鑽孔SCC-236沒有可報告的交匯,而SCC-238有一個可報告的交匯。然而,在低於0.70%銅總含量的下限下,分析結果確認了廣泛的銅礦化的存在(見圖3)。
Further exploration drilling in the Southwest Exploration Area will be considered after the results of recent three-dimensional seismic and ambient noise tomography surveys are processed and interpreted.
在對最近的三維地震和環境噪聲層析成像調查結果進行處理和解釋後,將考慮在西南勘探區進一步的勘探鑽探。
The Texaco Deposit is expected to have an updated MRE as part of the Santa Cruz Copper Project Preliminary Feasibility Study on track to be completed by the end of Q2 2025. Exploration drilling continues to demonstrate the potential for future expansion of the mineral resources at the Santa Cruz Copper Project.
Texaco存款預計將在聖克魯斯銅項目的初步可行性研究中更新MRE,該研究預計將在2025年第二季度末完成。勘探鑽探繼續展示聖克魯斯銅項目未來擴展礦產資源的潛力。
Figure 1. Plan view map of the Santa Cruz Copper Project showing completed drill holes since the December 2022 MRE contained in the September 2023 Initial Assessment, the location of drill holes from the 2024 exploration program, and the location of cross-sections A to A' and B to B'.
圖1. 聖克魯斯銅項目的平面圖,顯示自2022年12月MRE以來完成的鑽孔,包含在2023年9月的初步評估中,2024年勘探計劃的鑽孔位置,以及A到A'和b到B'的橫截面位置。
Figure 2. Cross-section A to A' at the Santa Cruz Copper Project, looking northwest, of drilling at the Texaco Deposit, showing SCC-242 intersecting broad mineralization below cut-off grades on the right, the northeastern edge of the Texaco MRE, and Typhoon chargeability data.
圖2. 聖克魯斯銅項目的A到A'橫截面,朝西北方向,顯示在Texaco存款的鑽探,SCC-242在右側交匯到低於下限的廣泛礦化,Texaco MRE的東北邊緣,以及颱風電性數據。
Figure 3. Cross-section B to B' at the Santa Cruz Copper Project, looking northwest, of drilling at the Southwest Exploration Area, showing SCC-236 and SCC-238 intersecting mineralization below the cut-off grade, the southwestern edge of the Santa Cruz MRE, and Typhoon chargeability data.
圖3. 聖克魯斯銅項目的b到B'橫截面,朝西北方向,顯示在西南勘探區的鑽探,SCC-236和SCC-238交匯到低於下限的礦化,聖克魯斯MRE的西南邊緣,以及颱風電性數據。
Exploration drilling in the Battle Butte Area at the Hog Heaven Project intersected a porphyry copper-gold-molybdenum system within a large, deep Typhoon-identified anomaly
在Hog Heaven項目的Battle Butte區域的勘探鑽探中,發現了一個大型、深層的由Typhoon識別的黃銅礦銅金鉬系統。
Exploration drilling at the Hog Heaven Project in Montana included approximately 14,000 meters in eleven drill holes (Figure 4). Exploration efforts focused on identifying the extensions of shallow mineralization that characterized historical production near the Flathead Mine (refer to Ivanhoe Electric's April 2, 2024 news release) and exploring for porphyry systems in the Battle Butte Area associated with a deep Typhoon-generated anomaly.
霍格天堂項目在蒙大拿州的勘探鑽探包括約14,000米的11個鑽孔(見圖4)。勘探工作重點在於識別薄層礦化的延伸,這些礦化特徵曾在Flathead礦附近的歷史生產中出現(參見Ivanhoe Electric於2024年4月2日發佈的新聞稿),並探索與深層Typhoon生成的異常相關的Battle Butte區域的黃銅礦系統。
Exploration drilling in the Flathead Mine area included drill holes HHD-012 through to HHD-016, which intersected broad intervals of epithermal-type low-grade precious metals-bearing polymetallic sulfide mineralization hosted in veins, breccia matrix fill, and disseminations. Subsequent exploration focused on exploring porphyry copper systems.
Flathead礦區的勘探鑽探包括HHD-012至HHD-016的鑽孔,發現了寬廣間隔的熱液型低品位貴金屬含有多金屬硫化礦化,主要分佈在脈絡、角礫岩基質填充物及分散體中。後續勘探重點在於探索黃銅礦銅系統。
Initial drilling at the Battle Butte Area, HHD-017 through to HHD-022, has intersected a porphyry copper-gold-molybdenum system ("Battle Butte Porphyry") associated with a large, 1,500 meters by 1,000 meters Typhoon conductivity anomaly at 1,200 meters depth (Figure 5). Mineralization is related to a series of variably mineralized and altered porphyry intrusives and hydrothermal breccias hosting gold-bearing copper, iron, and molybdenum sulfides as breccia matrix, sheeted to stockwork veining and as disseminations.
在Battle Butte區域的初步鑽探,HHD-017至HHD-022,發現了與大型1,500米乘1,000米Typhoon電導異常相關的黃銅礦銅金鉬系統("Battle Butte Porphyry"),該異常深度爲1,200米(見圖5)。礦化與一系列具有不同礦化和變質特徵的黃銅礦侵入體和熱液角礫岩相關,宿主爲含金的銅、鐵和鉬硫化礦,形式包括角礫岩基質、片狀至網狀脈和分散體。
- Hole HHD-018: 286.0 meters @ 0.14% copper, 0.14 grams per tonne of gold, 0.01% molybdenum, and 1.70 grams per tonne of silver from 947.0 meters
- HHD-018孔:從947.0米處,286.0米 @ 0.14% 銅,0.14克/噸金,0.01% 鉬,和1.70克/噸白銀。
- Including 97.9 meters @ 0.21% copper, 0.20 grams per tonne of gold, 0.01% molybdenum, and 2.79 grams per tonne of silver from 947.0 meters
- 包括從947.0米處,97.9米 @ 0.21% 銅,0.20克/噸金,0.01% 鉬,和2.79克/噸白銀。
- Hole HHD-019: 680.0 meters @ 0.09% copper, 0.06 grams per tonne of gold, 0.02% molybdenum, and 0.96 grams per tonne of silver from 1,172.0 meters
- HHD-019孔:從1,172.0米處,680.0米 @ 0.09% 銅,0.06克/噸金,0.02% 鉬,和0.96克/噸白銀。
Five drill holes intersecting the Battle Butte Porphyry demonstrate a porphyry system believed to be starting at approximately 900 meters depth, with a vertical thickness of 800 meters, at least 600 meters by 400 meters in lateral dimension, and open to the east and northeast. Initial assay results show broad intervals of low-grade mineralization with a gold-to-copper ratio near one-to-one. Narrower but higher-grade sub-intervals are associated with the presence of the higher-grade copper sulfide mineral bornite (approximately 63% copper by weight), where the gold-to-copper ratio starts to increase.
穿過Battle Butte Porphyry的五個鑽孔表明一個約在900米深處開始的黃銅礦系統,垂直厚度爲800米,橫向尺寸至少爲600米乘400米,並向東和東北開放。初步化驗結果顯示出寬闊的低品位礦化區間,金銅比接近1:1。較窄但品位較高的子區間與高品位銅硫化礦bornite(約63% 銅重量)相關,金銅比開始增加。
Current evidence suggests that the Battle Butte Porphyry system is open to the east and north, where the Typhoon anomaly remains untested at depth. Exploration in 2025 will continue to test the Battle Butte Porphyry, searching for higher-grade copper-gold zones and the presence of additional porphyry centers across the project.
當前證據表明,Battle Butte 磁鐵礦體系統在東部和北部是開放的,其中 Typhoon 異常在深度上仍未經過測試。2025年的探索將繼續測試 Battle Butte 磁鐵礦體,尋找更高品位的銅金礦區以及項目範圍內其他磁鐵礦中心的存在。
Ivanhoe Electric has leased a further 4,925 acres of private surface and mineral rights at the Hog Heaven Project from a private owner, consolidating the district and providing additional access to areas prospective for porphyry systems.
Ivanhoe Electric 從私人所有者那裏租賃了 Hog Heaven 項目進一步的4,925英畝私有地表和礦權,整合地區並提供額外的通往有前景的磁鐵礦系統區域的通道。
Figure 4. Plan view map of the Hog Heaven Project showing drill holes and their traces from the 2024 exploration program, newly leased land, and the location of cross-section A to A'.
圖4. Hog Heaven 項目的平面圖,顯示了2024年勘探計劃的鑽孔及其軌跡、新租賃土地以及截面 A 到 A' 的位置。
Figure 5. Cross-section A to A' at the Hog Heaven Project, looking northeast, of drilling at the Battle Butte Porphyry, showing Typhoon conductivity (left), drill holes, assay results, and simplified geology and alteration (right).
圖5. Hog Heaven 項目中的截面 A 到 A',向東北方向查看 Battle Butte 磁鐵礦體的鑽探,顯示了 Typhoon 導電性(左),鑽孔,分析結果,以及簡化的地質與變質情況(右)。
Exploration drilling at the Tintic Project targeted Typhoon-generated anomalies and continues to explore at depth for a large porphyry copper system
Tintic 項目的勘探鑽探以 Typhoon 產生的異常爲目標,繼續在深度探索大型磁鐵礦銅系統。
Exploration drilling at the Tintic Project in 2024 included nearly 6,500 meters in five deep drill holes drilled in a continuous program from January to November (Figure 6). Drilling in 2024 focused on exploring the areas below the Mammoth Mine and deep Typhoon anomalies in the Mammoth Area. Difficult drilling conditions slowed the progress of exploration in the Mammoth Area.
2024年 Tintic 項目的勘探鑽探包括近6,500米的五個深孔鑽探,持續從1月到11月進行(圖6)。2024年的鑽探重點探索 Mammoth Mine 下方的區域以及 Mammoth 區域深處的 Typhoon 異常。困難的鑽探條件減緩了對 Mammoth 區域探索的進展。
While the porphyry copper source that we believe is the originator of the Tintic district's high-sulfidation epithermal metal endowment has yet to be discovered, drilling this year intersected narrow intervals of precious metals-bearing carbonate-replacement-type mineralization, characterizing the distal expressions of a porphyry system. Exploration drilling and subsequent geological studies have provided valuable data used to refine our current geological understanding and inform future exploration efforts. Recent analysis of drill core and geophysical data, including Computational Geoscience Inc.'s updated merged inversion of deep-penetrating Typhoon and magnetotelluric geophysical data will be used to refine porphyry copper exploration at the Tintic Project in 2025.
儘管我們認爲這與 Tintic 地區的高硫化熱液金屬賦存相關的磁鐵礦銅源尚未被發現,但今年的鑽探交叉了狹窄的貴金屬礦化碳酸鹽替代類型的間隔,特徵是磁鐵礦系統的遠端表現。勘探鑽探和後續的地質研究提供了用於完善我們當前地質理解和指導未來勘探工作的寶貴數據。最近對鑽芯和地球物理數據的分析,包括計算地質科學公司的更新合併反演深度穿透的 Typhoon 和電磁地球物理數據,將用於在2025年進一步完善 Tintic 項目的磁鐵礦銅勘探。
Figure 6. Plan view map of the Tintic Project showing drill holes and their traces from the 2024 exploration program.
圖6. Tintic項目的平面圖,顯示2024年勘探計劃中的鑽孔及其軌跡。
Ivanhoe Electric efficiently evaluated several early-stage exploration opportunities across the Southwest U.S.
Ivanhoe Electric有效評估了美國西南部幾個早期勘探機會。
Exploration activities across Ivanhoe Electric's early-stage U.S. portfolio in 2024 included geological mapping, geochemical sampling, airborne and ground-based geophysical surveying, and geological studies. Exploration drill programs were completed at Bitter Creek (Arizona), Unity (Oregon), and White Hill (Nevada) and included approximately 5,000 meters. Drilling did not intersect significant mineralization but demonstrated Ivanhoe Electric's ability to use our technology-driven exploration platform to test numerous large-scale porphyry copper and skarn concepts efficiently. Data compilation and interpretation are ongoing and will inform subsequent exploration programs.
2024年,Ivanhoe Electric在美國早期投資組合中的勘探活動包括地質製圖、地球化學取樣、空中和地面地球物理勘測以及地質研究。勘探鑽探計劃在阿里ゾ納州的Bitter Creek、俄勒岡州的Unity和內華達州的White Hill完成,總計約5,000米。鑽探沒有發現顯著的礦化,但展示了Ivanhoe Electric運用我們技術驅動的勘探平台高效測試衆多大型斑岩銅礦和含金礦概念的能力。數據編制和解釋工作正在進行中,將爲後續勘探計劃提供信息。
Ivanhoe Electric is continually assessing and evaluating the next generation of earlier-stage exploration concepts to grow our exploration pipeline.
Ivanhoe Electric始終在評估和評估下一代早期勘探概念,以拓展我們的勘探管道。
Highlighted new drill intercepts from the Southwest Exploration Area and Texaco Deposit at the Santa Cruz Copper Project (Refer to the Santa Cruz Drill Results page on Ivanhoe Electric's website for complete details of all reported drill holes.)
來自聖克魯斯銅項目南部勘探區和Texaco礦牀的新鑽探截獲亮點(有關所有報告鑽孔的完整細節,請參閱Ivanhoe Electric網站上的聖克魯斯鑽探結果頁面)。
DRILL HOLE |
LOCATION |
FROM (M) |
TO (M) |
INTERVAL LENGTH (M) |
TOTAL COPPER (%) |
SCC-238 | Southwest Exploration Area | 883.05 | 889.75 | 6.70 | 0.75 |
SCC-242 | Texaco Deposit | 895.60 | 959.00 | 63.40 | 1.70 |
INCLUDING | 897.35 | 923.00 | 25.65 | 2.00 | |
INCLUDING | 927.00 | 959.00 | 32.00 | 1.62 | |
AND | 1045.00 | 1059.00 | 14.00 | 1.14 | |
INCLUDING | 1047.00 | 1053.00 | 6.00 | 1.46 | |
AND | 1073.00 | 1095.00 | 22.00 | 1.33 | |
INCLUDING | 1077.00 | 1095.00 | 18.00 | 1.42 | |
SCC-248 | Texaco Deposit | 859.00 | 869.00 | 10.00 | 1.19 |
AND | 877.00 | 901.00 | 24.00 | 1.06 | |
AND | 916.00 | 922.00 | 6.00 | 1.71 | |
SCC-249 | Texaco Deposit | 923.40 | 959.00 | 35.60 | 1.37 |
INCLUDING | 923.40 | 949.45 | 26.05 | 1.56 | |
AND | 1012.00 | 1018.00 | 6.00 | 1.13 | |
AND | 1026.00 | 1044.24 | 18.24 | 0.97 | |
INCLUDING | 1026.00 | 1036.00 | 10.00 | 1.04 | |
AND | 1088.00 | 1096.46 | 8.46 | 1.01 |
鑽探 鑽孔 |
地點 | 來自 (M) |
至 (M) |
時間間隔 長度 (M) |
總計 銅 (%) |
SCC-238 | 西南勘探區域 | 883.05 | 889.75 | 6.70 | 0.75 |
SCC-242 | 德克薩斯公司存入資金 | 895.60 | 959.00 | 63.40 | 1.70 |
包括 | 897.35 | 923.00 | 25.65 | 2.00 | |
包括 | 927.00 | 959.00 | 32.00 | 1.62 | |
與 | 1045.00 | 1059.00 | 14.00 | 1.14 | |
包括 | 1047.00 | 1053.00 | 6.00 | 1.46 | |
與 | 1073.00 | 1095.00 | 22.00 | 1.33 | |
包括 | 1077.00 | 1095.00 | 18.00 | 1.42 | |
SCC-248 | 德克薩斯公司存入資金 | 859.00 | 869.00 | 10.00 | 1.19 |
與 | 877.00 | 901.00 | 24.00 | 1.06 | |
與 | 916.00 | 922.00 | 6.00 | 1.71 | |
SCC-249 | 德克薩斯公司存入資金 | 923.40 | 959.00 | 35.60 | 1.37 |
包括 | 923.40 | 949.45 | 26.05 | 1.56 | |
與 | 1012.00 | 1018.00 | 6.00 | 1.13 | |
與 | 1026.00 | 1044.24 | 18.24 | 0.97 | |
包括 | 1026.00 | 1036.00 | 10.00 | 1.04 | |
與 | 1088.00 | 1096.46 | 8.46 | 1.01 |
*Reported intervals at the Southwest Exploration Area are calculated at a cut-off grade of 0.70% total copper.
*Reported intervals at the Texaco Deposit are calculated at a cut-off grade of 0.80% total copper.
*Results are derived from diamond core intervals and may not be true widths but are believed to be representative of actual drill thicknesses.
*Some rounding errors may occur.
*在西南勘探區報告的區間是按照0.70%的銅總含量的截止品位計算的。
*在德克薩斯存款報告的區間是按照0.80%的銅總含量的截止品位計算的。
*結果來源於金剛石岩心區間,可能不是實際寬度,但被認爲代表實際鑽探厚度。
*可能會出現一些四捨五入誤差。
Highlighted new epithermal-type drill intercepts from the Battle Butte Area at the Hog Heaven Project.
*在霍格天堂項目的戰鬥山區域強調新的岩漿型鑽探攔截。
DRILL HOLE |
LOCATION |
FROM (M) |
TO (M) |
INTERVAL LENGTH (M) |
COPPER EQUIVA-LENCY (%) |
SILVER (G/T) |
GOLD (G/T) |
COPPER (%) |
LEAD (%) |
ZINC (%) |
HHD-017 | Battle Butte Porphyry | 755.49 | 765.00 | 9.51 | 2.17 | 127.43 | 0.12 | 0.45 | 0.84 | 1.11 |
鑽探 鑽孔 |
地點 | 來自 (M) |
至 (M) |
區間 長度 (M) |
銅 等效性 (%) |
白銀 (克/噸) |
黃金 (克/噸) |
銅 (%) |
鉛 (%) |
鋅 (%) |
HHD-017 | 戰鬥鴉片岩 | 755.49 | 765.00 | 9.51 | 2.17 | 127.43 | 0.12 | 0.45 | 0.84 | 1.11 |
*The following long-term metal prices were used: $3.80/lb Cu, $1,707/oz Au, $22.42/oz Ag, $0.93/lb Pb, and $1.19/lb Zn.
* The specific formula used to report CuEq (%) is Cu% + ((0.655) * Au(g/t)) + ((0.009) * Ag(g/t)) + (0.245) * Pb (%)) + ((0.313) * Zn (%)).
*Flat recoveries of 100% were used for metal equivalency calculations.
*Intervals were derived on a CuEq basis with a cutoff of 0.1% CuEq.
*Maximum internal dilution of 5 meters was applied.
*Copper assays were capped at 10% for interval calculations.
*These are not true widths.
*以下長期金屬價格被使用:$3.80/磅 銅, $1,707/盎司 黃金, $22.42/盎司 白銀, $0.93/磅 鉛,和 $1.19/磅 鋅。
*報告CuEq(%)的具體公式爲:Cu% + ((0.655) * 黃金(g/t)) + ((0.009) * 白銀(g/t)) + (0.245) * 鉛(%) + ((0.313) * 鋅(%))。
*金屬等價計算使用了100%的平坦回收率。
*區間是基於CuEq計算得出的,截止值爲0.1% CuEq。
*最大內部稀釋爲5米。
*銅分析在區間計算中限制爲10%。
*這些不是實際寬度。
Highlighted new porphyry-type drill intercepts from the Battle Butte Area at the Hog Heaven Project.
在Hog Heaven項目的Battle Butte地區,高亮顯示新的斑岩型鑽探攔截。
DRILL HOLE |
LOCATION |
FROM (M) |
TO (M) |
INTERVAL LENGTH (M) |
COPPER EQUIVA- LENCY (%) |
COPPER (%) |
GOLD (G/T) |
MOLYB- DENUM (%) |
SILVER (G/T) |
HHD-018 | Battle Butte Porphyry | 947.00 | 1233.00 | 286.00 | 0.29 | 0.14 | 0.14 | 0.01 | 1.70 |
INCLUDING | 947.00 | 1044.85 | 97.85 | 0.40 | 0.21 | 0.20 | 0.01 | 2.79 | |
HHD-019 | Battle Butte Porphyry | 1172.00 | 1852.00 | 680.00 | 0.20 | 0.09 | 0.06 | 0.02 | 0.96 |
鑽探 鑽孔 |
地點 | 來自 (M) |
至 (M) |
區間 長度 (M) |
銅 等價 性 (%) |
銅 (%) |
黃金 (克/噸) |
鉬 鎢 (%) |
白銀 (克/噸) |
HHD-018 | 戰鬥鴉片岩 | 947.00 | 1233.00 | 286.00 | 0.29 | 0.14 | 0.14 | 0.01 | 1.70 |
包括 | 947.00 | 1044.85 | 97.85 | 0.40 | 0.21 | 0.20 | 0.01 | 2.79 | |
HHD-019 | 戰鬥鴉片岩 | 1172.00 | 1852.00 | 680.00 | 0.20 | 0.09 | 0.06 | 0.02 | 0.96 |
*The following long-term metal prices were used: $3.80/lb Cu, $1,707/oz Au, $22.42/oz Ag, and $16.00/lb Mo.
*The specific formula used to report CuEq (%) is Cu % + ((0.655) * Au(g/t)) + ((0.009) * Ag(g/t)) + ((4.211) * Mo (%)).
*Flat recoveries of 100% were used for metal equivalency calculations.
*Intervals were derived on a CuEq basis with a cutoff of 0.10% CuEq.
*Maximum internal dilution of 5 meters was applied for drill holes HHD-018 and HHD-019.
*Copper assays were capped at 10% for interval calculations.
*These are not true widths.
*以下長期金屬價格被使用:$3.80/磅 銅,$1,707/盎司 黃金,$22.42/盎司 白銀,以及$16.00/磅 鉬。
*報告銅當量(%)所使用的具體公式是:銅 % + ((0.655) * 黃金(g/t)) + ((0.009) * 白銀(g/t)) + ((4.211) * 鉬 (%)).
*金屬等價計算使用了100%的平坦回收率。
*間隔是基於銅當量計算得出的,截止值爲0.10%銅當量。
*對鑽孔HHD-018和HHD-019應用了最大內部稀釋5米的規定。
*銅測定值在間隔計算中限制爲10%。
*這些不是實際寬度。
Highlighted new drill intercepts from the Mammoth Area at the Tintic Project.
突出顯示了Tintic項目Mammoth區域的新鑽探截面。
DRILL HOLE |
LOCATION |
FROM (M) |
TO (M) |
INTERVAL LENGTH (M) |
SILVER (G/T) |
GOLD (G/T) |
COPPER (%) |
TTD-018A | Mammoth Mine Area |
1044.00 | 1044.25 | 0.25 | 310.00 | 0.83 | 1.16 |
TTD-018B | Mammoth Mine Area |
745.85 | 746.20 | 0.35 | 85.30 | 138.00 | 0.07 |
鑽探 鑽孔 |
地點 | 來自 (M) |
至 (M) |
區間 長度 (M) |
白銀 (克/噸) |
黃金 (克/噸) |
銅 (%) |
TTD-018A | 猛獁象 礦區 |
1044.00 | 1044.25 | 0.25 | 310.00 | 0.83 | 1.16 |
TTD-018B | 猛獁象 礦區 |
745.85 | 746.20 | 0.35 | 85.30 | 138.00 | 0.07 |
*These are not true widths.
*這些不是實際寬度。
Qualified Persons
合格人員
Disclosures of a scientific or technical nature included in this news release, including the sampling, analytical and technical data underlying the information, have been reviewed, verified, and approved by Glen Kuntz, P.Geo. (Santa Cruz) and Shawn Vandekerkhove, P.Geo. (Hog Heaven and Tintic), each of whom is a Qualified Person as defined by Regulation S-K, Subpart 1300 promulgated by the U.S. Securities and Exchange Commission and by Canadian National Instrument 43-101. Both Mr. Kuntz and Mr. Vandekerkhove are employees of Ivanhoe Electric Inc.
本新聞稿中包含的科學或技術性質的披露,包括抽樣、分析和技術數據,均已由Glen Kuntz(地質工程師,Santa Cruz)和Shawn Vandekerkhove(地質工程師,Hog Heaven和Tintic)審查、驗證並批准,每位都是根據美國證券交易委員會發佈的法規S-K,子部分1300和加拿大國家工具43-101定義的合格人員。Kuntz先生和Vandekerkhove先生均爲Iv淌克電氣公司的僱員。
For more information about data verification, exploration procedures and other matters relevant to the scientific and technical disclosure contained in this news release, please see Ivanhoe Electric's website and its filings with the U.S. Securities and Exchange Commission and Canadian Securities Administrators.
有關數據驗證、勘探程序及與本新聞稿中包含的科學和技術披露相關的其他事項的更多信息,請訪問Iv淌克電氣公司的官方網站及其在美國證券交易委員會和加拿大證券管理局的備案。
Other Technical Information
其他技術信息
Ivanhoe Electric employs industry standard QA/QC and data verification protocols at the Tintic and Hog Heaven projects. The diamond drill holes were completed using PQ, HQ, and NQ diameters. The drill core was cut lengthwise into halves using a diamond-bladed saw, with one-half used for the assay sample and the other half retained in core boxes and archived at site. Pulps and rejects are also stored on site for archival purposes. Mineralized zones were generally sampled on 2 meter intervals. Each core sample was placed into a bag with a unique numbered sample identification tag. Quality control samples were inserted between core samples using the same numbering sequence. Then samples were grouped into batches for shipping and laboratory submissions. Chain of custody records are maintained for sample shipments and the custody is transferred from Ivanhoe Electric expeditor to the laboratory upon delivery. Tintic core samples were shipped to ALS Laboratories in Twin Falls, Idaho, and ALS Laboratories in Elko, Nevada for sample preparation and analysis. Hog Heaven core samples were shipped to ALS Laboratories in Twin Falls, Idaho, for sample preparation and analysis. Samples were analyzed using customary four acid digestion and ICP-MS finish. A standard gold fire assay package was used to analyze gold. Silver content was assessed using either HCl leach and ICP-AES finish or fire assay with gravimetric finish depending on silver concentrations. ALS Minerals Twin Falls and ALS Laboratories in Elko, Nevada are both independent laboratories certified under ISO 9001:2008 and accredited under ISO/IEC 17025:2005 by the Standards Council of Canada.
Iv淌克電氣在Tintic和Hog Heaven項目中採用行業標準的QA/QC和數據驗證協議。金剛石鑽孔採用PQ、HQ和NQ直徑完成。鑽芯用金剛石刀鋸縱向切割成兩半,一半用於分析樣品,另一半保留在芯盒中並存檔於現場。脈石和廢料也存放在現場以供歸檔。礦化帶通常每隔2米進行抽樣。每個岩心樣品放入一個帶有獨特編號的樣品識別標籤的袋中。質量控制樣品按相同編號順序插入岩心樣品之間。然後將樣品分組以便交通和實驗室提交。樣品交通的保管鏈記錄被維護,並在交付時由Iv淌克電氣的快速通道轉移給實驗室。Tintic的岩心樣品被運送到愛達荷州雙瀑布市的ALS實驗室和內華達州埃爾科的ALS實驗室進行樣品準備和分析。Hog Heaven的岩心樣品被運送到愛達荷州雙瀑布市的ALS實驗室進行樣品準備和分析。樣品使用傳統的四酸消化和ICP-MS法進行分析。使用標準的黃金火焰分析包分析黃金。白銀含量的評估使用HCl浸出和ICP-AES法或火焰分析與重力法,具體取決於白銀濃度。阿爾斯礦業雙瀑布和內華達州埃爾科的ALS實驗室均爲獲得ISO 9001:2008認證的獨立實驗室,並根據加拿大標準委員會的ISO/IEC 17025:2005認證。
About Ivanhoe Electric
關於伊凡霍電氣
We are a U.S. company that combines advanced mineral exploration technologies with electric metals exploration projects predominantly located in the United States. We use our accurate and powerful Typhoon geophysical surveying system, together with advanced data analytics provided by our subsidiary, Computational Geosciences Inc., to accelerate and de-risk the mineral exploration process as we seek to discover new deposits of critical metals that may otherwise be undetectable by traditional exploration technologies. We believe the United States is significantly underexplored and has the potential to yield major new discoveries of critical metals. Our mineral exploration efforts focus on copper as well as other metals including nickel, vanadium, cobalt, platinum group elements, gold and silver. Through the advancement of our portfolio of electric metals exploration projects, headlined by the Santa Cruz Copper Project in Arizona and the Tintic Copper-Gold Project in Utah, as well as other exploration projects in the United States, we intend to support United States supply chain independence by finding and delivering the critical metals necessary for the electrification of the economy. We also operate a 50/50 joint venture with Saudi Arabian Mining Company Ma'aden to explore for minerals on ~48,500 km2 of underexplored Arabian Shield in the Kingdom of Saudi Arabia.
我們是一家美國公司,結合了先進的礦產勘探技術與主要位於美國的電金屬勘探項目。我們利用準確而強大的颱風地球物理勘測系統,以及我們的子公司計算地質科學公司提供的先進數據分析,來加速和降低礦產勘探過程的風險,以尋求發現可能無法通過傳統勘探技術探測到的新關鍵金屬礦藏。我們相信美國的勘探程度顯著不足,有潛力帶來主要的新關鍵金屬發現。我們的礦產勘探工作專注於銅以及其他金屬,包括鎳、釩、鈷、鉑族元素、黃金和白銀。通過我們電金屬勘探項目投資組合的推進,重點是位於亞利桑那州的聖克魯斯銅項目和猶他州的丁提克銅金項目,以及美國的其他勘探項目,我們計劃通過發現和提供經濟電氣化所需的關鍵金屬,支持美國供應鏈的獨立性。我們還與沙特阿拉伯礦業公司Ma'aden共同經營一個50/50的合資企業,探索位於沙特阿拉伯王國約48,500平方公里未被充分勘探的阿拉伯盾上的礦產。
Website:
網站:
Contact Information
聯繫信息
Mike Patterson
Vice President, Investor Relations and Business Development
Email: mike@ivnelectric.com
Phone: 1-480-601-7878
邁克·帕特森
副總裁,投資者關係和業務拓展
電子郵件:mike@ivnelectric.com
電話:1-480-601-7878
Follow us on X
請在X上關注我們
Ivanhoe Electric's Executive Chairman Robert Friedland: @robert_ivanhoe
伊凡霍電氣的執行董事長羅伯特·弗裏德蘭: @robert_ivanhoe
Ivanhoe Electric: @ivanhoeelectric
伊凡霍電氣: @ivanhoeelectric
Ivanhoe Electric's investor relations website located at should be considered Ivanhoe Electric's recognized distribution channel for purposes of the Securities and Exchange Commission's Regulation FD.
伊凡霍電氣的投資者關係網站應被視爲伊凡霍電氣在證券交易委員會的法規FD目的下認可的分銷渠道。
Forward-Looking Statements
前瞻性聲明
Certain statements in this news release constitute "forward-looking statements" or "forward-looking information" within the meaning of applicable U.S. and Canadian securities laws. Such statements and information involve known and unknown risks, uncertainties and other factors that may cause the actual results, performance or achievements of Ivanhoe Electric, its projects, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. Such statements can be identified by the use of words such as "may", "would", "could", "will", "intend", "expect", "believe", "plan", "anticipate", "estimate", "scheduled", "forecast", "predict" and other similar terminology, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. These statements reflect Ivanhoe Electric's current expectations regarding future events, performance and results and speak only as of the date of this news release.
本新聞稿中的某些陳述構成適用的美國和加拿大證券法意義上的「前瞻性陳述」或「前瞻性信息」。這些陳述和信息涉及已知和未知的風險、不確定性以及其他可能導致伊凡霍電氣、其項目或行業結果的實際結果、績效或成就與這些前瞻性陳述或信息所表達或暗示的任何未來結果、績效或成就存在實質性差異的因素。這樣的陳述可以通過使用「可能」、「會」、「能夠」、「將」、「打算」、「期待」、「相信」、「計劃」、「預期」、「估計」、「安排」、「預測」、「猜測」和其他類似術語來識別,或聲明某些行動、事件或結果「可能」、「能夠」、「會」、「可能」或「將」被採取、發生或實現。這些陳述反映了伊凡霍電氣對未來事件、績效和結果的當前預期,僅在本新聞稿發佈之日有效。
Such statements in this news release include, without limitation statements regarding the ability and success of Typhoon and Computational Geoscience Inc. to guide technology-led exploration efforts in the United States, continued drilling operations at Santa Cruz, Hog Heaven and Tintic, and the timing and results of drilling operations, the future exploration drilling around the Southwest Exploration and Texaco Areas and the potential for long-term growth at the Santa Cruz Copper Project, the timing and ability to complete the Santa Cruz Project Preliminary Feasibility Study by end of Q2 2025, continued exploration to test the Battle Butte Porphyry, the existence of higher-grade copper-gold zones and the presence of additional porphyry centers across the Hog Heaven Project, the potential for the discovery of a porphyry copper system at the Tintic Project, ongoing data compilation, interpretation and subsequent exploration programs at early stage exploration opportunities, including at Bitter Creek (Arizona), Unity (Oregon), and White Hill (Nevada), the potential for discovery of new deposits of critical metals, our goal of finding and delivering the critical metals necessary for the electrification of the economy, and other planned or potential developments in the businesses of Ivanhoe Electric.
本新聞稿中的這些陳述包括但不限於關於颱風和計算地球科學公司在美國引導科技主導的勘探工作的能力和成功的陳述,關於聖克魯斯、霍格天堂和廷提克的持續鑽探作業,以及鑽探作業的時間和結果,針對西南勘探和德克薩斯公司區域的未來勘探鑽探以及在聖克魯斯銅項目的長期增長潛力,2025年第二季度末完成聖克魯斯項目初步可行性研究的時間和能力,持續勘探測試戰鬥山輝巖,存在高品位銅金礦帶和霍格天堂項目中的其他輝巖中心,廷提克項目中發現輝巖銅系統的潛力,正在進行的數據彙編、解釋以及早期階段勘探機會的後續勘探計劃,包括在白河(亞利桑那州)、團結(俄勒岡州)和白山(內華達州),發現新關鍵金屬儲藏的潛力,我們發現和提供經濟電氣化所需關鍵金屬的目標,以及伊凡霍電氣業務中的其他計劃或潛在發展。
Forward-looking statements are based on management's beliefs and assumptions and on information currently available to management. Such statements are subject to significant risks and uncertainties, and actual results may differ materially from those expressed or implied in the forward-looking statements due to various factors, including changes in the prices of copper or other metals Ivanhoe Electric is exploring for; the results of exploration and drilling activities and/or the failure of exploration programs or studies to deliver anticipated results or results that would justify and support continued exploration, studies, development or operations; the final assessment of exploration results and information that is preliminary; the significant risk and hazards associated with any future mining operations, extensive regulation by the U.S. government as well as local governments; changes in laws, rules or regulations, or their enforcement by applicable authorities; the failure of parties to contracts with Ivanhoe Electric to perform as agreed; and the impact of political, economic and other uncertainties associated with operating in foreign countries, and the impact of the COVID-19 pandemic and the global economy. These factors should not be construed as exhaustive and should be read in conjunction with the other cautionary statements and risk factors described in Ivanhoe Electric's Annual Report on Form 10-K filed with the U.S. Securities and Exchange Commission.
前瞻性聲明基於管理層的信念和假設,以及目前可供管理層使用的信息。這些聲明面臨重大風險和不確定性,實際結果可能因各種因素而與前瞻性聲明中表達或暗示的結果存在重大差異,包括銅或其他金屬的價格變化,Ivanhoe Electric正在進行勘探的金屬;勘探和鑽探活動的結果,以及勘探項目或研究未能提供預期結果或未能支撐持續勘探、研究、開發或運營的結果;勘探結果的最終評估和初步信息;與未來任何礦業操作相關的重大風險和危害,美國政府以及地方政府的嚴格監管;法律、規章或規則的變化,或其由相關權威機構的執行;與Ivanhoe Electric簽署合同的各方未能按約履行義務;在外國運營所面臨的政治、經濟和其他不確定性的影響,以及COVID-19疫情和全球經濟的影響。這些因素不應被視爲詳盡無遺,並應與Ivanhoe Electric在美國證券交易委員會提交的10-K表格年報中描述的其他警示性聲明和風險因素一起閱讀。
No assurance can be given that such future results will be achieved. Forward-looking statements speak only as of the date of this news release. Ivanhoe Electric cautions you not to place undue reliance on these forward-looking statements. Subject to applicable securities laws, Ivanhoe Electric does not assume any obligation to update or revise the forward-looking statements contained herein to reflect events or circumstances occurring after the date of this news release, and Ivanhoe Electric expressly disclaims any requirement to do so.
無法保證未來的這些結果將會達到。前瞻性聲明僅在本新聞稿發佈之日有效。Ivanhoe Electric提醒您不要對這些前瞻性聲明過於依賴。根據適用的證券法,Ivanhoe Electric不承擔任何義務更新或修訂此處的前瞻性聲明,以反映本新聞稿發佈後發生的事件或情況,並且Ivanhoe Electric明確否認有此要求。