Eloro Resources Continues to Intersect Long Intervals of High-Grade Silver-Tin Polymetallic Mineralization in Its Definition Drilling Program at Its Iska Iska Deposit, Potosi Department, Bolivia
Eloro Resources Continues to Intersect Long Intervals of High-Grade Silver-Tin Polymetallic Mineralization in Its Definition Drilling Program at Its Iska Iska Deposit, Potosi Department, Bolivia
- Hole DSB-69 intersected 127.49g Ag/t, 0.50% Zn, 0.16% Pb and 0.31% Sn (193.00g Ag eq/t) over 41.25m within a broader interval of 49.71g Ag/t, 0.78% Zn, 0.32% Pb and 0.15% Sn (106.97g Ag eq/t) over 142.50m.
- Hole DSB-70 intersected, 45.71g Ag/t, 3.11% Zn, 1.91% Pb and 0.23% Sn (232.35g Ag eq/t) over 81.00m within a broader interval of 30.08g Ag/t, 1.63% Zn 0.98% Pb and 0.13% Sn (127.89g Ag eq/t) over 255.75m
- Hole DSB-71 intersected 53.17 Ag/t, 0.72% Zn, 0.40% Pb and 0.19% Sn (116.62 g Ag eq/t) over 45.00m within a broader interval of 29.26 Ag/t, 0.58% Zn, 0.22% Pb and 0.11% Sn (71.46g Ag eq/t) over 127.50m.
- 孔DSb-69在4125萬米的範圍內發現了127.49克銀每噸、0.50%鋅、0.16%鉛和0.31%錫(193.00克銀當量每噸),寬度爲49.71克銀每噸、0.78%鋅、0.32%鉛和0.15%錫(106.97克銀當量每噸)在14250萬米的範圍內。
- 孔DSb-70在8100萬米的範圍內發現了45.71克銀每噸、3.11%鋅、1.91%鉛和0.23%錫(232.35克銀當量每噸),寬度爲30.08克銀每噸、1.63%鋅、0.98%鉛和0.13%錫(127.89克銀當量每噸)在255.75米的範圍內。
- 孔DSb-71在4500萬米的範圍內發現了53.17克銀每噸、0.72%鋅、0.40%鉛和0.19%錫(116.62克銀當量每噸),寬度爲29.26克銀每噸、0.58%鋅、0.22%鉛和0.11%錫(71.46克銀當量每噸)在12750萬米的範圍內。
- These assay results come from Eloro's ongoing Definition Drilling Program which continue to demonstrate the presence of strong, broad zones of silver-tin polymetallic mineralization with good continuity. The Company's current highly focused infill and step-out drill program encompasses the potential starter pit at Santa Barbara and is designed to;
- fill-in gaps that are presently categorized as low-grade or internal waste in the mineral resource model but, as demonstrated by the results reported in this press release, are actually moderate to strongly mineralized,
- better define the full vertical and lateral extent of high-grade Ag mineralization,
- expand higher-grade Sn mineralization to the west and north west, and
- provide two large size PQ holes for further metallurgical testing (see Eloro's September 4, 2024 press release).
- 這些化驗結果來自Eloro公司正在進行的定義鑽探計劃,該計劃繼續證明存在強大且寬泛的銀-錫多金屬礦化區域,且具有良好的連續性。該公司的當前高集中填充和擴展鑽探程序涵蓋了聖巴巴拉潛在的開採坑,並旨在;
- 填補當前在礦產資源模型中被分類爲低品位或內部廢料的空白區域,但正如本新聞稿中報告的結果所示,這些區域實際上是適度到強礦化的,
- 更好地界定高品位銀礦化的垂直和橫向範圍,
- 向西和西北擴展更高品位的錫礦化,
- 提供兩個大型PQ孔進行進一步的冶金測試(參見Eloro公司2024年9月4日的新聞稿)。
TORONTO, Jan. 06, 2025 (GLOBE NEWSWIRE) -- Eloro Resources Ltd. (TSX: ELO; OTCQX: ELRRF; FSE: P2QM) ("Eloro", or the "Company") is pleased to announce further assay results in its definition diamond drilling program in the potential Santa Barbara starter pit area in the Iska Iska silver-tin polymetallic project in the Potosi Department of southwestern Bolivia. To date 4,902.8m of diamond drilling have been completed in ten (10) holes including one (1) hole in progress at the time of the Christmas break. PQ core size has been used for all holes in this program to obtain larger, more representative core samples.
多倫多,2025年1月6日(全球資訊)——Eloro Resources Ltd.(TSX: ELO; OTCQX: ELRRF; FSE: P2QM)("Eloro"或"公司")很高興地宣佈在波利維亞西南部波託西地區的Iska Iska銀錫多金屬項目潛在的聖巴巴拉起步坑區域的定義鑽探計劃中進一步的分析結果。截至目前,490280萬的金剛石鑽探已在十個(10)個孔中完成,包括在聖誕假期時正在進行的一個(1)個孔。該計劃中所有孔均使用PQ核心尺寸,以獲得更大、更具代表性的核心樣本。
Table 1 below lists significant results for the three holes reported, DSB-69, DSB-70 and DSB-71. Figure 1 shows locations of all the definition drill holes completed to date and in progress. Silver equivalent values (g Ag eq/t) have been calculated using 3-year average metal prices and preliminary metallurgical recoveries (see note below Table 1 for more information). Table 2 lists the coordinates of the drill holes completed and in progress.
下表1列出了報告的三個孔的重大結果,分別爲DSb-69、DSb-70和DSb-71。圖1顯示了迄今完成和正在進行的所有定義鑽孔的位置。銀當量值(g Ag eq/t)是根據三年平均金屬價格和初步冶金回收率計算得出的(詳見表1下方的註釋)。下表2列出了已完成和正在進行的鑽孔座標。
Hole DSB-69, collared 160m southwest of previously reported drill hole DSB-68 (see Eloro press release of November 26, 2024) returned a long intersection grading 49.71g Ag/t, 0.78% Zn, 0.32% Pb and 0.15% Sn (106.97g Ag eq/t) over 142.50m from 258.00m to 400.50m. This intersection includes a higher grade interval of:
DSb-69孔,位於之前報告的DSb-68鑽孔(見Eloro於2024年11月26日的新聞稿)西南16000萬處,返回了一個長的交匯區,品位爲49.71g Ag/t,0.78% Zn,0.32% Pb和0.15% Sn(106.97g Ag eq/t),長度爲14250萬,從25800萬到40050萬。該交匯包括一個較高品位的區間:
- 127.49g Ag/t, 0.50% Zn, 0.16% Pb and 0.31% Sn (193.00g Ag eq/t) over 41.25m from 258.00m to 299.25m
- The strong tin mineralization in this intersection is very notable and indicates that this hole is starting to intersect the major tin-silver domain to the west and northwest
- 127.49g Ag/t,0.50% Zn,0.16% Pb和0.31% Sn(193.00g Ag eq/t),長度爲4125萬,從25800萬到299.25m
- 該交匯中的強錫礦化非常顯著,表明該孔開始與西部和西北部的主要錫銀區交匯。
This hole also intersected near-surface high-grade silver mineralization:
該孔還交會了近表面高品位的白銀礦化:
-
80.10g Ag/t, 0.17% Pb (84.25g Ag eq/t) over 30.00m from 1.50m to 31.50m
- 80.10克銀/噸,0.17%鉛(84.25克銀當量/噸)在3000萬從150萬到31.50米
Hole DSB-70, collared 100m northeast of hole DSB-68, returned a very long intersection grading 30.08g Ag/t, 1.63% Zn, 0.98% Pb and 0.13% Sn (127.89g Ag eq/t) over 255.75m from near surface at 55.05m to 310.80m. This intersection includes higher grade intervals of:
DSb-70孔,位於DSb-68孔以10000萬東北,返回了非常長的交會,品位爲30.08克銀/噸,1.63%鋅,0.98%鉛和0.13%錫(127.89克銀當量/噸),在25575萬從近表面5505萬到31080萬。這一交會包括更高品位的區間:
- 45.71g Ag/t, 3.11% Zn, 1.91% Pb and 0.23% Sn (232.35g Ag eq/t) over 81.00m from 112.80m to 193.80m, and
- 30.68g Ag/t, 2.38% Zn, 1.73% Pb and 0.18% Sn (180.91g Ag eq/t) over 19.50m from 229.80m to 249.30m.
- Like Hole DSB-69, this hole intercepted strong tin mineralization grading 0.43% Sn over 34.5m from 423.32m to 457.8m within a broader mineralized zone grading 14.38g Ag/t, 0.34% Zn, 0.36% Pb and 0.25% Sn (80.16g Ag eq/t) over 70.50m from 387.30m to 457.80m.
- 45.71克銀/噸,3.11%鋅,1.91%鉛和0.23%錫(232.35克銀當量/噸)在8100萬從11280萬到19380萬,以及
- 30.68克銀/噸,2.38%鋅,1.73%鉛和0.18%錫(180.91克銀當量/噸)在1950萬從22980萬到24930萬。
- 與DSb-69孔相似,該孔攔截到強烈的錫礦化,品位爲0.43%錫,覆蓋3450萬從42332萬到45780萬,在一個更廣泛的礦化帶內,品位爲14.38克銀/噸,0.34%鋅,0.36%鉛和0.25%錫(80.16克銀當量/噸),覆蓋7050萬從38730萬到45780萬。
Hole DSB-71, collared 100m south-southwest of hole DSB-69, returned two long mineralized intersections, the first grading 41.89g Ag/t, 0.15% Pb and 0.14% Sn (66.90g Ag eq/t) over 123.00m from 45.95m to 168.95m, and the second, 29.26g Ag/t, 0.58% Zn, 0.22% Pb and 0.11% Sn (71.46g Ag eq/t) over 127.50m from 233.45m to 360.95m This latter intersection includes a higher grade interval of:
Hole DSb-71, collared 10000萬 south-southwest of hole DSb-69, returned two long mineralized intersections, the first grading 41.89g Ag/t, 0.15% Pb and 0.14% Sn (66.90g Ag eq/t) over 12300萬 from 4595萬 to 16895萬, and the second, 29.26g Ag/t, 0.58% Zn, 0.22% Pb and 0.11% Sn (71.46g Ag eq/t) over 12750萬 from 23345萬 to 36095萬 This latter intersection includes a higher grade interval of:
-
53.17g Ag/t, 0.72% Zn, 0.40% Pb and 0.19% Sn (116.62g Ag eq/t) over 45.00m from 263.45m to 308.45m
- 53.17g Ag/t, 0.72% Zn, 0.40% Pb and 0.19% Sn (116.62g Ag eq/t) over 4500萬 from 26345萬 to 308.45m
This hole also intersected a near-surface high grade tin zone:
This hole also intersected a near-surface high grade tin zone:
- 11.84g Ag/t and 0.44% Sn (96.81g Ag eq/t) over 21.95m from 1.50m to 23.45m
- 11.84g Ag/t and 0.44% Sn (96.81g Ag eq/t) over 2195萬 from 150萬 to 23.45m
Similar to DSB-68, results from these three additional holes continue to demonstrate potential significant underestimation of the silver grade, similar to that of the previously reported metallurgical test results from a 6.3 tonne bulk sample which returned a much higher silver head grade of 91 g Ag/t compared to the grade of 31 g Ag/t obtained in the original twinned holes (see Eloro press release January 3, 2024).
Similar to DSb-68, results from these three additional holes continue to demonstrate potential significant underestimation of the silver grade, similar to that of the previously reported metallurgical test results from a 6.3 tonne bulk sample which returned a much higher silver head grade of 91 g Ag/t compared to the grade of 31 g Ag/t obtained in the original twinned holes (see Eloro press release January 3, 2024).
Dr. Osvaldo Arce, P.Geo., Eloro's Executive Vice President, Latin America and General Manager of Eloro's Bolivian subsidiary, Minera Tupiza S.R.L., said: "The success of our current definition drilling program is a confirmation of our understanding and experience on the property. These holes' locations were selected to specifically verify the continuation of the higher grade, large volume polymetallic areas in the extensive mineralized system at Iska Iska. These areas occur where mineralizing fluids were deposited through intrusion breccias and injection tourmaline breccias in favorable lithologies and structures forming enriched bodies with significant resource potential."
埃爾羅的執行副總裁、拉丁美洲及埃爾羅在玻利維亞子公司Minera Tupiza S.R.L.的總經理奧斯瓦爾多·阿爾斯博士(P.Geo.)表示:"我們當前定義鑽探項目的成功確認了我們對該地塊的理解和經驗。這些鑽孔的位置是專門選擇的,以確認在Iska Iska廣泛的礦化系統中,高品位、大量多金屬區域的延續。這些區域出現在礦化液體通過侵入角礫岩和注入電氣石角礫岩沉積的有利巖性和構造中,形成具有顯著資源潛力的富集體。"
Tom Larsen, CEO of Eloro, commented: "The latest reported infill drilling intercepts further demonstrates the consistency of potential commercial value per tonne that will be incorporated in the PEA in later 2025. These results continue to dispel any previous misinterpretation that there are extensive areas of waste in the overall mineralized zone. The continual higher-grades that are being reported in the silver-tin polymetallic system from this latest drilling campaign are only adding to the overall economic potential of the deposit."
埃爾羅的首席執行官湯姆·拉森評論道:"最新報告的填補鑽探截面進一步證明了潛在商業價值每噸的一致性,這將納入2025年稍後的初步經濟評估(PEA)中。這些結果繼續消除之前對整體礦化區存在廣泛廢石的誤解。從本次最新的鑽探活動報告的白銀-錫多金屬系統的持續高品位,進一步增強了該礦牀的整體經濟潛力。"
Table 1: Definition Diamond Drill Results as of January 6, 2025, Santa Barbara Deposit, Iska, Iska
表1:截至2025年1月6日,聖巴巴拉存款的定義金剛石鑽孔結果,Iska Iska
SANTA BARBARA DEFINITION DIAMOND DRILL RESULTS | ||||||||
Hole No. |
From (m) |
To (m) |
Length (m) |
Ag | Zn | Pb | Sn | Ag eq |
g/t | % | % | % | g/t | ||||
DSB-69 | 1.50 | 31.50 | 30.00 | 80.10 | 0.00 | 0.17 | 0.05 | 84.25 |
88.50 | 93.00 | 4.50 | 118.67 | 0.00 | 0.16 | 0.03 | 113.90 | |
120.00 | 181.50 | 61.50 | 44.85 | 0.21 | 0.35 | 0.09 | 72.94 | |
Incl. | 120.00 | 159.00 | 39.00 | 67.81 | 0.03 | 0.32 | 0.06 | 79.19 |
201.00 | 228.75 | 27.75 | 18.16 | 0.95 | 0.34 | 0.06 | 68.09 | |
258.00 | 400.50 | 142.50 | 49.71 | 0.78 | 0.32 | 0.15 | 106.97 | |
Incl. | 258.00 | 299.25 | 41.25 | 127.49 | 0.50 | 0.16 | 0.31 | 193.00 |
409.50 | 459.00 | 49.50 | 9.17 | 0.12 | 0.18 | 0.25 | 64.61 | |
DSB-70 | 55.05 | 310.80 | 255.75 | 30.08 | 1.63 | 0.98 | 0.13 | 127.89 |
Incl. | 112.80 | 193.80 | 81.00 | 45.71 | 3.11 | 1.91 | 0.23 | 232.35 |
Incl. | 229.80 | 249.30 | 19.50 | 30.68 | 2.38 | 1.73 | 0.18 | 180.91 |
387.30 | 457.80 | 70.50 | 14.38 | 0.34 | 0.36 | 0.25 | 80.16 | |
Incl. | 423.30 | 457.80 | 34.50 | 10.03 | 0.20 | 0.54 | 0.43 | 110.82 |
DSB-71 | 1.50 | 23.45 | 21.95 | 11.84 | 0.00 | 0.05 | 0.44 | 96.81 |
45.95 | 168.95 | 123.00 | 41.89 | 0.00 | 0.15 | 0.14 | 66.90 | |
Incl. | 45.95 | 63.95 | 18.00 | 73.25 | 0.00 | 0.19 | 0.06 | 79.88 |
Incl. | 110.45 | 123.95 | 13.50 | 54.67 | 0.00 | 0.18 | 0.21 | 92.73 |
195.95 | 224.45 | 22.50 | 51.79 | 0.02 | 0.04 | 0.14 | 74.29 | |
233.45 | 360.95 | 127.50 | 29.26 | 0.58 | 0.22 | 0.11 | 71.46 | |
Incl. | 263.45 | 308.45 | 45.00 | 53.17 | 0.72 | 0.40 | 0.19 | 116.62 |
396.95 | 405.95 | 9.00 | 121.00 | 0.26 | 0.16 | 0.06 | 131.44 | |
422.45 | 447.95 | 25.50 | 38.71 | 0.19 | 0.17 | 0.05 | 54.12 | |
456.95 | 459.95 | 3.00 | 216.00 | 0.84 | 0.33 | 0.03 | 232.14 | |
497.45 | 503.45 | 6.00 | 59.25 | 0.37 | 0.14 | 0.07 | 81.76 |
聖巴巴拉定義金剛石鑽孔結果 | ||||||||
孔號 |
深度(米) |
到(m) |
長度 (米) |
銀 | 鋅 | 市凈率 | 錫 | 銀當量 |
克每噸 | % | % | % | 克每噸 | ||||
DSb-69 | 1.50 | 31.50 | 30.00 | 80.10 | 0.00 | 0.17 | 0.05 | 84.25 |
88.50 | 93.00 | 4.50 | 118.67 | 0.00 | 0.16 | 0.03 | 113.90 | |
120.00 | 181.50 | 61.50 | 44.85 | 0.21 | 0.35 | 0.09 | 72.94 | |
包括。 | 120.00 | 159.00 | 39.00 | 67.81 | 0.03 | 0.32 | 0.06 | 79.19 |
201.00 | 228.75 | 27.75 | 18.16 | 0.95 | 0.34 | 0.06 | 68.09 | |
258.00 | 400.50 | 142.50 | 49.71 | 0.78 | 0.32 | 0.15 | 106.97 | |
包括。 | 258.00 | 299.25 | 41.25 | 127.49 | 0.50 | 0.16 | 0.31 | 193.00 |
409.50 | 459.00 | 49.50 | 9.17 | 0.12 | 0.18 | 0.25 | 64.61 | |
DSb-70 | 55.05 | 310.80 | 255.75 | 30.08 | 1.63 | 0.98 | 0.13 | 127.89 |
包括。 | 112.80 | 193.80 | 81.00 | 45.71 | 3.11 | 1.91 | 0.23 | 232.35 |
包括。 | 229.80 | 249.30 | 19.50 | 30.68 | 2.38 | 1.73 | 0.18 | 180.91 |
387.30 | 457.80 | 70.50 | 14.38 | 0.34 | 0.36 | 0.25 | 80.16 | |
包括。 | 423.30 | 457.80 | 34.50 | 10.03 | 0.20 | 0.54 | 0.43 | 110.82 |
DSb-71 | 1.50 | 23.45 | 21.95 | 11.84 | 0.00 | 0.05 | 0.44 | 96.81 |
45.95 | 168.95 | 123.00 | 41.89 | 0.00 | 0.15 | 0.14 | 66.90 | |
包括。 | 45.95 | 63.95 | 18.00 | 73.25 | 0.00 | 0.19 | 0.06 | 79.88 |
包括。 | 110.45 | 123.95 | 13.50 | 54.67 | 0.00 | 0.18 | 0.21 | 92.73 |
195.95 | 224.45 | 22.50 | 51.79 | 0.02 | 0.04 | 0.14 | 74.29 | |
233.45 | 360.95 | 127.50 | 29.26 | 0.58 | 0.22 | 0.11 | 71.46 | |
包括。 | 263.45 | 308.45 | 45.00 | 53.17 | 0.72 | 0.40 | 0.19 | 116.62 |
396.95 | 405.95 | 9.00 | 121.00 | 0.26 | 0.16 | 0.06 | 131.44 | |
422.45 | 447.95 | 25.50 | 38.71 | 0.19 | 0.17 | 0.05 | 54.12 | |
456.95 | 459.95 | 3.00 | 216.00 | 0.84 | 0.33 | 0.03 | 232.14 | |
497.45 | 503.45 | 6.00 | 59.25 | 0.37 | 0.14 | 0.07 | 81.76 |
Note: True width is approximately 80% of core length. Silver equivalent (Ag eq) grades are calculated using 3-year average metal prices of Ag = US$24.14/oz, Zn = US$1.36/lb , Pb = 0.98/lb and Sn = US$13.74/lb, and preliminary metallurgical recoveries of Ag = 88%, Zn = 87%, Pb= 80% and Sn = 50%. In selecting intervals, a cutoff grade of 30 g Ag eq/t has been used. Lower grade material may be included in intersections where geological continuity is warranted.
注意:真實寬度大約是核心長度的80%。銀當量(Ag eq)等級是使用3年平均金屬價格計算的,銀=24.14美元/盎司,鋅=1.36美元/磅,鉛=0.98美元/磅,錫=13.74美元/磅,並且初步冶金回收率爲銀=88%,鋅=87%,鉛=80%和錫=50%。在選擇區間時,使用了30克銀當量/噸的截止品位。低品位材料可以在地質連續性有保證的交集處納入。
Table 2: Summary of Diamond Drill Hole Coordinates for Drill Holes Reported, Completed and in Progress at Iska Iska as of January 6, 2025
表2:截至2025年1月6日,Iska Iska已報告、完成及正在進行的金剛石鑽孔座標彙總
SUMMARY DIAMOND DRILLING ISKA ISKA | |||||||
Hole No. | Type | Collar Easting | Collar Northing | Elev | Azimuth | Angle | Hole Length (m) |
Santa Barbara Surface Definition Drill Holes Reported and In Progress | |||||||
DSB-68 | S | 205390.0 | 7656251.0 | 4220.0 | 225° | -50° | 402.9 |
DSB-69 | S | 205262.0 | 7656133.0 | 4291.8 | 225° | -85° | 502.0 |
DSB-70 | S | 205460.0 | 7656319.0 | 4191.0 | 225° | -50° | 467.3 |
DSB-71 | S | 205203.0 | 7656016.0 | 4282.0 | 225° | -85° | 533.7 |
DSB-72 | S | 205088.0 | 7656107.0 | 4341.0 | 225° | -85° | 653.4 |
DSB-73 | S | 205291.0 | 7656269.0 | 4273.0 | 225° | -85° | 479.6 |
DSB-74 | S | 205205.0 | 7656072.0 | 4305.6 | 225° | -75° | 470.5 |
DSB-75 | S | 205310.0 | 7656329.0 | 4257.0 | 225° | -85° | 527.4 |
DSB-76 | S | 205022.0 | 7656003.0 | 4342.0 | 225° | -85° | 356.6* |
Subtotal | 4,393.4 | ||||||
Southeast Extension Exploration Drilling | |||||||
DSE-01 | S | 206198.0 | 7655779.0 | 4000.0 | 225° | -65° | 509.4 |
Subtotal | 509.4 | ||||||
TOTAL | 4,902.8 | ||||||
*= hole in progress S = Surface; collar coordinates in metres; azimuth and dip in degrees. Total drilling since start of the definition drilling program on October 4, 2024 is 4,902.8m in 10 holes with 1 hole in progress. Since the start of the drilling at Iska Iska on September 20, 2020, a total of 108,101m in 166 drill holes (34 underground holes and 132 surface holes) have been completed. |
總結金剛石鑽探 Iska Iska | |||||||
孔號 | Type | 鑽孔東座標 | 鑽孔北座標 | 高程 | 方位 | 角度 | 孔長 (米) |
聖巴巴拉表面定義鑽孔報告及進行中 | |||||||
DSb-68 | S | 205390.0 | 7656251.0 | 4220.0 | 225° | -50° | 402.9 |
DSb-69 | S | 205262.0 | 7656133.0 | 4291.8 | 225° | -85° | 502.0 |
DSb-70 | S | 205460.0 | 7656319.0 | 4191.0 | 225° | -50° | 467.3 |
DSb-71 | S | 205203.0 | 7656016.0 | 4282.0 | 225° | -85° | 533.7 |
DSb-72 | S | 205088.0 | 7656107.0 | 4341.0 | 225° | -85° | 653.4 |
DSb-73 | S | 205291.0 | 7656269.0 | 4273.0 | 225° | -85° | 479.6 |
DSb-74 | S | 205205.0 | 7656072.0 | 4305.6 | 225° | -75° | 470.5 |
DSb-75 | S | 205310.0 | 7656329.0 | 4257.0 | 225° | -85° | 527.4 |
DSb-76 | S | 205022.0 | 7656003.0 | 4342.0 | 225° | -85° | 356.6* |
小計 | 4,393.4 | ||||||
東南延伸勘探鑽探 | |||||||
DSE-01 | S | 206198.0 | 7655779.0 | 4000.0 | 225° | -65° | 509.4 |
小計 | 509.4 | ||||||
總計 | 4,902.8 | ||||||
*= 鑽孔正在進行中 S = 地表;孔口座標以米爲單位;方位角和傾斜角以度爲單位。自2024年10月4日定義鑽探程序開始以來,累計鑽探490280萬,進行了10個孔,其中1個孔正在進行中。自2020年9月20日在Iska Iska開始鑽探以來,已完成總計10810100萬的166個鑽孔(34個地下孔和132個地表孔)。 |
Figure 1: Location Map of Definition Diamond Drill Holes, Santa Barbara, Iska Iska. Yellow circles highlight the location of holes in this release.
圖1: 聖巴巴拉,伊斯卡伊斯卡的定義鑽孔位置圖。黃色圓圈突出顯示本次發佈的孔的位置。
Qualified Person ("QP")
合格專業人士("QP")
Dr. Bill Pearson, P.Geo., Eloro's Executive Vice President, Exploration, and a Qualified Person ("QP") as defined by National Instrument ("NI") 43-101 has reviewed and approved the technical content of this news release. Dr. Pearson who has more than 50 years of worldwide mining exploration, development and production experience, including extensive work in South America, manages the overall technical program, working closely with Dr. Osvaldo Arce, P.Geo. Executive Vice President, Latin America for Eloro and General Manager of Eloro's Bolivian subsidiary, Minera Tupiza S.R.L., and a QP in the context of NI 43-101, who has supervised all field work carried out at Iska Iska.
培生博士,地質學家,Eloro的執行副總裁,勘探及合格專業人士("QP"),根據國家法規("NI")43-101的定義,已審查並批准本消息發佈的技術內容。培生博士在全球礦業勘探、開發和生產方面擁有超過50年的經驗,包括在南美的廣泛工作,負責總體技術程序,與Eloro的拉丁美洲執行副總裁及Eloro玻利維亞子公司Minera Tupiza S.R.L.總經理奧斯瓦爾多·阿爾塞博士密切合作,他也是NI 43-101的QP,監督在伊斯卡伊斯卡進行的所有實地工作。
Eloro utilized both ALS and AHK for drill core analyses, both of whom are major international accredited laboratories. Drill samples sent to ALS were prepared in both ALS Bolivia Ltda's preparation facility in Oruro, Bolivia and the preparation facility operated by AHK in Tupiza with pulps sent to the main ALS Global laboratory in Lima for analysis. Eloro employs an industry standard QA/QC program with standards, blanks and duplicates inserted into each batch of samples analyzed with selected check samples sent to a separate accredited laboratory.
Eloro利用ALS和AHk進行鑽核分析,這兩者都是主要的國際認可實驗室。送往ALS的鑽樣品在玻利維亞奧魯羅的ALS Bolivia Ltda的準備設施和由AHk在圖皮薩運營的準備設施中進行準備,樣品漿料送往位於利馬的主要ALS全球實驗室進行分析。Eloro實施行業標準的QA/QC程序,每批分析的樣品中插入標準品、空白和重複樣品,並將選定的檢查樣品送至其他認可實驗室。
Drill core samples sent to AHK Laboratories were prepared in a preparation facility installed and managed by AHK in Tupiza with pulps sent to the AHK laboratory in Lima, Peru. Check samples between ALS and AHK are regularly done as a QA/QC check. AHK is followed the same analytical protocols used as with ALS and with the same QA/QC protocols.
送到AHk實驗室的岩心樣本是在AHk在Tupiza設立和管理的製備設施中準備的,漿樣被送到位於秘魯利馬的AHk實驗室。ALS和AHk之間的檢查樣本定期進行,以進行質量保證/質量控制檢查。AHk遵循與ALS相同的分析協議,並使用相同的質量保證/質量控制協議。
About Iska Iska
關於Iska Iska
The Iska Iska silver-tin polymetallic project is a road accessible, royalty-free property, wholly controlled by the Title Holder, Empresa Minera Villegas S.R.L. and is located 48 km north of Tupiza city, in the Sud Chichas Province of the Department of Potosi in southern Bolivia. Eloro has an option to earn a 100% interest in Iska Iska.
Iska Iska銀錫多金屬項目是一個可通車、不需支付特許權使用費的地產,完全由持有者Empresa Minera Villegas S.R.L.控制,位於玻利維亞南部波託西省Sud Chichas省,距離Tupiza市48公里。Eloro有權選擇獲得Iska Iska的100%權益。
Iska Iska is a major silver-tin polymetallic porphyry-epithermal complex associated with a Miocene possibly collapsed/resurgent caldera, emplaced on Ordovician age rocks with major breccia pipes, dacitic domes and hydrothermal breccias. The caldera is 1.6km by 1.8km in dimension with a vertical extent of at least 1km. Mineralization age is similar to Cerro Rico de Potosí and other major deposits such as San Vicente, Chorolque, Tasna and Tatasi, all located along the same overall geological trend.
Iska Iska是一個主要的銀錫多金屬斑岩-熱液複雜體,與可能塌陷/復起的中新世火山口相關,位於寒武紀時期的岩石上,擁有主要的碎屑管、流紋岩穹和熱液碎屑岩。火山口的尺寸爲1.6公里乘1.8公里,垂直高度至少爲1公里。礦化年齡與波託西的 Cerro Rico 和其他主要礦牀如San Vicente、Chorolque、Tasna和Tatasi相似,所有這些礦牀均位於同一地質趨勢上。
Eloro began underground diamond drilling from the Huayra Kasa underground workings at Iska Iska on September 13, 2020. On November 18, 2020, Eloro announced the discovery of a significant breccia pipe with extensive silver polymetallic mineralization just east of the Huayra Kasa underground workings and a high-grade gold-bismuth zone in the underground workings. On November 24, 2020, Eloro announced the discovery of the Santa Barbara Breccia Pipe (SBBP) approximately 150m southwest of the Huayra Kasa underground workings.
Eloro於2020年9月13日在Iska Iska的Huayra Kasa地下工作面開始地下金剛石鑽探。2020年11月18日,Eloro宣佈在Huayra Kasa地下工作面東側發現了一個重要的角礫岩管,具有廣泛的白銀多金屬礦化,並在地下工作面發現了一個高品位的黃金-鉍區。2020年11月24日,Eloro宣佈在Huayra Kasa地下工作面西南約15000萬處發現了聖巴巴拉角礫岩管(SBBP)。
Subsequently, on January 26, 2021, Eloro announced significant results from the first drilling at the SBBP including the discovery hole from 0.0m to 257.5m. Subsequent drilling has confirmed the presence of significant values of Ag-Sn polymetallic mineralization in the SBBP and the adjacent Central Breccia Pipe (CBP). A substantive mineralized envelope which is open along strike and down-dip extends around both major breccia pipes. Continuous channel sampling along the walls of the of the Santa Barbara Adit located to the east of SBBP returned average grades of 164.96 g Ag/t, 0.46%Sn, 3.46% Pb and 0.14% Cu over 166m including 446 g Ag/t, 9.03% Pb and 1.16% Sn over 56.19m. The west end of the adit intersects the end of the SBBP.
隨後在2021年1月26日,Eloro宣佈SBBP首次鑽探的重大結果,包括從0萬至25750萬的發現鑽孔。後續鑽探證實SBBP及相鄰的中央角礫岩管(CBP)中存在顯著的Ag-Sn多金屬礦化。一個實質性的礦化包圍體在兩個主要角礫岩管周圍延伸,沿走向和下傾開放。位於SBBP東側的聖巴巴拉隧道沿牆壁的連續通道取樣的平均品位爲164.96克Ag/t,0.46%Sn,3.46%Pb和0.14%Cu,採樣長度爲16600萬,其中5619萬的品位爲446克Ag/t,9.03%Pb和1.16%Sn。隧道的西端與SBBP的末端相交。
Since the initial discovery hole DHK-15 which returned 29.53g Ag/t, 0.078g Au/t, 1.45%Zn, 0.59%Pb, 0.080%Cu and 0.056%Sn over 257.5m, Eloro has released a number of significant drill results in the SBBP and the surrounding mineralized envelope which, along with geophysical data, has defined an extensive target zone. On October 17, 2023, Eloro filed the NI 43-101 Technical Report outlining the initial inferred MRE for Iska Iska, prepared by independent consultantsMicon International Limited. The MRE was reported in two domains, the Polymetallic (Ag-Zn-Pb) Domain which is primarily in the east and south of the Santa Barbara deposit and the Tin (Sn-Ag-Pb) Domain which is primarily in the west and north.
自最初的發現鑽孔DHk-15返回29.53克Ag/t,0.078克Au/t,1.45%Zn,0.59%Pb,0.080%Cu和0.056%Sn,採樣長度爲25750萬,Eloro已發佈多項SBBP及周邊礦化包圍體的重要鑽探結果,這些結果與地球物理數據共同定義了一個廣泛的靶區。2023年10月17日,Eloro提交了NI 43-101技術報告,概述了Iska Iska的初步推測礦產資源評估(MRE),該評估由獨立顧問Micon國際有限公司編制。MRE在兩個域中報告,主要在聖巴巴拉礦牀的東部和南部是多金屬(Ag-Zn-Pb)域,主要在西部和北部是錫(Sn-Ag-Pb)域。
The Polymetallic Domain is estimated to contain 560Mt at 13.8 g Ag/t, 0.73% Zn & 0.28% Pb at an NSR cutoff of US$9.20 for potential open pit and an NSR cutoff of US$34.40 for potential underground. The majority of the mineral resource is contained in the constraining pit which has a stripping ratio of 1:1. The Polymetallic Domain contains a higher-grade mineral resource at a NSR cutoff of $US25/t of 132 million tonnes at 1.11% Zn, 0.50% Pb and 24.3 g Ag/t which has a net NSR value of US$34.40/t which is 3.75 the estimated operating cost of US$9.20/t. The Tin Domain which is adjacent to the Polymetallic Domain and does not overlap, is estimated to contain a mineral resource of 110Mt at 0.12% Sn, 14.2 g Ag/t and 0.14% Pb but is very under drilled.
多金屬域估計包含560萬噸,品位爲13.8克Ag/t,0.73%Zn和0.28%Pb,NSR截止爲9.20美元,適用於潛在的露天礦,並且NSR截止爲34.40美元,適用於潛在的地下礦。大部分礦產資源包含在限制性露天礦中,其剝離比爲1:1。多金屬域的礦產資源在NSR截止爲25美元/t的情況下,估計有13200萬噸,品位爲1.11%Zn,0.50%Pb和24.3克Ag/t,淨NSR價值爲34.40美元/t,是預計運營成本9.20美元/t的3.75倍。錫域與多金屬域相鄰且沒有重疊,估計有110萬噸礦產資源,品位爲0.12%Sn,14.2克Ag/t和0.14%Pb,但鑽探較少。
Results of the definition drill program which totalled 5,267.7m in 11 holes were reported on December 18, 2023 and January 11, 2024, respectively. Significant results included 279.22 g Ag/t, 0.47% Pb and 0.43% Sn (339.82g Ag eq/t) over 62.84m and 33.83 g Ag/t, 1.53% Zn, 0.93% Pb and 0.14% Sn (130.88g Ag eq/t) over 178.99m including 120.37 g Ag/t, 2.13% Zn, 1.57% Pb and 0.19% Sn in hole DSB-61; 57.62g Ag/t, 1.26% Zn, 0.94% Pb and 0.12% Sn (139.94g Ag eq/t) over 136.11min hole DSB-66 and 118.86g Ag/t, 0.35% Zn, 0.35% Pb and 0.15% Sn (152.29g Ag eq/t) over 81.28m in hole DSB-65. This latter intersection in hole DSB-65 included a very high-grade sample of 5,080g Ag/t, 0.12 g Au/t, 0.26% Zn, 1.34% Pb, 1.53% Cu and 1.27% Sn (4,746.46g Ag eq/t) over 1.46m.
在2023年12月18日和2024年1月11日分別報告了定義鑽探項目的結果,總計526770萬,涉及11個鑽孔。顯著結果包括在6284萬範圍內的279.22克銀每噸、0.47%鉛和0.43%錫(339.82克銀當量每噸)以及在17899萬範圍內的33.83克銀每噸、1.53%鋅、0.93%鉛和0.14%錫(130.88克銀當量每噸),其中DSb-61孔中的結果爲120.37克銀每噸、2.13%鋅、1.57%鉛和0.19%錫;在DSb-66孔中,136.11分鐘的鑽孔結果爲57.62克銀每噸、1.26%鋅、0.94%鉛和0.12%錫(139.94克銀當量每噸),而在DSb-65孔中8128萬範圍內的結果爲118.86克銀每噸、0.35%鋅、0.35%鉛和0.15%錫(152.29克銀當量每噸)。DSb-65孔中的最後交匯包括一個非常高品位的樣本,146萬範圍內的5,080克銀每噸、0.12克黃金每噸、0.26%鋅、1.34%鉛、1.53%銅和1.27%錫(4,746.46克銀當量每噸)。
Metallurgical tests reported on January 23, 2024 from a 6.3 tonne PQ drill core bulk sample representative of the higher grade Polymetallic (Ag-Zn-Pb) Domain returned a significantly higher average silver value of 91 g Ag/t compared to the weighted average grade of the original twinned holes at 31 g Ag/t strongly suggesting that the average silver grade is likely significantly underreported in the original twinned holes due to the much smaller sample size.
2024年1月23日報告的冶金測試來自於6.3噸PQ鑽心散裝樣本,該樣本代表了高品位多金屬(銀-鋅-鉛)區域的情況,結果顯示其平均銀值爲91克每噸,顯著高於原雙孔鑽的加權平均品位31克每噸,這強烈表明原雙孔鑽的銀平均品位可能因樣本量較小而嚴重低報。
On January 29, 2024, the Company reported that the new chargeability high outlined southeast of the MRE open pit by the expanded induced polarization (IP) survey indicates that the major mineralized structural corridor that is up to 800m wide extends a further 600m along strike to the southeast for an overall strike length of at least 2km. This new area has not been drilled.
2024年1月29日,公司報告稱,新定義的充電能力高,位於MRE露天礦東南方向,由擴展的激發極化(IP)勘測顯示,主要的礦化結構走廊寬度可達80000萬,並向東南延伸60000萬,整體走向長度至少爲2公里。該新區域尚未鑽探。
The Company reported on July 30, 2024, that updated modelling of the potential starter pit area at Santa Barbara zone highlights the importance of completing additional drilling to better define the grade and extent of the mineral resource in this area. Areas with higher-grade resource typically have much better drilling density but holes outside the core potential pit area are too widely spaced to give an accurate estimate of grade.
公司於2024年7月30日報道,聖巴巴拉區潛在的起始礦坑區域的更新建模突顯了完成額外鑽探以更好定義該區域礦產資源的品位和範圍的重要性。更高品位的資源區域通常具有更好的鑽探密度,但核心潛在礦坑區域外的孔距離過寬,無法準確估計品位。
On September 4, 2024, the Company announced the restart of definition drilling in the potential starter pit area at Santa Barbara. Previous drilling has shown that areas with high-grade mineralization typically have much better drilling density, whereas holes outside the core area are too widely spaced to give an accurate grade estimate. This increased drilling density is particularly important for defining the extent of the high-grade Ag-bearing and Sn-bearing structures, and for categorizing the mineral resources from inferred to indicated, which have a major influence on overall grade and resources that will contribute to the preliminary economic assessment ("PEA").
2024年9月4日,公司宣佈在聖巴巴拉的潛在起始坑區域重新開始定義鑽探。之前的鑽探表明,高品位礦化區域通常具有更好的鑽探密度,而核心區域外的孔距過大,無法準確估算品位。這種增加的鑽探密度對於界定高品位含銀和含錫結構的範圍,以及將礦產資源從推斷類別分類爲已指示類別至關重要,這對整體品位和資源的影響很大,將有助於初步經濟評估(\"PEA\")。
An initial program of 5,700m of diamond drilling in 13 holes in the Santa Barbara starter pit area is now in progress to better define the vertical and lateral extent of high-grade Ag mineralization; fill-in gaps that are presently categorized as low-grade or waste in the resource model but are very likely mineralized; expand the higher-grade Sn mineralization to the west; and complete an additional 1,400m in two large size PQ holes for further metallurgical testing.
在聖巴巴拉起始坑區域,570000萬的金剛石鑽探初始計劃正在進行中,鑽探13個孔,以更好地界定高品位含銀礦化的垂直和橫向延展;填補當前在資源模型中被分類爲低品位或廢料的空白,但極有可能是礦化的;將高品位含錫礦化向西擴展;並在兩個大型PQ孔中完成額外的140000萬,以進行進一步的冶金測試。
Results from the first definition drill hole DSB-68 were released on November 26, 2024. This hole intersected 66.90g Ag/t, 0.63% Zn, 0.42% Pb and 0.11% Sn (111.14g Ag eq/t) over 289.13m including higher grade intervals of includes higher grade intervals of:
第一口定義鑽孔DSb-68的結果於2024年11月26日發佈。該孔網穿過66.90克含銀/噸,0.63%鋅,0.42%鉛和0.11%錫(111.14克含銀當量/噸)在28913萬米中,包括更高品位的區間:
- 126.10g Ag/t, 0.55% Zn, 0.60% Pb and 0.09% Sn (160.72g Ag eq/t) over 122.03m,
- 47.61g Ag/t, 0.22% Zn, 0.40% Pb and 0.45% Sn (146.06g Ag eq/t) over 16.51m, and
-
25.52g Ag/t, 2.19% Zn, 0.65% Pb and 0.10% Sn (129.60g Ag eq/t) over 7.46m
- 126.10克含銀/噸,0.55%鋅,0.60%鉛和0.09%錫(160.72克含銀當量/噸)在12203萬米中,
- 47.61克 白銀/噸,0.22% 鋅,0.40% 市凈率 和 0.45% 錫 (146.06克 白銀當量/噸) 在1651萬上,和
- 25.52克 白銀/噸,2.19% 鋅,0.65% 市凈率 和 0.10% 錫 (129.60克 白銀當量/噸) 在7.46米上
About Eloro Resources Ltd.
關於 Eloro Resources Ltd.
Eloro is an exploration and mine development company with a portfolio of gold and base-metal properties in Bolivia, Peru and Quebec. Eloro has an option to acquire a 100% interest in the highly prospective Iska Iska Property, which can be classified as a polymetallic epithermal-porphyry complex, a significant mineral deposit type in the Potosi Department, in southern Bolivia. A recent NI 43-101 Technical Report on Iska Iska, which was completed by Micon International Limited, is available on Eloro's website and under its filings on SEDAR. Iska Iska is a road-accessible, royalty-free property. Eloro also owns an 82% interest in the La Victoria Gold/Silver Project, located in the North-Central Mineral Belt of Peru some 50 km south of the Lagunas Norte Gold Mine and the La Arena Gold Mine.
Eloro是一家勘探和礦業開發公司,擁有在玻利維亞、秘魯和魁北克的黃金和基本金屬資產組合。Eloro有權收購100%股權的Iska Iska物業,該物業可以被歸類爲多金屬熱液-斑岩複雜體,是位於玻利維亞南部波託西州的一個重要礦藏類型。最近由Micon International Limited完成的NI 43-101技術報告可在Eloro的網站和其在SEDAR的文件中獲取。Iska Iska是一個可通公路訪問的、無需支付特許權使用費的物業。Eloro還擁有La Victoria黃金/白銀項目82%的股權,該項目位於距離Lagunas Norte金礦和La Arena金礦大約50公里的秘魯北中部礦帶。
For further information please contact either Thomas G. Larsen, Chairman and CEO or Jorge Estepa, Vice-President at (416) 868-9168.
如需進一步信息,請聯繫董事長兼首席執行官Thomas G. Larsen或副總裁Jorge Estepa,電話(416) 868-9168。
Information in this news release may contain forward-looking information. Statements containing forward-looking information express, as at the date of this news release, the Company's plans, estimates, forecasts, projections, expectations, or beliefs as to future events or results and are believed to be reasonable based on information currently available to the Company. There can be no assurance that forward-looking statements will prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements. Readers should not place undue reliance on forward-looking information.
本新聞稿中的信息可能包含前瞻性信息。包含前瞻性信息的陳述在本新聞稿日期時,表達了公司的計劃、估計、預測、預估、期望或對未來事件或結果的信念,並基於公司當前可獲得的信息被認爲是合理的。不能確保前瞻性陳述將被證明是準確的。實際結果和未來事件可能與這些陳述中預期的結果有實質性差異。讀者不應對前瞻性信息過分依賴。
Neither the TSX nor its Regulation Services Provider (as that term is defined in the policies of the TSX) accepts responsibility for the adequacy or accuracy of this release.
TSX或其監管服務提供者(如TSX政策中定義)對本發佈的充分性或準確性不承擔任何責任。
A photo accompanying this announcement is available at
此公告的配圖可在此查看