Brixton Metals Provides Results From Ivanhoe Electric's 2024 Drilling at the Hog Heaven Project, Montana, USA
Brixton Metals Provides Results From Ivanhoe Electric's 2024 Drilling at the Hog Heaven Project, Montana, USA
Ivanhoe Electric Identifies a new Porphyry Copper-Gold-Molybdenum System in the Battle Butte Area Associated with a Typhoon-identified Anomaly
伊凡霍電力在戰鬥山地區發現新的斜長石銅-黃金-鉬系統,與颱風識別的異常相關
VANCOUVER, British Columbia, Jan. 07, 2025 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the "Company" or "Brixton") is pleased to announce exploration results provided by operator Ivanhoe Electric Inc. ("Ivanhoe Electric") (NYSE American: IE; TSX: IE), on the Hog Heaven Project. The road-accessible project is located in Flathead County, 50 miles southwest of the town of Kalispell, northwestern Montana, USA. Highlights below are sourced and further defined by Ivanhoe Electric's press release dated January 6, 2025.
溫哥華,卑詩省,2025年1月07日(全球新聞通訊社)--布里克斯頓金屬公司(TSX-V: BBb,OTCQB: BBBXF)("公司"或"布里克斯頓")欣喜地宣佈由運營商伊凡霍電力公司("伊凡霍電力")(紐交所美國: IE;TSX: IE)提供的霍格天堂項目的勘探結果。該項目可通過道路進入,位於美國西北部蒙大拿州卡利斯佩爾鎮以南50英里處的弗拉特海德縣。以下亮點來源於並進一步定義於伊凡霍電力於2025年1月6日發佈的新聞稿。
Highlights
亮點
- Exploration drilling at the Hog Heaven Project in Montana included approximately 14,000 meters in eleven drill holes (Figure 1).
- 蒙大拿州霍格天堂項目的勘探鑽探共進行了約14,000米的鑽探,包含11個鑽孔(見圖1)。
- Exploration drilling in the Battle Butte Area at the Hog Heaven Project intersected a porphyry copper-gold-molybdenum system within a large, deep Typhoon-identified anomaly.
- 霍格天堂項目戰鬥山地區的勘探鑽探穿透了一個大型深度的颱風識別異常中的斜長石銅-黃金-鉬系統。
- Exploration drilling in the Flathead Mine area included drill holes HHD-012 through to HHD-016, which intersected broad intervals of epithermal-type low-grade precious metals-bearing polymetallic sulphide mineralization hosted in veins, breccia matrix fill, and disseminations.
- 弗拉特海德礦區的勘探鑽探包括HHD-012至HHD-016的鑽孔,穿透了含有低品位貴金屬礦石的多金屬硫化物礦化,主要存在於脈絡、角礫岩基質填充物和分散體中。
- Ivanhoe Electric has leased a further 4,925 acres of private surface and mineral rights from a private owner, consolidating the district and providing additional access to areas prospective for porphyry systems.
- 伊凡霍電力公司從私人擁有者那裏再租賃了4,925英畝的私有地表和礦產權,整合了該地區並提供了對有潛力的斑岩系統區域的額外訪問。
Chairman and Chief Executive Officer, Gary R. Thompson, stated, "Drilling at the Hog Heaven Project continues to deliver highly encouraging copper-gold results. The multiple phases of porphyry at the Battle Butte Area are typical in these types of mineralizing systems and key next steps would be to isolate the high-grade copper-gold porphyry phase."
董事長兼首席執行官加里·R·湯普森表示:"霍格天堂項目的鑽探持續帶來非常可喜的銅金結果。戰鬥山地區的多階段斑岩是這些類型礦化系統的典型,下一步的關鍵將是隔離高品位的銅金斑岩階段。"
Initial drilling at the Battle Butte Area, HHD-017 through to HHD-022, has intersected a porphyry copper-gold-molybdenum system ("Battle Butte Porphyry") associated with a large, 1,500 meters by 1,000 meters Typhoon conductivity anomaly at 1,200 meters depth (Figure 2). Mineralization is related to a series of variably mineralized and altered porphyry intrusives and hydrothermal breccias hosting gold-bearing copper, iron, and molybdenum sulphides as breccia matrix, sheeted to stockwork veining and as disseminations.
在戰鬥山地區的初步鑽探中,HHD-017至HHD-022交叉了一個與大規模1,500米乘1,000米的颱風電導異常在1,200米深度相關的斑岩銅金鉬系統("戰鬥山斑岩")。礦化與一系列具有不同礦化和改變特徵的斑岩侵入體和熱液破碎巖有關,這些破碎巖中的基質、條帶至脈絡的銅、鐵和鉬硫化物均含黃金。
- Hole HHD-018: returned 286.0m of 0.14% copper, 0.14 g/t gold, 0.01% molybdenum, and 1.70 g/t of silver from 947.0m depth.
- Including 97.9m of 0.21% copper, 0.20 g/t gold, 0.01% molybdenum and 2.79 g/t silver from 947.0m.
- HHD-018孔:從94700萬深度返回了28600萬的0.14%銅,0.14克/噸黃金,0.01%鉬以及1.70克/噸白銀。
- 包括從94700萬返回的9790萬的0.21%銅,0.20克/噸黃金,0.01%鉬以及2.79克/噸白銀。
- Hole HHD-019 returned 680.0m of 0.09% copper, 0.06 g/t gold, 0.02% molybdenum, and 0.96 g/t silver from 1,172.0m depth.
- HHD-019孔返回了68000萬的0.09%銅,0.06克/噸黃金,0.02%鉬,以及0.96克/噸白銀,從117200萬深度。
Five drill holes intersecting the Battle Butte Porphyry demonstrate a porphyry system believed to be starting at approximately 900 meters depth, with a vertical thickness of 800 meters, at least 600 meters by 400 meters in lateral dimension, and open to the east and northeast. Initial assay results show broad intervals of low-grade mineralization with a gold-to-copper ratio near one-to-one. Narrower but higher-grade sub-intervals are associated with the presence of the higher-grade copper sulphide mineral bornite (approximately 63% copper by weight), where the gold-to-copper ratio starts to increase.
五個鑽孔穿過戰鬥岩脈,顯示出一個被認爲起始於大約900米深度的岩脈系統,其垂直厚度爲800米,水平尺寸至少爲600米乘400米,並向東和東北開放。初步化驗結果顯示出廣泛的低品位礦化區間,黃金與銅的比例接近1:1。更窄但品位更高的子區間與高品位銅硫化礦礦石(重量約63%銅)的存在有關,其中黃金與銅的比例開始上升。
Current evidence suggests that the Battle Butte Porphyry system is open to the east and north, where the Typhoon anomaly remains untested at depth. Exploration in 2025 will continue to test the Battle Butte Porphyry, searching for higher-grade copper-gold zones and the presence of additional porphyry centers across the project.
當前證據表明,戰鬥岩脈系統向東和北方開放,颱風異常在深度上尚未進行測試。2025年的勘探將繼續測試戰鬥岩脈,尋找更高品位的銅金礦區和項目範圍內其他岩脈中心的存在。
Figure 1. Plan view map of the Hog Heaven Project showing drill holes and their traces from the 2024 exploration program, newly leased land, and the location of cross-section A to A'.
圖1. 霍格天堂項目的平面圖,顯示了2024年勘探計劃的鑽孔及其軌跡、新租賃土地,以及A到A'的橫截面位置。
Figure 2. Cross-section A to A' at the Hog Heaven Project, looking northeast, of drilling at the Battle Butte Porphyry, showing Typhoon conductivity (left), drill holes, assay results, and simplified geology and alteration (right).
圖2. 霍格天堂項目的A到A'的橫截面,朝東北方向,顯示戰鬥岩脈的鑽探,顯示颱風電導(左)、鑽孔、化驗結果,以及簡化的地質和變質(右)。
Table 1. Highlighted new epithermal-type drill intercepts from the Battle Butte Area at the Hog Heaven Project.
表1. 霍格天堂項目中巴特爾山地區的新型淺熱液鑽探攔截數據。
Drill Hole | Location | From (m) |
To (m) | Interval (m) |
CuEq % | Ag g/t | Au g/t | Cu % | Pb % | Zn % |
HHD-017 | Battle Butte Porphyry |
755.49 | 765.00 | 9.51 | 2.17 | 127.43 | 0.12 | 0.45 | 0.84 | 1.11 |
鑽孔 | 位置 | 從 (米) |
到(m) | 間隔 (米) |
銅當量百分比 | 銀克/噸 | 黃金 克/噸 | 銅 % | 鉛 % | 鋅 % |
HHD-017 | 戰鬥山 斑狀巖 |
755.49 | 765.00 | 9.51 | 2.17 | 127.43 | 0.12 | 0.45 | 0.84 | 1.11 |
- The following long-term metal prices were used: $3.80/lb Cu, $1,707/oz Au, $22.42/oz Ag, $0.93/lb Pb, and $1.19/lb Zn.
- The specific formula used to report CuEq (%) is Cu% + ((0.655) * Au(g/t)) + ((0.009) * Ag(g/t)) + (0.245) * Pb (%)) + ((0.313) * Zn (%)).
- Flat recoveries of 100% were used for metal equivalency calculations.
- Intervals were derived on a CuEq basis with a cutoff of 0.1% CuEq.
- Maximum internal dilution of 5 meters was applied.
- Copper assays were capped at 10% for interval calculations.
-
These are not true widths.
- 以下長期金屬價格爲:銅$3.80/磅,黃金$1,707/盎司,白銀$22.42/盎司,鉛$0.93/磅,鋅$1.19/磅。
- 用於報告CuEq(%)的具體公式爲:Cu% + ((0.655) * Au(克/噸)) + ((0.009) * Ag(克/噸)) + (0.245) * Pb(%)+ ((0.313) * Zn(%))。
- 在金屬當量計算中使用了100%的平坦回收率。
- 根據CuEq基準,使用0.1% CuEq的切割值推導出區間。
- 最大內部稀釋爲5米。
- 銅的檢測結果在區間計算中限於10%。
- 這些並不是真實寬度。
Table 2. Highlighted new porphyry-type drill intercepts from the Battle Butte Area at the Hog Heaven Project.
表2。來自霍格天堂項目Battle Butte地區的新型斜長巖鑽探攔截的亮點。
Drill Hole | Location | From (m) | To (m) | Interval (m) |
CuEq (%) |
Cu (%) | Au (g/t) | Mo (%) | Ag (g/t) |
HHD-018 | Battle Butte Porphyry |
947.00 | 1233.00 | 286.00 | 0.29 | 0.14 | 0.14 | 0.01 | 1.70 |
Including | 947.00 | 1044.85 | 97.85 | 0.40 | 0.21 | 0.20 | 0.01 | 2.79 | |
HHD-019 | Battle Butte Porphyry |
1172.00 | 1852.00 | 680.00 | 0.20 | 0.09 | 0.06 | 0.02 | 0.96 |
鑽孔 | 位置 | 深度(米) | 到(m) | 間隔 (米) |
銅當量 (%) |
銅 (%) | 黃金(克/噸) | 鉬(%) | Ag (克/噸) |
HHD-018 | 戰鬥 博特 斑狀巖 |
947.00 | 1233.00 | 286.00 | 0.29 | 0.14 | 0.14 | 0.01 | 1.70 |
包括 | 947.00 | 1044.85 | 97.85 | 0.40 | 0.21 | 0.20 | 0.01 | 2.79 | |
HHD-019 | 戰鬥 博特 斑狀巖 |
1172.00 | 1852.00 | 680.00 | 0.20 | 0.09 | 0.06 | 0.02 | 0.96 |
- The following long-term metal prices were used: $3.80/lb Cu, $1,707/oz Au, $22.42/oz Ag, and $16.00/lb Mo.
- The specific formula used to report CuEq (%) is Cu % + ((0.655) * Au(g/t)) + ((0.009) * Ag(g/t)) + ((4.211) * Mo (%)).
- Flat recoveries of 100% were used for metal equivalency calculations.
- Intervals were derived on a CuEq basis with a cutoff of 0.10% CuEq.
- Maximum internal dilution of 5 meters was applied for drill holes HHD-018 and HHD-019.
- Copper assays were capped at 10% for interval calculations.
-
These are not true widths.
- 以下長期金屬價格被使用:每磅銅$3.80,每盎司黃金$1,707,每盎司白銀$22.42,以及每磅鉬$16.00。
- 用於報告銅當量(CuEq (%))的具體公式爲:銅 % + ((0.655) * 黃金(克/噸)) + ((0.009) * 銀(克/噸)) + ((4.211) * 鉬 (%))。
- 在金屬當量計算中使用了100%的平坦回收率。
- 根據銅當量計算得出的區間的截止值爲0.10% CuEq。
- 對鑽孔HHD-018和HHD-019應用了最大內部稀釋5米的標準。
- 銅的檢測結果在區間計算中限於10%。
- 這些並不是真實寬度。
Quality Assurance and Quality control
質量保證和質量控制
Ivanhoe Electric employs industry standard QA/QC and data verification protocols. The diamond drill holes were completed using PQ and HQ diameters. The drill core was cut lengthwise into halves using a diamond-bladed saw, with one-half used for the assay sample and the other half retained in core boxes and archived at site. Pulps and rejects are also stored on site for archival purposes. Mineralized zones were generally sampled at 2m intervals. Each core sample was placed into a bag with a unique numbered sample identification tag. Quality control samples were inserted between core samples using the same numbering sequence. Then samples were grouped into batches for shipping and laboratory submissions. Chain of custody records are maintained for sample shipments and the custody is transferred from Ivanhoe Electric expeditor to the laboratory upon delivery.
伊凡霍電力公司採用行業標準的QA/QC和數據驗證協議。鑽探孔使用PQ和HQ直徑完成。鑽探岩心使用金剛石鋸縱向切成兩半,一半用於分析樣本,另一半保留在岩心箱中並存檔在現場。樣品和廢料也在現場存放以供歸檔。礦化帶通常以200萬的間隔進行取樣。每個岩心樣本放入帶有獨特編號樣本識別標籤的袋中。質量控制樣本在岩心樣本之間插入,遵循相同的編號順序。然後樣本分組爲批次以便交通和實驗室提交。樣本交通的監管記錄得以保持,監管責任從伊凡霍電力的發貨員轉移給實驗室。
Samples were shipped to ALS Laboratories in Twin Falls, Idaho, for sample preparation and analysis. Samples were analyzed using customary four acid digestion and ICP-MS finish. A standard gold fire assay package was used to analyze gold. Silver content was assessed using either HCl leach and ICP-AES finish or fire assay with gravimetric finish depending on silver concentrations. ALS Minerals Twin Falls is an independent laboratory certified under ISO 9001:2008 and accredited under ISO/IEC 17025:2005 by the Standards Council of Canada.
樣品被運送到愛爾斯實驗室,位於愛達荷州的雙瀑布,進行樣品製備和分析。樣品採用傳統的四酸消化和ICP-MS完成分析。標準的黃金火焰分析包用於分析黃金。白銀含量通過HCl浸出及ICP-AES完成或依據銀濃度使用火焰分析和重力法評估。愛爾斯礦業雙瀑布是一個獨立實驗室,獲得ISO 9001:2008認證,並根據ISO/IEC 17025:2005獲得加拿大標準委員會的認證。
The Hog Heaven copper-silver-gold project is an advanced-stage exploration project, which historically produced high-grade silver, gold, and copper. Between 1913 and 1975, Anaconda Copper Mining and lessees produced 6.7Moz Ag, 3,000 oz Au, 23M lbs of lead, and 0.6M lbs copper from 0.23Mt of direct-ship ore, grading 29 opt silver. The road-accessible property is located in Flathead County, 50 miles southwest of the town of Kalispell, northwestern Montana, USA.
The Hog Heaven copper-silver-gold project is an advanced-stage exploration project, which historically produced high-grade silver, gold, and copper. Between 1913 and 1975, Anaconda Copper Mining and lessees produced 6.7Moz Ag, 3,000 oz Au, 2300萬 lbs of lead, and 60萬 lbs copper from 0.23Mt of direct-ship ore, grading 29 opt silver. The road-accessible property is located in Flathead County, 50 miles southwest of the town of Kalispell, northwestern Montana, USA.
Ivanhoe Electric and Brixton entered into an earn-in agreement in 2021. Under the earn-in agreement, Ivanhoe Electric may earn up to a 75% interest in the Hog Heaven Project by making cash payments totaling USD$4.5 million ($2.5 million paid to date) and incurring an aggregate of USD$40 million in exploration expenditures by 2032.
Ivanhoe Electric and Brixton entered into an earn-in agreement in 2021. Under the earn-in agreement, Ivanhoe Electric may earn up to a 75% interest in the Hog Heaven Project by making cash payments totaling USD$450萬 ($250萬 paid to date) and incurring an aggregate of USD$4000萬 in exploration expenditures by 2032.
For additional Hog Heaven Projects details, click here:
For additional Hog Heaven Projects details, click here:
Table 3. Hog Heaven Project Drill Collar information.
Table 3. Hog Heaven Project Drill Collar information.
DRILL HOLE | STATUS | DEPTH (m) | AZIMUTH (°) | DIP (°) | EASTING | NORTHING | ELEVATION (m) |
HHD-001 | COMPLETE | 580.34 | 275 | -50 | 678352 | 5309703 | 1200 |
HHD-002 | COMPLETE | 1001.50 | 270 | 70 | 678317 | 5309025 | 1151 |
HHD-003 | COMPLETE | 1248.76 | 65 | -85 | 679760 | 5309704 | 1067 |
HHD-004 | COMPLETE | 1316.13 | 305 | -55 | 680093 | 5308712 | 1027 |
HHD-005 | COMPLETE | 1248.76 | 185 | -80 | 680725 | 5310624 | 1250 |
HHD-006 | COMPLETE | 773.58 | 340 | -61 | 680748 | 5310254 | 1210 |
HHD-007 | COMPLETE | 824.79 | 210 | -75 | 680727 | 5310624 | 1255 |
HHD-008 | COMPLETE | 735.18 | 0 | -60 | 680752 | 5310259 | 1226 |
HHD-009 | COMPLETE | 785.47 | 100 | -77 | 680533 | 5310551 | 1206 |
HHD-010 | COMPLETE | 1212.49 | 120 | -70 | 680364 | 5310565 | 1214 |
HHD-011 | COMPLETE | 633.37 | 70 | -65 | 680360 | 5310574 | 1213 |
HHD-012 | COMPLETE | 544.37 | 285 | -75 | 680458 | 5310455 | 1181 |
HHD-013 | COMPLETE | 1157.63 | 240 | -70 | 679768 | 5310382 | 1111 |
HHD-014 | COMPLETE | 864.72 | 220 | -60 | 680273 | 5310468 | 1192 |
HHD-015 | COMPLETE | 594.06 | 250 | -60 | 680273 | 5310468 | 1192 |
HHD-016 | COMPLETE | 1343.80 | 305 | -80 | 680372 | 5310370 | 1169 |
HHD-017 | COMPLETE | 1394.60 | 310 | -75 | 679466 | 5309311 | 1077 |
HHD-018 | COMPLETE | 1488.89 | 30 | -85 | 679466 | 5309311 | 1077 |
HHD-019 | COMPLETE | 1852.54 | 215 | -85 | 679564 | 5309388 | 1058 |
HHD-020 | COMPLETE | 1571.95 | 290 | -74 | 679775 | 5309496 | 1078 |
HHD-021 | COMPLETE | 1441.09 | 220 | -77 | 679704 | 5309273 | 1079 |
HHD-022 | RESULTS PENDING | 1753.70 | 32 | -75 | 679489 | 5309066 | 1056 |
鑽孔 | 狀態 | 深度 (米) | 方位角 (°) | 傾斜角 (°) | 東座標 | 北座標 | 海拔 (米) |
HHD-001 | 完成 | 580.34 | 275 | -50 | 678352 | 5309703 | 1200 |
HHD-002 | 完成 | 1001.50 | 270 | 70 | 678317 | 5309025 | 1151 |
HHD-003 | 完成 | 1248.76 | 65 | -85 | 679760 | 5309704 | 1067 |
HHD-004 | 完成 | 1316.13 | 305 | -55 | 680093 | 5308712 | 1027 |
HHD-005 | 完成 | 1248.76 | 185 | -80 | 680725 | 5310624 | 1250 |
HHD-006 | 完成 | 773.58 | 340 | -61 | 680748 | 5310254 | 1210 |
HHD-007 | 完成 | 824.79 | 210 | -75 | 680727 | 5310624 | 1255 |
HHD-008 | 完成 | 735.18 | 0 | -60 | 680752 | 5310259 | 1226 |
HHD-009 | 完成 | 785.47 | 100 | -77 | 680533 | 5310551 | 1206 |
HHD-010 | 完成 | 1212.49 | 120 | -70 | 680364 | 5310565 | 1214 |
HHD-011 | 完成 | 633.37 | 70 | -65 | 680360 | 5310574 | 1213 |
HHD-012 | 完成 | 544.37 | 285 | -75 | 680458 | 5310455 | 1181 |
HHD-013 | 完成 | 1157.63 | 240 | -70 | 679768 | 5310382 | 1111 |
HHD-014 | 完成 | 864.72 | 220 | -60 | 680273 | 5310468 | 1192 |
HHD-015 | 完成 | 594.06 | 250 | -60 | 680273 | 5310468 | 1192 |
HHD-016 | 完成 | 1343.80 | 305 | -80 | 680372 | 5310370 | 1169 |
HHD-017 | 完成 | 1394.60 | 310 | -75 | 679466 | 5309311 | 1077 |
HHD-018 | 完成 | 1488.89 | 30 | -85 | 679466 | 5309311 | 1077 |
HHD-019 | 完成 | 1852.54 | 215 | -85 | 679564 | 5309388 | 1058 |
HHD-020 | 完成 | 1571.95 | 290 | -74 | 679775 | 5309496 | 1078 |
HHD-021 | 完成 | 1441.09 | 220 | -77 | 679704 | 5309273 | 1079 |
HHD-022 | 結果待定 | 1753.70 | 32 | -75 | 679489 | 5309066 | 1056 |
Qualified Person
合格人員
Disclosures of a scientific or technical nature included in this news release, including the sampling, analytical and technical data underlying the information, have been reviewed, verified, and approved by Shawn Vandekerkhove, P.Geo. of whom is a Qualified Person as defined by Regulation S-K, Subpart 1300 promulgated by the U.S. Securities and Exchange Commission and by Canadian National Instrument 43-101. Mr. Vandekerkhove is an employee of Ivanhoe Electric Inc.
本新聞稿中包含的科學或技術性質的披露,包括取樣、分析和技術數據,已由合格人士Shawn Vandekerkhove(P.Geo.)審核、驗證並批准。根據美國證券交易委員會發佈的法規S-k,第1300小節及加拿大國家工具43-101的定義,Vandekerkhove先生是合格人士。他是Ivanhoe Electric Inc.的員工。
Corporate Update
公司動態
Effective January 6, 2025, Christina Anstey has ceased to act as the Company's VP Exploration. We wish to thank Christina for her service to the Company and wish her all the best in her future endeavors.
自2025年1月6日起,Christina Anstey 不再擔任公司的探索副總裁。我們感謝Christina爲公司所做的貢獻,並祝願她在未來的努力中一切順利。
About Brixton Metals Corporation
關於Brixton Metals Corporation
Brixton Metals is a Canadian exploration company focused on the advancement of its mining projects. Brixton wholly owns four exploration projects: Brixton's flagship Thorn copper-gold-silver-molybdenum Project, the Hog Heaven copper-silver-gold Project in NW Montana, USA, which is optioned to Ivanhoe Electric Inc., the Langis-HudBay silver-cobalt-nickel Project in Ontario and the Atlin Goldfields Project located in northwest BC which is optioned to Eldorado Gold Corporation. Brixton Metals Corporation shares trade on the TSX-V under the ticker symbol BBB, and on the OTCQB under the ticker symbol BBBXF. For more information about Brixton, please visit our website at .
Brixton Metals是一家專注於礦業項目進展的加拿大勘探公司。Brixton全資擁有四個勘探項目:Brixton的旗艦項目—Thorn銅金銀鉬項目,位於美國蒙大拿州西北部的Hog Heaven銅銀金項目,該項目已租賃給Ivanhoe Electric Inc.,安大略省的Langis-HudBay銀鈷鎳項目,以及位於不列顛哥倫比亞省西北部的Atlin Goldfields項目,該項目已租賃給Eldorado Gold Corporation。Brixton Metals Corporation的股票在TSX-V的逐筆明細下交易,代碼爲BBb,在OTCQb的逐筆明細下交易,代碼爲BBBXF。如需了解更多有關Brixton的信息,請訪問我們的網站。 .
On Behalf of the Board of Directors
董事會代表
Mr. Gary R. Thompson, Chairman and CEO
加里·R·湯普森先生,董事長兼首席執行官
For Investor Relations inquiries please contact: Mr. Michael Rapsch, Senior Manager, Investor Relations. email: michael.rapsch@brixtonmetals.com or call: 604-630-9707
有關投資者關係的查詢,請聯繫:邁克爾·拉普施先生,高級經理,投資者關係。電子郵件: michael.rapsch@brixtonmetals.com 或撥打:604-630-9707
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
TSX創業公司交易所或其監管服務提供商(如TSX創業公司政策中定義的那樣)不對本公告的充分性或準確性負責。
Information set forth in this news release may involve forward-looking statements under applicable securities laws. Forward-looking statements are statements that relate to future, not past, events. In this context, forward-looking statements often address expected future business and financial performance, and often contain words such as "anticipate", "believe", "plan", "estimate", "expect", and "intend", statements that an action or event "may", "might", "could", "should", or "will" be taken or occur, including statements that address potential quantity and/or grade of minerals, potential size and expansion of a mineralized zone, proposed timing of exploration and development plans, or other similar expressions. All statements, other than statements of historical fact included herein including, without limitation, statements regarding the use of proceeds. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, the following risks: the need for additional financing; operational risks associated with mineral exploration; fluctuations in commodity prices; title matters; and the additional risks identified in the annual information form of the Company or other reports and filings with the TSXV and applicable Canadian securities regulators. Forward-looking statements are made based on management's beliefs, estimates and opinions on the date that statements are made and the Company undertakes no obligation to update forward-looking statements if these beliefs, estimates and opinions or other circumstances should change, except as required by applicable securities laws. Investors are cautioned against attributing undue certainty to forward-looking statements.
本新聞稿中所述的信息可能涉及適用證券法下的前瞻性陳述。前瞻性陳述是指與未來事件相關的聲明,而非過去事件。在此背景下,前瞻性陳述通常涉及預期的未來業務和財務表現,通常包含諸如「預期」、「相信」、「計劃」、「估計」、「期望」和「打算」等字眼,以及表示某項行爲或事件「可能」、「或許」、「能夠」、「應該」或「將」採取或發生的聲明,包括涉及礦物質潛在數量和/或品位、礦化區的潛在規模和擴展、擬定的勘探和開發計劃的時間安排或其他類似表述。除包含在此處的歷史事實陳述外,所有陳述均爲前瞻性陳述,包括但不限於有關收益使用的聲明。由於其性質,前瞻性陳述涉及已知和未知的風險、不確定性及其他可能導致我們的實際結果、表現或成就,或其他未來事件,與任何前瞻性陳述所表達或暗示的未來結果、表現或成就有重大差異的因素。這些因素包括但不限於以下風險:對額外融資的需求;與礦物勘探相關的操作風險;商品價格波動;所有權問題;以及在公司年度信息表或與TSXV及適用的加拿大證券監管機構的其他報告和文件中確定的其他風險。前瞻性陳述是基於管理層在做出聲明時的信念、估計和意見而作出,並且公司沒有義務在這些信念、估計和意見或其他情況發生變化時更新前瞻性陳述,除非適用的證券法要求。投資者應謹慎對待前瞻性陳述,不應過度確定其準確性。
Photos accompanying this announcement are available at:
隨此公告發佈的照片可在以下位置獲取: