Bam Bam Signs Contract with Core Driller for Springtime Drilling at Majuba Hill Copper-Gold Porphyry, Nevada
Bam Bam Signs Contract with Core Driller for Springtime Drilling at Majuba Hill Copper-Gold Porphyry, Nevada
Vancouver, British Columbia--(Newsfile Corp. - March 17, 2022) - Bam Bam Resources Corp. (CSE: BBR) (OTC Pink: NPEZF) (FSE: 4NPB) ("Bam Bam" or the "Company") is pleased to have signed a core drilling contract with Falcon Drilling, Inc. for the Majuba Hill Project in Pershing County Nevada. Falcon drilled at Majuba in 2020 and 2021. Drilling is planned to begin in mid-April.
温哥華,不列顛哥倫比亞省--(Newsfile Corp.-2022年3月17日)-Bam Bam Resources Corp.(CSE:BBR)(場外交易市場代碼:NPEZF)(FSE:4NPB)(“Bam Bam”或“公司”)很高興與Falcon Drilling,Inc.就內華達州潘興縣的Majuba Hill項目簽署了一份核心鑽探合同。獵鷹曾於2020年和2021年在馬朱巴進行鑽探。鑽探計劃於4月中旬開始。
Approximately 4,000 meters (13,000 ft) is planned to drill deeper holes below the copper enriched Known Copper Oxide Zone and to extend the granodiorite footprint discovered in the Copper-Gold Target area.
計劃在銅礦富集區下方約4,000米(13,000英尺)處鑽更深的孔,並擴大在銅金礦目標區發現的花崗閃長巖足跡。
David Greenway, President and CEO, commented: "This is a key development phase for Majuba Hill. I expect these deeper holes to expand the copper mineralization footprint and signify that Majuba can be a very significant source for world copper demands."
總裁兼首席執行官大衞·格林威評論道:“這是馬朱巴山的一個關鍵發展階段。我預計這些更深的鑽孔將擴大銅礦化的足跡,並意味着馬朱巴可以成為世界銅需求的一個非常重要的來源。”
Project Infrastructure and Development
項目基礎設施和開發
Copper mineralization at Majuba is centered within a large contiguous land position. Bam Bam has 100% control of the emerging Majuba Hill Copper District by private surface and mineral ownership, patented mining claims, and Federal Lode Mining claims. The property is in Nevada, a Tier 1 mining district that is the most mining friendly place in North America and has well developed transportation, power, and workforce infrastructure.
馬朱巴的銅礦化集中在一大片毗連的陸地上。BAM Bam通過私人地表和礦產所有權、專利採礦權和聯邦Lode採礦權擁有新興的Majuba Hill銅礦區的100%控制權。該物業位於內華達州,這是一個一級礦區,是北美最適合採礦的地方,擁有發達的交通、電力和勞動力基礎設施。
Majuba is easily reached by 23 miles of well-maintained roads leading from U.S. Interstate 80. The existing highways are sufficient for transportation of exploration-size heavy equipment. The Company has engaged EM Strategies-A Westland Resources Inc. Company provide long-range environmental planning services. Development logistics can use the 4 lane Interstate 80 highway, Union Pacific railroad tracks and power, natural gas, and fiber optic transmission lines in the rail - highway corridor.
從美國80號州際公路出發,有23英里維護良好的公路可以很容易地到達馬朱巴。現有的公路足以運輸勘探規模的重型設備。本公司已聘請EM Strategy-A Westland Resources Inc.公司提供長期環境規劃服務。發展物流可利用80號駭維金屬加工4車道州際公路、聯合太平洋鐵路和電力、天然氣、光纖傳輸線路組成的鐵路-駭維金屬加工走廊。
Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody
質量保證/質量控制(QA/QC)措施、監管鏈
The Company has a QA/QC program using best industry practices in place at the Majuba Hill Project. The samples are transported from the BBR secure warehouse or directly from the project to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS then transports the prepared pulps to their analytical lab in Reno, Nevada or Vancouver, B.C. Soil and rock chip samples are transported by the company directly to Elko or Reno, Nevada.
該公司有一個QA/QC計劃,使用Majuba Hill項目的最佳行業實踐。樣品從BBR安全倉庫或直接從項目運送到位於內華達州里諾或埃爾科的ALS樣品準備設施。然後,ALS將準備好的紙漿運送到他們位於內華達州里諾或不列顛哥倫比亞省温哥華的分析實驗室。土壤和巖石芯片樣本由該公司直接運送到內華達州的埃爾科或裏諾。
Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth sample bags. All samples are analyzed for copper, gold, silver, and 33 other elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are determined by ALS method ME-ICP61 which is a four acid digestion and ICP-AES assay. Approximately 5% of the submitted samples are drill duplicates and copper-gold-porphyry commercial standard reference material pulps.
鑽芯樣品被縱向鋸成兩半,一半放在有標籤的布樣袋中。對所有樣品進行了銅、金、銀和其他33種元素的分析。金是通過ALS方法Au-Aa23測定的,這是一種火試金法,AAS在30克的裂片上完成。銅、銀及其餘31種元素的測定採用四酸消解-電感耦合等離子體原子發射光譜法ME-ICP61。提交的樣品中約有5%是鑽頭複製品和銅金斑巖商業標準物質漿。
Qualified Person
有資格的人
The scientific and technical information contained in this news release has been reviewed by E.L. "Buster" Hunsaker III, CPG 8137, a non-independent consulting geologist who is a "Qualified Person" as such term is defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").
本新聞稿中包含的科學和技術信息已由E.L.“Buster”Hunsaker III,CPG 8137,非獨立諮詢地質學家,其定義為“合格人士”,其定義見國家標準43-101--礦產項目信息披露標準(“NI 43-101”).
About Bam Bam Resources Corp.
關於Bam Bam Resources Corp.
Bam Bam Resources Corp. (CSE: BBR) (OTC Pink: NPEZF) (FSE: 4NPB) is engaged in the identification, review and acquisition of latter stage copper and copper/silver/gold assets. This is in direct response to the growing worldwide demand and lack of supply for precious metals fueled by the Green New Deal in the US and most other developed nations with similar programs aimed at addressing climate change. Such programs are heavily reliant on silver, gold and especially copper to produce Electric Vehicles and other renewable power sources, as well as building infrastructure to provide clean and affordable electricity.
BAM Bam Resources Corp.(CSE:BBR)(OTC Pink:NPEZF)(FSE:4NPB)從事識別、審核和收購後期銅和銅/銀/金資產。這是對全球貴金屬需求增長和供應不足的直接回應,這是由美國和其他大多數發達國家的綠色新政推動的,這些國家都有旨在應對氣候變化的類似計劃。這些項目嚴重依賴白銀、黃金,尤其是銅來生產電動汽車和其他可再生能源,以及建設基礎設施,以提供清潔和負擔得起的電力。
The flagship project is the Majuba Hill copper, silver and gold District located 156 miles outside Reno, Nevada, USA. Management has been mandated to focus on safe, mining friendly jurisdictions where government regulations are supportive of mining operations.
該旗艦項目是位於美國內華達州里諾市外156英里的馬朱巴山銅銀金礦區。管理層已受命專注於安全、有利於採礦的司法管轄區,在這些司法管轄區,政府法規支持採礦作業。
On Behalf of the Board of Bam Bam Resources Corp.
我代表Bam Bam Resources Corp.董事會發言。
"David Greenway"
《大衞·格林威》
David C. Greenway
President & CEO
大衞·C·格林威
總裁兼首席執行官
For further information, please contact:
Joel Warawa
VP of Corporate Communications
E: jw@bambamresources.com
P: 1 (855) 475-0745
如需更多信息,請聯繫:
喬爾·瓦拉瓦
企業傳播部副總裁
電子郵件:jw@bambamresource ces.com
P: 1 (855) 475-0745
Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.
加拿大證券交易所及其市場監管機構(該術語在加拿大證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。
Forward-Looking Statements
前瞻性陳述
This news release contains certain statements that may be deemed "forward-looking" statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although Bam Bam Resources Corp. believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Forward looking statements are based on the beliefs, estimates and opinions of Bam Bam Resources Corp. management on the date the statements are made. Except as required by law, Bam Bam Resources Corp. undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.
本新聞稿包含可被視為“前瞻性”陳述的某些陳述。前瞻性表述是指不是歷史事實的表述,一般但並非總是以“預期”、“計劃”、“預期”、“相信”、“打算”、“估計”、“項目”、“潛在”和類似的表述,或事件或條件“將”、“將”、“可能”、“可能”或“應該”發生。儘管Bam Bam Resources Corp.認為這些前瞻性陳述中表達的預期是基於合理的假設,但這些陳述並不能保證未來的業績,實際結果可能與前瞻性陳述中的結果大不相同。前瞻性陳述是基於Bam Bam Resources Corp.管理層在陳述發表之日的信念、估計和意見。除法律要求外,Bam Bam Resources Corp.沒有義務在管理層的信念、估計或意見或其他因素髮生變化時更新這些前瞻性陳述。
To view the source version of this press release, please visit
要查看本新聞稿的源版本,請訪問