Vancouver, British Columbia--(Newsfile Corp. - December 7, 2022) - E79 Resources Corp. (CSE: ESNR) (OTCQB: ESVNF) ("E79" or the "Company") is pleased to report on its exploration activities at the Myrtleford and Beaufort gold properties in Victoria, Australia.
EXPLORATION HIGHLIGHTS
- All drill results have been received from the Happy Valley and Twist Creek prospects with key intersections including:
- Reconnaissance rock chip sampling and geological mapping continues along the 7km-long Twist Creek and 16km-long Magpie trends. Areas of significant historical gold production and LIDAR-identified structural targets will be prioritized.
- The Exploration License (ELA007670) application process is in its final stages for the 7km extension of the Happy Valley high-grade gold corridor towards the southeast containing multiple historical gold workings.
- The Company, which is well financed with ~$6 million in cash, is reviewing other opportunities in the Victorian Goldfields and beyond to expand its gold project portfolio.
Patrick Donnelly, E79's President and Chief Executive Officer, stated, "We are very pleased to see that the Myrtleford Project continues to deliver encouraging drill results. We have been drilling continuously for 18 months for over 12,768m of drill core. We are continuing to focus on reviewing all the compelling targets along the 40km-trend at Myrtleford and utilizing our understanding of the geology and latest full LIDAR coverage to generate future targets. Additionally, we have a strong cash balance and are looking for other opportunities within the Victorian Goldfields and beyond to grow our exciting project portfolio."
TWIST CREEK DRILLING
The drilling program at Twist Creek comprising 18 drillholes (TWD001-TWD018) for 4,437m has now been completed. This drill program was the first ever to test beneath the shallow high-grade historical gold workings at this area where a total of six prospects were targeted over a 3km-long by 1km-wide trend. This trend contained an increased number of gold workings with multiple sub-parallel trends identified from the detailed LIDAR and historical reports.
Significant results from this first-pass drill program previously released include:
- 1.60m at 17 g/t Au from 73m including 0.60m at 43 g/t Au (hole TWD006 - Scandinavian Prospect).
- 1.10m at 15.3 g/t Au from 67.9m including 0.60m at 27.4 g/t Au (hole TWD003 - Scandinavian Prospect).
- 0.35m at 40.1 g/t Au from 82m (hole TWD009 - Victoria Prospect).
- 1.20m at 8.6 g/t Au from 133.8m including 0.40m at 25 g/t Au (hole TWD007 - Victoria Prospect).
For more information on these previously released drilling results, please see the Company's press releases dated July 13, 2022 and August 3, 2022 at .
The successful results from this inaugural drill program prompted a follow-up drill program at the Scandinavian and Victoria prospects. This program consisted of five drillholes (TWD014-TWD018) for 806m and aimed to expand the high-grade mineralization previously intersected on a 40m by 40m drill pattern. The last drillhole of this program, TWD018 was drilled at the Victoria Prospect. Significant intersections include:
- 0.20m at 6.43 g/t Au from 101.95m (hole TWD015 - Scandinavian Prospect), 0.25m at 7.29 g/t Au from 107.15m, and 1.00m at 3.42 g/t Au from 89m.
- 1.00m at 2.15 g/t Au from 152m (hole TWD016 - Scandinavian Prospect) and 1.00m at 2.12 g/t Au from 84m.
More drilling was planned at Twist Creek but due to the unseasonal wet weather conditions, the program was suspended. These conditions also restricted access to drill sites planned to test the more favorable southerly plunge of the high-grade gold shoots. These areas will be re-evaluated once ground conditions improve and are deemed safe to access.
The gold mineralization drilled at Twist Creek consisted of narrow laminated quartz reefs or broader mineralized shear zones containing sulphides, arsenopyrite and pyrite, with or without, silver, galena, and sphalerite. The presence of visible gold was intersected in many of these zones with grades varying from 6 g/t to 43 g/t Au were observed. The mineralized quartz structures and shear zones are interpreted to dip sub-vertically to steep west. The gold shoot plunge referenced in historical reports, indicate a steep southerly plunge but is difficult to confirm from the Company's shortened drill program.
All drillholes at Twist Creek were drilled on inclinations ranging between -30 and -70 degrees, and drilled as perpendicular to the targets as the drill sites would allow (see Table 2). Historical mining operations were undertaken on steeply west-dipping quartz vein structures. Drill core intersection angles of the quartz vein structures range between 45 and 80 degrees to the core axis, so the true width is expected to be between 50% and 80% of the downhole width.
HAPPY VALLEY GEOLOGICAL INTERPRETATION AND 3D MODEL
All assay results have now been received and 3D geological models completed at the Happy Valley Prospect, including first-pass drilling from nearby Champion-Franklin and Managers Hut prospects.
In the Happy Valley historical mining area, the overall gold system comprises four individual reefs of variable widths and grades. The gold system plunges steeply towards the southeast (60 to 75degrees southeast) and have been drill tested to 400m below surface where they remain open at depth (see Figure 2).
The gold mineralization is interpreted to be structurally controlled and located within the axial zone of the overturned Hope Anticline. A series of post-mineralization, low-angle southwest dipping reverse faults (labelled SW1 to SW4 in Figure 2), systematically offset the mineralization towards the southeast and with depth, giving rise to the steep gold shoot plunge as shown on the long-section (see Figure 3). Although interpreted as post-mineralization structures, the higher gold grades appear to be associated with the lower angle faults where they are in closer proximity (labelled SW1 to SW3 in Figure 2), perhaps suggesting some remobilization and concentration of gold.
Drillhole HVD010, the deepest drill intercept within the gold trend, indicates that the mineralization continues and remains open at depth.
In the Champion/Franklin historical mining area, mineralization occurs within the western limb of the Franklin Anticline and does not appear to be associated with any significant low angle faulting. Fold frequency and intensity is variable with as little as 130m between the Hope Anticline and the syncline to the west, while the Franklin Anticline shows a larger 315m to the syncline axis to the west.
The 3D geological interpretation has identified up to three gold target zones - upper, mid, and deeps, on multiple quartz reefs within and below areas previously drill tested (see Figure 3). These targets are currently under review along with an extensive list of other targets within the Myrtleford Project area. These will be ranked and prioritized for future drilling after the assessment is complete.
Following the high-grade gold discovery hole at Happy Valley where drilling intersected 11.1m at 160.45 g/t Au (hole HVD003), the Company made a commitment to ramp up drill activities to test the Twist Creek targets containing up to six lines of reef over a 3km strike length (within the 7km-long trend) that were historically mined with grades up to 2 ounces of gold per tonne. The Twist Creek inaugural drill program was designed to focus on zones containing multiple reef structures with historical gold production.
The Twist Creek area is situated in the northern portion of the Company's Exploration Licence EL006724 in Victoria, Australia (see Figure 4). It lies within a 7km-long trend of historical workings and mines. The Twist Creek Mining Centre produced gold at an average grade of ~31 g/t Au. Prior to E79's inaugural drill program, no modern exploration activities had been conducted within this area.
NEXT STEPS
- At Myrtleford, geological interpretation of the tenement-wide detailed LIDAR is in progress along with reconnaissance rock chip sampling and geological mapping along the 7km-long Twist Creek and 16km-long Magpie trends.
- Await granting of tenement EL7670 which will extend the Happy Valley trend a further 7km southeast. Upon granting, reconnaissance rock chip sampling and geological mapping will commence.
- At the Beaufort Property, further rock chip sampling and mapping of outcropping quartz reefs is in progress. Any further work will be dependent on results.
- Assess opportunities to expand the Company's project portfolio in the Victorian Goldfields.
Table 1 - Myrtleford Project drill intercepts for gold (>0.2 g/t Au).
HOLE ID | From | To | Interval | Gold (g/t) | Silver (g/t) | Lead (%) | Zinc (%) | Prospect | Trend |
CFD001 | 20.3 | 24 | 3.7 | 0.33 | | | | Champion-Franklin | Happy Valley |
CFD002 | 27.7 | 28.5 | 0.8 | 0.21 | | | |
CFD002 | 35.3 | 37 | 1.7 | 0.44 | | | |
CFD002 | 229 | 233 | 4 | 0.20 | | | |
CFD002 | 336 | 337 | 1 | 2.98 | | | |
CFD004 | 23.9 | 25.5 | 1.6 | 8.15 | | | |
within | 21.5 | 31.7 | 10.2 | 1.59 | | | |
HVD018 | 193.9 | 195.4 | 1.5 | 0.40 | | | | Happy Valley |
TWD010 | 115.3 | 116 | 0.7 | 0.33 | | | | Lily/Orion | Twist Creek |
TWD010 | 348 | 360 | 12 | 0.20 | | | |
TWD012 | 36 | 43 | 7 | 0.20 | | | | Sydney |
TWD012 | 372.4 | 372.6 | 0.2 | 8.30 | 4.2 | 0.2 | 0.42 |
TWD012 | 383.3 | 385.65 | 2.35 | 3.00 | | | |
including | 383.3 | 383.8 | 0.5 | 5.66 | | | |
and | 385 | 385.65 | 0.65 | 6.49 | | | |
TWD013 | 207.3 | 207.9 | 0.6 | 0.33 | | | | Excelsior |
TWD013 | 333.6 | 334.6 | 1 | 0.30 | | | |
TWD013 | 395.25 | 395.9 | 0.65 | 1.20 | | | |
TWD014 | 119.3 | 120.3 | 1 | 0.31 | | | | Scandinavian |
TWD015 | 80.2 | 81.2 | 1 | 2.58 | | | |
TWD015 | 89 | 90 | 1 | 3.42 | | | |
TWD015 | 101.95 | 102.15 | 0.2 | 6.43 | 5.2 | 0.24 | 0.56 |
TWD015 | 107.15 | 107.4 | 0.25 | 7.29 | 1.9 | | |
TWD016 | 84 | 85 | 1 | 2.12 | | | |
TWD016 | 139 | 141 | 2 | 1.15 | | | |
TWD016 | 152 | 153 | 1 | 2.15 | | | |
TWD016 | 176 | 178 | 2 | 1.84 | | | |
Table 2 - Myrtleford Project drill hole locations.
Hole ID | GDA (Z55) East | GDA (Z55) North | RL (m) | GDA (Z55) Azimuth | Dip | EOH (m) | Status |
TWD010 | 479301.26 | 5981588.30 | 538.468 | 139.5 | -30 | 396.8 | All assays received |
TWD011 | 479301.42 | 5981588.01 | 538.987 | 139.9 | -20 | 341.1 | All assays received |
TWD012 | 479579.64 | 5981850.83 | 558.855 | 81.7 | -30 | 458.9 | All assays received |
TWD013 | 479590.00 | 5980909.00 | 673 | 78.5 | -42 | 488.7 | All assays received |
TWD014 | 480280.91 | 5980666.39 | 513.102 | 130 | -66 | 197 | All assays received |
TWD015 | 480283.23 | 5980667.24 | 514.222 | 89 | -37 | 188.5 | All assays received |
TWD016 | 480280.91 | 5980666.39 | 513.102 | 89.5 | -56 | 225 | All assays received |
TWD017 | 480280.91 | 5980666.39 | 513.102 | 46 | -32 | 37.3 | Hole failed - no samples |
TWD018 | 479859.24 | 5979628.46 | 594.11 | 126.2 | -35 | 158.6 | All assays received |
HVD017 | 494243.68 | 5945699.71 | 681.605 | 205 | -30 | 297 | All assays received |
HVD018 | 494243.55 | 5945699.25 | 681.905 | 205.1 | -20 | 246 | All assays received |
HVD019 | 494243.97 | 5945699.86 | 681.186 | 200 | -52 | 567 | All assays received |
* All collar positions surveyed by qualified surveyor using differential GPS
QUALITY ASSURANCE/QUALITY CONTROL
All samples are ½ HQ diameter (63.5mm) diamond drill core. Sampling was conducted to geological contacts. Samples were shipped by E79 contractors to ALS Global in Poorooka, SA, Australia. The samples were crushed to a nominal 85% passing 3.15 mm. A 1 kg split was obtained using a Boyd rotary splitter and pulverized in its entirety to a nominal 85% <75 m. Two quartz washes were run through both the crushing and pulverizing equipment between all samples and sizing tests were performed on both the coarse crush and pulverized material. All samples were analyzed by 50-gram fire assay with an atomic absorption finish (Au-AA26). This method has an upper detection limit of 100 ppm. All samples containing visible gold were analyzed by a second 50g fire assay using a gravimetric finish with an upper detection limit of 10,000 ppm (Au-GRA22) for comparison and as a check to the original fire assay (Au-AA26). Certified reference materials (CRM) and coarse quartz blanks were also submitted with the samples to monitor accuracy and possible cross contamination, respectively. The results for all quality control samples lie within acceptable limits.
QUALIFIED PERSON
The technical content of this news release has been reviewed, verified, and approved by Shane Mele, MAIMM (Fellow), Vice President of Exploration for E79 Resources, a "Qualified Person" as defined by National Instrument 43-101. Historical records were verified by the Qualified Person's review of annual and quarterly reports from government records.
ABOUT E79 RESOURCES CORP.
E79 Resources is focused on exploring for Fosterville-type mineralization at its Beaufort and Myrtleford properties in the Victorian Goldfields, Australia. The Myrtleford property represents the consolidation of an entire historic gold camp with over 70 past producing gold mines on the property, where the bulk of historic mining stopped at the water table. At Beaufort, an opportunity exists to explore for a hard rock source of a major alluvial goldfield along a structure that is known to host gold in the region.
Patrick Donnelly
President and Chief Executive Officer
Email: patrick@E79resources.com
Website:
Cautionary Note Regarding Forward-Looking Statements
Neither the Canadian Securities Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.
This news release contains certain statements that may be deemed "forward-looking statements" with respect to the Company within the meaning of applicable securities laws. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential", "indicates", "opportunity", "possible" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although E79 believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, are subject to risks and uncertainties, and actual results or realities may differ materially from those in the forward-looking statements. Such material risks and uncertainties include, but are not limited to, the Company's ability to raise sufficient capital to fund its obligations under its property agreements going forward; to maintain its mineral tenures and concessions in good standing; to explore and develop its projects; to repay its debt and for general working capital purposes; changes in economic conditions or financial markets; the inherent hazards associates with mineral exploration and mining operations; future prices of gold, copper and other metals; changes in general economic conditions; accuracy of mineral resource and reserve estimates; the potential for new discoveries; the ability of the Company to obtain the necessary permits and consents required to explore, drill and develop the projects and if obtained, to obtain such permits and consents in a timely fashion relative to the Company's plans and business objectives for the projects; the general ability of the Company to monetize its mineral resources; and changes in environmental and other laws or regulations that could have an impact on the Company's operations, compliance with environmental laws and regulations, dependence on key management personnel and general competition in the mining industry. Forward-looking statements are based on the reasonable beliefs, estimates and opinions of the Company's management on the date the statements are made. Except as required by law, the Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.
To view the source version of this press release, please visit
バンクーバー、ブリティッシュコロンビア州-(Newsfile Corp.-2022年12月7日)-E 79資源会社(CSE:ESNR) (OTCQB:ESVNF)(“E 79”または“会社”)オーストラリアビクトリア州MyrtlefordおよびBeaufort金鉱における探査活動を喜んで報告する
探検のハイライト
- 全ての掘削結果はランナーとTwist Creek Prospectsから来ています主な交差点は
- 7キロのねじれ小川と16キロのカササギの傾向に沿って引き続き踏査、岩屑サンプリングと地質測量を行った。重要な歴史的黄金生産量を持つ地域とレーザーレーダーが決定した構造的目標が優先される
- 探査許可証(ELA 007670)の申請手続きはすでに最終段階に入り、即ち馬地高品位金回廊は東南に7キロ延在し、その中に多数の歴史金鉱採掘が含まれている。
- 同社は約600万ドルの現金を持ち、資金が豊富で、ビクトリア金鉱や他の地域の他の機会を評価しており、その黄金プロジェクトの組み合わせを拡大している
E 79社のパトリック·ドナリー最高経営責任者兼最高経営責任者は、“Myrtlefordプロジェクトが引き続き刺激的な掘削結果をもたらしていることを見て嬉しいです。私たちは18ヶ月連続で掘削しており、掘削コアは12,768メートルを超えています。Myrtleford 40キロトレンド沿線のすべての注目された目標を評価し、地質に対する理解と最新の全面レーザーレーダーカバー範囲を利用して未来の目標を生み出していきます。また、私たちは強力な現金残高を持ち、ビクトリア金鉱内外で他の機会を探して、私たちの興奮するプロジェクトの組み合わせを拡大しています”と話している
小川をゆがめて井戸を掘る
Twist Creekの掘削計画は18個の掘削穴(TWD 001-TWD 018)を含み、4437メートルに達し、現在完成している。この掘削計画はこの地区が初めて浅層高品位歴史金鉱井の下でテストを行うもので、この地区は全部で6つの探査目標があり、その傾向は長さ3キロ、幅1キロである。この傾向には、ますます多くの金鉱採掘が含まれており、レーザーレーダーと歴史の詳細な報告から複数の平行傾向を決定した
これまでに発表されたこの掘削計画の重要な成果は
- 1.60 m,17 g/トンAu7300万ポンドから始めます0.60 m,43 g/トンAu (穴穴 TWD 006-スカンジナビアの見通し)。
- 1.10 m,15.3 g/トンAu6790万元から0.60メートル、27.4 g/トン金 (孔TWD 003-スカンジナビアの見通し)
- 0.35 m、40.1 g/トンAu8200万から穴穴 TWD 009-ビクトリア展望)。
- 1.2メートル、8.6 g/トンの金1兆338億ドルから0.40 m,25 g/トンAu (穴穴 TWD 007-ビクトリア展望)
先に発表された掘削結果の詳細については、会社が2022年7月13日と2022年8月3日に発表したプレスリリース、URLを参照してください .
この初の掘削計画の成功結果はスカンジナビアとビクトリア前観光地の後続掘削計画を促進した。このプロジェクトは、40 m×40 mの掘削構造上で以前に交差していた高品位鉱化を拡大するために、5つの806 mの掘削孔(TWD 014−TWD 018)を含む。このプロジェクトの最後の掘削孔TWD 018はビクトリア探鉱場で掘削された。重要な交差点は
- 0.20 m、6.43 g/トン101.95 Mから(孔TWD 015-スカンジナビアの見通し)0.25メートル、7.29 g/トンの金10715メートルから1.00メートル、3.42 g/トンAu8900万ドルからです
- 1.00メートル、2.15 g/トンの金152 Mから(孔TWD 016-スカンジナビアの見通し)と1.00メートル、2.12 g/トンの金84 Mからです。
Twist Creekでより多くの掘削を行う予定であるが,異常な湿った天候条件のため,この計画は一時停止されている。これらの条件は、計画テストに入るより有利な高品位金鉱の南への飛び込みの掘削地点も制限されている。地上条件が改善されると、これらの地域は再評価され、安全に入ることができると考えられる。
Twist Creek掘削の金鉱化は、硫化物、毒砂および黄鉄鉱を含み、銀、方鉛鉱およびフラッシュ亜鉛鉱を有するか、または含まない狭い層状石英礁またはより広い鉱化せん断帯からなる。多くの見られる金の付与帯が交わっており,金の品位は6 g/tから43 g/tまで様々である。鉱化した石英構造とせん断帯は近垂直に西に急傾斜していると解釈された。歴史報道で言及された金価格の暴落は南への急落を示しているが、会社が短縮した掘削計画から実証することは困難である
Twist Creekのすべての掘削は、−30度から−70度の間の傾斜角で掘削され、掘削地点が許容される範囲で目標に対して可能な限り垂直である(表2参照)。歴史上の採鉱作業は西に傾斜した石英脈構造上で行われている。石英脈構造のドリルコアと岩マンドレルのなす角は45度から80度の間であるため,真の幅は井戸の下幅の50%から80%の間と予想される。
歓楽谷地質解釈と三次元モデル
すべての検査結果は現在すでに受け取り、走馬地展望はすでに3 D地質モデルを完成し、近くのChampion-FranklinとManagers Hut Prospectsの最初の掘削を含む
走馬地歴史鉱区では、金システム全体が4つの異なる幅と等級の独立したサンゴ礁で構成されている。金システムは南東方向に急激に低下した(60%~75%海面以下400メートルで掘削テストを行い,深さで開放状態を維持した(図2参照)
金鉱化は構造によって制御され,反転した希望背斜軸帯内に位置する。一連の鉱化後の低角度西南傾斜角逆断(図2ではSW 1~SW 4と表記)は体系的に南東方向と深さに鉱化を相殺し、長い断面で示すような急峻な金鉱射出暴落を招いた(図3参照)。鉱化後構造と解釈されているにもかかわらず,高い金品位は低い角度の断層に関係しているようであり,これらの断層距離は近く(図2ではSW 1~SW 3と表記されている),金のいくつかの再活性化や集積を示している可能性がある
掘削HVD 010は金鉱傾向の中で最も深い掘削切片であり,成鉱作用が継続しており,深部で開放されていることが示唆された
Champion/Franklin歴史鉱区では,Franklinの背斜めの西翼内で鉱化が発生し,いかなる重大な低角度断層とは無関係のようであった。しわの周波数と強度は異なり,ホープ背斜と斜め間の距離は130 mであったのに対し,フランクリン背斜め西への斜軸方向はより大きな315 mを示した
3 D地質解釈は、以前に掘削された領域内および下方の複数の石英礁上に位置する3つまでの金鉱目標区である上部、中部、および深層を識別する(図3参照)。現在、このような目標とMyrtlefordプロジェクト地域内の他の目標の広範なリストが検討されている。評価が完了した後、これらの項目を順位付けし、将来の掘削のための優先順位を決定する。
高品位金鉱の発見に続いて掘削と11.1 m,160.45 g/トンAuこれまで、会社はTwist Creek目標をテストするために掘削活動を強化することを約束しており、この目標には3キロの走行長さ(7キロの傾向範囲内)で最大6つの暗礁が含まれており、歴史的に採掘された金の品位は1トン2オンスに達する。Twist Creek初の掘削計画は、歴史的な黄金生産量を有する複数のサンゴ礁構造を含む地域に集中することを目的としている
Twist Creek地区はオーストラリアビクトリア州会社の探査許可証EL 006724の北部に位置する(図4参照)。それは7キロに及ぶ歴史採掘と鉱山の走行範囲内に位置している。Twistクリーク採鉱センターは金鉱工場で金を生産しています平均品位約31 g/トン金それは.E 79の初掘削計画まで,この地域では現代探査活動は行われていなかった。
次のステップ
- Myrtlefordでは,家屋全体で詳細なレーザレーダの地質解釈が行われているとともに,長さ7キロのTwist Creekと16キロのカササギ傾向に沿って岩屑採取と地質マッピングを行っている。
- EL 7670号マンションの承認を待って、歓楽谷の傾向を東南に7キロ延長します。承認後、岩屑のサンプリングと地質充填図の調査を開始する
- Beaufort Propertyでは,露出した石英礁のさらなる岩屑サンプリングとマッピングを行っている。どんな追加的な仕事も結果にかかっているだろう。
- ビクトリア金鉱プロジェクトの組み合わせで会社を拡大する機会を評価する
表1--Myrtlefordプロジェクト掘削で傍受された金(>0.2 g/トン金)
孔ID | 自自 | 至れり尽くせり | 間隔.間隔 | 金(g/トン) | 銀(g/トン) | 販売手がかり(%) | 亜鉛(%) | 展望 | 趨勢 |
CFD 001 | 20.3 | 24 | 3.7 | 0.33 | | | | 優勝者フランクリン | 歓楽穀 |
CFD 002 | 27.7 | 28.5 | 0.8 | 0.21 | | | |
CFD 002 | 35.3 | 37 | 1.7 | 0.44 | | | |
CFD 002 | 229 | 233 | 4 | 0.20 | | | |
CFD 002 | 336 | 337 | 1 | 2.98 | | | |
CFD 004 | 23.9 | 25.5 | 1.6 | 8.15 | | | |
はい | 21.5 | 31.7 | 10.2 | 1.59 | | | |
HVD 018 | 193.9 | 195.4 | 1.5 | 0.40 | | | | 歓楽穀 |
TWD 010 | 115.3 | 116 | 0.7 | 0.33 | | | | 百合/オリオン座 | 小川をゆがめる |
TWD 010 | 348 | 360 | 12 | 0.20 | | | |
TWD 012 | 36 | 43 | 7 | 0.20 | | | | シドニー |
TWD 012 | 372.4 | 372.6 | 0.2 | 8.30 | 4.2 | 0.2 | 0.42 |
TWD 012 | 383.3 | 385.65 | 2.35 | 3.00 | | | |
含まれています | 383.3 | 383.8 | 0.5 | 5.66 | | | |
そして | 385 | 385.65 | 0.65 | 6.49 | | | |
TWD 013 | 207.3 | 207.9 | 0.6 | 0.33 | | | | ますます精を求める |
TWD 013 | 333.6 | 334.6 | 1 | 0.30 | | | |
TWD 013 | 395.25 | 395.9 | 0.65 | 1.20 | | | |
TWD 014 | 119.3 | 120.3 | 1 | 0.31 | | | | スカンジナビア |
TWD 015 | 80.2 | 81.2 | 1 | 2.58 | | | |
TWD 015 | 89 | 90 | 1 | 3.42 | | | |
TWD 015 | 101.95 | 102.15 | 0.2 | 6.43 | 5.2 | 0.24 | 0.56 |
TWD 015 | 107.15 | 107.4 | 0.25 | 7.29 | 1.9 | | |
TWD 016 | 84 | 85 | 1 | 2.12 | | | |
TWD 016 | 139 | 141 | 2 | 1.15 | | | |
TWD 016 | 152 | 153 | 1 | 2.15 | | | |
TWD 016 | 176 | 178 | 2 | 1.84 | | | |
表2-Myrtlefordプロジェクトのドリル位置
孔ID | GDA(Z 55)東 | GDA(Z 55)北 | RL(M) | GDA(Z 55)方位角 | 浸漬する | EOH(M) | 状態.状態 |
TWD 010 | 479301.26 | 5981588.30 | 538.468 | 139.5 | -30 | 396.8 | すべての検査結果を受け取りました |
TWD 011 | 479301.42 | 5981588.01 | 538.987 | 139.9 | -20 | 341.1 | すべての検査結果を受け取りました |
TWD 012 | 479579.64 | 5981850.83 | 558.855 | 81.7 | -30 | 458.9 | すべての検査結果を受け取りました |
TWD 013 | 479590.00 | 5980909.00 | 673 | 78.5 | -42 | 488.7 | すべての検査結果を受け取りました |
TWD 014 | 480280.91 | 5980666.39 | 513.102 | 130 | -66 | 197 | すべての検査結果を受け取りました |
TWD 015 | 480283.23 | 5980667.24 | 514.222 | 89 | -37 | 188.5 | すべての検査結果を受け取りました |
TWD 016 | 480280.91 | 5980666.39 | 513.102 | 89.5 | -56 | 225 | すべての検査結果を受け取りました |
TWD 017 | 480280.91 | 5980666.39 | 513.102 | 46 | -32 | 37.3 | 穴を開けるのに失敗した-サンプルがない |
TWD 018 | 479859.24 | 5979628.46 | 594.11 | 126.2 | -35 | 158.6 | すべての検査結果を受け取りました |
HVD 017 | 494243.68 | 5945699.71 | 681.605 | 205 | -30 | 297 | すべての検査結果を受け取りました |
HVD 018 | 494243.55 | 5945699.25 | 681.905 | 205.1 | -20 | 246 | すべての検査結果を受け取りました |
HVD 019 | 494243.97 | 5945699.86 | 681.186 | 200 | -52 | 567 | すべての検査結果を受け取りました |
*合格した測定者が差分GPSを使用して測定したすべての襟元位置
品質保証·品質管理
すべての試料は1/2 HQ直径(63.5 mm)のダイヤモンドコアであった。地質接触箇所をサンプリングする.サンプルはE 79請負業者によってオーストラリア南オーストラリアPoorookaのALS Globalに運ばれた。試料は3.15 mmを超える公称の85%まで粉砕された。ボイド回転分離器を用いて1 kgの溶解を得、全体を公称85%に粉砕した
資格のある人
本プレスリリースの技術内容はすでに国家機器43-101が定義したE 79資源探査副総裁、MAIMM(研究員)Shane Meleによって審査、確認と承認された。歴史記録は合格者が政府記録中の年度と四半期報告を審査することで確認された。
E 79資源会社について
E 79 Resourcesはオーストラリアビクトリア金鉱区に位置するBeaufortとMyrtleford鉱物探査Fostervilleタイプの鉱化に集中している。Myrtleford地産は歴史金鉱キャンプ全体の統合を代表し、過去にこの土地で生産された金鉱は70基を超え、大部分の歴史金鉱は地下水位に止まっていた。ボフォードでは、この地域で知られている金付与構造に沿って、主に金鉱田を沖積する硬い岩石源を探査する機会がある。
パトリック·ドナリー
社長と最高経営責任者
Eメール:パトリック@E 79 resource ces.com
ウェブサイト:
前向き陳述に関する注意事項
カナダ証券取引所及びその監督サービス提供者は、本プレスリリースの十分性又は正確性に対して責任を負わない。
本プレスリリースに含まれるいくつかの陳述は、証券法の適用が指す会社に関する“前向き陳述”と考えられる可能性がある。前向き表現は、歴史的事実ではない表現を意味するが、一般に、常に“予想”、“計画”、“予想”、“信じる”、“意図”、“推定”、“プロジェクト”、“潜在”、“表明”、“機会”、“可能”および同様の表現、またはイベントまたは条件“将”、“将”、“可能”、“可能”または“すべき”で発生するわけではない。E 79はこれらの展望性陳述の中で表現された期待は合理的な仮定に基づいていると考えているが、これらの陳述は未来の業績に対する保証ではなく、リスクと不確定要素の影響を受け、実際の結果或いは現実は展望性陳述中のと大きく異なる可能性がある。このような重大なリスクおよび不確定要素は、会社が十分な資本を調達する能力があり、その将来の財産合意に規定された義務に資金を提供する能力があること、その鉱物所有権と特許権の良好な地位を維持すること、探査とそのプロジェクトを開発すること、債務の返済と一般運営資金の目的のためのこと、経済状況や金融市場の変化、鉱物探査と採鉱作業に関連する固有の危険、金、銅および他の金属の未来価格、全体的な経済状況の変化、鉱物資源と埋蔵量推定の正確性、新しい発見の潜在力、などを含むが、これらに限定されない。会社が探査·掘削·開発プロジェクトに必要な許可と同意を得る能力を獲得すれば, 当社のプロジェクト計画及び業務目標,当社がその鉱物資源を貨幣化する一般的な能力,及び当社の運営,環境法律及び法規の遵守,主要管理者への依存及び採鉱業の全体競争に影響を与える可能性のある環境及びその他の法律又は法規の変更について,速やかに当該等の許可及び同意を取得する。前向き陳述は、会社経営陣が発表の日に発表した合理的な信念、推定と意見に基づいている。法律に別途規定がある以外に、会社は経営陣の信念、推定または意見またはその他の要素が変化したときにこれらの前向き陳述を更新する義務はない。
本プレスリリースのソースバージョンをご覧になりますので、ごアクセスください