Vancouver, British Columbia--(Newsfile Corp. - November 21, 2023) - NORTEC MINERALS CORP. (TSXV: NVT) ("Nortec" or the "Company") is pleased to announce initial soil sampling results from the 2023 Soil Sampling Program on the Sturgeon Lake VMS project. Results from the first of four soil grids have confirmed anomalous copper - zinc - gold and manganese values, coincident with both Magnetic and Electromagnetic ("EM") geophysical survey results, thereby confirming prospectivity of three high-priority VMS targets in Grid 1 (Figure 3) of the 2023 VTEM ("Versatile Time Domain Electromagnetic") survey (see news release May 31, 2023).
Highlights
- Three high quality targets identified, where highly anomalous copper - zinc - gold and manganese (a key pathfinder in the Sturgeon Lake Camp) were discovered in soils and are coincident with both Magnetic and Electromagnetic geophysical survey results (Figure 3).
- Ground truthing of the Northeast copper target is continuing to expose the potential for a high-grade copper-rich VMS discovery (Figure 4).
- Drill permits have been received for the Sturgeon Lake project.
- The Company has been selected as a 2023 OJEP ("Ontario Junior Exploration Program) recipient and appreciates Ontario's financial commitment to early-stage exploration projects, such as our Critical Mineral project at Sturgeon Lake.
"The initial results from the 2023 soil survey clearly demonstrate the strong prospectivity of this underexplored part of the Sturgeon Lake VMS camp. We now have established drill targets that host the correct technical criteria for a potential VMS deposit discovery. As the remainder of our soil assays and ground EM data are received and interpreted, we hope to continue generating drill targets for the 2024 drilling campaign," stated Cameron Bell, Vice President of Exploration.
Soil results on Grid 1 have confirmed the presence of three high-quality VMS targets that all host coincident Magnetic and EM values with each having a depositional geometry.
VMS Target 1 (Figure 3) hosts a strong correlation between high Cu, Zn, Au, and Mn soil assays in and around two strongly coincident Magnetic and EM anomalies. Limited and shallow historical drilling within the Target 1 area has provided results of 5.8g/t Au, 4.5g/t Ag, 0.64%Pb over 0.9m in historical hole C81-2, thereby confirming that the target is mineralized.
VMS Target 2 (Figure 3) hosts a significant copper soil anomaly of 2450ppm or 0.245% within a coincident Magnetic and EM anomaly and has never been drill tested.
Work on the Northeast copper target (Soil Grid 4 - Figures 1 and 4) is confirming the potential for a new copper-rich VMS discovery in an underexplored part of the Sturgeon Lake camp, namely the central sturgeon assemblage. Five short historic holes have been drilled in the area's >2km strike length and each hole intersected VMS depositional lithologies, alteration and sulphide mineralization, which are characteristic of a copper-rich VMS mineral system. Two holes, C-2 (Ontario Assessment File 52G15NW0042) and H-9 intersected pervasive sections of copper-rich stockwork mineralization (0.16%Cu over 15.2m and 0.34% Cu over 13.4m including 3.1% Cu over 0.3m respectively) on the periphery of the 2023 VTEM anomalies. The Company has recently completed a ground EM survey (results pending) to help define discrete VMS conductors for target refinement in the planned 2024 drill program. The area is fully permitted for drill testing.
The 2023 Soil Sampling Program is complete and remaining results are expected in the coming weeks.
Ontario Junior Exploration Program ("OJEP")
The Company is also pleased to announce it has been selected as a recipient of the 2023 OJEP funding program with support of up to $200,000 having been awarded to the Company.
About Sturgeon Lake VMS Property
The Sturgeon Lake VMS Property lies immediately north and adjacent to Glencore's past-producing mines and is host to the highly prospective continuation of the volcanogenic massive sulphide ("VMS") producing volcanic stratigraphy. Numerous historical drill intercepts on the property host anomalous zinc - copper mineralization and favourable VMS geology. Drill holes H-9 (Ontario Assessment File 52G15NW0086) and C-81-2 (Ontario Assessment File 52G15NW0038) also display strong potential for both copper and gold-rich VMS systems in two highly prospective areas, where drill intercepts of 3.1% Cu over 0.3m and 5.8g/t Au over 0.9m were realized.
The Sturgeon Lake VMS mining camp is host to five high-grade past producing zinc - copper - lead - silver - gold mines of Glencore plc, having a total combined production of 19.8Mt @ 8.50% Zn, 1.06% Cu, 0.91% Pb and 119.7g/t Ag (Franklin, J. M., 1996. Volcanic-associated massive sulphide base metals in Eckstrand, O. R., Sinclair, W. D., Thorpe, R.I. (eds.), Geol. Survey Canada Geology of Canada 8, 158-183.).
The Sturgeon Lake Mine Camp is located within the prolific Sturgeon Lake greenstone belt in the Wabigoon sub-province of Ontario's Superior Province, approximately 270 kilometers northwest of Thunder Bay.
Figure 1: 2023 Soil grids with the 2023 VTEM results (SFz15 EM) as background.
Figure 2: 2023 Soil grids with infrastructure as background.
Figure 3: 2023 soil results over soil grid 1. Locations of historical DDH collars are interpreted from government assessment data.
Figure 4: Northeast copper target area with soil grid 4 layout (results pending). Locations of historical DDH collars, and projected intersections, are interpreted from government assessment data.
Qualified Person
The technical information in this release has been reviewed and verified by Cameron Bell, P. Geo., Vice President of Exploration of the Company, and the Qualified Person as defined by National Instrument 43-101.
About Nortec Minerals Corp.
Nortec is a mineral exploration company that holds 100% interests in two exploration stage critical mineral (zinc) projects, namely the Mattagami River Zinc and the Sturgeon Lake VMS properties, both located in Ontario, Canada. Additionally, the Company holds a 16.4% interest in the Tammela Gold and Tammela Lithium projects in Southwest Finland. Additional information can be found on the Company's SEDAR profile at and its website at .
On behalf of the Company,
"Sara Hills"
Chief Financial Officer
info@nortecminerals.com
Neither the TSX Venture Exchange nor its Market Regulator (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Information set forth in this press release may contain forward-looking statements. Forward-looking statements are statements that relate to future, not past events. In this context, forward-looking statements often address a company's expected future business and financial performance, and often contain words such as "anticipate", "believe", "plan", "estimate", "expect", and "intend", statements that an action or event "may", "might", "could", "should", or "will" be taken or occur, or other similar expressions. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, risks associated with project development; the need for additional financing; operational risks associated with mining and mineral processing; fluctuations in palladium and other commodity prices; title matters; environmental liability claims and insurance; reliance on key personnel; the absence of dividends; competition; dilution; the volatility of our common share price and volume; and the impact of governmental entities. Forward-looking statements are made based on management's beliefs, estimates and opinions on the date that statements are made and the Company undertakes no obligation to update forward-looking statements if these beliefs, estimates and opinions or other circumstances should change. Investors are cautioned against attributing undue certainty to forward-looking statements.
To view the source version of this press release, please visit
バンクーバー、ブリティッシュコロンビア-(ニュースファイル社-2023年11月21日)-NORTEC MINERALS CORP.(tsxv:nvt) ("ノルテックまたは「企業」は、スタージョンレイクVMSプロジェクトの2023年土壌サンプリングプログラムから初期の土壌サンプリング結果を発表することを喜んでいます。4つの土壌グリッドのうち、第1グリッドの結果は異常な銅-亜鉛-金およびマンガンの値を確認し、磁気および電磁気測量調査の結果と一致しており、2023年VTEM(「多目的時間領域電磁気」)調査(2023年5月31日のニュースリリース参照)のグリッド1の3つの優先高位のVMSターゲットの見通しが確認されました(図3)。
ハイライト
- 銅-亜鉛-金およびマンガン(スタージョンレイクキャンプの主要なパスファインダー)の異常に高い値が土壌で発見され、磁気および電磁気測量調査の結果と一致している場所が3つの高品質のターゲットが確認されました(図3)。
- 東北銅ターゲットの地上確認が続いており、高品位の銅豊富なVMS鉱床の発見の可能性が示唆されています(図4)。
- スタージョンレイクプロジェクトの掘削許可が受領されました。
- 同社は2023年のOJEP(「オンタリオジュニア探査プログラム」)受賞者として選ばれ、オンタリオ州が初期段階の探査プロジェクト、特にスタージョンレイクの重要鉱物プロジェクトを支援するための財政的な取り組みに感謝しています。
「2023年土壌サーベイの初期結果は、スタージョンレイクVMSキャンプの未開発の部分の強い見通しを明確に示しています。潜在的なVMS鉱床の発見に適した正確な技術基準を持つ掘削ターゲットを確立しました。残りの土壌分析および地上EMデータが受信および解釈されるにつれて、2024年の掘削キャンペーンのために引き続き掘削ターゲットを生成できることを願っています」このように、ExplorationのバイスプレジデントであるCameron Bellは述べています。
第1グリッドの土壌調査結果は、それぞれ堆積幾何学を持ち、磁気およびEM値が一致する3つの高品質のVMSターゲットの存在を確認しました。
VMSターゲット1(図3)は、2つの強く一致する磁気とEM異常の周辺および内部で高Cu、Zn、Au、およびMn土壌アッセイの間に強い相関関係があります。ターゲット1エリア内の限定的で浅い歴史的掘削により、史上最高の5.8g/tのAu、4.5g/tのAg、0.64%のPbの結果が提供され、ターゲットが鉱化物質であることが確認されました。0.9mの歴史的孔C81-2での5.8g/tのAu、4.5g/tのAg、0.64%のPbを提供し、ターゲットが鉱化物質であることを確認しています。
VMSターゲット2(図3)は、一致する磁気とEM異常の内部に2450ppmの重要銅土壌異常を有し、今まで掘削テストが行われたことがありません。2450ppm もしくは0.245%です。
ノースイースト銅鉱のターゲット(土壌グリッド4 - 図1および4)への作業が、Sturgeon Lakeキャンプの未開発部分である中央Sturgeonアッセンブリにおける新しい銅豊富なVMS発見の可能性を確認しています。2 kmを超えるストライク長で5つの短い歴史的な穴が掘られ、それぞれの穴はVMS堆積岩、変成作用、硫化物鉱物化が適合し、これらは銅豊富なVMS鉱床系の特徴です。2つの穴、C-2(オンタリオ評価ファイル52G15NW0042)とH-9は、2023 VTEM異常の周縁部にある銅豊富な冠晶鉱物化の浸透性部分を交差し、15.2 mで0.16%Cu、13.4 mで0.34% Cuを含み、それぞれ0.3mの3.1%Cuを含有しています。会社は最近、地上のEM調査を完了し(結果は保留中)、計画された2024年の掘削プログラムでターゲットの絞り込みに向けて個別のVMSコンダクタを定義するのに役立ちました。このエリアは掘削試験のために完全に許可されています。(0.16%のCu、15.2m以上と0.34%Cu以上13.4m、3.1%Cu以上0.3mを含む) 3つの短い歴史的穴がVMS沈積岩、変成作用、硫化物鉱物化を交差したため、新しい銅豊富なVMS発見の可能性が確認されました。含むそれぞれ0.3メートルの3.1%Cu2023 VTEM異常の周縁部にある銅豊富な冠晶鉱物化の浸透性部分を交差しています。会社は最近、地上のEM調査を完了し(結果は保留中)、計画された2024年の掘削プログラムでターゲットの絞り込みに向けて個別のVMSコンダクタを定義するのに役立ちました。このエリアは掘削試験のために完全に許可されています。
2023年の土壌サンプリングプログラムは完了し、残りの結果は数週間以内に予想されています。
オンタリオジュニア探査プログラム(「OJEP」)
会社はまた、2023年のOJEP資金調達プログラムの受賞者の1つとして選ばれ、同社に最大$200,000の支援が授与されました。
Sturgeon Lake VMSプロパティについて
Sturgeon Lake VMSプロパティは、Glencoreの過去の生産鉱山のすぐ北隣に位置し、火山性マグマ質硫化物(「VMS」)を産出する高度に見込みのある断層火山堆積物の継続をホストしています。プロパティ上の多数の歴史的な掘削標本は異常な亜鉛-銅鉱化をホストし、有利なVMS地質を持っています。H-9(オンタリオ評価ファイル52G15NW0086)とC-81-2(オンタリオ評価ファイル52G15NW0038)の穴は、それぞれ0.3メートルで3.1%Cu、0.9メートルで5.8g/t Auの銅や金豊富なVMSシステムの強い可能性を示しています。3.1%Cu0.3メートルを超える5.8g/t Au0.9メートルで
Sturgeon Lake VMS鉱山地帯は、Glencore plcの高品位鉱山である亜鉛-銅-鉛-銀-金の5つの過去の生産鉱山を持ち、合計1980万トンの鉱石が8.50%Zn、1.06% Cu、0.91% Pb、119.7 g/トンのAgで生産されました。 」(Franklin、J.M.、1996。Eckstrand、O.R.、Sinclair、W.D.、Thorpe、R.I。(eds。)、Geol。Survey Canada Geology of Canada 8、158-183.)。Sturgeon Lake Mine Campは、オンタリオのスーペリア・プロビンスのウォビグーン・サブプロビンスのSturgeon Lake緑片岩帯内に位置しています。サブ地帯内。小テスト村から約270キロメートル北西に位置しています。
図1:2023年の土壌グリッドと2023年のVTEM結果(SFz15 EM)を背景にしたもの。
図1:2023年土壌グリッドと2023年VTEM結果(SFz15 EM)を背景にしたもの。
図2:2023年の土壌グリッドにインフラストラクチャーを背景にしています。
図3:2023年の土壌グリッド1の土壌結果。歴史的なDDHの首輪の場所は、政府の評価データから解釈されます。
図4:ノースイースト銅ターゲットエリアには土壌グリッド4のレイアウト(未発表の結果)があります。歴史的なDDH首輪の場所と予測される交差点は、政府の評価データから解釈されています。
資格を持つ担当者
本リリースの技術情報は、同社の探鉱副社長であるCameron Bell P. Geo.が確認し、検証しました。この結果、 Qualified Person(National Instrument 43-101に定義される)に準拠しています。
ノーテック・ミネラルズ社について
ノルテックは、カナダのオンタリオ州にある2つの探査段階クリティカルミネラル(亜鉛)プロジェクト、すなわちMattagami River ZincおよびSturgeon Lake VMSプロパティの両方に100%持ち分を保有しています。さらに、同社は南西フィンランドのタンメラ・ゴールドおよびタンメラ・リチウムプロジェクトに16.4%の持分を保有しています。 追加情報は、同社のSEDARプロファイル およびWebサイト で入手できます。
会社を代表して
Sara Hills
最高財務責任者
info@nortecminerals.com
TSXベンチャー取引所およびその市場規制当局(TSXベンチャー取引所のポリシーで定義される用語として)は、このリリースの適切さまたは正確さに対する責任を負いません。
このプレスリリースに記載されている情報には、将来の見通しを含む場合があります。将来を見据えた声明(forward-looking statements)は、過去の事象ではなく、今後の事象に関連するものです。この文脈では、将来の見通しの声明には、通常、企業の今後の事業および財務パフォーマンスについて言及し、「予想する」「信じる」「計画する」「推定する」「期待する」および「意図する」という語句が多用され、「行動が」「イベントが」「取られる」「発生する」という言葉を含んでいる場合があります。その他同様の表現が含まれます。その性質上、将来を見据えた声明には、事前に知られているリスク、不確実性、その他の要因が含まれることがあり、それらによって、実際の結果、パフォーマンス、または将来のイベントが、そのような将来を見据えた声明によって明示または黙示される将来の結果、パフォーマンスまたはイベントと実質的に異なる可能性があります。そのような要因には、プロジェクト開発に関するリスク、追加資金調達の必要性、鉱山および鉱物処理に関連する運営上のリスク、パラジウムおよびその他の商品価格の変動、タイトル関連事項、環境責任請求および保険、キー人材への依存、配当のないこと、競争、希釈、当社の普通株価の変動性と出来高、および政府機関の影響が含まれます。将来を見据えた声明は、声明がなされた日に、当社の管理陣の信念、見積り、および意見に基づいてなされ、その後、これらの信念、見積り、および意見、またはその他の状況に変化があった場合、当社は将来を見据えた声明を更新する義務を負わないものとします。投資家は、将来を見据えた声明に対して過度な確信を与えることがないように注意を喚起されます。
このプレスリリースのソースバージョンを表示するには、を訪問してください