Vancouver, British Columbia--(Newsfile Corp. - January 10, 2024) - Eureka Lithium Corp. (CSE: ERKA) (OTCQB: UREKF) (FSE: S580) ("Eureka Lithium" or "Eureka" or the "Company"), continues its review and assessment of the Lac La Motte lithium project (see Press Release December 8th, 2023) as part of its Due Diligence period under the letter of intent, to be followed by the negotiation and drafting of the Definitive Agreement with the optionor, Medaro Mining Corp., ("Medaro" or "the Optionor").
The Lac La Motte property is located in La Corne township, in the prolific mining area of the Abitibi- Témiscamingue region, Quebec province, 40 kilometres ("km") northwest of the city of Val d'Or. Spodumene lithium occurrences hosted in the intrusive rocks of the La Corne Batholithe have been explored since the 1950s, with the "La Corne Region" renowned as one of the world's most prospective and active area for hard rock lithium deposits.
The Property is situated almost mid-way between the North American Lithium (NAL) mine and the Authier project. The NAL operation started in March 2023, and is Quebec's only producing lithium mine, and Canada's most recent producer owned by Sayona Quebec, a joint venture between Australia's Sayona Mining Ltd. & North Carolina's Piedmont Lithium Inc. Sayona Mining also owns the Authier project in Lac Motte Township, which is at the permit stage for open pit production, with processing at the NAL site. With two operating lithium mines in the near term, and numerous advanced and early-stage projects the La Motte-La Corne area represents an emerging "lithium hub". The Company's Lac La Motte project is located 9 kms east of the Authier Project, and 15 kms west of the NAL Mine.
Jeff Wilson, CEO of Eureka Lithium, stated: "We are excited about the opportunity the Lac La Motte project presents to Eureka and its shareholders. Should our due diligence lead us to proceed to a Definitive Agreement, the favourable terms under which Eureka can earn a 100% interest in the project allows Eureka to put money in the ground in exploration and drilling expenditures on a prospective project with year-round access. Furthermore, the high-quality work and advancement of targets by prior operators provides Eureka with a drill-ready and drill-permitted asset with multiple compelling target areas to test in the coming months."
Two areas key areas of interest have been identified on the Lac La Motte Property, designated as the West Target and East Target, respectively.
East Target
The East Target is located near the southeast corner of Lac La Motte, approximately 300 metres ("m") inland from the lake shore. Sampling, prospecting and mapping by the Optionor in 2022 identified multiple spodumene occurrences, which was investigated with surface sampling and a 9 hole diamond drill program (MD22-01 to 09). The work was mainly focussed along a roughly 500 m long pegmatite trend partially exposed at surface with widths in the range of 0.5 to 2 metres.
Work Results Highlights:
The surface samples result from the main La Motte showing indicate lithium oxide (Li2O) values in the range of less than 0.02% Li2O to 2.58% Li2O.
Drill Hole MD22-02 Intersected a 0.7 m wide pegmatite with 0.89% lithium oxide (Li2O) at 72.7 m drilled depth.
Drill Hole MD22-05 Intersected three pegmatites: top 0.79 m wide with 1.34% Li2O at 13.18 m depth; middle 0.7 m wide with 0.5% Li2O at 20 m depth; lower 0.81 m wide at 0.78% Li2O at 22.92 m depth.
Drill Hole MD22-06 Intersected three pegmatites: top 0.11 m wide with 1.10% Li2O at 31.95 m depth; middle 0.87 m wide with 1.01% Li2O at 34.53 m depth; lower 0.80 m wide at 0.55% Li2O at 37.58 m depth.
Drill Hole MD22-07 Intersected 1.76 m wide pegmatite with average 4,375 ppm Li / 0.94% Li2O.
Drill Hole MD22-08 Intersected two pegmatites: Upper 1.33 m wide with 1.49% Li2O at 36 m depth; and lower 0.93 m wide at 88% Li2O at 41.2 m depth.
West Target
The West Target comprises an historical lithium spodumene prospect "La Motte VII-47" discovered in the 1950s, with the "La Motte" showing located approximately 280 metres to the northeast, discovered in 2010. Spodumene mineralization is hosted in a pegmatite dike cutting metasedimentary rocks of the Caste Formation (Kewagama Group) which are in contact to the west with basalts of the La Motte-Vassan Formation (Malartic Group). In 2022, the Optionor completed five (5) diamond drill holes (MD22-10 to 15) over the La Motte showing, over a NNW-SSE strike of approximately 240 metres. The drill holes intersected multiple low-grade pegmatites.
In 2022, the Optionor also contracted CC Explorations LLC for Satellite Imaging Technology (SIT) to define lithium exploration targets in the West Target area. The SIT survey was able to detect and plot potential lithium concentrations, possibly veins but appearing to run along contact zones as well as indications of outcrops in the bedrock surrounding these areas at depth and near surface.
The optionor has reported (see press release February 15, 2023) that all intersections reported are based on drilled widths and have not been converted to the true width. The drill core from the 2022 program was logged and sampled at facility located about 50 kilometres from the property in the village of Saint-Dominique-du-Rosaire. The samples were bagged and tagged, using best practices, and were delivered to Activation Laboratories in Ancaster, Ont., for sample preparation and analyses, using laboratory code Ultratrace 7 and sodium peroxide fusion (Na2O2). Activation Laboratories is an independent, commercial, ISO-certified laboratory.
The Optionor reports that the pegmatites encountered within the significant drill intercepts correlate strongly with the historical diamond drilling completed on the property in the 1950s. Results from the Optionor's 2022 field prospecting and sampling program was the basis for deciding on the targets for the 2022 drill program. The 2022 results are being compiled and assessed by Eureka and this information will be used to plan a follow-up drill program at the property in 1st quarter 2024, subject to Eureka's completion of its due diligence process and election to proceed with the Option.
The Optionor has acquired 15 additional claims in the Lac La Motte area which can also be included in the final Property Purchase agreement.
About Satellite Imaging Technology (SIT)
The Optionor contracted CC Explorations LLC of the USA to complete a first phase Satellite Assessment over a part of the CYR Lithium Property. CC Exploration provided the following rationale for usefulness of their technology to define lithium exploration targets at depth:
Satellite technology has been around for almost 80 years and there are continuous new developments on applications. The study of molecular structures ( atoms, protons, neutrons ) has been going on for centuries and each element of the periodic table has its own structure. Every element on the periodic table and any other material product , organic or inorganic , has its own measurable frequency. This includes all metals, oil and gas, water.
One satellite-based technology has been deployed now for over a decade and that is NMR technology, or nuclear magnetic resonance in which the satellite can capture neutron measurements. These can then be extrapolated into readings of different elements and subsurface bodies. This is a fast reconnaissance instrument and can be used as a prospecting instrument to guide any future follow up.
In practical operations CC Exploration first do the satellite imaging which confirms the presence of the target element. This information then provides GPS locations to place the ground sensors.
Frequency density data is then collected for 30 days onto SD cards. At the end of 30 days the cards are shipped to the research facility for processing and 3-D modelling.
Table 1: East Target Drill Holes Results 2022
DRILL HOLE ID | FROM (m) | TO (m) | LENGTH | Li (ppm) | Li2O % | COMMENTS |
MD22-01 | 14.57 | 15.6 | 1.03 | 64 | 0.01 | Intersected three pegmatites: top 1.03 m wide with 64 ppm Li at 14.57 m depth; middle 0.94 m wide with 1,420 ppm Li at 59.5 m depth; and lower 0.67 m wide at 1,310 ppm Li at 75.7 m depth. |
59.5 | 60.44 | 0.94 | 1420 | 0.31 |
75.7 | 76.37 | 0.67 | 1310 | 0.28 |
MD22-02 | 11.4 | 12.3 | 0.90 | 56 | 0.01 | 0.7 m wide pegmatite with 0.89% Li2O at 72.7 m drilled depth |
20.7 | 21.23 | 0.53 | 244 | 0.05 |
72 | 72.7 | 0.70 | 142 | 0.03 |
72.7 | 73.4 | 0.70 | 4160 | 0.89 |
117.69 | 118.53 | 0.84 | 77 | 0.02 |
MD-22-03 | 23.6 | 24 | 0.4 | 386 | 0.08 | Two pegmatites: top 1.06 m at 0.6% Li2O at 24.12 m; lower 1 m at 0.17% Li2O at 62.2 m drilled depth |
24.12 | 25.18 | 1.06 | 2780 | 0.60 |
26.43 | 26.85 | 0.42 | 179 | 0.04 |
62.2 | 63.2 | 1 | 806 | 0.17 |
129.2 | 129.65 | 0.45 | 46 | 0.01 |
137.66 | 138.2 | 0.54 | 59 | 0.01 |
MD-22-04 | 4.72 | 5.17 | 0.45 | < 15 |
| Intersected 0.62 m wide pegmatite with 381 parts per million (ppm) Li at 59.68 m depth |
59.68 | 60.3 | 0.62 | 381 | 0.08 |
MD-22-05 | 13.18 | 13.97 | 0.79 | 6240 | 1.34 | Intersected three pegmatites: top 0.79 m wide with 1.34% Li2O at 13.18 m depth; middle 0.7 m wide with 0.5% Li2O at 20 m depth; lower 0.81 m wide at 0.78% Li2O at 22.92 m depth. |
20 | 20.7 | 0.70 | 2330 | 0.50 |
22.92 | 23.73 | 0.81 | 3650 | 0.78 |
MD22-06 | 31.95 | 32.06 | 0.11 | 5110 | 1.10 | Intersected three pegmatites: top 0.11 m wide with 1.10% Li2O at 31.95 m depth; middle 0.87 m wide with 1.01% Li2O at 34.53 m depth; lower 0.80 m wide at 0.55% Li2O at 37.58 m depth. |
34.53 | 35.4 | 0.87 | 4680 | 1.01 |
37.58 | 38.38 | 0.80 | 2550 | 0.55 |
48 | 48.4 | 0.40 | 173 | 0.04 |
119.25 | 120 | 0.75 | 253 | 0.05 |
MD22-07 | 37.34 | 38.23 | 0.89 | 3060 | 0.66 | 1.76 m wide pegmatite with average 4,375 ppm Li / 0.94% Li2O |
38.23 | 39.1 | 0.87 | 5690 | 1.22 |
37.34 | 39.1 | 1.76 | 4375 | 0.94 |
MD22-08 | 36 | 36.62 | 0.62 | 5110 | 1.10 | Intersected two pegmatites: Upper 1.33 m wide with 1.49% Li2O at 36 m depth; lower 0.93 m wide at 88% Li2O at 41.2 m depth. |
36.62 | 37.33 | 0.71 | 8710 | 1.87 |
36 | 37.33 | 1.33 | 6910 | 1.49 |
41.2 | 42.13 | 0.93 | 4080 | 0.88 |
47.93 | 48.38 | 0.45 | 199 | 0.04 |
MD22-09 | 144 | 144.59 | 0.59 | 210 | 0.05 | One 0.59 m wide pegmatite with 210 ppm Li at 144 m depth |
Table 2: West Target Drill Holes Results 2022
DRILL HOLE ID | FROM (m) | TO (m) | LENGTH | Li (ppm) | Li2O % | COMMENTS |
MD22-10 | 3 | 4 | 1.00 | 227 | 0.05 | Intersected two pegmatites: Upper 1.60 m wide with 167.5 ppm Li at 3 m depth; lower 0.93 m wide at 204 ppm Li at 29.07 m depth. |
4 | 4.6 | 0.60 | 108 | 0.02 |
3 | 4.6 | 1.60 | 167.5 |
|
29.07 | 29.49 | 0.42 | 169 | 0.04 |
29.49 | 30 | 0.51 | 239 | 0.05 |
29.07 | 30 | 0.93 | 204 |
|
MD22-11 | 57.93 | 63 | 5.07 | 31.2 | 0.01 | Intersected multiple lower grade pegmatites including two mains: upper 5.07 m wide with 31.2 ppm Li at 57.93 m depth; lower 14.13 m wide at 53.80 ppm Li at 53.80 m depth. |
64.37 | 78.5 | 14.13 | 53.80 | 0.01 |
81.18 | 81.81 | 0.63 | 70 | 0.02 |
93.2 | 93.83 | 0.63 | 60 | 0.01 |
100.74 | 101.3 | 0.56 | 61 | 0.01 |
105.4 | 106.2 | 0.80 | 141 | 0.03 |
8.25 | 9.08 | 0.83 | 61 | 0.01 |
MD22-12 | 47.67 | 48.72 | 1.05 | 65 | 0.01 | Intersected 1.03 m wide pegmatite with 1,080 ppm Li at 46.9 m depth. |
MD22-13 | 48.2 | 49 | 0.80 | 51 | 0.01 | Intersected two low grade pegmatites: upper 0.80 m grading 51 ppm Li at 48.2 m, lower 1.16 m grading 60 ppm Li at 49 m depth. |
49 | 50.16 | 1.16 | 60 | 0.01 |
MD22-14 |
|
|
|
|
| No significant mineralization |
MD22-15 | 32.22 | 33.1 | 0.88 | 373.00 | 0.08 | One 0.88 m wide pegmatite with 373 ppm Li at 33.22 m depth |
Corporate Video
To view a new Eureka Lithium corporate video, visit () or the following URL:
Corporate Presentation
Visit the Eureka Lithium homepage or click on the following URL to view the Company's Corporate Presentation:
Qualified Person
The scientific and technical content of this news release has been reviewed and approved by Afzaal Pirzada, P. Geo., who is a "qualified person" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects.
About Eureka Lithium Corp.
Eureka Lithium is the largest lithium-focused landowner in the northern third of Quebec, known as the Nunavik region, with 100-per-cent ownership of three projects comprising 1,408 square km in the emerging Raglan West, Raglan South and New Leaf lithium camps. These claims were acquired from legendary prospector Shawn Ryan and are located in a region that hosts two operating nickel mines with deep-sea port access. The recent acquisition of the La Motte lithium project near Val D'Or, Quebec broadens Eureka Lithium's holdings into the heart of Canada's major lithium production district.
For more information please contact:
Jeffrey Wilson
Chief Executive Officer
Email: info@eurekalithiumcorp.com
Cautionary Statement
Certain statements contained in this news release, including statements which may contain words such as "expects", "anticipates", "intends", "plans", "believes", "estimates", or similar expressions, and statements related to matters which are not historical facts, such as statements regarding the contemplated completion of the Acquisition and the Concurrent Financing, are forward-looking information within the meaning of applicable securities laws. Such forward-looking statements reflect management's expectations and are based on certain factors and assumptions and involve known and unknown risks and uncertainties which may cause the actual results, performance, or achievements to be materially different from future results, performance, or achievements expressed or implied by such forward-looking statements. These factors should be considered carefully, and readers should not place undue reliance on the Company's forward-looking statements. The Company believes that the expectations reflected in the forward-looking statements contained in this news release are reasonable, but no assurance can be given that these expectations will prove to be correct, nor that the Acquisition will be completed as contemplated, or at all, or that the Concurrent Financing will be completed as contemplated, or at all. The Company undertakes no obligation to release publicly any future revisions to forward-looking statements to reflect events or circumstances after the date of this news or to reflect the occurrence of unanticipated events, except as expressly required by law.
The Canadian Securities Exchange (CSE) has not reviewed, approved, or disapproved the contents of this press release.
To view the source version of this press release, please visit
ブリティッシュコロンビア州バンクーバー--(Newsfile Corp.-2024年1月10日)-ユーレカリチウム株式会社(CSE:ERKA)(OTCQB:UREKF)(FSE:S580)(「ユーレカリチウム」または「ユーレカ」または「当社」)は、ラック・ラ・モットのリチウムプロジェクトの見直しと評価を続けています(12月8日のプレスリリースを参照)番目の、2023)意向書に基づくデューデリジェンス期間の一部として、その後、オプション者であるメダロ鉱業株式会社(「メダロ」または「オプション人」)との最終契約の交渉と起草が行われます。
Lac La Motteの物件は、ヴァル・ドール市から北西に40km(「km」)、ケベック州アビティビ・テミスカマング地方の多産地にあるラ・コルヌ・タウンシップにあります。ラ・コルヌ・バソリスの侵入岩に含まれるスポジュメンリチウムの産出は、1950年代から調査されてきました。「ラコルヌ地域」は、硬岩リチウム鉱床が世界で最も有望で活発な地域の1つとして知られています。
この物件は、北米のリチウム(NAL)鉱山とオーティエプロジェクトのほぼ中間に位置しています。NAL事業は2023年3月に開始され、ケベック州で唯一生産されているリチウム鉱山であり、オーストラリアのサヨナ・マイニング社とノースカロライナのピエモンテ・リチウム社の合弁会社であるサヨナ・ケベックが所有するカナダで最も新しい生産者です。サヨナ・マイニングはラック・モット・タウンシップのオーティエ・プロジェクトも所有しています。このプロジェクトは露天掘り生産の許可段階にあり、NALの敷地内で処理を行っています。La Motte-La Corne地域は、短期的に2つのリチウム鉱山が稼働し、数多くの先進的かつ初期段階のプロジェクトが進行中で、新たな「リチウムの拠点」となっています。同社のラック・ラ・モットプロジェクトは、オーティエ・プロジェクトの東9km、NAL鉱山の西15kmに位置しています。
ユーレカリチウムのCEO、ジェフ・ウィルソンは次のように述べています。「ラックラモットプロジェクトがユーレカとその株主に与える機会にわくわくしています。デューデリジェンスによって最終合意に至った場合、ユーレカがプロジェクトの 100% の持分を獲得できるという有利な条件があれば、ユーレカは、年間を通じてアクセスできる将来のプロジェクトの探査と掘削の支出に資金を投入することができます。さらに、以前のオペレーターによる質の高い作業とターゲットの前進により、ユーレカは今後数か月以内にテストすべき複数の魅力的なターゲットエリアを備えた掘削準備が整い、掘削が許可された資産を手に入れました。」
Lac La Motteプロパティには、それぞれ西ターゲットと東ターゲットという2つの主要関心分野が特定されています。
イーストターゲット
イーストターゲットは、湖岸から約300メートル(「m」)内陸にある、ラック・ラ・モットの南東の角近くにあります。2022年にOptionorが行ったサンプリング、探査、マッピングにより、複数のスポジュミンの発生が確認され、表面サンプリングと9ホールのダイヤモンドドリルプログラム(MD22-01〜09)で調査されました。この作業は主に、幅0.5〜2メートルの範囲の表面に部分的に露出した長さ約500mのペグマタイトトレンドに焦点を当てました。
仕事成果のハイライト:
メインのラモットの表面サンプルの結果は、酸化リチウム(Li2O)の値がLi2Oの0.02%未満からLi2Oの2.58%の範囲であることを示しています。
ドリルホール MD22-02は、幅0.7mのペグマタイトと 0.89% の酸化リチウム(Li2O)が72.7mの深さで交差しました。
ドリルホールMD22-05が交差した3つのペグマタイト:深さ13.18mで上部幅0.79m、深さ13.18mでLi2O1.34%、中央幅0.7m、深さ20mで幅0.7m、深さ22.92mでLi2O0.78%の下部幅0.81メートル。
ドリルホール MD22-06 3つのペグマタイトが交差しています。上部幅0.11m、深さ31.95mで1.10%のLi2O、中央の幅0.87m、深さ34.53mで幅0.87m、深さ37.58mで0.55%のLi2Oがあります。
ドリルホール MD22-07は幅1.76mのペグマタイトと交差し、平均リチウムは4,375ppm/リチウム2Oは0.94%でした。
ドリルホール MD22-08 2つのペグマタイトが交差しています。深さ36メートルで上部幅1.33メートル、リチウム2O1.49%、下部幅0.93メートル、深さ41.2メートルで幅88%のリチウム2O。
ウエストターゲット
ウエストターゲットは、1950年代に発見された歴史的なリチウムスポジュメン鉱床「ラ・モット VII-47」で構成されており、「ラ・モット」は2010年に発見された、北東約280メートルに位置する探鉱物です。スポジュミンの鉱化作用は、ラ・モット・ヴァッサン層(マラティックグループ)の玄武岩と西側で接触しているカースト層(ケワガマグループ)のメタ堆積岩を切断するペグマタイト堤防で行われます。2022年、オプションノールは約240メートルの南西-SSEストライクで、ラモットショーの上空に5つのダイヤモンドドリルホール(MD22-10から15)を完成させました。ドリルホールが複数の低品位ペグマタイトと交差していました。
2022年に、オプションノールは衛星画像技術(SIT)のCC Explorations LLCと契約して、西ターゲット地域のリチウム探査ターゲットを定義しました。SITの調査では、潜在的なリチウム濃度を検出してプロットすることができました。おそらくは静脈ですが、接触帯に沿って走っているように見えます。また、これらの領域を囲む岩盤の深さと表面近くの露頭の兆候も検出してプロットできました。
optionorは、報告されたすべての交差点はドリル幅に基づいており、実際の幅に変換されていないと報告しました(2023年2月15日のプレスリリースを参照)。2022年のプログラムのドリルコアは、サン・ドミニク・デュ・ロゼール村の施設から約50km離れた施設で伐採され、サンプリングされました。サンプルはベストプラクティスに従って袋詰めされ、タグ付けされ、オンタリオ州アンカスターのアクティベーションラボラトリーズに届けられ、ラボコードUltratrace 7と過酸化ナトリウム融合(Na2O2)を使用してサンプルの準備と分析が行われました。アクティベーションラボラトリーズは、独立した商業用ISO認定ラボです。
Optionorは、重要な掘削インターセプトで遭遇したペグマタイトは、1950年代にこの施設で完了した歴史的なダイヤモンド掘削と強く相関していると報告しています。Optionorの2022年の現地調査およびサンプリングプログラムの結果が、2022年の訓練プログラムの目標決定の基礎となりました。2022年の結果はユーレカによってまとめられ、評価されています。この情報は、1月の施設でのフォローアップ訓練プログラムの計画に使用されますセント 2024年四半期。ユーレカがデューデリジェンスプロセスを完了し、オプションを進めるかどうかの選択を条件とします。
オプション提供者は、ラック・ラ・モット地区でさらに15件の請求権を取得しました。これらの請求は、最終的な不動産購入契約にも含めることができます。
衛星画像技術(SIT)について
オプション提供者は、米国のCC Explorations LLCと契約して、CYRリチウム資産の一部に関する第1段階の衛星評価を完了しました。CC Explorationは、リチウム探査ターゲットを詳細に定義するための自社技術の有用性について、次の根拠を示しました。
衛星技術は約80年前から存在しており、アプリケーションに関しては常に新しい開発が行われています。分子構造(原子、陽子、中性子)の研究は何世紀にもわたって行われており、周期表の各元素には独自の構造があります。周期表のすべての元素と、有機または無機を問わず、その他の材料製品には、独自の測定可能な周波数があります。これには、すべての金属、石油、ガス、水が含まれます。
衛星ベースの技術の1つが10年以上前から導入されています。それはNMR技術、つまり衛星が中性子測定値をキャプチャできる核磁気共鳴技術です。その後、これらをさまざまな元素や地表下の物体の測定値に推定できます。これは迅速な偵察手段であり、今後のフォローアップの指針となる調査手段として使用できます。
実際の運用では、CC Explorationはまず、ターゲット元素の存在を確認する衛星画像処理を行います。この情報は、その後、地上センサーを配置するためのGPS位置を提供します。
その後、周波数密度のデータは30日間SDカードに収集されます。30日が経過すると、カードは研究施設に発送され、処理と3Dモデリングが行われます。
表1:2022年イーストターゲットのドリルホールの結果
ドリルホールID | から (m) | へ (m) | 長さ | リー (ppm) | リチウム2O% | コメントします |
22-01 | 14.57 | 15.6 | 1.03 | 64 | 0.01 | 交差した3つのペグマタイト:深さ14.57mで上部幅1.03m、深さ14.57mでリチウム64ppm、中央部幅0.94m、深さ59.5mでリチウム1,420ppm、下部幅0.67m、深さ75.7mでリチウム1,310ppmです。 |
59.5 | 60.44 | 0.94 | 1420 | 0.31 |
75.7 | 76.37 | 0.67 | 1310 | 0.28 |
MD22-02 | 11.4 | 12.3 | 0.90 | 56 | 0.01 | 幅0.7mのペグマタイト、72.7mの深さで0.89%のLi2Oが含まれています |
20.7 | 21.23 | 0.53 | 244 | 0.05 |
72 | 72.7 | 0.70 | 142 | 0.03 |
72.7 | 73.4 | 0.70 | 4160 | 0.89 |
117.69 | 118.53 | 0.84 | 77 | 0.02 |
MD-22-03 | 23.6 | 24 | 0.4 | 386 | 0.08 | 2つのペグマタイト:24.12メートルで上部1.06m、深さ62.2mでリチウム2O0.6%、下部1mで深さ62.2mでリチウム2Oは0.17% |
24.12 | 25.18 | 1.06 | 2780 | 0.60 |
26.43 | 26.85 | 0.42 | 179 | 0.04 |
62.2 | 63.2 | 1 | 806 | 0.17 |
129.2 | 129.65 | 0.45 | 46 | 0.01 |
137.66 | 138.2 | 0.54 | 59 | 0.01 |
MD-22-04 | 4.72 | 5.17 | 0.45 | < 15 |
| 深さ59.68mで幅0.62mのペグマタイトと381ppm(100万分の1)のリウムが交差しています |
59.68 | 60.3 | 0.62 | 381 | 0.08 |
MD-22-05 | 13.18 | 13.97 | 0.79 | 6240 | 1.34 | 交差した3つのペグマタイト:上部幅0.79m、深さ13.18mでLi2O1.34%、深さ20mで中央幅0.7m、深さ22.92mで幅0.78%のLi2O。 |
20 | 20.7 | 0.70 | 2330 | 0.50 |
22.92 | 23.73 | 0.81 | 3650 | 0.78 |
22-06 | 31.95 | 32.06 | 0.11 | 5110 | 1.10 | 交差した3つのペグマタイト:深さ31.95mで上部幅0.11m、深さ31.95mで1.10%のLi2O、中央の幅0.87m、深さ34.53mで幅0.87m、深さ37.58mでLi2O0.55%の下部幅0.80m |
34.53 | 35.4 | 0.87 | 4680 | 1.01 |
37.58 | 38.38 | 0.80 | 2550 | 0.55 |
48 | 48.4 | 0.40 | 173 | 0.04 |
119.25 | 120 | 0.75 | 253 | 0.05 |
22-07 | 37.34 | 38.23 | 0.89 | 3060 | 0.66 | 幅1.76mのペグマタイト、平均4,375ppmのリチウム/0.94%のリチウム2O |
38.23 | 39.1 | 0.87 | 5690 | 1.22 |
37.34 | 39.1 | 1.76 | 4375 | 0.94 |
22-08 | 36 | 36.62 | 0.62 | 5110 | 1.10 | 交差した2つのペグマタイト:深さ36mで上部幅1.33m、Li2O1.49%。下部幅0.93m、深さ41.2mで幅0.93m、Li2O 88%。 |
36.62 | 37.33 | 0.71 | 8710 | 1.87 |
36 | 37.33 | 1.33 | 6910 | 1.49 |
41.2 | 42.13 | 0.93 | 4080 | 0.88 |
47.93 | 48.38 | 0.45 | 199 | 0.04 |
22-09 | 144 | 144.59 | 0.59 | 210 | 0.05 | 幅0.59mのペグマタイト1つ、深さ144mでリチウム210ppm |
表2:2022年のウエストターゲットのドリルホールの結果
ドリルホールID | から (m) | へ (m) | 長さ | リー (ppm) | リチウム2O% | コメントします |
22-10 | 3 | 4 | 1.00 | 227 | 0.05 | 交差した2つのペグマタイト:上部幅1.60m、深さ3mでリチウム167.5ppm、下部幅0.93m、深さ29.07mでリチウム204ppm。 |
4 | 4.6 | 0.60 | 108 | 0.02 |
3 | 4.6 | 1.60 | 167.5 |
|
29.07 | 29.49 | 0.42 | 169 | 0.04 |
29.49 | 30 | 0.51 | 239 | 0.05 |
29.07 | 30 | 0.93 | 204 |
|
22-11 | 57.93 | 63 | 5.07 | 31.2 | 0.01 | 2つの主電源を含む、複数の下級ペグマタイトが交差しています。上部幅5.07m、深さ57.93mでリチウム31.2ppm、深さ53.80mで下部幅14.13m、深さ53.80ppmで幅14.13m。 |
64.37 | 78.5 | 14.13 | 53.80 | 0.01 |
81.18 | 81.81 | 0.63 | 70 | 0.02 |
93.2 | 93.83 | 0.63 | 60 | 0.01 |
100.74 | 101.3 | 0.56 | 61 | 0.01 |
105.4 | 106.2 | 0.80 | 141 | 0.03 |
8.25 | 9.08 | 0.83 | 61 | 0.01 |
22-12 | 47.67 | 48.72 | 1.05 | 65 | 0.01 | 幅1.03メートルのペグマタイトと1,080ppmのリチウムと46.9メートルの深さで交差しています。 |
22-13 | 48.2 | 49 | 0.80 | 51 | 0.01 | 交差した2つの低品位ペグマタイト:上部0.80mは48.2mでLi 51ppm、下部は深さ49mでグレード60ppmリチウムです。 |
49 | 50.16 | 1.16 | 60 | 0.01 |
22-14 |
|
|
|
|
| 著しい鉱化作用はありません |
22-15 | 32.22 | 33.1 | 0.88 | 373.00 | 0.08 | 幅0.88メートルのペグマタイト1つ、リチウムは373ppm、深さは33.22m |
コーポレートビデオ
ユーレカリチウムの新しい企業ビデオを見るには、() または次の URL にアクセスしてください。
企業プレゼンテーション
ユーレカリチウムのホームページにアクセスするか、次のURLをクリックして、会社の企業プレゼンテーションをご覧ください。
適格者
このニュースリリースの科学的および技術的内容は、ナショナルインスツルメンツ43-101で定義されている「有資格者」であるP.Geo. のAfzaal Pirzadaによってレビューされ、承認されました- 鉱物プロジェクトの開示基準。
ユーレカリチウム社について
ユーレカリチウムは、ヌナヴィク地域として知られるケベック州の北部3分の1でリチウムに焦点を当てた最大の土地所有者で、新興のラグランウエスト、ラグランサウス、ニューリーフのリチウムキャンプの1,408平方キロメートルの3つのプロジェクトを100%所有しています。これらの主張は、伝説的な探鉱者ショーン・ライアンが入手したもので、深海の港にアクセスできる2つのニッケル鉱山が操業している地域にあります。最近、ケベック州ヴァルドール近郊のラモットリチウムプロジェクトが買収されたことで、ユーレカリチウムの持ち株はカナダの主要なリチウム生産地区の中心にまで広がりました。
詳細については、以下にお問い合わせください。
ジェフリー・ウィルソン
最高経営責任者
電子メール:info@eurekalithiumcorp.com
注意事項
このニュースリリースに含まれる特定の記述には、「期待」、「予想」、「意図」、「計画」、「信念」、「見積もり」などの言葉が含まれる可能性のある記述や、買収や同時資金調達の完了予定に関する記述など、歴史的事実ではない事項に関連する記述など、適用される証券法の意味における将来の見通しに関する情報です。このような将来の見通しに関する記述は、経営陣の期待を反映し、特定の要因と仮定に基づいており、既知および未知のリスクと不確実性を伴います。そのため、実際の結果、業績、または成果が、そのような将来の見通しに関する記述によって表現または暗示される将来の結果、業績、または成果と大きく異なる可能性があります。これらの要素は慎重に検討する必要があり、読者は会社の将来の見通しに関する記述に過度に依存すべきではありません。当社は、このニュースリリースに含まれる将来の見通しに関する記述に反映されている期待は妥当であると考えていますが、これらの期待が正しいことを証明すること、買収が計画どおりに完了すること、またはまったく完了すること、または同時資金調達が予定どおりに完了すること、またはまったく保証することはできません。当社は、法律で明示的に義務付けられている場合を除き、このニュースの日付以降の出来事や状況を反映するため、または予期しない出来事の発生を反映するために、将来の見通しに関する記述の将来の改訂を公に発表する義務を負いません。
カナダ証券取引所(CSE)は、このプレスリリースの内容を確認、承認、または不承認していません。
このプレスリリースのソースバージョンを表示するには、次のサイトをご覧ください。