  • Plutonic and Henty quarterly production 24,576oz and 6,926oz respectively – both representing the most successful production quarters under Catalyst ownership
  • Cashflows from operations allowed Catalyst to end the quarter with $37m in cash and bullion, $45m liquidity and only $8m debt in the form of a 2,220oz gold loan repayable in six, monthly instalments
  • Studies confirmed Trident and Plutonic East as near-term, low-cost development priorities
  • Reported maiden Ore Reserve Estimate for Trident, increasing group Reserves to 793koz

Production

  • Gold produced for the quarter totalled 31,502oz at an average AISC of A$2,352, comprising:
    • Plutonic: 24,576oz gold produced at an AISC of A$2,291/oz
    • Henty: 6,926oz gold produced at an AISC of A$2,524/oz

Discovery and Growth

  • High grade assays from shallow drilling was incorporated into Trident's maiden Ore Reserve Estimate (ORE) of 188koz at 4.5g/t
  • ORE provided the foundation for updated, lower cost, lower risk development Trident – key metrics at A$3,400/oz:
    • $15m pre-production capital drawdown
    • Initial 5.5 year life of mine; average underground production of 37koz pa
    • AISC of A$1,592/oz
    • Average annual free cashflow of A$53m; NPV7 A$198m
  • Dewatering at Plutonic East underway with plans to commence rehabilitation and grade control in Q1 FY25

Financial and Corporate

  • As of 30 June 2024, the Company held cash of $31m, bullion of $6m and undrawn facilities of $8m
  • All inherited call options delivered into, leaving Catalyst unhedged – previous realised prices last quarter of $3,130/oz versus spot of A$3,490/oz (at end of quarter)
  • Continued debt repayments totalling $11m, leaving only a 2,220oz gold loan

PERTH, Australia, July 24, 2024 /PRNewswire/ -

OVERVIEW

Figure 1: Plutonic TRIFR and reportable injuries – 18 months (CNW Group/Catalyst Metals LTD.)
Table 2: Henty operating metrics (CNW Group/Catalyst Metals LTD.)
Figure 3: Catalyst's consolidated Plutonic Gold Belt, showing tenements (CNW Group/Catalyst Metals LTD.)
Figure 4: Trident long section with new mine development plan (CNW Group/Catalyst Metals LTD.)
Figure 5: Plutonic East long section showing historical mine workings (CNW Group/Catalyst Metals LTD.)
Figure 6: Plutonic East open pit and underground portal – dewatering progress (CNW Group/Catalyst Metals LTD.)
Figure 7: Plutonic east dewatering progress (CNW Group/Catalyst Metals LTD.)
Figure 8: Plutonic gold belt showing mineralisation below 100m versus drilling density below 100m (CNW Group/Catalyst Metals LTD.)