share_log

Paycore Minerals Intersects 4.5 G/t AuEq over 28 m and 5.3 G/t AuEq over 23.9 m from near Surface Oxide Target, and Commences Trading on the TSXV Under Ticker Symbol "CORE"

Paycore Minerals Intersects 4.5 G/t AuEq over 28 m and 5.3 G/t AuEq over 23.9 m from near Surface Oxide Target, and Commences Trading on the TSXV Under Ticker Symbol "CORE"

Paycore Minerals在距近地表氧化物目标28米处相交4.5克/吨AuEq,在23.9米处相交5.3 g/t AuEq,并开始在TSXV上交易,交易代码为“CORE”
newsfile ·  2022/04/25 07:10

Toronto, Ontario--(Newsfile Corp. - April 25, 2022) - Paycore Minerals Inc. (TSXV: CORE) ("Paycore" or the "Company") is pleased to announce exploration drilling results from the Company's 100%-owned FAD Property located on the Battle Mountain-Eureka Gold Belt in Nevada, USA. The Company also announces that its common shares will commence trading on the TSX Venture Exchange at the open of the markets today, under the ticker symbol "CORE".

安大略省多伦多-(Newsfile Corp.-2022年4月25日)-Paycore Minerals Inc.(TSXV:CORE)(Paycore“或”公司“)很高兴宣布公司位于美国内华达州巴特尔山-尤里卡金矿带的全资拥有的FAD物业的勘探钻探结果。公司还宣布,其普通股将于今天在多伦多证券交易所创业板上市交易,股票代码为”CORE“。

Drill Highlights Include:

演练要点包括:

  • The first hole drilled to test for near-surface mineralization intersected multiple mineralized horizons over the first 110.6 metres of the hole including:
    • 4.5 g/t AuEq* over 28.0m in hole PC22-02 comprised of 1.02 g/t Au, 25.7 g/t Ag, 4.3% Zn, 1% Pb and 0.09% Cu starting at 40 meters from surface; and
    • 5.3 g/t AuEq* over 23.9m comprised of 2.3 g/t Au, 24.0 g/t Ag, 4.15% Zn, 0.4% Pb and 0.09% Cu starting at 86.7m from surface.
  • Drilling in the FAD Main Zone returned:
    • 13.0 g/t AuEq* over 36.6m in hole GH21-02 comprised of 5.1 g/t Au, 185.5 g/t Ag, 4.5 % Pb, and 6.0 % Zn
  • 为测试近地表矿化而钻探的第一个孔在孔的前110.6米内与多个矿化层相交,包括:
    • 4.5 g/t AuEq*超过28.0M在距地面40米处的PC22-02孔,含Au 1.02g/t、Ag 25.7g/t、锌4.3%、铅1%、铜0.09%;
    • 5.3 g/t AuEq*超过23.9米含Au 2.3g/t,Ag 24.0g/t,锌4.15%,铅0.4%,铜0.09%,距地表86.7m。
  • 在FAD主区的钻探返回:
    • 13.0 g/t AuEq*超过36.6米在GH21-02孔中,Au含量为5.1g/t,Ag含量为185.5 g/t,铅含量为4.5%,锌含量为6.0%

Paycore has completed the acquisition of a 100% interest in the high-grade, polymetallic, FAD project located in one of the most prolific gold belts in the world, the Eureka gold district of Nevada. Overseen by an experienced board and management team that includes Jim Gowans (Non-executive Chairman), Christina McCarthy (President & C.E.O), Steve Filipovic (C.F.O. and Corporate Secretary) and John Begeman (Director), the Company intends to aggressively advance the delineation of mineral deposits on the FAD Project (which is situated immediately to the south of, and along strike from, I-80 Gold Corp's Ruby Hill Mine).

Paycore已经完成了对高品位多金属FAD项目的100%收购,该项目位于世界上最多产的金矿带之一--内华达州的尤里卡金矿区。在经验丰富的董事会和管理团队的监督下,公司打算积极推进FAD项目(该项目位于I-80黄金公司的红宝石山矿南面,沿走向)的矿藏圈定。管理团队包括吉姆·高恩(非执行主席)、克里斯蒂娜·麦卡锡(总裁兼首席执行官)、史蒂夫·菲利波维奇(首席财务官兼公司秘书)和约翰·贝格曼(董事)。

Paycore is currently completing its Phase-1 drill program targeting two primary targets: high-grade polymetallic mineralization in the FAD Main Zone and near-surface oxide mineralization proximate to the historic Ruby Hill Mine workings, both with historical previous production. Seven holes have been completed to-date with assay results having been received for the first four drill holes (see Table 1 below). Assays are pending for the remaining three holes and will be released upon receipt.

Paycore目前正在完成其第一阶段钻探计划,目标是两个主要目标:FAD主区的高品位多金属矿化和历史悠久的Ruby Hill矿山工作面附近的近地表氧化物矿化,这两个矿化都具有历史上的产量。到目前为止,已经完成了7个孔,收到了前4个孔的化验结果(见下文表1)。其余三个洞的化验仍在等待中,收到后将放行。

Table 1: Drill Highlights from the FAD Underground Target

表1:FAD地下目标的演练要点

Hole ID From
(m)
To
(m)
Core Length
(m)
Estimated True Width (%) Au Grade (g/t) Ag Grade (g/t) Pb
(%)
Zn
(%)
Cu
(%)
AuEq*
(g/t)
GH21-01 737.0 740.5 3.5 90 - 100 10.4 153.8 1.8 8.4 - 18.1
GH21-02 711.7 748.3 36.6 90 - 100 5.1 185.5 4.5 6.0 - 13.0
Including 725.4 733.0 7.6 90 - 100 9.7 242.0 7.1 9.6 - 21.6
GH21-03 673.9 688.2 14.3 90 - 100 2.3 50.9 0.7 3.7 - 5.3
PC22-02 39.6 67.7 28.0 90 - 100 1.0 25.7 1.0 4.3 0.09 4.5
And 86.7 110.6 23.9 90 - 100 2.3 23.8 0.4 4.1 0.09 5.3
孔ID 从…
(m)

(m)
岩心长度
(m)
估计真实宽度(%) Au品位(g/t) AG等级(克/吨)
(%)

(%)
CU
(%)
AuEq*
(克/吨)
GH21-01 737.0 740.5 3.5 90 - 100 10.4 153.8 1.8 8.4 - 18.1
GH21-02 711.7 748.3 36.6 90 - 100 5.1 185.5 4.5 6.0 - 13.0
包括 725.4 733.0 7.6 90 - 100 9.7 242.0 7.1 9.6 - 21.6
GH21-03 673.9 688.2 14.3 90 - 100 2.3 50.9 0.7 3.7 - 5.3
PC22-02 39.6 67.7 28.0 90 - 100 1.0 25.7 1.0 4.3 0.09 4.5
86.7 110.6 23.9 90 - 100 2.3 23.8 0.4 4.1 0.09 5.3

*USD values used to calculate AuEq; Au $1500.00/oz, Ag $20.00/oz, Pb $2204.60/mt, Zn $2,755.75/mt, Cu $7,716.17/mt. Formula used: AuEq = Gold g/t + Silver g/t x 0.0133 + Zinc % x 0.571 + Lead % x .457 + Copper % x 1.6. Values may not add precisely due to rounding. Actual true widths are not known. Gold equivalent (AuEq) is used for illustrative purposes, to express the combined value of Au and Ag as a percentage of Au. AuEq is calculated using 75:1 silver to gold ratio

*用于计算AuEq的美元价值;Au$1500.00/oz,Ag$20.00/oz,Pb$2204.60/Mt,Zn$2,755.75/Mt,Cu$7,716.17/Mt。使用公式:AUEQ=黄金g/t+白银g/t x 0.0133+锌%x 0.571+铅%x.457+铜%x 1.6。由于四舍五入的原因,值可能不会精确相加。实际的真实宽度是未知的。金当量(AuEq)用于说明目的,用来表示Au和Ag的合计价值占Au的百分比。AUEQ按75:1的白银与黄金比例计算

"Today is Paycore's first day as a publicly traded Company and an opportunity to bring this exciting high-grade project to investors in the mineral sector. Results to-date demonstrate the near-surface oxide potential and confirm the historic mineralization in the FAD Main Zone. The FAD Property was previously owned by Barrick and Homestake who were more focused on near-surface mineralization in the Archimedes/Ruby-Hill area. No drilling has tested this highly-prospective FAD Main Zone in more than 50 years. The FAD Property is located in one of the world's most favourable mining jurisdictions, Nevada, and has the potential to host a world-class deposit," stated Christina McCarthy, Paycore's President & C.E.O.

今天是Paycore作为一家上市公司的第一天,也是一个将这个令人兴奋的高品位项目带给矿产行业投资者的机会。迄今的结果显示了近地表的氧化电位,并证实了FAD主带的历史成矿作用。FAD地产以前由Barrick和Homestake拥有,他们更关注阿基米德/Ruby-Hill地区的近地表矿化。50多年来,没有钻井测试过这一极具前景的FAD主区。FAD地产位于世界上最有利的矿业管辖区之一内华达州,有可能拥有世界级的矿藏,“Paycore总裁兼首席执行官Christina McCarthy说。

Based on the historic data, the FAD deposit has a mineralized footprint of approximately 1.5 x 1.5 km and is open in multiple directions. Outside of the core deposit area, little to no exploration has been completed and its extensions are largely untested. Additionally, near-surface oxide mineralization is a priority target that was overlooked by previous operators and has the potential for widespread mineralization proximal to the historic high-grade underground mine that last operated more than 100 years ago. Hole PC22-02 is the first hole drilled to test the near-surface opportunity at FAD.

根据历史数据,FAD矿床的矿化足迹约为1.5x1.5公里,并向多个方向开放。在核心矿藏区外,很少或根本没有完成勘探,其延伸也基本上没有经过测试。此外,近地表氧化物矿化是以前运营商忽视的优先目标,有可能在100多年前最后一次运营的历史悠久的高品位地下矿山附近广泛进行矿化。PC22-02孔是为测试FAD的近地表机会而钻出的第一个孔。

In the 1950's, a shaft was sunk to a depth of approximately 700 metres to access the FAD deposit, with development work completed between 1956-58 including underground drilling. Since then, no modern-day drilling or exploration has been completed on the FAD Main Zone, until now.

在20世纪50年代,为了进入FAD矿藏,一个竖井被挖到了大约700米深,1956-58年间完成了包括地下钻探在内的开发工作。从那时起,直到现在,法德主区还没有完成过现代钻探或勘探。

Holes GH21-01, GH21-02 and GH21-03 were the first three holes completed in the program. Holes GH21-01 and GH21-02 were drilled on the main FAD deposit and are approximately 150 and 200 meter step-outs to the southeast of the FAD Main Zone. Hole GH21-03 was drilled as a 40 m step-out to the southwest of the core of the main FAD deposit.

GH21-01、GH21-02和GH21-03孔是该计划中完成的前三个孔。GH21-01和GH21-02孔是在FAD主要矿藏上钻探的,位于FAD主区东南约150米和200米处。GH21-03井被钻成40m的台阶,位于主要FAD矿床核心的西南部。

All holes have intersected high-grade poly-metallic (Au, Ag, Pb, Zn) mineralization and demonstrate significant expansion potential. Hole GH21-01 returned 3.5 meters grading 18.1 g/t AuEq; hole GH21-02 returned 36.6 meters grading 13.0 g/t AuEq including 7.6 meters of 21.6 g/t AuEq and hole GH21-03 returned 14.3 meters of 5.3 g/t AuEq.

所有钻孔都与高品位多金属(金、银、铅、锌)矿化相交,并显示出显著的扩张潜力。GH21-01井返还3.5m,18.1g/t AuEq;GH21-02井返还36.6m,13.0g/t AuEq;GH21-03井返还14.3m,5.3g/t AuEq。

The phase one exploration program is near completion and will consist of approximately 3,900 metres of drilling. A phase-two program consisting of approximately 3,800 meters is expected to commence thereafter.

第一阶段勘探计划接近完成,将包括大约3900米的钻探。预计此后将开始一项由大约3800米组成的第二阶段计划。


Figure 1: Cross-section of FAD deposit demonstrating the underground FAD and oxide target.


图1:FAD沉积的横截面显示地下FAD和氧化物靶。

About Paycore

关于Paycore

Paycore is a corporation incorporated under the Business Corporations Act (Ontario) and, through its subsidiaries, holds a 100% interest in the FAD Property that is located in the heart of the Eureka-Battle Mountain trend in Nevada, USA. The FAD Property is host to the high-grade poly-metallic FAD deposit that was partially delineated with surface and underground drilling in the 1940s and 1950s.

Paycore是一家根据《商业公司法》(安大略省),并通过其子公司持有位于美国内华达州尤里卡-巴特山趋势中心的FAD物业的100%权益。FAD地产是高品位多金属FAD矿床的所在地,该矿床在20世纪40年代和50年代通过地面和地下钻探部分圈定。

The FAD Property is located less than 3 miles from Eureka, Nevada and has established infrastructure, including a shaft, roads and old buildings.

FAD地产距离内华达州尤里卡不到3英里,已经建立了基础设施,包括竖井、道路和旧建筑。

Quality Assurance (QA) / Quality Control (QC) Procedures

质量保证(QA)/质量控制(QC)程序

All samples were submitted to either ALS Minerals (ALS) or Paragon Geochemical Assay Laboratories (PAL) both of Sparks, NV, which are ISO 9001 and 17025 certified and accredited laboratories, which are independent of the Company. Samples submitted through PAL and ALS are run through standard prep methods and analysed using FA-Pb30-ICP (Au; 30g fire assay) and 48MA-MS (48 element Suite; 0.5g 4-acid digestion/ICP-MS) methods for PAL and Au-AA23 (Au; 30g fire assay) and ME-MS61 (48 element suite; 0.25g 4-acid/ICP-AES and ICP-MS) for ALS. ALS and PAL also undertake their own internal coarse and pulp duplicate analysis to ensure proper sample preparation and equipment calibration. Paycore's QA/QC program includes regular insertion of CRM standards, duplicates, and blanks into the sample stream with a stringent review of all results.

所有样品都被提交给内华达州斯帕克斯的ALS Minerals(ALS)或Paragon地球化分析实验室(PAL),这两个实验室都是ISO9001和17025认证和认可的实验室,它们独立于公司。通过PAL和ALS提交的样品通过标准的准备方法运行,并使用FA-Pb30-ICP30(Au;30g火焰分析)和48MA-MS(48元素组;0.5g 4酸消化/电感耦合等离子体质谱)方法分析PAL和Au-aa23(Au;30g火试剂法)和ME-MS61(48元素组;0.25g 4-酸/ICP-AES和ICP-MS)分析方法。ALS和PAL还承担自己的内部粗和纸浆重复分析,以确保适当的样品准备和设备校准。Paycore的QA/QC计划包括定期在样品流中插入CRM标准、副本和空白,并对所有结果进行严格审查。

Qualified Person

有资格的人

The scientific and technical data contained in this news release pertaining to the FAD Property was reviewed and approved by Matthew Rhoades, CPG, who is a "qualified person" within the meaning of NI 43-101 - Standards of Disclosure for Mineral Projects.

本新闻稿中包含的与FAD财产有关的科学和技术数据已由中央人民政府马修·罗迪斯审查和批准,他是NI 43-101所指的“合格人士”-《矿产项目信息披露标准》.

Cautionary Statements

警示声明

This news release contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable securities laws. Any statements that are contained in this news release that are not statements of historical fact may be deemed to be forward-looking statements. Forward-looking statements are often identified by terms such as "may", "should", "anticipate", "will", "estimates", "believes", "intends" "expects" and similar expressions which are intended to identify forward-looking statements. More particularly and without limitation, this news release contains forward-looking statements concerning (i) the timing of the trading of the common shares of the Company on the TSX Venture Exchange, (ii) the proposed business objectives of the Company, (iii) the impact, and anticipated results, of ongoing drill program and results on the Company, (iv) the possible economics of the FAD Property, and the Company's understanding of the FAD Property, (v) the development potential and timetable of the FAD Property, and (vi) the estimation of potential mineral resources, (vii) the timing and amount of estimated future exploration on the FAD Property. Forward-looking statements are inherently uncertain, and the actual performance may be affected by a number of material factors, assumptions and expectations, many of which are beyond the control of the Company, including expectations and assumptions concerning the Company and the FAD Property. Specifically, factors that could cause the actual performance and results of the Company to differ materially from those in forward-looking statements include, without limitation, changes to commodity prices, metallurgical recovery, operating and capital costs, foreign exchange rates, ability to obtain required permits on a timely basis, exploitation and exploration successes, continued availability of capital and financing, and general economic, market or business conditions. Readers are cautioned that assumptions used in the preparation of any forward-looking statements may prove to be incorrect. Events or circumstances may cause actual results to differ materially from those predicted as a result of numerous known and unknown risks, uncertainties and other factors, many of which are beyond the control of the Company. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. Readers are cautioned not to place undue reliance on any forward-looking statements, as such information, although considered reasonable by the management of the Company at the time of preparation, may prove to be incorrect and actual results may differ materially from those anticipated.

本新闻稿包含前瞻性陈述和前瞻性信息(统称为,“前瞻性陈述“)在适用的证券法的含义内。本新闻稿中包含的任何非历史事实的陈述均可被视为前瞻性陈述。前瞻性表述通常使用诸如“可能”、“应该”、“预期”、“将”、“估计”、“相信”、“打算”、“预期”以及类似的表述来确定前瞻性表述。更具体地说,本新闻稿包含前瞻性陈述,涉及(I)公司普通股在多伦多证券交易所创业板交易的时间,(Ii)公司的拟议业务目标,(Iii)正在进行的钻探计划和结果对公司的影响和预期结果,(Iv)FAD财产的可能经济状况,以及公司对FAD财产的理解,(V)FAD财产的开发潜力和时间表,以及(Vi)潜在矿产资源的估计。(Vii)估计未来对FAD物业进行勘探的时间和数量。前瞻性陈述本质上是不确定的,实际业绩可能会受到许多重大因素、假设和预期的影响,其中许多因素不是公司所能控制的,包括对公司和FAD财产的预期和假设。具体地说,可能导致公司的实际业绩和结果与前瞻性陈述中的结果大不相同的因素包括但不限于大宗商品价格的变化、冶金回收、运营和资本成本、汇率、及时获得所需许可证的能力、开采和勘探的成功、资本和融资的持续可获得性以及总体经济, 市场或商业环境。提醒读者,在编制任何前瞻性陈述时使用的假设可能被证明是不正确的。由于许多已知和未知的风险、不确定性和其他因素,其中许多是公司无法控制的,事件或情况可能会导致实际结果与预测的结果大不相同。尽管公司试图确定可能导致实际结果与前瞻性陈述中包含的结果大不相同的重要因素,但可能还有其他因素导致结果与预期、估计或预期的不同。告诫读者不要过度依赖任何前瞻性陈述,因为这些信息尽管在准备时被公司管理层认为是合理的,但可能被证明是不正确的,实际结果可能与预期的大不相同。

The forward-looking statements contained in this news release are made as of the date of this news release, and are expressly qualified by the foregoing cautionary statement. Except as expressly required by securities law, the Company does not undertake any obligation to update publicly or to revise any of the included forward-looking statements, whether as a result of new information, future events or otherwise.

本新闻稿中包含的前瞻性陈述是截至本新闻稿发布之日作出的,并明确受到前述警示声明的限制。除证券法明确要求外,本公司不承担任何因新信息、未来事件或其他原因而公开更新或修改所含前瞻性陈述的义务。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

多伦多证券交易所创业板交易所及其监管服务提供商(该术语在多伦多证券交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

Further Information

进一步资料

For further information please contact:

欲了解更多信息,请联系:

Paycore Minerals Inc.
Christina McCarthy, President, C.E.O, Director
Telephone: 416-712-6151
Email: christina.mccarthy@paycoreinc.com

Paycore矿业公司。
克里斯蒂娜·麦卡锡董事总裁兼首席执行官
电话:416-712-6151
电子邮件:christina.mccarthy@paycoreinc.com

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发