share_log

BCM Resources Corp Announces Phase 3 Exploration Plans, TK Cu-Au Porphyry Project, Utah, USA

BCM Resources Corp Announces Phase 3 Exploration Plans, TK Cu-Au Porphyry Project, Utah, USA

BCM Resources Corp宣布美国犹他州TK铜-金斑岩项目第三阶段勘探计划
Accesswire ·  2022/09/08 17:30

VANCOUVER, BC / ACCESSWIRE / September 8, 2022 / BCM Resources Corp ("B" or the "Company") would like to inform shareholders on the details of its Phase 3 exploration drilling planned at its Thompson Knolls (TK) greenfield Cu-Au-Ag-Mo project in the southwestern Utah, USA. It is expected that Phase 3 drilling at TK will begin in October.

温哥华,卑诗省/ACCESSWIRE/2022年9月8日/BCM Resources Corp(“B”或“本公司”)谨告知股东有关其位于美国犹他州西南部的Thompson Knolls(TK)绿地铜-金-银-钼项目第三期勘探钻探计划的详情。预计TK的第三阶段钻探将于10月份开始。

President Dr. Sergei Diakov stated, "We are looking forward to this newly permitted phase of drilling at the TK Cu-Au-Ag-Mo porphyry system. Phase 3 drilling will help us with the search for the copper core of the porphyry system. Our focus will be directed both on the central and eastern part of the porphyry system."

总裁博士谢尔盖·迪亚科夫表示,我们期待着在TK铜-金-银-钼斑岩系统进行这一新允许的钻探阶段。三期钻探将帮助我们寻找斑岩系统的铜芯。我们的重点将放在斑岩系统的中部和东部."

The company has received permits from the BLM to drill additional 7 diamond drill holes for 24,200 feet (~7.4 km) with the proposed drill hole locations in Fig 1.

该公司已经获得了BLM的许可,可以在24,200英尺(~7.4公里)的范围内再钻7个钻石钻孔,钻孔位置如图1所示。

Figure 1. TK project plan view with the location of drill holes completed by BCM (Phase 1 & 2 drill programs) in grey-blue and planned drill holes (Phase 3 drill program) in green.

图1.TK项目平面图,由BCM(第一阶段和第二阶段钻探计划)完成的钻孔位置以灰蓝色显示,计划钻孔(第三阶段钻探计划)以绿色显示。

TK Phase 3 Program Design

TK第三阶段程序设计

Phase 3 drilling program will be directed at vectoring in towards a potential Cu-rich core and testing several targets from the western to the eastern flank of the project as follows:

第三阶段钻探计划将导向潜在的富铜岩心,并测试从项目西侧到东侧的几个目标,具体如下:

  • TK8 will be drilled to a depth of 4000 ft (~1220 m ) and is designed to reach the mineralized intrusion beneath the mineralized skarn previously intercepted in TK5. It will be an 800 ft (~245 m) step out to the west from TK3A.
  • TK7 will be directed at testing the most intensively magnetic part of the TK porphyry intrusion and will have a projected length of 3000 ft (~915 m). TK7 is a 1457 ft (~444 m) step-out south-southeast from TK3A.
  • Holes TK9, TK10 & TK11 are positioned along the northern edge of the porphyry intrusion to test the potential for intensely mineralized skarns along the northern contract of the intrusion with the host carbonate rocks. TK9 will be drilled to 4000 ft (~1220 m) whereas TK10 and TK11 will be drilled to 3600 ft (~1100 m).
  • TK12 and TK13 will test the eastern flank of the TK porphyry intrusion and each hole will be drilled down to 3000 ft (~915 m).
  • TK8将钻至4000英尺(约1220米)的深度,旨在到达先前在TK5截获的矿化矽卡岩下的矿化侵入体。从TK3A向西将是800英尺(~245米)的台阶。
  • TK7将用于测试TK斑岩侵入体最强烈的磁性部分,预计长度为3000英尺(~915米)。TK7是一个1457英尺(约444米)的台阶,位于TK3A东南偏南方向。
  • TK9、TK10及TK11沿着斑岩侵入体的北缘定位,以测试沿侵入体北部收缩与寄主碳酸盐岩的强烈矿化夕卡岩的可能性。TK9将被钻至4000英尺(约1220米),而TK10和TK11将被钻至3600英尺(约1100米)。
  • TK12和TK13将测试TK斑岩侵入体的东侧,每个洞将被钻至3000英尺(~915米)。

The greenfield TK Cu-Au-Ag-Mo porphyry project is located approximately 210 km southwest of Rio Tinto's giant Bingham Canyon porphyry copper-molybdenum-gold mine and smelter complex near Salt Lake City, Utah. It is accessed by a highway and then by a network of gravel roads.

绿地TK铜-金-银-钼斑岩项目位于力拓巨大的宾汉峡谷斑岩铜钼金矿和冶炼综合体西南约210公里处,靠近犹他州盐湖城。它可以通过骇维金属加工访问,然后通过砂砾公路网访问。

Qualified Person

有资格的人

The Company's Director, Mr. Richard R. Redfern, M.Sc., and Certified Professional Geologist, a "qualified person" for the purposes of National Instrument 43-101, has verified and approved the information contained in this news release.

公司董事理查德·R·雷德费恩先生和注册专业地质学家已核实并批准了本新闻稿中包含的信息。雷德费恩先生是美国国家仪器43-101的“合格人士”。

About BCM Resources Corporation

关于BCM Resources Corporation

BCM Resources Corporation is a diversified Canadian mineral exploration company focused on the continued exploration of the Thompson Knolls Porphyry Cu-Au-Mo project. BCM also controls prospective Copper, Gold, and Molybdenum exploration projects in British Columbia. BCM Resources is managed by experienced and successful board members and advisors. For further information, including area maps, sections, and photos, please visit our website at or contact us by e-mail at info@bcmresources.com.

BCM Resources Corporation是一家多元化的加拿大矿产勘探公司,专注于汤普森诺尔斯斑岩铜金钼项目的持续勘探。BCM还控制着不列颠哥伦比亚省未来的铜、金和钼勘探项目。BCM Resources由经验丰富且成功的董事会成员和顾问管理。欲了解更多信息,包括区域地图、横断面和照片,请访问我们的网站或通过电子邮件与我们联系:info@bcmresource ces.com。

ON BEHALF OF BCM RESOURCES CORP.
Dr. Sergei Diakov
President & Director

代表BCM Resources Corp.
谢尔盖·迪亚科夫博士
总裁与董事

For further information, please contact:

如需更多信息,请联系:

Investor relations 604-646-0144 ext. 222
info@bcmresources.com

投资者关系部604-646-0144转222
邮箱:Info@bcmresource ces.com

Caution Concerning Forward-Looking Statements:

有关前瞻性陈述的注意事项:

This news release and related texts and images on BCM Resource Corporation's website contain certain "forward-looking statements" including, but not limited to, statements relating to interpretation of mineralization potential, drilling and assay results, future exploration work, and the anticipated results of this work. Forward-looking statements are statements that are not historical facts and are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metals prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical, governmental, social, or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the company's projects; uncertainties involved in the interpretation of sampling and drilling results and other tests; the possibility that required permits and access agreements may not be obtained in a timely manner; risk of accidents, equipment breakdowns or other unanticipated difficulties or interruptions, and; the possibility of cost overruns or unanticipated expenses in these exploration programs.

本新闻稿以及BCM资源公司网站上的相关文本和图片包含某些“前瞻性陈述”,包括但不限于与成矿潜力解释、钻探和化验结果、未来勘探工作以及这项工作的预期结果有关的陈述。前瞻性表述为非历史事实的表述,受各种风险和不确定因素的影响,这些风险和不确定性可能导致实际事件或结果与前瞻性表述中反映的情况大不相同,包括但不限于:与金属价格波动有关的风险;与及时以可接受的条件筹集足够资金为计划工作提供资金有关的不确定性;天气、后勤、技术、政府、社会或其他因素导致计划工作的变化;工作结果不能实现预期并实现公司项目的预期潜力的可能性;对采样和钻探结果及其他测试的解释涉及的不确定性;可能无法及时获得所需的许可和准入协议;发生事故、设备故障或其他意想不到的困难或中断的风险;以及这些勘探计划中可能出现的成本超支或意外费用。

SOURCE: BCM Resources Corporation

资料来源:BCM资源公司


View source version on accesswire.com:
在accesswire.com上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发