share_log

Infinity Stone Hits Massive Graphite on Rockstone Step-Out Hole

Infinity Stone Hits Massive Graphite on Rockstone Step-Out Hole

无限大石头击中岩石台阶孔上的巨型石墨
newsfile ·  2022/11/22 22:25

Highlights

亮点

  • Infinity Stone has completed drilling of the RS-22-03 step out drillhole, intersecting four separate intervals comprising a total of 45.5 metres of semi-massive to massive graphite.
  • The Company has expanded the drill program with an additional drill hole. RS-22-04 is a northern step-out of RS-22-03.
  • Infinity Stone已经完成了RS-22-03阶梯钻孔的钻探,该钻孔横跨四个独立的区段,总共包括45.5米长的半块状到块状石墨。
  • 该公司扩大了钻探计划,增加了一个钻孔。RS-22-04是RS-22-03的一个向北延伸。

Vancouver, British Columbia--(Newsfile Corp. - November 22, 2022) - Infinity Stone Ventures Corp. (CSE: GEMS) (OTCQB: GEMSF) (FSE: B2I) (the "Company" or "Infinity Stone"), is pleased to provide an update on its Fall drill program (the "Fall Drill Program") on the Rockstone Graphite project located near Thunder Bay, Ontario ("Rockstone" or the "Rockstone Graphite Project").

温哥华,不列颠哥伦比亚省-(Newsfile Corp.-2022年11月22日)-Infinity Stone Ventures Corp.(CSE:GEMS)(OTCQB:GEMSF)(FSE:B2I)(The“公司“或”无限之石),很高兴地提供其秋季演习计划的最新情况秋季演练计划)位于安大略省桑德湾附近的Rockstone Graphite项目(Rockstone“或”岩石石墨石项目").

The Company has completed the drilling of RS-22-03, a step-out of the historic GC-12-01 and RS-22-01 hole. Within RS-22-03, four graphitic zones, consisting of semi-massive to massive graphite, were encountered in the following intervals (Table 1).

该公司已经完成了RS-22-03的钻井,这是历史悠久的GC-12-01和RS-22-01井的一步。在RS-22-03中,在以下间隔内遇到了四个石墨化带,由半块状到块状石墨组成(表1).

Table 1: RS-22-03 - Graphitic Intervals

表1:RS-22-03-石墨化间隔

Drillhole From (m) To (m) Interval (m)
RS-22-03 52.5 61.2 8.7
RS-22-03 109.5 137.0 27.5
RS-22-03 139.1 142.4 3.3
RS-22-03 156.5 162.5 6.0
钻孔 发件人(M) 至(M) 间隔(M)
RS-22-03 52.5 61.2 8.7
RS-22-03 109.5 137.0 27.5
RS-22-03 139.1 142.4 3.3
RS-22-03 156.5 162.5 6.0


Infinity Stone has expanded the Fall Drill Program with an additional drill hole RS-22-04 that will be a step-out hole to the north of the RS-22-03. The Company has already upgraded flotation concentrate from core samples from the GC-12-01 discovery hole to 96.1% Cg, and is actively working with SGS Canada Inc. ("SGS Labs"), in Lakefield Ontario, to conduct a flotation and hydrometallurgical test program (the "Met Program") on a 2.7kg sample The goal of the Met Program is to explore the production of EV battery-grade graphite (99.8% Cg purity) derived from the Rockstone Project.


Infinity Stone已经扩展了秋季钻探计划,增加了RS-22-04孔,这将是RS-22-03以北的一个台阶孔。公司已经将浮选精矿从GC-12-01发现孔的岩心样品升级到96.1%CG,并正在积极与位于安大略省莱克菲尔德的SGS加拿大公司(“SGS实验室”)合作,对2.7公斤的样品进行浮选和湿法冶金测试项目(“Met计划”)。Met计划的目标是探索从Rockstone项目生产电动汽车电池级石墨(99.8%CG纯度)。

Graphite is a key mineral in the production of EV battery cells. Approximately 1.2kg of graphite per kWh of energy capacity is required for modern EV battery cells. For reference, this means that a Tesla Model S 100D has approximately 120kg of graphite.

石墨是生产电动汽车电池的关键矿物。现代电动汽车电池每千瓦时的能量容量大约需要1.2公斤石墨。作为参考,这意味着一辆特斯拉Model S 100D大约有120公斤的石墨。

"We are very pleased with the initial results from the RS-22-03 step-out hole. Hitting massive graphite alongside sulphides has given us valuable data that will assist in visualizing the structure and trend of the Rockstone deposit. The observed mineralization has warranted an extension of the program with the drilling of the RS-22-04 hole," said Zayn Kalyan, CEO of Infinity Stone. "We look forward to analysis of the core samples, alongside the results of our ongoing metallurgy program at SGS, as we work towards next steps in furthering exploration on this exciting project," furthered Mr. Kalyan.

Infinity Stone首席执行官Zayn Kalyan表示:“我们对RS-22-03步出孔的初步结果感到非常满意。将块状石墨与硫化物放在一起,为我们提供了宝贵的数据,这些数据将有助于可视化Rockstone矿床的结构和趋势。所观察到的矿化证明,通过钻探RS-22-04孔来延长该计划是合理的。”Kalyan先生进一步表示:“我们期待着对岩心样品的分析,以及我们在SGS正在进行的冶金项目的结果,因为我们正在为进一步探索这一令人兴奋的项目而努力。”

About Rockstone Graphite Project

关于Rockstone Graphite项目

The Rockstone Graphite Project is located 45 km west of the seaway port at the City of Thunder Bay, Ontario Canada. The Project has excellent access by logging haul roads that connect to paved/gravel roads with nearby railways and a shipping port. Based upon the reprocessed Versatile Time Domain Electromagnetic (VTEM) survey completed by Sabina Silver Corporation in 2007, there are 18 drill-ready electromagnetic targets. Greencastle's drilling in 2012 consisted of 4 diamond drillholes (916 metres). Diamond drill hole GC-12-01 intersected a 24 metre interval averaging 0.82% zinc and 0.15% copper within a graphitic argillite unit. Analysis of the pulps for the 24 metres returned a value of 25% Cg (graphitic carbon) using a LECO analytical procedure. Rockstone graphite morphology appears to be highly-ordered hexagonal graphite crystallites and crystallite agglomerates, likely formed by hydrothermal activity at a formation temperature of 702C.

罗克斯通石墨项目位于加拿大安大略省桑德湾市海港以西45公里处。该项目通过记录连接到铺面/碎石公路和附近铁路和航运港口的长途公路,获得了极好的通道。根据Sabina Silver Corporation于2007年完成的重新处理的多功能时域电磁(VTEM)测量,有18个可供钻探的电磁目标。Greencastle在2012年的钻探包括4个钻石钻孔(916米)。GC-12-01钻石钻孔在一个石墨泥岩单元内相交24米,平均含锌量为0.82%,含铜量为0.15%。使用LECO分析程序对24米的纸浆进行分析,得到25%的CG(石墨碳)值。岩石石石墨的形态为高度有序的六方石墨微晶和微晶团聚,可能是在702C的形成温度下的水热活动形成的。

Qualified Person

有资格的人

Technical information in this news release has been reviewed and approved by Case Lewis, P.Geo., a "Qualified Person" as defined under NI 43-101 Standards of Disclosure for Mineral Projects and a director of the Company.

本新闻稿中的技术信息已由Case Lewis,P.Geo,NI 43-101矿产项目披露标准和公司董事定义的“合格人士”审阅和批准。

About Infinity Stone Ventures

关于Infinity Stone Ventures

Infinity Stone's mission is to be a diversified, single source supplier for the critical energy metals being used in the clean energy revolution alongside its established SaaS solution portfolio. Infinity Stone is meeting the demand from battery and wind turbine manufacturers, nuclear and hydrogen energy producers, and energy metals speculators by acquiring 100% interest in critical mineral deposits and occurrences in stable mining-friendly jurisdictions, close to final use destinations in North American manufacturing hubs.

Infinity Stone的使命是成为清洁能源革命中使用的关键能源金属的多元化、单一来源供应商,以及其成熟的SaaS解决方案组合。Infinity Stone正在满足电池和风力涡轮机制造商、核能和氢能生产商以及能源金属投机者的需求,收购了稳定的采矿友好型司法管辖区关键矿藏和矿藏的100%权益,这些司法管辖区靠近北美制造业中心的最终使用目的地。

To register for investor updates please visit .

要注册投资者更新,请访问。

Connect with Infinity Stone

与无限之石连接

Email | Website | Facebook | LinkedIn | Twitter | Instagram |

电子邮件|网站|脸书|领英|推特|Instagram |

Infinity Stone Contact
Zayn Kalyan
CEO and Director
Direct: 778-938-3367
zayn@altuscapital.ca

无限大石头触点
泽恩·卡里安
首席执行官兼董事
直拨:778-938-3367
邮箱:zayn@altuscapal.ca

The Canadian Securities Exchange has not reviewed, approved or disapproved the content of this news release.

加拿大证券交易所没有审查、批准或不批准本新闻稿的内容。

Forward Looking Statements Disclaimer

前瞻性声明免责声明

This press release contains "forward-looking information" within the meaning of applicable securities laws. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "projects", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Such forward-looking statements necessarily involve known and unknown risks and uncertainties, which may cause actual performance and financial results in future periods to differ materially from any projections of future performance or result expressed or implied by such forward-looking statements. Although forward-looking statements contained in this press release are based upon what management of Company believes are reasonable assumptions, there can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking statements may also be affected by risks and uncertainties in the business of the Company, including those described in the Company's public filings available on . The Company undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking statements.

本新闻稿包含适用证券法所指的“前瞻性信息”。前瞻性陈述是指不是历史事实的陈述,一般但并非总是通过使用“计划”、“预期”或“不预期”、“预期”、“预算”、“计划”、“估计”、“预测”、“项目”、“打算”、“预期”或“不预期”或“相信”等词语或短语的变体来确定,或陈述某些行动、事件或结果“可能”、“可能”、“将”,“可能”或“将被采取”,“发生”或“将被实现”。这些前瞻性表述必然涉及已知和未知的风险和不确定因素,这些风险和不确定性可能会导致未来的实际业绩和财务结果与此类前瞻性表述明示或暗示的对未来业绩或结果的任何预测大不相同。尽管本新闻稿中包含的前瞻性陈述是基于公司管理层认为合理的假设,但不能保证前瞻性陈述将被证明是准确的,因为实际结果和未来事件可能与此类陈述中预期的大不相同。前瞻性陈述还可能受到公司业务中的风险和不确定因素的影响,包括在公司的公开文件中所描述的风险和不确定因素。除非适用的证券法要求,否则如果情况或管理层的估计或意见发生变化,公司不承担更新前瞻性陈述的义务。告诫读者不要过度依赖前瞻性陈述。

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发