share_log

Benz Mining Corp. 2023 Diamond Drilling Campaign Underway

Benz Mining Corp. 2023 Diamond Drilling Campaign Underway

奔驰矿业公司 2023 年钻石钻探活动正在进行中
newsfile ·  2023/02/01 08:08

HIGHLIGHTS

亮点

  • 2023 winter diamond drilling campaign has commenced on the Upper Eastmain Greenstone Belt Project.
  • First drillhole is following up on several gold intersections at the E Zone discovery, including 1.0m at 365.5g/t gold from 81.0m (EM21-229, highest grade to date for Benz).
  • 12,000m of diamond drilling planned including 4,000m exclusively dedicated to critical minerals exploration including lithium, copper and nickel following up maiden drill program intersecting 30m at 0.9% Li2O.
  • Second helicopter portable diamond drill rig booked for mid-February starting on Ruby Hill East targets on IP chargeability anomalies and surface geochemistry results.
  • Assays pending for 1,600 samples including lithium assays from Ruby Hill West and gold assays from Eastmain.
  • Resource estimation work progressing with preliminary results expected in Q1 2023.
  • 2023 年冬季钻石钻探活动已在上伊斯特曼绿岩带项目开始。
  • 第一个钻孔正在对E区发现的多个黄金交叉路口进行跟踪,包括从81.0米处钻出的1.0米的365.5g/t黄金(EM21-229,奔驰迄今为止的最高等级)。
  • 计划进行12,000米的金刚石钻探,其中4,000米专门用于包括锂、铜和镍在内的关键矿物勘探,此后首次钻探计划在30米处穿越0.9%的锂电池2O。
  • 第二台直升机便携式金刚石钻机预定于 2 月中旬在 Ruby Hill East 目标上启动,具体取决于知识产权可充电性异常和地表地球化学结果。
  • 1,600份样本的化验尚待进行,包括来自Ruby Hill West的锂检测和来自伊斯特曼的黄金检测。
  • 资源估算工作正在进行中,初步结果预计将在2023年第一季度公布。

Toronto, Ontario--(Newsfile Corp. - February 1, 2023) - Benz Mining Corp. (TSXV: BZ) (ASX: BNZ) (the "Company" or "Benz") is pleased to provide an update on exploration activities in the Upper Eastmain Greenstone Belt, located in the James Bay area of Quebec.

安大略省多伦多--(新闻档案公司——2023年2月1日)- 奔驰矿业公司(多伦多证券交易所股票代码:BZ)(澳大利亚证券交易所:BNZ) (那个 “公司” 要么 “奔驰”)很高兴提供位于魁北克詹姆斯湾地区的上伊斯特曼绿石带勘探活动的最新情况。

Dahrouge Geological Consultants and Major Drilling, the two contracting groups selected by Benz to conduct the 2023 diamond drilling campaign in the Company's Upper Eastmain Greenstone Belt projects, have mobilised to the Eastmain Camp and drilling has commenced.

奔驰选择在公司上伊斯特曼绿岩带项目中进行2023年钻石钻探活动的两个承包集团达鲁格地质顾问公司和大型钻探集团已动员到伊斯特曼营地,钻探已经开始。

Figure 1: Drill rig and equipment at Benz's Eastmain Camp, January 2023

图 1:2023 年 1 月奔驰东部营地的钻机和设备

The objective of the diamond drilling campaign is to follow up previous gold intersections and to expand the resources at the E Zone and D Zone prospects. Drilling is also planned to commence in March 2023 at the Julien and Michel prospects, following up on previous positive drill results.

钻石钻探活动的目标是沿着以前的黄金交叉路口采取后续行动,扩大E区和D区勘探区的资源。继先前的积极钻探结果之后,还计划于2023年3月在朱利安和米歇尔勘探区开始钻探。

The first drillhole for the 2023 winter exploration campaign targets extensions to the newly discovered E Zone at the Eastmain gold project. E Zone is a substantial virgin gold discovery made by Benz by testing electromagnetic targets, both ground and down-hole electromagnetic survey (DHEM).

2023年冬季勘探活动的第一个钻孔的目标是扩建Eastmain黄金项目新发现的E区。E Zone 是奔驰通过测试地面和井下电磁探测的电磁目标,发现了大量的原生金(DHEM)。

A helicopter portable drill rig is scheduled to mobilise in February to drill critical minerals targets. The first target to be drilled will be a large induced polarisation (IP) anomaly located at Ruby Hill West, coincident with soils geochemical anomalies including lithium, nickel and copper. This area is completely under shallow cover so no surface outcrop is exposed making it an extremely exciting target given the circa 4km long Li, Cs, Ta soil anomaly wrapping around a magnetic intrusive body.

一台直升机便携式钻机计划于二月份动员起来钻探关键矿物目标。第一个要钻探的目标将是大型感应极化 (IP)异常位于红宝石山西部,与包括锂、镍和铜在内的土壤地球化学异常相吻合。该区域完全处于浅层覆盖之下,因此没有露出地表,这使其成为一个极其令人兴奋的目标,因为围绕着磁性侵入物体的长约4千米的Li、Cs、Ta土壤异常现象。

Figure 2: Multiple soil anomalies with lithium, caesium, tantalum and niobium on the Ruby Hill East Prospect

图 2:Ruby Hill East Prospect 上有多个土壤异常,包括锂、铯和钽

Benz is also waiting for multielement analysis of multiple surface samples of pegmatites collected in 2022. Results from those rock chips samples will guide the future drilling programs at the Ruby Hill West prospect commencing after the snow melts, with soil and till surficial geochemical surveys and further prospecting along the pegmatite trend. The initial area to target will follow up on Benz's successful maiden program which intersected multiple spodumene bearing pegmatites with best intercept being 30m at 0.9% Li2O from 2.6m depth in an area that hasn't been explored previously.

奔驰还在等待对2022年采集的伟晶岩的多个表面样本进行多元素分析。这些岩屑样本的结果将指导Ruby Hill West勘探区的未来钻探计划,该项目将在积雪融化后开始,进行土壤和土壤表面地球化学调查,并沿伟晶岩趋势进行进一步勘探。最初的目标区域将继奔驰成功的首个项目之后,该项目与多块含有伟晶岩的锂辉石相交,最佳拦截率为 30m 在 0.9% Li2O 来自 2.6m 以前未曾探索过的区域的深度。

The planned C$10 million 2023 drilling and exploration campaign is fully funded following the Company's successful capital raising of C$11.9 million in October 2022. The budget includes C$7 million for critical minerals exploration and C$3 million for gold exploration.

继公司于2022年10月成功筹集了1,190万加元的资金之后,计划中的2023年1000万加元的钻探和勘探活动已获得全额资金。预算包括用于关键矿物勘探的700万加元和用于黄金勘探的300万加元。

Figure 3: EM21-229 - 81.3m visible gold. Best assay (by PhotonAssay) returned 1.0m at 365.5g/t gold

图 3:EM21-229-81.3 万可见黄金。最佳检测(由 PhotoNassay 提供)以 365.5 g/t 的速度返回 1.0 万枚黄金

Benz Mining Corp Chairman, Evan Cranston, commented:

奔驰矿业公司董事长埃文·克兰斯顿评论说:

"We are really excited to kick off our fully funded $10 million 2023 drill program. Initially, we will be targeting gaps in our gold resource model that are too broad to be considered for resource classification whilst we wait for assays from our 2022 drill program on the regional targets.

“我们非常高兴启动我们全额资助的1000万美元2023年钻探计划。最初,我们将瞄准黄金资源模型中存在的差距,这些缺口过于宽泛,无法用于资源分类,同时我们正在等待2022年钻探项目对区域目标的分析。

"We are also thrilled to have secured the services of Dahrouge Geological Consultants who have been involved in several high-profile lithium discoveries in the James Bay Region. To have their skillset will be invaluable to accelerate the lithium exploration on a greenstone belt that has seen less than a handful of holes targeting this critical element."

“我们也很高兴获得Dahrouge Geology Consultants的服务,他们参与了詹姆斯湾地区几项备受瞩目的锂发现。拥有他们的技能对于加快绿岩带上的锂勘探是非常宝贵的,因为绿岩带上针对这一关键元素的漏洞不多。”

About the E Zone Discovery:

关于 E Zone Discovery:

The E Zone prospect is located 3km to the SE of the Mine portal and 1km to the SE of the D Zone prospect. E Zone is a virgin discovery made by Benz under glacial cover following electromagnetics targeting in 2020.

E 区勘探区位于矿山入口东南 3 千米处,距离 D 区勘探区东南 1 千米。E Zone 是奔驰在 2020 年以电磁为目标后,在冰川覆盖下发现的一项原始发现。

Figure 4: E Zone drilling coloured by max gold abundance over simplified geology and electromagnetics modelled plates projected to surface

图 4:在投射到地表的简化地质和电磁学建模板块上的 E 区钻探按最大金丰度着色

To date, Benz has drilled 33 holes into E Zone with 11 of those holes returning assays of over 8.0g/t gold. Gold has been intersected in wide spaced drilling in an area that measures 700m by 600m from surface down to 350m vertical depth and is still open at all sides. Benz has followed mineralisation all the way to subsurface with the shallowest mineralised horizon intercepted in drillhole EM21-234 with 1.6m at 2.9g/t from 4.4m.

迄今为止,奔驰已经在E区钻了33个洞,其中11个洞的检测结果超过8.0g/t。在从地表向下到垂直深度为350米的区域中,黄金在宽间距钻探中相交,该区域的深度为700米乘600米,并且四面仍然开放。奔驰一直沿着矿化过程一直延伸到地下,在 EM21-234 钻孔中截获了最浅的矿化地平线,从 4.4 米高达 2.9 克/吨,深度为 1.6 米。

At E Zone, mineralisation occurs in several settings.

在E区,矿化发生在多种环境中。

  • A strongly deformed and altered horizon mostly located at the contact of the volcanosedimentary sequence and a deformed altered tonalite intrusion structurally interpreted as sitting in the hanging wall of the Mine horizon. This horizon is strongly altered in biotite, sericite and carbonate and is cut by sulphide and quartz veins. Garnet porphyroblast are observed as well, sulphides are mostly pyrrhotite, pyrite, chalcopyrite, sphalerite with rare molybdenite. Visible gold has been observed in this setting in several holes associated with quartz veins.

  • Strongly sericite, albite and carbonate altered and locally deformed tonalite with quartz, carbonate and tourmaline veins and veinlets. Pyrite, sphalerite and locally arsenopyrite (with pyrrhotite and chalcopyrite) are observed in association with quartz veins. Visible gold has been observed in several holes in this setting.

  • 强烈变形和改变的地平线主要位于火山-沉积层序的接触处,变形的变形的流态岩入侵在结构上被解释为位于矿山地平线的悬墙中。黑云母、绢云母和碳酸盐中的地平线发生了强烈的变化,被硫化物和石英脉切割。还观察到石榴石卟啉细胞,硫化物主要是磁黄铁矿、黄铁矿、黄铜矿、含有稀有辉钼矿的闪锌矿。在这种环境中,在与石英脉相关的几个孔中观察到了可见的金色。

  • 带有石英、碳酸盐和碧玺脉和脉状的强丝云母和钠盐岩经过改变和局部变形的托纳石。据观察,黄铁矿、闪锌矿和局部砷黄铁矿(包括磁黄铁矿和黄铜矿)与石英脉有关。在此设置的几个孔中已经观察到可见的金色。

This tonalite intrusion has a variable thickness over the area, dips parallel to foliation (45 dg to the NE) and seems to pinch out to the west. We have identified it over an area of 700 m by 500m. Monzonite and quartz diorite were observed in the margins of this intrusion.

这种扁桃体入侵物在该区域的厚度各不相同,与树叶平行(向东北 45 dg)倾角,似乎向西挤压。我们已经在 700 米 x 500 米的区域内发现了它。在这次入侵的边缘观察到了蒙脱石和石英闪长岩。

Gold mineralisation can be found associated with shears and quartz - albite veins throughout the intrusion but more abundantly in the upper half and closer to the sheared contact with the volcanic sequence.

在整个入侵过程中,可以发现金矿化与剪刀和石英——白岩脉有关,但在上半部分更为丰富,更接近于与火山序列的剪切接触。

Best intersections are:

最好的十字路口是:

EM21-229: 1.0m at 365.5g/t gold (11.7oz/t) starting at a shallow 81.0m in a sulphide bearing quartz vein with visible gold.

EM21-229:1.0 m 在 365.5g/t 黄金(11.7 盎司/t) 从含有可见金的含硫化物石英矿脉的浅层81.0m处开始。

EM21-200: 4.3m at 4.9g/t gold from 230.74 including 1.3m at 8.7g/t gold in a shear at the contact been volcanics and a gabbro and 4.8m at 0.5g/t gold from 417.5 within altered tonalite.

EM21-200:来自230.74的4.3m含金量为4.9g/t,包括触点处剪切处的1.3m质量为8.7g/t的金是火山岩和辉长岩,4.8m为0.5g/t的金来自变异的调质岩中的417.5克/吨黄金。

EM21-207: 3.0m at 9.8 g/t gold from 345.0m including 0.8m at 35.8g/t gold in altered tonalite.

EM21-207:3.0m,从 345.0m 起 9.8 g/t 黄金,包括 0.8 米(35.8 g/t)的改性黄金。

EM21-213: 1.8m at 3.9g/t gold from 97.2 meters in altered tonalite and 2.7m at 1.7g/t gold from 173.2m in quartz veins with sulphides within the tonalite showing high-grade bearing structures within the intrusion.

EM21-213:在变质的滑石中,从97.2米处的3.9g/t金中提取1.8m,从石英脉的173.2m处获得2.7m的1.7g/t黄金,渗透液中的硫化物显示出高品质的承载结构。

EM21-218: 4.8m at 4.7g/t Au from 130.9m including 1.0m at 10.4 g/t gold in sheared volcanics above the tonalite contact and within 100m from surface showing shallow high-grade material at E Zone.

EM21-218:从130.9米处以4.7g/t Au为4.8m,包括在扁桃体接触点上方的剪切火山岩中以及距离地表 100 米以内,在 E 区显示出浅层高品位物质。

EM21-220: 1.1m at 9.5g/t gold from 24.4m in a sheared ultramafic with quartz and tourmaline veins and 2.0m at 6.7 g/t gold in sheared volcanics at 91.0m, highlighting multiple stacked high-grade structures just below shallow (<20.0m) overburden at E Zone.

EM21-220:采用 9.5g/t 的 1.1 米的金在带有石英和电气石脉的剪切超镁铁质中产生 24.4 米,在 91.0 米的剪切火山岩中采用 6.7 g/t 的金,突出显示了 E 区浅层(

EM21-227: 3.8m at 5.4g/t gold from 222.8m in a shear zone including 1.3m at 18.3g/t gold.

EM21-227:从剪切区的 222.8 米处以 5.4g/t 的黄金起始于 3.8 米,包括 18.3 克/吨的黄金。

EM21-233: 4.6m at 2.5g/t gold starting at 397.68 in a shear zone includes 0.9m at 8.1g/t gold.

EM21-233:4.6m,2.5g/t 的黄金在剪切区起始于 397.68,包括以 8.1g/t 为起点的 0.9m 黄金。

EM21-234: 1.6m at 2.9g/t gold starting at a very shallow 4.4m and 0.88 g/t Au over 7 m from 70.7 m highlighting potential for bulk low-grade material within the body of the tonalite, a common setting in Archean greenstone belts where later felsic intrusions can be host to disseminated low grade gold over the whole body of the intrusion.

EM21-234:1.6m,2.9g/t 金起始于非常浅的 4.4 米,从 70.7 米处超过 7 m 的 0.88 g/t Au 突显了流星岩体内存在块状低品位物质的可能性,这在太古时代的绿岩带中很常见,后来的英质入侵可能成为整个入侵物体内散布的低品位金的宿主。

Figure 5: E Zone cross section with geology, DHEM conductors and highlight intervals

图 5:包含地质学、DHEM 导体和高光间隔的 E 区横截面

Mineral Resource estimate update:

矿产资源估算更新:

The Mineral Resource estimate is well underway with all geological modelling finalised and the mineral resource modelling to commence shortly. The Company expects preliminary results to be available during Q1 2023.

矿产资源估算正在顺利进行中,所有地质建模都已完成,矿产资源建模将很快开始。该公司预计将在2023年第一季度公布初步业绩。

This release was prepared under supervision and approved by Dr. Danielle Giovenazzo, P.Geo, acting as Benz's qualified person under National Instrument 43-101 for the reporting of exploration and drilling results.

本新闻稿是在监督下编写的,由P.Geo的Danielle Giovenazzo博士批准,他是奔驰根据国家仪器43-101报告勘探和钻探结果的合格人员。

Benz Mining will keep the market updated with upcoming assay results as they become available.

Benz Mining将在即将公布的化验结果公布后随时向市场通报最新情况。

This announcement has been authorised for release by the Board of Benz Mining Corp.

本公告已获奔驰矿业公司董事会授权发布

For more information please contact:

欲了解更多信息,请联系:

Evan Cranston
Executive Chairman,
Benz Mining Corp.
Telephone: +61 8 6143 6702
Email: info@benzmining.com

埃文·克兰斯顿
执行主席,
奔驰矿业公司
电话:+61 8 6143 6702
电子邮件:info@benzmining.com

Dannika Warburton
Principal
Investability Partners
Email: benzmining@investability.com.au
Telephone: +61 401 094 261

丹妮卡·沃伯顿
校长
可投资合作伙伴
电子邮件:benzmining@investability.com.au
电话:+61 401 094 261

About Benz Mining Corp.

奔驰矿业公司简介

Benz Mining Corp. (TSXV: BZ) (ASX: BNZ) brings together an experienced team of geoscientists and finance professionals with a focused strategy to unlock the immense mineral potential of the Upper Eastmain Greenstone Belt in Northern Quebec, which is prospective for gold, lithium, nickel, copper and other high-value minerals. Benz is earning a 100% interest in the former producing high grade Eastmain gold mine, Ruby Hill West and Ruby Hill East projects in Quebec and owns 100% of the Windy Mountain project.

Benz Mining Corp. (TSXV: BZ) (ASX: BNZ) 汇集了一支由地球科学家和金融专业人士组成的经验丰富的团队,他们的战略是释放魁北克北部上伊斯特曼绿石带的巨大矿产潜力,该地有望开采黄金、锂、镍、铜和其他高价值矿物。奔驰在魁北克以前生产高品位的伊斯特曼金矿、Ruby Hill West和Ruby Hill East项目中获得了100%的权益,并拥有Windy Mountain项目的100%股份。

At the Eastmain Gold Project, Benz has identified a combination of over 380 modelled in-hole and off-hole DHEM conductors over a strike length of 6km which is open in all directions (final interpretation of some of the conductors still pending).

在Eastmain Gold Project中,奔驰已经确定了超过380个建模的井内和井外DHEM导体的组合,行程长度为6公里,向四面八方开放(一些导体的最终解释尚待确定)。

In 2021, Benz confirmed the presence of visible spodumene in a pegmatite at the Ruby Hill West Project, indicating lithium mineralisation which Benz intends to further explore in 2022.

2021 年,奔驰证实,在 Ruby Hill West 项目,伟晶岩中存在可见的锂辉石,这表明奔驰打算在 2022 年进一步探索锂矿化。

Benz tenure over Upper Eastmain Greenstone Belt simplified geology.

奔驰在上伊斯特曼绿岩带的任期简化了地质学。

About Eastmain Gold Project

关于伊斯特曼黄金项目

The Eastmain Gold Project, situated on the Upper Eastmain Greenstone Belt in Quebec, Canada, currently hosts a NI 43-101 and JORC (2012) compliant resource of 376,000oz at 7.9gpt gold (Indicated: 236,500oz at 8.2gpt gold, Inferred: 139,300oz at 7.5gpt gold). The existing gold mineralisation is associated with 15-20% semi-massive to massive pyrrhotite, pyrite and chalcopyrite in highly deformed and altered rocks making it amenable to detection using electromagnetic techniques. Multiple gold occurrences have been identified by previous explorers over a 12km long zone along strike from the Eastmain Mine with very limited but highly encouraging testing outside the existing resource area.

Eastmain Gold Project位于加拿大魁北克的上伊斯特曼绿岩带,目前拥有符合NI 43-101和JORC(2012)标准的资源,为37.6万盎司的7.9gpt黄金(表示:236,500盎司兑8.2gpt黄金,推断:139,300盎司和7.5gpt黄金)。在高度变形和变化的岩石中,现有的金矿化与15-20%的半块状至块状磁黄铁矿、黄铁矿和黄铜矿有关,因此易于使用电磁技术进行探测。以往的探险家已经在Eastmain Mine的袭击沿线12公里长的区域内发现了多处金矿点,在现有资源区之外的测试非常有限但非常令人鼓舞。

About Ruby Hill West Lithium Project

关于 Ruby Hill West 锂业项目

The Ruby Hill West Lithium project is a surface occurrence of spodumene bearing pegmatite within the Ruby Hill West project, located 50km due west of the Eastmain exploration camp. The occurrence was first sampled in 2016 by Eastmain Resources and then by Quebec government geologists in 2018. Only limited sampling was conducted by both groups.

Ruby Hill West Lithium 项目是 Ruby Hill West 项目中含有锂辉石的伟晶岩地表出现,该项目位于伊斯特曼勘探营正西 50 公里处。Eastmain Resources在2016年首次对这一事件进行了采样,然后由魁北克政府的地质学家在2018年进行了采样。两组仅进行了有限的抽样。

In March 2022 Benz conducted a drilling program at the Ruby Hill West lithium pegmatite prospect and reported a 31.2m at 0.9% Li2O interval of visible spodumene rich pegmatite in the drilling (ASX & TSX-V releases dated 29 April 2022 "Multiple spodumene pegmatites intersected at Ruby Hill West").

2022 年 3 月,奔驰在 Ruby Hill West 锂伟晶岩勘探区进行了一项钻探计划,并报告了 312m 在 0.9% Li2O 钻探过程中可见的富含锂辉石伟晶岩的时间间隔(澳大利亚证券交易所和多伦多证券交易所于2022年4月29日发布的 “多块锂辉石伟晶岩在红宝石山西部相交”)。

Core samples from this drilling program have been submitted to the laboratory in late April and early May and results are expected shortly.

该钻探计划的岩心样本已于4月下旬和5月初提交给实验室,预计不久将得出结果。

Competent Person's Statement: The information in this announcement that relates to historical exploration results was first reported to the ASX in accordance with ASX Listing Rule 5.7 on 7 June 2022. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements. The mineral resource estimate in this announcement was reported by the Company in accordance with listing rule 5.8 on 21 December 2020. The Company confirms it is not aware of any new information or data that materially affects the information included in the previous announcement and that all material assumptions and technical parameters underpinning the estimates in the previous announcement continue to apply and have not materially changed.

合资格人士声明: 根据澳大利亚证券交易所上市规则5.7,本公告中与历史勘探结果相关的信息于 2022 年 6 月 7 日首次向澳大利亚证券交易所报告。公司确认,它不知道有任何新信息或数据会对原始市场公告中包含的信息产生重大影响。本公告中的矿产资源估算由公司于2020年12月21日根据《上市规则》第5.8条申报。公司证实,它不知道有任何对先前公告中包含的信息产生重大影响的新信息或数据,并且支持先前公告中估计的所有重大假设和技术参数继续适用且没有发生重大变化。

Forward-Looking Information: Certain statements contained in this news release may constitute "forward-looking information" as such term is used in applicable Canadian securities laws. Forward-looking information is based on plans, expectations and estimates of management at the date the information is provided and is subject to certain factors and assumptions, including, that the Company's financial condition and development plans do not change as a result of unforeseen events and that the Company obtains regulatory approval. Forward-looking information is subject to a variety of risks and uncertainties and other factors that could cause plans, estimates and actual results to vary materially from those projected in such forward-looking information. Factors that could cause the forward-looking information in this news release to change or to be inaccurate include, but are not limited to, the risk that any of the assumptions referred to prove not to be valid or reliable, that occurrences such as those referred to above are realized and result in delays, or cessation in planned work, that the Company's financial condition and development plans change, and delays in regulatory approval, as well as the other risks and uncertainties applicable to the Company as set forth in the Company's continuous disclosure filings filed under the Company's profile at . The Company undertakes no obligation to update these forward-looking statements, other than as required by applicable law.

前瞻性信息: 本新闻稿中包含的某些陈述可能构成 “前瞻性信息”,因为适用的加拿大证券法中使用了该术语。前瞻性信息基于提供信息之日管理层的计划、预期和估计,并受某些因素和假设的约束,包括公司的财务状况和发展计划不会因不可预见的事件而发生变化以及公司获得监管部门的批准。前瞻性信息受各种风险和不确定性以及其他因素的影响,这些因素可能导致计划、估计和实际结果与此类前瞻性信息中的预测存在重大差异。可能导致本新闻稿中前瞻性信息发生变化或不准确的因素包括但不限于所提及的任何假设被证明无效或不可靠的风险、上述情况发生并导致计划工作延迟或停止的风险、公司的财务状况和发展计划发生变化以及监管部门批准延迟的风险,以及适用于公司的其他风险和不确定性载于公司的持续披露中在公司简介下提交的文件,网址为。除非适用法律要求,否则公司没有义务更新这些前瞻性陈述。

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ACCURACY OR ADEQUACY OF THIS RELEASE.

多伦多证券交易所风险投资交易所及其监管服务提供商(该术语在多伦多证券交易所风险投资交易所的政策中定义)均不对本新闻稿的准确性或充分性承担责任。

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发