Blue Lagoon Encounters Additional Significant Intersections From Drilling Along Strike West of The Boulder Vein Resource
Blue Lagoon Encounters Additional Significant Intersections From Drilling Along Strike West of The Boulder Vein Resource
VANCOUVER, BC / ACCESSWIRE / February 14, 2023 / Blue Lagoon Resources Inc. (the "Company") (CSE:BLLG)(FSE:7BL)(OTCQB:BLAGF) is pleased to announce final results from the 2022 Phase II drilling program on its year-round, road accessible, Dome Mountain Gold Project, located a short 50-minute drive from Smithers, British Columbia.
温哥华,卑诗省/ACCESSWIRE/2023年2月14日/蓝泻湖资源公司(“公司)(CSE:BLG)(法兰克福证券交易所股票代码:7BL)(OTCQB:BLAGF)高兴地宣布了2022年第二阶段钻探计划的最终结果,该项目位于距离不列颠哥伦比亚省史密瑟斯50分钟车程的全年可通行道路的穹顶山金矿项目。
Significant intersections from drill holes drilled along the western strike extension of the Boulder Vein, include:
沿着Boulder矿脉西侧走向延伸钻出的钻孔的重要交叉点包括:
- DM-22-280 - 8.68 g/t Au, 68.4 g/t Ag and 0.27% Cu over 3.55 meters including 24.40 g/t Au, 158.0 g.t Ag, 0.50% Cu over 0.60 metres, and,
- DM-22-283 - 7.28 g/t Au, 60.0 g/t Ag and 0.94% Cu over 3.87 meters, including 14.98 g/t Au, 78.5 g/t Ag, 0.53% Cu over 1.40 metres
- DM-22-2808.68g/t Au,68.4g/t Ag和0.27%Cu3.55米以上,包括24.40g/t Au,158.0 g/t Ag,0.50%Cu0.60m,以及,
- DM-22-283-7.28克/吨金、60.0克/吨银和0.94%铜,超过3.87米,其中14.98克/吨金、78.5克/吨银、0.53%铜超过1.40米
These drill holes were part of a series of holes to test the Boulder structure at depth (> 200 metres from surface) and along strike to the west beyond the current (2021) resource model.
这些钻孔是测试Boulder结构的一系列孔的一部分,这些孔位于深度(离地面>200米)处,并沿着超出当前(2021年)资源模型的西向走向。
DM-22-280 intersected typical quartz-carbonate vein material within altered tuffs, mineralized with mainly pyrite and lesser chalcopyrite, sphalerite and galena at a drill depth of 226.00 to 229.55 metres grading 8.68 g/t Au, 68.4 g/t Ag and 0.27% Cu over 3.55 meters including 24.40 g/t Au, 158.0 g.t Ag, 0.50% Cu over 0.60 metres. The vein orientation appears to be steeper in this area - greater than 70° to the south.
DM-22-280型矿物与蚀变凝灰岩中的典型石英-碳酸盐脉状物质相交,矿化以黄铁矿为主,黄铜矿、闪锌矿和方铅矿次之,钻探深度为226.00~229.55米。3.55米以上含金8.68g/t,含银68.4g/t,含铜0.27%,含金24.40g/t,含银158.0克,含铜0.50%。这一地区的矿脉方向似乎更陡峭--向南大于70°。
DM-22-283 intersected two wide mineralized quartz-carbonate veins and strong clay-sericite altered zones, with the upper zone from 307.00 to 316.00 metres returning 3.69 g/t Au, 28.2 g/t Ag, and 0.43% Cu over 9.00 metres, including a higher grade core of 7.28 g/t Au, 60.0 g/t Ag and 0.94% Cu over 3.87 meters. The lower zone was drilled from 349.30 to 364.45 metres, returning 1.97 g/t Au, 38.5 g/t Ag and 0.39% Cu over 15.15 metres, including 4.30 g/t Au, 80.0 g/t Ag, and 0.79% Cu over 4.27 metres. The lower zone also included a short interval (0.43m) of massive sulphides.
DM-22-283与两条宽阔的矿化石英碳酸盐脉和强烈的粘土-绢云母蚀变带相交,上部带从307.00米到316.00米,在9.00米以上返回3.69g/t金、28.2g/t银和0.43%铜,包括一个品位较高的岩芯。3.87米内含7.28克/吨金、60.0克/吨银和0.94%铜。下部钻探深度349.30~364.45米,含金1.97g/t,含银38.5g/t,含铜0.39%。4.30克/吨金,80.0克/吨银,0.79%铜,超过4.27米。下部还包括一小段(0.43米)块状硫化物。
Table 1: Selected significant intersections (>1 g/t Au)
表1:选定的重要交叉口(>1g/t Au)
Hole |
Intersection (m) |
Grade |
|||||||
From |
To |
Length |
True Width 1 |
Au (g/t) |
Ag (g/t) |
Cu (%) |
Pb (%) |
Zn (%) |
|
DM-22-276 | 234.00 |
236.00 |
2.00 |
1.33 |
2.42 |
10.7 |
0.050 |
<0.001 |
0.050 |
DM-22-276 | 242.00 |
244.00 |
2.00 |
1.33 |
1.04 |
5.2 |
0.070 |
<0.001 |
0.150 |
DM-22-277 | 244.90 |
247.00 |
2.10 |
1.84 |
1.92 |
14.6 |
0.090 |
0.230 |
0.370 |
DM-22-277 | 371.61 |
371.85 |
0.24 |
0.21 |
5.19 |
73.7 |
0.060 |
0.430 |
0.160 |
DM-22-278 | 6.23 |
6.55 |
0.32 |
0.25 |
7.26 |
87.0 |
0.730 |
0.100 |
0.050 |
DM-22-278 | 38.45 |
38.75 |
0.30 |
0.23 |
5.10 |
21.5 |
0.170 |
0.010 |
0.110 |
DM-22-278 | 123.30 |
125.30 |
2.00 |
1.49 |
1.55 |
1.5 |
0.010 |
<0.001 |
0.400 |
DM-22-278 | 321.56 |
322.00 |
0.44 |
0.32 |
1.73 |
96.0 |
0.340 |
0.360 |
0.630 |
DM-22-280 | 87.66 |
88.11 |
0.45 |
0.41 |
6.94 |
16.5 |
0.270 |
0.000 |
0.010 |
DM-22-280 | 226.00 |
229.55 |
3.55 |
3.14 |
8.68 |
68.4 |
0.270 |
0.410 |
2.310 |
incl |
226.00 |
226.60 |
0.60 |
0.53 |
24.40 |
158.0 |
0.500 |
0.580 |
4.760 |
incl |
227.09 |
228.37 |
1.28 |
1.13 |
6.31 |
42.1 |
0.170 |
0.160 |
3.010 |
incl |
228.95 |
229.55 |
0.60 |
0.53 |
11.30 |
129.0 |
0.490 |
1.470 |
2.130 |
DM-22-280 | 332.00 |
334.00 |
2.00 |
1.76 |
1.02 |
0.9 |
0.010 |
<0.001 |
0.020 |
DM-22-281 | 216.00 |
219.00 |
3.00 |
2.20 |
1.35 |
11.7 |
0.100 |
<0.001 |
0.530 |
DM-22-281 | 237.30 |
238.00 |
0.70 |
0.51 |
1.25 |
1.2 |
0.010 |
<0.001 |
0.020 |
DM-22-281 | 323.75 |
323.95 |
0.20 |
0.14 |
4.18 |
291.0 |
3.430 |
0.260 |
0.400 |
DM-22-282 | 198.25 |
198.84 |
0.59 |
0.51 |
1.11 |
0.4 |
0.000 |
<0.001 |
0.010 |
DM-22-282 | 238.08 |
239.45 |
1.37 |
1.17 |
4.60 |
58.5 |
0.130 |
0.090 |
0.130 |
DM-22-283 | 307.00 |
310.00 |
3.00 |
2.14 |
1.66 |
6.3 |
0.050 |
0.010 |
0.200 |
incl |
309.70 |
310.00 |
0.30 |
0.21 |
5.56 |
38.5 |
0.270 |
0.020 |
0.150 |
DM-22-283 | 312.13 |
316.00 |
3.87 |
2.75 |
7.28 |
60.0 |
0.940 |
0.270 |
0.550 |
incl |
312.13 |
313.53 |
1.40 |
1.00 |
14.98 |
78.5 |
0.530 |
0.540 |
0.960 |
incl |
313.99 |
315.00 |
1.01 |
0.72 |
5.42 |
87.0 |
2.020 |
0.190 |
0.580 |
DM-22-283 | 349.30 |
364.45 |
15.15 |
10.70 |
1.97 |
38.5 |
0.390 |
0.270 |
0.400 |
incl |
360.18 |
364.45 |
4.27 |
3.01 |
4.30 |
80.0 |
0.790 |
0.500 |
0.730 |
DM-22-284 | 23.72 |
25.00 |
1.28 |
1.13 |
22.00 |
11.0 |
0.020 |
0.020 |
0.030 |
DM-22-284 | 240.00 |
241.00 |
1.00 |
0.88 |
3.86 |
0.8 |
0.000 |
<0.001 |
0.020 |
孔洞 |
交叉点(M) |
等级 |
|||||||
从… |
至 |
长度 |
真宽度1 |
Au(克/吨) |
银(克/吨) |
CU(%) |
PB(%) |
锌(%) |
|
DM-22-276 | 234.00 |
236.00 |
2.00 |
1.33 |
2.42 |
10.7 |
0.050 |
0.050 |
|
DM-22-276 | 242.00 |
244.00 |
2.00 |
1.33 |
1.04 |
5.2 |
0.070 |
0.150 |
|
DM-22-277 | 244.90 |
247.00 |
2.10 |
1.84 |
1.92 |
14.6 |
0.090 |
0.230 |
0.370 |
DM-22-277 | 371.61 |
371.85 |
0.24 |
0.21 |
5.19 |
73.7 |
0.060 |
0.430 |
0.160 |
DM-22-278 | 6.23 |
6.55 |
0.32 |
0.25 |
7.26 |
87.0 |
0.730 |
0.100 |
0.050 |
DM-22-278 | 38.45 |
38.75 |
0.30 |
0.23 |
5.10 |
21.5 |
0.170 |
0.010 |
0.110 |
DM-22-278 | 123.30 |
125.30 |
2.00 |
1.49 |
1.55 |
1.5 |
0.010 |
0.400 |
|
DM-22-278 | 321.56 |
322.00 |
0.44 |
0.32 |
1.73 |
96.0 |
0.340 |
0.360 |
0.630 |
DM-22-280 | 87.66 |
88.11 |
0.45 |
0.41 |
6.94 |
16.5 |
0.270 |
0.000 |
0.010 |
DM-22-280 | 226.00 |
229.55 |
3.55 |
3.14 |
8.68 |
68.4 |
0.270 |
0.410 |
2.310 |
包括 |
226.00 |
226.60 |
0.60 |
0.53 |
24.40 |
158.0 |
0.500 |
0.580 |
4.760 |
包括 |
227.09 |
228.37 |
1.28 |
1.13 |
6.31 |
42.1 |
0.170 |
0.160 |
3.010 |
包括 |
228.95 |
229.55 |
0.60 |
0.53 |
11.30 |
129.0 |
0.490 |
1.470 |
2.130 |
DM-22-280 | 332.00 |
334.00 |
2.00 |
1.76 |
1.02 |
0.9 |
0.010 |
0.020 |
|
DM-22-281 | 216.00 |
219.00 |
3.00 |
2.20 |
1.35 |
11.7 |
0.100 |
0.530 |
|
DM-22-281 | 237.30 |
238.00 |
0.70 |
0.51 |
1.25 |
1.2 |
0.010 |
0.020 |
|
DM-22-281 | 323.75 |
323.95 |
0.20 |
0.14 |
4.18 |
291.0 |
3.430 |
0.260 |
0.400 |
DM-22-282 | 198.25 |
198.84 |
0.59 |
0.51 |
1.11 |
0.4 |
0.000 |
0.010 |
|
DM-22-282 | 238.08 |
239.45 |
1.37 |
1.17 |
4.60 |
58.5 |
0.130 |
0.090 |
0.130 |
DM-22-283 | 307.00 |
310.00 |
3.00 |
2.14 |
1.66 |
6.3 |
0.050 |
0.010 |
0.200 |
包括 |
309.70 |
310.00 |
0.30 |
0.21 |
5.56 |
38.5 |
0.270 |
0.020 |
0.150 |
DM-22-283 | 312.13 |
316.00 |
3.87 |
2.75 |
7.28 |
60.0 |
0.940 |
0.270 |
0.550 |
包括 |
312.13 |
313.53 |
1.40 |
1.00 |
14.98 |
78.5 |
0.530 |
0.540 |
0.960 |
包括 |
313.99 |
315.00 |
1.01 |
0.72 |
5.42 |
87.0 |
2.020 |
0.190 |
0.580 |
DM-22-283 | 349.30 |
364.45 |
15.15 |
10.70 |
1.97 |
38.5 |
0.390 |
0.270 |
0.400 |
包括 |
360.18 |
364.45 |
4.27 |
3.01 |
4.30 |
80.0 |
0.790 |
0.500 |
0.730 |
DM-22-284 | 23.72 |
25.00 |
1.28 |
1.13 |
22.00 |
11.0 |
0.020 |
0.020 |
0.030 |
DM-22-284 | 240.00 |
241.00 |
1.00 |
0.88 |
3.86 |
0.8 |
0.000 |
0.020 |
1 True widths are estimates, vein dip is variable.
1真实宽度是估计值,静脉倾角是可变的。
Figure 1: 2022 Phase 2 Boulder-Cabin area drilling plan map
图1:2022年二期巨石-机舱区域钻探平面图
The 2022 Phase 2 drill program totalled 41 drill holes totalling 12,327 meters (Figure 1).
2022年第二阶段钻探计划共钻41个孔,总长12,327米(图1)。
Figure 2: Schematic long section, Boulder Vein, looking north
图2:向北看的Boulder矿脉示意图
Previously released results (January 16, 2023) from shallow, up-dip drilling in this area included DM-22-263 (3.68 g/t Au and 37.4 g/t Ag over 6.44 meters and including 1.24 meters of 15.10 g/t Au and 103 g/t Ag) and DM-22-264 (7.76 g/t Au and 218.3 g/t Ag over 1.82 meters and including 0.89 meters of 13.80 g/t Au and 345 g/t Ag).
此前(2023年1月16日)公布的该地区浅层上倾角钻探结果包括DM-22-263(6.44米以上3.68克/吨金和37.4克/吨银含1.24m的15.10g/t Au和103g/t Ag)和DM-22-264(1.82m内7.76g/t Au和218.3 g/t Ag含0.89m的13.80g/t Au和345g/t Ag).
QUALITY ASSURANCE AND CONTROL
质量保证和控制
Core selected for sampling was cut in half with a core saw or split with a hydraulic splitter with one half bagged for shipping. Strict chain of custody storing, and shipping protocol was maintained. All core preparation and analyses were completed by Activation Laboratories Ltd. located in Kamloops, BC. Core was crushed, split, and pulverized with 250 grams passing 200 mesh. Each sample was analyzed for gold by fire assay with ICP-OES finish (Act Labs Code 1A2-ICP) and for multi-elements by 4-acid total digestion ICP with OES finish.(Act Labs Code 1F2) Any gold overlimits (>30 ppm Au) were analyzed by gravimetric fire assay. Standards and blanks were inserted by Company staff. The drilling and sampling program was undertaken by Company personnel and under the direction of Ted Vanderwart, P.Geo.
选择取样的岩芯用岩心锯切成两半,或用液压劈裂器将一半装袋运输。严格的保管、储存和运输协议都得到了维护。所有的核心准备和分析都由位于不列颠哥伦比亚省坎卢普斯的激活实验室有限公司完成。芯子被粉碎、劈裂和粉碎,250克通过200目。每个样品用火焰试金分析金(Act Labs Code1A2-ICP),多元素分析用4酸全消解电感耦合等离子体光谱分析(ACT Labs Code1F2)。任何金的超标(>30ppm Au)都用重量火试法分析。标准和空白由公司工作人员填写。钻探和取样计划由公司人员承担,并在泰德·范德华特的指导下进行,P.Geo.
The scientific and technical disclosure in this news release was approved by William Cronk, P.Geo, a Qualified Person as defined in NI 43-101 and a consultant to the Company.
本新闻稿中的科技披露得到了威廉·克朗克的批准,P.Geo,NI 43-101中定义的合格人员和公司的顾问。
For further information, please contact:
如需更多信息,请联系:
Rana Vig
President and Chief Executive Officer
Telephone: 604-218-4766
Email: rana@ranavig.com
拉娜·维格
总裁与首席执行官
电话:604-218-4766
电子邮件:raa@ranavig.com
The CSE has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.
CSE未对本新闻稿的充分性或准确性进行审查,也不承担任何责任。
Statement Regarding Forward-Looking Information: This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that Blue Lagoon Resources Inc. (the "Company") expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include results of exploration activities may not show quality and quantity necessary for further exploration or future exploitation of minerals deposits, volatility of gold and silver prices, and continued availability of capital and financing, permitting and other approvals, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.
关于前瞻性信息的陈述:本新闻稿包括某些可被视为“前瞻性陈述”的陈述。本新闻稿中除有关历史事实的陈述外,涉及Blue Lagoon Resources Inc.(以下简称“公司”)预期发生的事件或发展的所有陈述均为前瞻性陈述。前瞻性陈述是指不是历史事实的陈述,一般但并非总是以“预期”、“计划”、“预期”、“相信”、“打算”、“估计”、“项目”、“可能”和类似的表述,或事件或条件“将”、“将”、“可能”、“可能”或“应该”发生。尽管公司认为这些前瞻性陈述中表达的预期是基于合理的假设,但这些陈述并不能保证未来的业绩,实际结果可能与前瞻性陈述中的结果大不相同。可能导致实际结果与前瞻性表述大相径庭的因素包括:勘探活动的结果可能没有显示进一步勘探或未来开采矿藏所需的质量和数量、金银价格的波动、资本和融资的持续可获得性、许可和其他批准以及一般经济、市场或商业状况。请投资者注意,任何此类陈述都不是对未来业绩的保证,实际结果或发展可能与前瞻性陈述中预测的大不相同。前瞻性陈述是基于公司管理层在陈述发表之日的信念、估计和意见。除非适用的证券法要求,否则公司没有义务在管理层的信念、估计或意见发生变化时更新这些前瞻性陈述, 或其他因素,都应该改变。
SOURCE: Blue Lagoon Resources Inc.
资料来源:蓝色泻湖资源公司。