share_log

Orestone Continues to Refine Gold Copper Trend and Porphyry Drill Targets at Captain Property

Orestone Continues to Refine Gold Copper Trend and Porphyry Drill Targets at Captain Property

Orestone 繼續在船長物業精煉金銅趨勢和斑岩鑽靶
newsfile ·  2023/03/02 07:02

Vancouver, British Columbia--(Newsfile Corp. - March 2, 2023) - Orestone Mining Corp. (TSXV: ORS) (OTC Pink: ORESF) (FSE: O2R1) (WKN: O2R1) continues to refine the model for the gold copper porphyry trend on Captain Property through compilation and interpretation of structural and geological data combined with the interpretation of results of the airborne MagnetoTelluric (MT) survey resistivity and magnetic results. Three distinct MT low resistivity (high conductivity) targets have been outlined over a five kilometre strike length along a prominent north/south trending inferred regional fault. The three targets are aligned at the intersection of northeast and northwest trending interpreted cross faults. This trend remains open to the north and south on Orestone claims and additional airborne MT surveys are planned for 2023.

温哥華,不列顛哥倫比亞省-(Newsfile Corp.-2023年3月2日)-Orestone礦業公司(多倫多證券交易所代碼:ORS) (場外粉色:ORESF) (FSE:O2R1)(WKN:O2R1)通過對構造和地質數據的彙編和解釋,結合對航空大地電磁(MT)測量的電阻率和磁學結果的解釋,繼續完善Capter Property上的金、銅斑巖趨勢模型。三個不同的大地電磁低阻率(高傳導性)目標已被勾勒出沿一個明顯的北/南方向推斷的區域斷層的五公里走向長度。三個靶區位於北東向和北西向解釋交叉斷裂的交匯處。這一趨勢仍然對北部和南部的礦石主張開放,計劃在2023年進行更多的航空MT調查。

The airborne MT vertical pseudo-sections over the primary target "T1" indicate a steeply easterly dipping structurally controlled porphyry system beginning several hundred metres beneath a conductive tabular section of sulphide rich highly phyllic - potassic altered latite volcanics. The T1 MT conductive anomaly measures 300-400 metres x 1200 metres at a depth of 500 metres and increases to size to 1500 x 1500 metres at a depth of 1300 metres indicating the deep potential porphyry system narrows to a dyke system near surface. Drilling in 2023 is planned to target the core of the system with two holes planned to a depth of 1000 metres and will continue to depth if gold-copper mineralized altered porphyry is encountered.

主要目標“T1”上方的航空大地電磁垂直偽剖面表明,一個陡峭的向東傾斜的受構造控制的斑巖系統,始於富含高葉質鉀質蝕變的寬闊火山巖的導電性板狀硫化物段下方數百米處。T1 MT導電性異常在500米處測量300-400米×1200米,在1300米處增大到1500米×1500米,表明深部潛在斑巖系統縮小為近地表的巖牆系統。2023年的鑽探計劃以該系統的核心為目標,計劃在1000米深打兩個孔,如果遇到金銅礦化蝕變斑巖,將繼續深入。

While no previous drilling has been conducted in the core of the system, seven fringing drill holes have intersected numerous vertical to subvertical porphyry dykes within a wide tabular zone of phyllic alteration 200-500 metres thick. Gold-copper mineralization associated with sericite-potassium feldspar (kspar) alteration have been intercepted from 20-160 metres thick grading 0.20 to 0.84 g/t gold and 0.05-0.11 percent (500-1100 ppm) copper and is believed to have been produced by a large porphyry system directly below. Drilling to date has defined a large scale alteration halo over an area measuring 2000 by 2000 metres.

雖然以前沒有在該系統的核心進行過鑽探,但在200-500米厚的廣泛的葉狀蝕變帶內,7個邊緣鑽孔與許多垂直到近垂直的斑巖巖脈相交。與絹雲母-鉀長石(鉀石)蝕變有關的金-銅礦化已被截獲,品位為20-160米,品位為0.20-0.84g/t金和0.05-0.11%(500-1100ppm)銅,據信是由正下方的大型斑巖系統產生的。到目前為止,鑽探已經在2000米乘2000米的區域上確定了一個大規模的蝕變暈。

"We continue to refine and de-risk the large T1 gold dominant porphyry target. Our modeling indicates an area of approximately one cubic kilometre (1km3) in size and there is more than enough room to encounter some considerable tonnage. The next drill program is being planned for the summer of 2023," states David Hottman, CEO and Director of Orestone Mining Corp.

Orestone Mining Corp.首席執行官兼董事首席執行官David·霍特曼表示:“我們繼續提煉以T1金礦為主的大型斑巖靶區,降低其風險。我們的模擬顯示,該靶區的面積約為1立方公里(1千米3),有足夠的空間遇到一些相當大的噸位。下一次鑽探計劃將於2023年夏天進行。”

Gold rich porphyry systems such as the Red Chris deposit to the north of Captain are typically strongly structurally controlled and are characterized by a narrow zone of multiple intrusive dyke phases widening at depth with a halo of copper-gold rich disseminated sulphides and quartz stock works near the top of the dyke system.

富金斑巖系統,如船長以北的Red Chris礦牀,典型地受到強烈的構造控制,其特徵是多個侵入巖脈相組成的狹窄帶在深部加寬,在靠近巖牆系統頂部的地方有一圈富銅金浸染型硫化物和石英巖塊。

Quality assurance/quality control procedures
Orestone Mining has implemented a rigorous quality assurance/quality control program to ensure best practices in work programs by the company and contractors including sampling and analysis of diamond drill core as well as geophysical surveys and other work conducted on the property. Gary Nordin, P.Geo, a Director of the Company, is a qualified person as defined by National Instrument 43-101. Mr. Nordin has reviewed and approved the technical information in this press release.

質量保證/質量控制程序
Orestone Mining實施了嚴格的質量保證/質量控制計劃,以確保公司和承包商在工作計劃中採取最佳做法,包括對鑽石鑽芯進行採樣和分析,以及在該礦區進行地球物理測量和其他工作。加里·諾丁,P.Geo,公司董事的一員,是National Instrument 43-101所定義的合格人員。諾丁先生已經審查並批准了本新聞稿中的技術信息。

The 100 percent owned Captain gold-copper Project encompasses 105 square kilometres and hosts a large gold dominate porphyry system located 41 kilometres north of Fort St. James and 30 kilometres south of the Mt. Milligan copper-gold mine in North Central British Columbia. The Captain Project features relatively flat terrain, moderate tree cover, and an extensive network of logging and Forest Service roads suitable for exploration year round. To stay informed of Orestone's latest activities please click here to provide consent and receive news and updates. For more information, please visit Orestone's website at: .

100%擁有的金銅船長項目佔地105平方公里,擁有一個大型的以黃金為主的斑巖系統,位於聖詹姆斯堡以北41公里,聖詹姆斯山以南30公里。不列顛哥倫比亞省中北部的米利根銅金礦。船長項目的特點是地形相對平坦,樹木覆蓋率適中,以及適合全年勘探的廣泛的伐木和林業局道路網絡。要隨時瞭解Orestone的最新活動,請單擊此處提供同意並獲取新聞和最新消息。欲瞭解更多信息,請訪問Orestone的網站:

ON BEHALF OF ORESTONE MINING CORP.

代表ORESTONE礦業公司。

David Hottman

David·霍特曼

CEO

首席執行官

For further information contact: David Hottman at 604-629-1929 | info@orestone.ca

欲瞭解更多信息,請聯繫:David·霍特曼,電話:6046291929

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this News Release. This news release has been prepared by management and no regulatory authority has approved or disapproved the information contained herein.

多倫多證券交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。本新聞稿由管理層準備,沒有任何監管機構批准或不批准本新聞稿中包含的信息。

Forward-Looking Statements
This news release contains certain forward-looking statements, which relate to future events or future performance and reflect management's current expectations and assumptions. Such forward-looking statements reflect management's current beliefs and are based on assumptions made by and information currently available to the Company. Readers are cautioned that these forward-looking statements are neither promises nor guarantees, and are subject to risks and uncertainties that may cause future results to differ materially from those expected including, but not limited to, market conditions, availability of financing, currency rate fluctuations, actual results of exploration and development activities, environmental risks, future prices of copper, gold, silver and other metals, operating risks, accidents, labor issues, delays in obtaining governmental or regulatory approvals and permits, and other risks in the mining industry. In addition, there is uncertainty about the spread of the COVID-19 virus and the impact it will have on the Company's operations, global supply chains and economic activity in general. All the forward-looking statements made in this news release are qualified by these cautionary statements and those in our continuous disclosure filings available on SEDAR at . These forward-looking statements are made as of the date hereof and the Company does not assume any obligation to update or revise them to reflect new events or circumstances save as required by applicable law.

前瞻性陳述
本新聞稿包含一些與未來事件或未來業績有關的前瞻性陳述,反映了管理層'目前的預期和假設。這樣的前瞻性陳述反映了管理層'的當前信念,並基於公司所做的假設和目前可獲得的信息。敬請讀者注意,這些前瞻性表述既不是承諾,也不是擔保,會受到風險和不確定性的影響,這些風險和不確定性可能會導致未來結果與預期產生重大差異,這些風險和不確定性包括但不限於市場條件、融資渠道、匯率波動、勘探和開發活動的實際結果、環境風險、銅、金、銀和其他金屬的未來價格、經營風險、事故、勞工問題、在獲得政府或監管部門批准和許可方面的延誤以及採礦業的其他風險。此外,新冠肺炎病毒的傳播及其將對公司運營、全球供應鏈和總體經濟活動產生的影響存在不確定性。本新聞稿中的所有前瞻性陳述均受這些警告性聲明和我們在SEDAR上提供的持續披露文件中的警告性聲明所限制,網址為. 這些前瞻性陳述是自本新聞稿發佈之日起作出的,除適用法律要求外,公司不承擔任何更新或修訂這些陳述以反映新事件或新情況的義務。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論