share_log

High Tide Resources to Present at CIM's Iron Ore Symposium in Montreal on Monday, May 1, 2023

High Tide Resources to Present at CIM's Iron Ore Symposium in Montreal on Monday, May 1, 2023

High Tide Resources 将于 2023 年 5 月 1 日星期一在蒙特利尔举行的 CIM 铁矿石研讨会上发表
Accesswire ·  2023/04/27 07:34

TORONTO, ON / ACCESSWIRE / April 27, 2023 / High Tide Resources Corp. ("High Tide" or the "Company") (CSE:HTRC) is pleased to announce, at the request of The Canadian Institute of Mining, Metallurgy and Petroleum (CIM) and the Society for Mining, Metallurgy and Exploration (SME), Minnesota Chapter, the Company will present the Labrador West Iron Project during the 9th North American Iron Ore Symposium in Montreal, Quebec.

多伦多,on/ACCESSWIRE/2023年4月27日 /High Tide(“Sequoia Resources Corp.)High Tide“或”公司“)(CSE:HTRC)很高兴地宣布,应加拿大采矿、冶金和石油学会(CIM)和采矿、冶金和勘探学会(SME)明尼苏达州分会的要求,公司将提交拉布拉多西铁项目在测试期间设置第九届北美铁矿石研讨会在魁北克的蒙特利尔。

High Tide's presentation will take place Monday, May 1, 2023 at 3:30 pm in room 516C in the Palais des congrès de Montréal. The presentation is titled 'The Labrador West Iron Project: How Green Can We Get?' and will be given by Steve Roebuck P. Geo, Director & Interim CEO and Michael T. Zurowski P. Eng., Executive Vice President.

High Tide的发布会将于2023年5月1日星期一下午3:30在宫殿̀s de Montréal 516C室举行。演示文稿的标题为‘拉布拉多西铁项目:我们能变得多绿色?颁奖典礼将由董事临时首席执行官史蒂夫·罗巴克·P·吉奥和执行副总裁总裁·T·祖罗夫斯基·P·英格主持。

Interested parties attending CIM MTL 23 Convention + Expo are encouraged to drop-in to the presentation to find out more about the Labrador West Iron Project and our development plans or reach out at anytime during the convention to say hello, exchange ideas and business cards.

有兴趣参加CIM MTL 23大会+博览会的人士,欢迎亲临现场,了解更多有关拉布拉多西铁项目和我们的发展计划或在大会期间的任何时间伸手打招呼,交流想法和名片。

For more information please see:

有关更多信息,请参阅:

Labrador West Iron Project

拉布拉多西铁项目

The Labrador West Iron Project hosts a NI 43-101 inferred iron resource of 655 Mt @ 28.84% Fe and is comprised of one mineral licence (99 mineral claims), 2,475 hectares in size. The area was explored and drilled by Rio Tinto Exploration from 2010 to 2012, and then by High Tide Resources in 2020 & 2022. To date, approximately 7,500 m of core in 27 completed holes has been drilled on the property. Located less than 20 kilometres northeast of Labrador City, the Project is proximal to all the critical infrastructure required to explore and develop a major new iron deposit in the heart of the southern Labrador Trough. Experience by major producers operating in the Labrador Trough indicates that hematite and magnetite in this geological setting are readily recoverable using modern, industry standard beneficiation methods, that produce high purity, desirable iron concentrates.

拉布拉多西铁项目拥有NI 43-101推断铁资源655公吨@28.84%铁,由一个矿产许可证(99个矿物主张)组成,面积为2,475公顷。2010年至2012年,力拓勘探公司对该地区进行了勘探和钻探,2020年和2022年,High Tide资源公司对该地区进行了勘探和钻探。到目前为止,已经在27个已完成的孔中钻出了大约7500米的岩心。该项目位于拉布拉多市东北不到20公里处,毗邻勘探和开发拉布拉多海槽南部中心大型新铁矿所需的所有关键基础设施。在拉布拉多海槽运营的主要生产商的经验表明,该地质环境中的赤铁矿和磁铁矿很容易使用现代的行业标准选矿方法进行回收,从而生产出高纯度、令人满意的铁精矿。

Iron and the Western Labrador Trough Infrastructure Advantage

铁和西部拉布拉多海槽的基础设施优势

The Labrador Trough of western Labrador and adjoining Quebec constitutes Canada's primary iron producing district and is host to world-class deposits that have been mined for more than half a century. These have produced over 2 billion tonnes of iron ore to date and are considered to have very significant growth potential. The high quality of the deposits in the region allows for a wide range in product diversity, which includes premium fines, concentrate and pellet grades.

拉布拉多西部和毗邻魁北克的拉布拉多海槽构成了加拿大主要的铁矿石产区,拥有半个多世纪以来开采的世界级矿藏。到目前为止,这些公司已经生产了超过20亿吨铁矿石,被认为具有非常大的增长潜力。该地区矿藏的高质量允许产品多样化,包括优质粉矿、精矿和球团矿等级。

The Property is strategically located near the mining communities of Wabush and Labrador City in the province of Newfoundland & Labrador and Fermont in Quebec. The area is home to Champion Iron Ore's Bloom Lake Mine, ArcelorMittal's Mont-Wright Mine, Tacora Resources' Scully Mine, and Rio Tinto IOC's Carol Lake Mine.

该地产位于纽芬兰的瓦布什和拉布拉多市的矿业社区附近,以及魁北克省的拉布拉多省和费尔蒙特。该地区拥有Champion Iron Ore的Bloom Lake矿、ArcelorMittal的Mont-Wright矿、Tacora Resources的Scully矿和力拓国际奥委会的Carol Lake矿。

The Wabush and Labrador City region is very well served with skilled labour and a highway as well as access to abundant low-cost hydroelectricity and a common carrier railway. The railway has 80 million tonnes per year of capacity for transport of iron products to the deep-water port of Sept Isles, Quebec, which provides year-round access to global markets.

瓦布什和拉布拉多市地区有很好的服务,有熟练的劳动力和骇维金属加工,以及大量的低成本水力发电和一条公共运输铁路。这条铁路每年有8000万吨的运力,可以将铁产品运输到魁北克的深水港9月岛,那里提供了全年进入全球市场的通道。

About High Tide

关于High Tide

High Tide is focused on and committed to the development of mineral projects critical to infrastructure development using industry best practices combined with a strong social license from local communities. High Tide owns a 100% interest in the Labrador West Iron Project which hosts a NI 43-101 Inferred iron resource of 655 Mt @ 28.84% Fe and is located adjacent to IOCC's Carol Lake Mine in Labrador City, NL. This resource is exposed at surface and was pit constrained for an open-pit mining scenario. The Technical Report was filed on SEDAR on April 6, 2023 and was authored by Ryan Kressall M.Sc., P.Geo, Matthew Herrington, M.Sc., P.Geo, Catharine Pelletier, P.Eng. and Jeffrey Cassoff P.Eng.

High Tide专注于并致力于利用行业最佳实践与当地社区颁发的强有力的社会许可证相结合,开发对基础设施发展至关重要的矿产项目。High Tide拥有拉布拉多西铁项目的100%权益,该项目拥有NI 43-101推断铁矿655 Mt@28.84%Fe,并毗邻IOCC位于北卡罗来纳州拉布拉多市的Carol Lake矿山。这种资源暴露在地表,露天矿开采时受到矿坑的限制。该技术报告于2023年4月6日在SEDAR上提交,作者为Ryan Kressall M.Sc.,P.Geo,Matthew Herrington,M.Sc,P.Geo,凯瑟琳·佩尔蒂埃,P.Eng。和杰弗里·卡索夫·P.Eng。

The Company also owns a 100% interest in the Lac Pegma copper-nickel-cobalt deposit located 50 kilometres southeast of Fermont, Quebec and is earning a 100% interest in the road accessible Clearcut Lithium Project located ~75 kilometres southwest of Val d'Or, Quebec and the road accessible Big Bang Lithium Project located ~275 kilometres northeast of Thunder Bay, Ontario. Majority shareholder Avidian Gold (TSX.V: AVG) controls approximately 30% of High Tide's outstanding shares.

本公司还拥有位于魁北克省费尔蒙特东南50公里处的Lac PegMa铜镍钴矿床的100%权益,并正在赚取位于魁北克省Val d‘Or西南约75公里处的公路可达清晰切割锂项目和位于安大略省桑德贝东北约275公里处的公路可达大爆炸锂项目的100%权益。大股东Avidian Gold(多伦多证券交易所股票代码:AVG)控制着High Tide约30%的流通股。

Further details on the Company, including a NI 43-101 technical report on the Labrador West Iron property can be found on the Company's website at .

有关公司的更多细节,包括关于拉布拉多西铁资产的NI 43-101技术报告,可在公司网站上找到。

Qualified Person

有资格的人

The technical information contained in this news release has been approved by Steve Roebuck,

本新闻稿中包含的技术信息已得到史蒂夫·罗巴克的批准,

P.Geo., Director, President and Interim CEO of High Tide, who is a Qualified Person as defined in "National Instrument 43-101, Standards of Disclosure for Mineral Projects."

P·Geo、董事、总裁和High Tide临时首席执行官,他是“国家仪器43-101,矿产项目披露标准”中定义的合格人员。

For further information, please contact:

如需更多信息,请联系:

Steve Roebuck
Director, President & Interim CEO
Mobile: (905) 741-5458
Email: sroebuck@hightideresources.com

史蒂夫·罗巴克
董事,总裁兼临时首席执行官
手机:(905)741-5458
电子邮件:sroebuck@Hightideresources.com

Neither Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this news release.

加拿大证券交易所及其监管服务提供商(该术语在加拿大证券交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

Forward looking information

前瞻性信息

This news release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, developing the Labrador West Iron Project into the next producer , the acquisition of low cost and potentially high reward lithium projects, the ability to keep exploration costs low, expected access to regional lithium processing hubs, the Company's objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to: the ability to anticipate and counteract the effects of COVID-19 pandemic on the business of the Company, including without limitation the effects of COVID-19 on the capital markets, commodity prices supply chain disruptions, restrictions on labour and workplace attendance and local and international travel, failure to receive requisite approvals in respect of the foregoing, failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, inability to fulfill the duty to accommodate First Nations and other indigenous peoples, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

本新闻稿包括一些不包含历史事实的“前瞻性陈述”。前瞻性陈述包括描述公司未来计划、目标或目标的估计和陈述,包括公司或管理层预期将出现的情况或结果的表述。前瞻性陈述可以用“相信”、“预期”、“预期”、“估计”、“可能”、“将”或“计划”等术语来识别。由于前瞻性陈述以假设为基础,涉及未来的事件和情况,因此它们本身就具有内在的风险和不确定性。虽然这些陈述是基于公司目前掌握的信息,但公司不能保证实际结果将符合管理层的期望。前瞻性信息涉及的风险、不确定性和其他因素可能导致实际事件、结果、业绩、前景和机会与此类前瞻性信息明示或暗示的情况大不相同。本新闻稿中的前瞻性信息包括,但不限于,将拉布拉多西铁项目开发成下一个生产商,对低成本和潜在高回报锂项目的收购,保持低勘探成本的能力,预期获得地区锂加工中心的机会,公司的目标、目标或未来计划,声明,勘探结果,潜在矿化,矿产资源估计,勘探和矿山开发计划,开始运营的时间和对市场状况的估计。可能导致实际结果与此类前瞻性信息大不相同的因素包括但不限于:预测和抵消新冠肺炎大流行对公司业务影响的能力,包括但不限于新冠肺炎对资本市场的影响、商品价格供应链中断、对劳动力和工作场所出勤以及当地和国际旅行的限制、未能就上述情况获得必要的批准、未能查明矿产资源、未能将估计的矿产资源转换为储量、未能完成建议生产决策的可行性研究、冶金测试结果的初步性质、未能获得所需的政府批准、这些风险包括:环境或其他项目审批的不确定性、政治风险、无法履行容纳原住民和其他土著人民的义务、与未来所需融资的可获得性和成本有关的不确定性、股票市场的变化、通货膨胀、汇率变化、大宗商品价格的波动、项目开发的延迟、资本和运营成本与估计相差甚远、矿产勘探和开发行业涉及的其他风险,以及公司在提交给SEDAR的公开文件中陈述的风险。尽管本公司认为在准备本新闻稿中的前瞻性信息时使用的假设和因素是合理的,但不应过度依赖这些信息,因为这些信息仅适用于本新闻稿发布之日,并且不能保证此类事件将在披露的时间框架内发生或根本不会发生。除法律要求外,公司没有任何更新或修改任何前瞻性信息的意图或义务,无论是由于新信息、未来事件或其他原因。

SOURCE: High Tide Resources Corp.

资料来源:High Tide资源公司


View source version on accesswire.com:
在accesswire.com上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发