share_log

Europacific Metals Acquires 100 % Interest in EVX Portugal for the Borba 2 Copper-Gold Properties in Portugal

Europacific Metals Acquires 100 % Interest in EVX Portugal for the Borba 2 Copper-Gold Properties in Portugal

Europacific Metals收購葡萄牙EVX的100%權益,用於葡萄牙的Borba 2銅金地產
Accesswire ·  2023/05/04 12:30

VANCOUVER, BC / ACCESSWIRE / May 4, 2023 / Europacific Metals Inc (TSXV:EUP) the ("Company" or "Europacific") is pleased to announce that it has signed an agreement with European Electric Metals Inc. ("EVX"). Whereby, Europacific acquired the remaining 30 % equity interest (for a total of 100% equity interest) in EVX Portugal (a Europacific and EVX subsidiary), a private Portugal based company, that holds the legal exploration rights from the Portugal Government on the Borba 2 ("Borba 2") exploration properties, covering approximately 328 square kilometers in the Alentejo region in Southern Portugal.

溫哥華,BC/ACCESSWIRE/2023年5月4日/EuroPacific Metals Inc.(TSXV:EUP)(“公司“或”歐洲太平洋“)很高興地宣佈,它已與歐洲電氣金屬公司(”EVX“)簽署了一項協定,據此,EuroPacific收購了EVX葡萄牙公司(EVX葡萄牙公司的子公司)剩餘30%的股權(總計100%股權),EVX葡萄牙公司是一家總部位於葡萄牙的私營公司,持有葡萄牙政府對葡萄牙南部Alentejo地區Borba 2(”Borba 2“)勘探物業的合法探礦權,該專案佔地約328平方公里。

Borba 2 projects have a well-documented potential to host precious and base metals mineralization often enhanced by the presence of abundant Au and /or Cu mineral occurrences in shear zones and in epithermal systems associated with intra-Ordovician volcanics. The most prominent project is the Miguel Vacas open pit copper deposit which produced 1.9 million lbs of copper from the oxide zone of a shear zone in schists at least 2000 meters along strike and 10 to 20 meters in width.

Borba 2專案有充分的證據證明有可能容納貴金屬和賤金屬礦化,在剪切帶和與奧陶紀內火山有關的淺成熱液系統中存在豐富的金和/或銅礦物,往往會增強這一潛力。最突出的專案是Miguel Vacas露天銅礦,它從沿走向至少2000米、寬度10至20米的片岩中剪切帶的氧化帶中生產了190萬磅銅。

Borba 2 includes a total of four separate projects including three past producing mines as follows.

Borba 2總共包括四個獨立的專案,包括三個過去生產的礦山具體如下。

Miguel Vacas- Past Producing Copper Mine

Miguel Vacas-過去生產銅礦

The copper mine last operated in 1986 and has produced at an average grade of 1.2-1.4% Cu. Historical near surface drilling (60 to 71.63m) intercepted 1.79 % Cu over 10.54m including 2.29% Cu over 7.30 m.

該銅礦上一次運營是在1986年,銅的平均品位為1.2-1.4%。歷史近地表鑽井(60~71.63米)在10.54米以上截獲1.79%的銅,其中7.30米以上截獲2.29%的銅。

The project remains open for exploration.

該專案仍在開放進行勘探。

Mostardeira Copper-Gold Mine

莫斯塔代拉銅金礦

This Cu-Au mine area, located approximately 2 km south of the town of Estremoz represents a wide WSW-ESE shear zone that is developed for at least 700 m along strike and is open into both directions. This shear zone has been historically mined for Cu with most of the mining works concentrated along a thin high-grade Cu zone (<2m) averaging over 5% Cu.

該銅金礦區位於埃斯特雷莫茲鎮以南約2公里處,是一條寬闊的西南向-東南向剪切帶,沿走向發展至少700米,並向兩個方向開放。該剪切帶歷史上曾開採過銅,大部分採礦工作集中在平均含銅量超過5%的薄的高品位銅礦帶(

Mineralization is hosted by Silurian and Devonian metasediments. Channel sampling by Rio Narcea (2006) has intercepted the following mineralized intervals: 2.60m grading 4.15 g/t Au, 0.40% Cu including 0.60m grading 11.20 g/t Au and 0.65 % Cu and another 3.60m interval grading 2.40 g/t Au, 0.82 % Cu and 80 g/t Ag. The average grade for the total of 34 samples analysed was 1.54 g/t Au, 22 g/t Ag and 0.25% Cu with a maximum of 11.20 g/t Au and a minimum of 0.10 g/t Au.

礦化賦存於志留系和泥盆系的變質沉積中。Rio Narcea(2006)的河道取樣截獲瞭如下礦化區間:2.60m品位4.15g/t Au,0.40%銅,其中0.60m品位11.20g/t Au和0.65%銅;另外3.60m區間品位2.40g/t Au,0.82%Cu和80g/t Ag。所分析的34個樣品的平均品位分別為:Au 1.54g/t,Ag 22g/t,銅0.25%,Au最高11.20g/t,最低0.10g/t。

The project is open for exploration.

該專案對勘探開放。

Bugalho Copper-Gold Mine

布加略銅金礦

Dump samples of silicified and sheared acid tuffs from the Bugalho mine area assay up to 10.97 g/t Au, 5.36% Cu and 20 g/t Ag.
Mineralization can be mapped about 5 km along strike and includes three main veins up to 1.3m thick within a several meter wide shear zone.

從Bugalho礦區排出的矽化和剪切的酸性凝灰岩樣品中,Au含量高達10.97g/t,銅含量高達5.36%,銀含量高達20g/t。
礦化可沿走向繪製約5公里,幷包括三個厚達1.3米的主脈,位於幾米寬的剪切帶內。

The project is open for exploration

該專案開放進行勘探。

Almagreira Gold Prospect

阿爾馬格雷拉金礦遠景

This area Drilling has been identified by Rio Tinto during the early eighties and limited trenching and drilling have indicated the presence of gold mineralization associated with clay-sericite-silica alteration zones associated with a ENE-WSW fracture zone and represents an epithermal system identified in this sector hosted by brecciated acid volcanics and dolomites.

這一地區的鑽探是力拓在80年代初發現的,有限的開挖和鑽探表明,存在與與ENE-WSW斷裂帶有關的黏土-絹雲巖-硅質蝕變帶有關的金礦化,並代表了該地區發現的以角礫狀酸性火山岩和白雲巖為主體的低溫熱液系統。

Historical drilling intercepted an interval of 5.45 m grading 1.53 g/t Au, including 2.47m grading 2.44 g/t Au from hole PAM-01. The highest individual value obtained came from a gossanous quartz-dolomite altered marble grading 5.77 g/t Au over an intercept of 0.75m. Hole Pam-02 intercepted an interval of 2m grading 3.7 g/t Au. The mineralized zone coincides with sections of intense silica-carbonate alteration with several massive gossan zones and localized fresh sulphide dissemination (chalcopyrite and pyrite).

歷史鑽探從PAM-01孔截獲5.45m品位1.53g/t Au,其中2.47m品位2.44g/t。獲得的最高個體價值來自於一塊石英白雲石蝕變大理岩,其金品位為5.77g/t,截距為0.75m。Pam-02孔截距2m,品位3.7g/t Au。礦化帶與強烈的硅碳酸鹽蝕變帶相吻合,有幾個塊狀鐵帽帶和局部的新鮮硫化物(黃銅礦和黃鐵礦)侵入。

The project is open for exploration.

該專案對勘探開放。

Transaction Details

交易細節

Europacific has acquired the remaining 30% equity interest in EVX Portugal (that it did not already own) by making a cash payment of $50,000 to EVX (paid) and by issuing a total of 700,000 Europacific common shares to EVX by July 25, 2023, subject to receipt of Toronto Stock Exchange Venture approval. The Europacific shares (to be issued) will bear certain trading restrictions.

EuroPacific通過向EVX支付5萬美元的現金支付(已支付),並在2023年7月25日之前向EVX發行總計70萬股EuroPacific普通股,獲得了EVX葡萄牙公司剩餘的30%股權(這是它尚未擁有的),但仍需獲得多倫多證券交易所的合資企業批准。歐洲太平洋公司的股票(將發行)將受到某些交易限制。

Qualified Person

有資格的人

Jose Mario Castelo Branco, P.Geo., Vice President Exploration, is a "Qualified Person" for the purposes of NI 43-101, and he has reviewed and approved the scientific and technical disclosure contained in this news release.

總裁勘探公司副總裁何塞·馬利奧·卡斯特洛·布蘭科是符合NI 43-101標準的“合格人員”,他已審核並批准了本新聞稿中包含的科學技術披露內容。

About Europacific Metals Inc

關於歐洲太平洋金屬公司

Europacific Metals Inc. is a Canadian public company listed on TSXV and in US on OTCQB. The Company holds brownfield gold, and copper-gold projects located in Portugal. The Company is focused on exploration in highly prospective geological settings in Europe and Eurasian jurisdictions.

EuroPacific Metals Inc.是一家加拿大上市公司,在多倫多證券交易所上市,在美國OTCQB上市。該公司在葡萄牙擁有棕地金礦和銅金專案。該公司專注於在歐洲和歐亞司法管轄區極具前景的地質環境中進行勘探。

On behalf of the Board of Directors

我謹代表董事會

"Chris Osterman"
CEO

《克裡斯·奧斯特曼》
首席執行官

For further information please contact:

欲瞭解更多資訊,請聯繫:

Europacific Metals Inc.

歐洲太平洋金屬公司。

Mr. Chris Osterman, Chief Executive Officer
Suite 650 - 1021 West Hastings Street
Vancouver, BC V6E 0C3
E: chris@europacificmetals.ca

首席執行官Chris Osterman先生
西黑斯廷斯街650-1021號套房
溫哥華,BC V6E 0C3
電子郵箱:chris@uropacatimetals.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所創業板交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

This news release contains "forward-looking information" within the meaning of applicable securities laws relating to the exploration potential of the the Company's properties. Generally forward-looking statements can be identified by the use of terminology such as "anticipate", "will", "expect", "may", "continue", "could", "estimate", "forecast", "plan", "potential" and similar expressions. These forward-looking statements involve risks and uncertainties relating to, among other things, results of future exploration and development activities, uninsured risks, regulatory changes, defects in title, availability of materials and equipment, timeliness of government approvals, changes in commodity prices and unanticipated environmental impacts on operations. Although the Company believes current conditions and expected future developments and other factors that have been considered are appropriate and that the expectations reflected in this forward-looking information are reasonable, undue reliance should not be placed on them because the Company can give no assurance that they will prove to be correct or enduring. Readers are cautioned to not place undue reliance on forward-looking information. The statements in this press release are made as of the date of this release. Except as required by law, the Company does not undertake any obligation to update publicly or to revise any forward-looking statements that are contained or incorporated in this press release. All forward-looking statements contained in this press release are expressly qualified by this cautionary statement. The readers should not rely on any historical estimates. The Company and the QP has not done sufficient work to classify historical estimate as a current resource. Company is not treating the historical estimate as a current resource. Additional work including drilling will be required to verify and upgrade historical estimates.

本新聞稿包含與公司財產勘探潛力有關的適用證券法所指的“前瞻性資訊”。一般而言,前瞻性陳述可通過使用諸如“預期”、“將”、“預期”、“可能”、“繼續”、“可能”、“估計”、“預測”、“計劃”、“可能”等術語加以識別。這些前瞻性表述涉及的風險和不確定性涉及但不限於未來勘探和開發活動的結果、未投保的風險、監管變化、所有權缺陷、材料和設備的可用性、政府批准的及時性、大宗商品價格的變化以及對運營的意外環境影響。儘管公司認為目前的情況和預期的未來發展以及已考慮的其他因素是適當的,這些前瞻性資訊中反映的預期是合理的,但不應過度依賴這些預期,因為公司不能保證這些預期將被證明是正確的或持久的。提醒讀者不要過度依賴前瞻性資訊。本新聞稿中的陳述是在本新聞稿發佈之日作出的。除法律另有要求外,公司不承擔公開更新或修改本新聞稿中包含或包含的任何前瞻性陳述的任何義務。本新聞稿中包含的所有前瞻性陳述均明確受本警告性聲明的限制。讀者不應依賴任何歷史估計。本公司和QP沒有做足夠的工作來將歷史估計歸類為當前資源。該公司沒有將歷史估計視為當前資源。將需要包括鑽探在內的額外工作來核實和更新曆史估計。

SOURCE: Europacific Metals Inc.

資料來源:歐洲太平洋金屬公司。


View source version on accesswire.com:
在accesswire.com上查看源代碼版本:

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論