share_log

Vendetta Reports High Grade Exploration Intersections in Zone 2 and 3 at the Pegmont Lead-Zinc Project, Queensland

Vendetta Reports High Grade Exploration Intersections in Zone 2 and 3 at the Pegmont Lead-Zinc Project, Queensland

Vendetta报告了昆士兰州佩格蒙特铅锌项目2区和3区的高等级勘探交叉口
newsfile ·  2023/05/18 08:30

Vancouver, British Columbia--(Newsfile Corp. - May 18, 2023) - Vendetta Mining Corp. (TSXV: VTT) ("Vendetta" or the "Company") is pleased to announce the drill results from the 2022 Exploration drilling program on the Pegmont Lead-Zinc and Killer Bore projects in Queensland.

温哥华,不列颠哥伦比亚省-(Newsfile Corp.-2023年5月18日)-Vendetta矿业公司(多伦多证券交易所股票代码:VTT)(以下简称“Vendetta”或“公司”)高兴地宣布了昆士兰佩格蒙特铅锌和杀手钻孔项目2022年勘探钻探计划的钻探结果。

Highlights:

重点:

PVD209: 8.95 metres of 9.09 % Pb+Zn (8.95% Pb, 2.29% Zn);

PVD209: 8.95米9.09%铅+锌(8.95%铅,2.29%锌);

PVD211: 5.32 metres of 12.43% Pb+Zn (9.38% Pb, 3.05% Zn);

PVD211: 5.32米12.43%铅+锌(9.38%铅,3.05%锌);

PVD213: 4.80 metres of 9.13% Pb+Zn (6.00% Pb, 3.14% Zn); and

PVD213: 4.80米9.13%铅+锌(6.00%铅,3.14%锌);

PVD218: 5.14 metres of 12.78% Pb+Zn (8.88% Pb, 3.90% Zn)

PVD218: 5.14米12.78%铅+锌(8.88%铅,3.90%锌)

Drilling occurred at the north-eastern end of Zone 3 and the western portion of Zone 2. Results are summarised in Table 1. In addition, exploration drilling was conducted at the Killer Bore Zinc project, located approximately 5 km to the west of Pegmont. The program was ended with the early onset of the wet season.

钻探工作在3区的东北端和2区的西段进行。钻探结果摘要见表1。此外,还在位于佩格蒙特以西约5公里处的Killer Bull锌项目进行了勘探钻探。随着雨季的提前到来,该计划结束了。

Michael Williams, Vendetta's President and CEO, commented, "It's unfortunate that the rain forced the early cessation of the program at Killer Bore., This was the most prudent cause of action as it is located in a sandy plain and presented a high risk of not being able to move the drill equipment for a long period due to the conditions at the time. We are excited to get back into the field and definitively follow up on the high-grade historic zinc results at Killer Bore."

文德塔的总裁兼首席执行官迈克尔·威廉姆斯评论道:不幸的是,这场雨迫使Killer Bull的项目提前停止。这是最谨慎的行动理由,因为它位于沙质平原,由于当时的条件,存在着长时间无法移动钻探设备的高风险。我们很高兴能回到现场,并明确跟踪Killer Bull的高品位历史锌结果。

Exploration Drilling Zone 3 and 2

勘探钻探3区和2区

A total of eight holes were drilled in north-eastern end of Zone 3 attempting to extend the mineral resource in that area, the holes targeting the upper flat portion of the "Z" fold were successful however up dip from that the mineralised beds were structurally attenuated.

于三区东北端共钻了八个孔,试图扩大该地区的矿产资源,但以“Z”字形褶皱的上平坦部分为目标的孔是成功的,但矿化层在结构上有所减弱。

In Zone 2 five holes were drilled to extend the mineral resource in Zone 2 up dip, two were successful and the other three holes intersected weakly mineralised garnet rich beds.

在二区钻了五个孔,以扩大二区上倾角的矿产资源,其中两个成功,另外三个孔与弱矿化石榴石富集层相交。

Exploration Drilling at Killer Bore

压井孔处的勘探钻探

The Company drilled two holes out of a planned ten-hole program at Killer Bore before suspending drilling due to the early onset of the wet season. The first hole, VKD001 (-45° dip towards 270° azimuth) intersected 0.14% Zn over 4.8 metres, from 96.36 metres down hole, at the targeted position of the pyrrhotite iron stone horizon. The second hole VKD002 (-45° dip towards 270° azimuth) attempted to drill 100 m down dip of the VKD001 mineralised bed however it was suspended above target depth due to the onset of the rain.

由于雨季的提前到来,该公司在Killer Drill计划的十孔计划中钻出了两个孔,然后暂停了钻探。第一个孔VKD001(向270°方位倾斜-45°)在磁黄铁矿铁石层的目标位置从井下96.36米开始,在4.8米内与0.14%的锌相交。第二个钻孔VKD002(-45°倾角朝270°方位角)试图在VKD001矿化层向下100米处钻探,但由于开始下雨,它被悬浮在目标深度以上。

Table 1. Summary of Pegmont Assay Results.

表1.佩格蒙特化验结果摘要

Bore
Hole
Dip / Azimuth From (m) To (m) Interval (m)* Grade#
Pb+Zn % Pb
%
Zn
%
Ag
g/t
Zone 3
PVD209 -63/320 238.18 247.13 6.80 9.09 6.80 2.29 11
PVD210 -56/320 No Significant Result
PVD211 -71/330 203.78 209.10 5.32 12.43 9.38 3.05 15
PVD212 -75/326 No Significant Result
PVD213 -67/331 213.00 217.80 4.80 9.13 6.00 3.14 11
PVD214 -61/333 No Significant Result
PVD215 -56/323 No Significant Result
PVD216 -53/324 No Significant Result
Zone 2
PVD217 -74/324 No Significant Result
PVD218 -78/172 111.86 117.00 5.14 12.78 8.88 3.90 12
PVD219 -71/138 118.16 121.34 3.18 10.25 8.47 1.78 21
PVD220 -60/306 No Significant Result
PVD221 -53/303 No Significant Result
钻孔
孔洞
倾角/方位角 发件人(M) 至(M) 间隔(M)* 等级#
铅+锌%
百分比

百分比

克/吨
第三区
PVD209 -63/320 238.18 247.13 6.80 9.09 6.80 2.29 11.
PVD210 -56/320 没有显著结果
PVD211 -71/330 203.78 209.10 5.32 12.43 9.38 3.05 15个
PVD212 -75/326 没有显著结果
PVD213 -67/331 213.00 217.80 4.80 9.13 6.00 3.14 11.
PVD214 -61/333 没有显著结果
PVD215 -56/323 没有显著结果
PVD216 -53/324 没有显著结果
第二区
PVD217 -74/324 没有显著结果
PVD218 -78/172 111.86 117.00 5.14 12.78 8.88 3.90 12
PVD219 -71/138 118.16 121.34 3.18 10.25 8.47 1.78 21岁
PVD220 -60/306 没有显著结果
PVD221 -53/303 没有显著结果

* True thickness is estimated at 80 to 95% of the intersection length, three-dimensional geological modelling is ongoing.

*实际厚度估计为交叉口长度的80%至95%,三维地质建模正在进行中。

# Drill intersections are summarized intersection lengths ≥2.0 m, using a combined 3% lead and zinc grade with maximum 1 m internal dilution.

#钻探交叉点总结为交叉点长度≥2.0米,使用3%的铅锌品位,最大内部稀释度为1米。

Preparation for 2023 Exploration Drill Program

2023年勘探演练计划准备工作

Planning for the 2023 drilling program has commenced. Exploration drilling is expected to take place in Zone 5, following up on the successful 2021 program, see the Companies news release dated November 8, 2021.

2023年钻探计划的规划已经开始。勘探钻探预计将在5区进行,继成功的2021年计划之后,见公司日期为2021年11月8日的新闻稿。

At Killer Bore the planned program will resume, with the aim of conclusively testing the two prospects with historic intersections in three holes: AND041 3.0 m @ 15.44% Zn, ANP418 4 m @ 8.26% Zn and DDH01KB001 4.0 m @ 10% Zn, as described in more detail in the Companies news release dated August 9, 2021.

在Killer Bill,计划中的计划将恢复,目的是最终测试在三个洞中具有历史交叉点的两个前景:AND041 3.0 m@15.44%锌、ANP418 4 m@8.26%锌和DDH01KB001 4.0 m@10%锌,这在2021年8月9日的公司新闻稿中有更详细的描述。

Notes on Drilling and Assay QA/QC

关于钻井和化验QA/QC的说明

All boreholes were drilled in HQ2 diamond core All reported intersections are from diamond core samples taken on nominal 1 m lengths but varied to match geological contacts. Samples of the core are obtained using a diamond saw to half cut the core, retaining a half for a permanent core record. Assay intervals shown in Table 1 are summarised using length weighted down hole intervals. Approximate true thickness range is based on visual assessment of the core to bedding angles. All diamond core is orientated using digital core orientation systems, this data will be incorporated into the 3D interpretations.

所有钻孔都是在HQ2钻石岩芯中钻成的,所有报告的交叉点都是从标称长度为1米的钻石岩芯样品中采集的,但为了与地质接触相匹配,这些样品都有所变化。岩心样品是用钻石锯将岩心切割一半,保留一半作为永久岩心记录。表1所示的化验间隔是用长度加权井下间隔汇总的。近似的真实厚度范围是基于对岩心到层理角度的目测评估。所有的钻石岩心都是使用数字岩心定位系统进行定位的,这些数据将被纳入3D解释。

Samples used for the results described herein were prepared and analyzed at ALS Laboratory Group in Townsville, Queensland. Analysis was undertaken using a four-acid digest and ICP (ALS method: ME-ICP61 for 7 elements) with over limit (>10,000 ppm lead and zinc and >100 ppm silver) high grade samples being read with an atomic absorption spectrometer (AAS), (ALS methods: Pb-OG62 [Pb>10%], Pb-OG62h [Pb>20%], Zn-OG62 [Zn>10%] and Ag-OG62 [Ag>100 pm]). Blanks and commercially prepared certified reference materials (standards) were added into the sample sequence for every hole submitted. These were analysed by the Company and no issues were noted with analytical accuracy or precision.

用于这里描述的结果的样品是在昆士兰州汤斯维尔的ALS实验室小组准备和分析的。分析采用四酸消化和电感耦合等离子体(ALS法:7种元素:ME-ICP61),超限(>10,000 ppm铅和锌,>100 ppm银)高品位样品用原子吸收光谱仪(AAS)读取,(ALS方法:铅-OG62[铅>10%],铅-OG62H[铅>20%],锌-OG62[锌>10%]和银-OG62[银>100 PM])。对于每个提交的孔,在样品序列中添加空白和商业制备的经认证的标准物质(标准)。该公司对这些问题进行了分析,没有发现任何分析准确无误的问题。

A series of pulp duplicates are currently being submitted for analysis.

目前正在提交一系列纸浆复制品进行分析。

Drill hole collars are located using handheld GPS. Down hole surveys were undertaken using a true north seeking gyroscope with stations nominally every 6 metres down hole.

使用手持全球定位系统定位钻孔卡箍。井下勘测是使用真正的寻北陀螺仪进行的,名义上每隔6米井下就有一个站。

Bulk density determinations are made on every sample sent for analysis that was deemed visually to be above 3% Pb+Zn.

对每个送去进行分析的样品进行体积密度测定,这些样品被认为是目测含量高于3%的铅+锌。

About Pegmont

关于佩格蒙特

Vendetta's 100% owned Pegmont Lead Zinc Project is situated in the Mount Isa - McArthur Mineral Province, Australia which hosts one of the world's richest endowments of lead-zinc-silver mineralization, including several significant lead-zinc-silver mines.

维德塔拥有100%股权的Pegmont铅锌项目位于澳大利亚芒特伊萨-麦克阿瑟矿产省,拥有世界上最丰富的铅锌银矿化资源之一,包括几个重要的铅锌银矿。

The current Mineral Resource Estimate at the Project is as follows:

该项目目前的矿产资源估算如下:

Indicated 5,758 Kt @ 6.5% Pb, 2.6% Zn, 11 g/t Ag
Inferred 8,277 Kt @ 5.1% Pb, 2.8% Zn, 8 g/t Ag

表示5758千吨,含6.5%铅、2.6%锌、11克/吨银
推算为8277kt@5.1%铅,2.8%锌,8克/吨银

The results of a Preliminary Economic Assessment ("PEA") on Pegmont were released by the Company by news release dated January 28, 2019. The PEA outlined a 10-year mine plan that generates a strong economic return with a (base case) pre-tax IRR of 32% (after tax 24%) and NPV8% of $201M ($128M after tax) using long term consensus metal prices of $0.91/lb lead, $1.09/lb zinc and $16.50/oz silver.

公司在日期为2019年1月28日的新闻稿中公布了对Pegmont的初步经济评估(PEA)结果。PEA概述了一个产生强劲经济回报的10年采矿计划,(基本情况)税前IRR为32%(税后24%),NPV8%为2.01亿美元(税后1.28亿美元),使用长期共识金属价格0.91美元/磅、1.09美元/磅锌和16.50美元/盎司银。

The PEA indicated a strong sensitivity to metal prices and US$:A$ exchange rate with a pre-tax IRR of 37% (after tax 27%) and NPV8% of $249M ($158M after tax), using metal prices as of January 22, 2019 of $0.94/lb lead, $1.25/lb zinc and $15.30/oz silver and US$:A$ of $0.71.

PEA显示出对金属价格和美元的强烈敏感性:A美元汇率,税前IRR为37%(税后27%),NPV8%为2.49亿美元(税后1.58亿美元),使用截至2019年1月22日的金属价格:铅0.94美元/磅,锌1.25美元/磅,白银15.30美元/盎司,美元:0.71美元。

About Vendetta Mining Corp.

关于Vendetta矿业公司

Vendetta Mining Corp. is a Canadian junior exploration company focused on advanced stage exploration and development at the Pegmont Lead Zinc Project in Australia. Vendetta has an option to acquire a 100% interest by completing certain work requirements and making option and advance royalty payments. Additional information on the Company can be found at .

维德塔矿业公司是一家加拿大初级勘探公司,专注于澳大利亚佩格蒙特铅锌项目的高级勘探和开发。Vendta有权通过完成某些工作要求并支付选择权和预付版税来获得100%的权益。有关该公司的更多信息,请访问。

Qualified Person

有资格的人

Peter Voulgaris, MAIG, MAusIMM, a Director of Vendetta, is a non-independent Qualified Person as defined by NI 43-101. Mr. Voulgaris has reviewed the technical content of this press release, and consents to the information provided in the form and context in which it appears.

Peter Voulgaris,MAIG,MAUSIMM,Vendetta的董事成员,是NI 43-101定义的非独立合格人员。Voulgaris先生审查了本新闻稿的技术内容,并同意以其形式和背景提供的信息。

ON BEHALF OF THE BOARD OF DIRECTORS

我代表董事会

"Michael Williams"

《迈克尔·威廉姆斯》

Michael Williams
President & CEO
Ph: 604-484-7855

迈克尔·威廉姆斯
总裁兼首席执行官
电话:604-484-7855

Cautionary Note Regarding Forward-Looking Information

关于前瞻性信息的注意事项

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.

多伦多证券交易所创业板不对本新闻稿的充分性或准确性承担责任。

This release includes certain statements and information that may be deemed to be "forward‐looking statements" or "forward-looking information" within the meaning of the applicable Canadian Securities laws. All statements in this release, other than statements of historical facts are forward-looking statements or information, including without limitation, statements or information regarding the use of proceeds of the Private Placement, and other future events or developments. Forward-looking statements include statements that are predictive in nature, are reliant on future events or conditions, Forward‐looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "estimate", "expect", "may", "will", "project", "predict", "potential", "targeting", "intend", "could", "might", "should", "believe" and similar expressions.

本新闻稿包括可能被视为适用的加拿大证券法所指的“前瞻性陈述”或“前瞻性信息”的某些陈述和信息。除有关历史事实的陈述外,本新闻稿中的所有陈述均为前瞻性陈述或信息,包括但不限于有关私募收益的使用以及其他未来事件或发展的陈述或信息。前瞻性陈述包括具有预测性、依赖于未来事件或条件的陈述,前瞻性陈述常常但不总是通过使用诸如“寻求”、“预期”、“计划”、“继续”、“估计”、“预期”、“可能”、“将”、“项目”、“预测”、“潜在”、“目标”、“打算”、“可能”、“可能”、“应该”、“相信”等词语来确定。

These statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated. Although the Company believes the expectations expressed in such forward‐looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward‐looking statements.

这些陈述涉及已知和未知的风险、不确定性和其他因素,可能导致实际结果或事件与预期的大不相同。尽管公司认为这些前瞻性陈述中表达的预期是基于合理的假设,但这些陈述并不是对未来业绩的保证,实际结果或发展可能与前瞻性陈述中的大不相同。

Factors that could cause actual results to differ materially from those in forward‐looking statements include, but are not limited to, changes in commodities prices; changes in expected mineral production performance; unexpected increases in capital costs; exploitation and exploration results; continued availability of capital and financing; differing results and recommendations in the preliminary economic assessment; and general economic, market or business conditions.

可能导致实际结果与前瞻性表述大相径庭的因素包括但不限于大宗商品价格的变化;预期矿产生产业绩的变化;资本成本的意外增加;开采和勘探结果;资本和融资的持续可获得性;初步经济评估中的不同结果和建议;以及总体经济、市场或商业状况。

In addition, forward‐looking statements are subject to various risks, including but not limited to operational risk; political risk; currency risk; capital cost inflation risk; that data is incomplete or inaccurate; the limitations and assumptions within drilling, engineering and socio‐economic studies relied upon in preparing the 2019 Pegmont PEA; and receipt of regulatory and other approvals and/or consents in respect of the Offering in particular. There can be no assurance that the Offering will be completed on their terms or at all.

此外,前瞻性表述会受到各种风险的影响,包括但不限于操作风险、政治风险、货币风险、资本成本通胀风险、数据不完整或不准确、在准备2019年Pegmont PEA时所依据的钻探、工程和社会经济研究中的限制和假设,以及特别是在此次发行方面获得监管和其他批准和/或同意的情况。不能保证此次发行将按他们的条款完成,或者根本不能保证。

The reader is referred to the Company's filings with the Canadian securities regulators for disclosure regarding these and other risk factors, accessible under the Company's profile at .

读者可参阅该公司向加拿大证券监管机构提交的披露上述及其他风险因素的文件,可在公司简介中查阅,网址为

There is no certainty that any forward‐looking statement will prove to be accurate and investors should not place undue reliance upon forward‐looking statements. The Company does not undertake to provide updates to any of the forward‐looking statements in this release, except as required by law.

任何前瞻性陈述都不一定是准确的,投资者不应过度依赖前瞻性陈述。除法律要求外,公司不承诺对本新闻稿中的任何前瞻性陈述进行更新。

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发