share_log

Benz Announces Filing of NI 43-101 Technical Report for Previously Announced Eastmain Project Updated Mineral Resource

Benz Announces Filing of NI 43-101 Technical Report for Previously Announced Eastmain Project Updated Mineral Resource

奔驰宣布提交先前宣布的伊斯特曼项目更新矿产资源的 NI 43-101 技术报告
newsfile ·  2023/07/07 19:27

Toronto, Ontario--(Newsfile Corp. - July 7, 2023) - Benz Mining Corp. (TSXV: BZ) (ASX: BNZ) (Benz or the Company) announces that the Company has filed a National Instrument 43-101 technical report in support of the updated Mineral Resource Estimate for the Eastmain Project located in Northern Quebec, which was reported in the Company's news release dated May 24, 2023.

安大略省多伦多-(Newsfile Corp.-2023年7月7日)-奔驰矿业公司(TSXV:BZ)(澳大利亚证券交易所代码:BNZ)(奔驰公司)宣布,公司已提交国家仪器43-101技术报告,以支持公司日期为2023年5月24日的新闻稿中报道的位于魁北克北部的Eastmain项目的最新矿产资源估计。

The technical Report was prepared in accordance with Canadian Securities Administrators' NI 43-101 Standards off disclosure for Mineral Projects and Form 43-101 F1 and is available on SEDAR () and the Company's website ().

该技术报告是根据加拿大证券管理人的NI 43-101矿产项目披露标准和表格43-101 F1编写的,可在SEDAR()和公司网站()上查阅。

This announcement has been authorized for release by the Board of Benz Mining Corp.

本公告已获奔驰矿业公司董事会授权发布。

For more information please contact:

如需更多信息,请联系:

Evan Cranston
Chairman
Benz Mining Corp.
Email: info@benzmining.com
Telephone: +61 8 6143 6702

埃文·克兰斯顿
主席
奔驰矿业公司
电子邮件:info@enzmining.com
电话:+61 86143 6702

Dannika Warburton
Principal
Investability Partners
Email: benzmining@investability.com.au
Telephone: +61 401 094 26

丹尼卡·沃伯顿
本金
可投资性合伙人
电子邮件:enzmining@investablity.com.au
电话:+61 401 094 26

About Benz Mining Corp.

关于奔驰矿业公司

Benz Mining Corp. (TSXV: BZ) (ASX: BNZ) brings together an experienced team of geoscientists and finance professionals with a focused strategy to unlock the immense mineral potential of the Upper Eastmain Greenstone Belt in Northern Quebec, which is prospective for gold, lithium, nickel, copper and other high-value minerals. Benz is earning a 100% interest in the former producing high grade Eastmain gold mine, Ruby Hill West and Ruby Hill East Projects in Quebec and owns 100% of the Windy Mountain Project.

奔驰矿业公司(多伦多证券交易所股票代码:BZ)(多伦多证券交易所股票代码:BNZ)汇集了一支经验丰富的地球科学家和金融专业人士团队,他们的重点战略是发掘魁北克北部上Eastmain绿岩带巨大的矿产潜力,该带有望开采金、锂、镍、铜和其他高价值矿产。奔驰在原生产高品位Eastmain金矿、魁北克Ruby Hill West和Ruby Hill East项目中获得100%权益,并拥有Windy Mountain项目100%。

At the Eastmain Gold Project, Benz has identified a combination of over 380 modelled in-hole and off-hole DHEM conductors over a strike length of 6km which is open in all directions (final interpretation of some of the conductors still pending).

在Eastmain Gold Project,奔驰已经确定了380多个井内和井下DHEM模型导线的组合,走向长度为6公里,向所有方向开放(一些导线的最终解释仍未完成)。

Benz has also confirmed the presence of visible spodumene in a pegmatite at the Ruby Hill West Project, indicating lithium mineralisation which Benz intends to further explore in 2023.

奔驰还证实,在红宝石山西部项目的伟晶岩中存在可见的锂辉石,这表明锂矿化,奔驰打算在2023年进一步勘探。

Forward-Looking Information: Certain statements contained in this news release may constitute "forward-looking information" as such term is used in applicable Canadian securities laws. Forward-looking information is based on plans, expectations and estimates of management at the date the information is provided and is subject to certain factors and assumptions, including, that the Company's financial condition and development plans do not change as a result of unforeseen events and that the Company obtains regulatory approval. Forward-looking information is subject to a variety of risks and uncertainties and other factors that could cause plans, estimates and actual results to vary materially from those projected in such forward-looking information. Factors that could cause the forward-looking information in this news release to change or to be inaccurate include, but are not limited to, the risk that any of the assumptions referred to prove not to be valid or reliable, that occurrences such as those referred to above are realized and result in delays, or cessation in planned work, that the Company's financial condition and development plans change, and delays in regulatory approval, as well as the other risks and uncertainties applicable to the Company as set forth in the Company's continuous disclosure filings filed under the Company's profile at . The Company undertakes no obligation to update these forward-looking statements, other than as required by applicable law.

前瞻性信息:本新闻稿中包含的某些陈述可能构成“前瞻性信息”,因为该术语在适用的加拿大证券法中使用。前瞻性信息以提供信息之日管理层的计划、预期和估计为基础,受到某些因素和假设的制约,包括公司的财务状况和发展计划不会因不可预见的事件而发生变化,以及公司获得监管部门的批准。前瞻性信息受各种风险、不确定因素和其他因素的影响,这些因素可能导致计划、估计和实际结果与这些前瞻性信息中预测的大不相同。可能导致本新闻稿中的前瞻性信息发生变化或不准确的因素包括,但不限于,任何提及的假设被证明无效或可靠的风险,上述情况发生并导致公司财务状况和发展计划变化的延迟或停止,公司财务状况和发展计划变化的延迟,监管批准的延迟,以及公司提交给公司的持续披露文件中阐述的其他风险和不确定因素。除适用法律要求外,公司不承担更新这些前瞻性陈述的义务。

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ACCURACY OR ADEQUACY OF THIS RELEASE.

多伦多证券交易所创业板交易所及其监管服务提供商(该术语在多伦多证券交易所创业板交易所的政策中定义)均不对本新闻稿的准确性或充分性承担责任。

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发