share_log

Kingsview Minerals Reports Strong Gold Results at the Hubcap Project in Wawa, Ontario

Kingsview Minerals Reports Strong Gold Results at the Hubcap Project in Wawa, Ontario

Kingsview Minerals在安大略省瓦瓦的Hubcap項目公佈了強勁的黃金業績
newsfile ·  2023/07/18 07:07

Highlights include gold grades of 62.6 g/t, 30.7 g/t, and 25.0 g/t

亮點包括 62.6 g/t、30.7 g/t 和 25.0 g/t 的黃金等級

Toronto, Ontario--(Newsfile Corp. - July 18, 2023) - Kingsview Minerals Ltd. (CSE: KVM) (FSE: 0L4) (the "Company" or "Kingsview") is pleased to announce results from a field sampling program at the Hubcap Project in the active Wawa Gold Corridor of northern Ontario.

安大略省多倫多--(Newsfile Corp. ——2023 年 7 月 18 日) 金斯維尤礦業有限公司 (CSE: KVM) (FSE: 0L4) (the”公司“或”金斯維尤“)很高興地宣佈位於安大略省北部活躍的瓦瓦黃金走廊的Hubcap項目實地採樣計劃的結果。

The exploration carried out in the spring of 2023 is part of a multi-phase program across the 15,295-hectare property portfolio expected to take place over the summer of 2023. Current sampling results reported are focused on the Hubcap Project located immediately south of Red Pine Exploration's Wawa Gold Project where Red Pine recently reported a drill intersection of 1.32 grams of gold per tonne (g/t Au) over 100.99 metres (m).

2023年春季進行的勘探是預計將於2023年夏季進行的佔地15,295公頃的房地產投資組合的多階段計劃的一部分。目前報告的採樣結果集中在位於Red Pine Exploration的Wawa Gold Project以南的Hubcap項目上,Red Pine最近報告說,該項目的鑽探交叉點爲每噸(g/t Au)超過100.99米(m)1.32克。

Surface sampling highlights from the Hubcap Main block included: sample E5707121 from HBFS-23-004, which graded 62.60 g/t Au and 6.10 g/t of silver (Ag); sample E5707117 from HBFS-23-002, which graded 30.70 g/t Au and 5.40 g/t Ag with 1400 ppm of copper (Cu); and sample E5707119 from HBFS-23-003, which graded 25.00 g/t Au and 4.40 g/t Ag. Significant sample results are highlighted below in Table 1, and locations are shown on Figure 1 below.

來自 Hubcap Main 模塊的表面採樣亮點包括:來自 HBFS-23-004 的 E5707121 樣本,它進行了分級 62.60 g/t Au 和 6.10 g/t 銀 (Ag); 來自 HBFS-23-002 的 E5707117 樣本,它已分級 30.70 g/t Au 和 5.40 g/t Ag,含有 1400 ppm 的銅 (Cu);還有來自 HBFS-23-003 的 E5707119 樣本,後者進行了分級 25.00 g/t Au 和 4.40 g/t Ag。重要的樣本結果在下表 1 中突出顯示,位置如下面的圖 1 所示。

James Macintosh, President and CEO, commented: "These results from our spring field sampling continue to provide strong evidence that the greenstones and intrusive rocks found at Hubcap resemble the regional geologic setting that has brought Red Pine Exploration so much success. The fact that 40% of the samples collected from outcrops returned gold assays in excess of 2 grams per tonne is very encouraging. We hope to replicate the success of our northern neighbour, given that the encouragingly strong gold values at Hubcap are associated with strong alteration, sulphide mineralization and structural deformation. The results provide excellent targets for our future exploration, including drill testing of the best targets we define."

總裁兼首席執行官詹姆斯·麥金託什評論道: “我們春季田間採樣的這些結果繼續提供有力的證據,表明在Hubcap發現的綠巖和侵入性岩石類似於爲紅松勘探帶來巨大成功的區域地質環境。從露頭採集的樣本中,有40%返回的金含量超過每噸2克,這一事實非常令人鼓舞。我們希望複製我們北方鄰國的成功,因爲Hubcap令人鼓舞的強勁黃金價值與強烈的改變、硫化物礦化和結構變形有關。這些結果爲我們未來的勘探提供了很好的目標,包括對我們定義的最佳目標進行鑽探測試。”

Table 1: Kingsview Minerals Hubcap Project Field Sampling Highlights, Spring 2023**

表 1:Kingsview Minerals Hubcap 項目實地採樣亮點,2023 年春季**

Field ID Sample Easting (m) Northing (m) Au (g/t) Ag (g/t) Cu (ppm)
HBFS-23-001A E5707114 667083 5311217 13.60 3.50 457
HBFS-23-001B E5707115 667083 5311217 3.73 0.70 53
HBFS-23-001C E5707116 667083 5311217 2.45 0.70 68
HBFS-23-002A E5707117 667084 5311220 30.70 5.40 20
HBFS-23-002B E5707118 667084 5311220 4.35 2.60 1400
HBFS-23-003A E5707119 667088 5311217 25.00 4.40 69
HBFS-23-003B E5707120 667088 5311217 4.15 1.00 118
HBFS-23-004 E5707121 667085 5311185 62.60 6.10 15
HBFS-23-008B E5707130 666667 5310725 0.33 0.25 169
HBFS-23-010B E5707133 666795 5311302 2.04 0.25 481
字段 ID 示例 東方 (m) 北方 (m) 金 (g/t) 銀 (g/t) 銅 (ppm)
HBFS-23-001A E5707114 667083 5311217 13.60 3.50 457
HBFS-23-001B E5707115 667083 5311217 3.73 0.70 53
HBFS-23-001C E5707116 667083 5311217 2.45 0.70 68
HBFS-23-002A E5707117 667084 5311220 30.70 5.40 20
HBFS-23-002B E5707118 667084 5311220 4.35 2.60 1400
HBFS-23-003A E5707119 667088 5311217 25.00 4.40 69
HBFS-23-003B E5707120 667088 5311217 4.15 1.00 118
HBFS-23-004 E5707121 667085 5311185 62.60 6.10 15
HBFS-23-008B E5707130 666667 5310725 0.33 0.25 169
HBFS-23-010B E5707133 666795 531302 2.04 0.25 481

**All sample values are from grab samples which by their nature are not representative of overall grades of mineralized areas. Readers are cautioned to not place undue reliance on the assay values reported in the table above. The 10 samples above are part of a suite of 22 samples collected and assayed. Assay values for the samples not reported ranged from trace to approximately 0.3 g/t gold.

**所有樣本值均來自採集樣本,從本質上講,這些樣本並不代表礦化區域的總體品位。提醒讀者不要過分依賴上表中報告的化驗值。上面的10個樣本是收集和分析的22個樣本的一部分。未報告的樣本的化驗值從痕量到大約0.3 g/t的金不等。


Figure 1: 2023 Spring Hubcap Surface Sample Locations


圖 1:2023 年 Spring Hubcap 表面樣品位置

Next Steps at Hubcap Project

Hubcap 項目的後續步驟

The Company has an extensive exploration plan to follow up on high-priority targets at the 2,200-hectare Hubcap Project.

該公司制定了廣泛的勘探計劃,以跟進佔地2200公頃的Hubcap項目的高優先目標。

  • Surface Exploration at Hubcap - Field and channel sampling to better understand over 30 additional exploration targets identified at Hubcap.

  • IP Survey - Carry out an IP survey over previously cut grid lines at East Hubcap to help vector exploration and drilling efforts.

  • Re-Logging and Sampling Historic Core - Examine and review all historic core available and sample any overlooked intervals potentially mineralized to help build a better understanding of the historic work.

  • Drill Program - Initiate drilling at Hubcap utilizing the results of the surface, exploration, IP survey and re-analysis of the historic work.

  • Hubcap 的地表探索- 現場和信道採樣 爲了更好地理解 在 Hubcap 又確定了 30 個勘探目標。

  • 知識產權調查 -對East Hubcap先前切斷的網格線進行知識產權調查,以幫助矢量勘探和鑽探工作。

  • 重新記錄和採樣歷史核心- 檢查和審查所有可用的歷史核心,並採樣任何被忽視的潛在礦化間隔,以幫助更好地了解歷史工作。

  • 演習計劃 -利用地表、勘探、知識產權調查和對歷史工作的重新分析的結果,開始在Hubcap進行鑽探。

Qualified Person

合格人員

Bruce Durham, P.Geo., is a Qualified Person, as that term is defined by Canadian regulatory guidelines under NI 43-101, and has read and approved the technical information contained in this press release.

Bruce Durham,P.Geo.,是合格人員,該術語由加拿大監管準則根據NI 43-101定義,並已閱讀並批准了本新聞稿中包含的技術信息。

About Kingsview Minerals Ltd.

關於金斯威礦業有限公司

Kingsview is a mineral exploration company focused on its gold and base metal exploration properties, including the flagship 13,056-hectare Echum Project and the 2,239-hectare Hubcap Project, both located in the active Wawa Gold Corridor in Ontario, Canada. The Company's properties are surrounded by advanced infrastructure in a well-developed mining district. Kingsview will draw on its strong technical team with significant exploration success to advance its properties. Learn more: .

Kingsview是一家礦產勘探公司,專注於其黃金和賤金屬勘探物業,包括佔地13,056公頃的旗艦Echum項目和佔地2,239公頃的Hubcap項目,均位於加拿大安大略省活躍的瓦瓦黃金走廊。該公司的物業周圍環繞着先進的基礎設施,位於發達的礦區。Kingsview將利用其強大的技術團隊來開發其物業,這些團隊在勘探方面取得了重大成功。了解更多:.

For more information, please contact investor relations at investors@kingsviewminerals.ca.

欲了解更多信息,請通過 investors@kingsviewminerals.ca 聯繫投資者關係部。

On Behalf of the Board of Directors,

代表董事會,

James Macintosh
President and CEO

詹姆斯·麥金託什
總裁兼首席執行官

Neither the Canadian Securities Exchange nor its regulation services provider has reviewed or accepted responsibility for the adequacy or accuracy of this press release.

加拿大證券交易所及其監管服務提供商均未對本新聞稿的充分性或準確性進行審查或承擔責任。

This press release contains forward-looking statements. Forward-looking statements involve known and unknown risks, uncertainties and assumptions and accordingly, actual results and future events could differ materially from those expressed or implied in such statements. You are hence cautioned not to place undue reliance on forward-looking statements. Forward-looking statements include words or expressions such as "proposed", "will", "subject to", "near future", "in the event", "would", "expect", "prepared to" and other similar words or expressions. All statements other than statements of present or historical fact are forward-looking statements and include but are not limited to statements regarding the potential that the projects will yield any precious metals in future exploration programs and the Company's ability to advance its properties.

本新聞稿包含前瞻性陳述。前瞻性陳述涉及已知和未知的風險、不確定性和假設,因此,實際結果和未來事件可能與此類陳述中表達或暗示的結果和未來事件存在重大差異。因此,提醒您不要過分依賴前瞻性陳述。前瞻性陳述包括諸如 “提議”、“將”、“待於”、“不久的將來”、“在事件中”、“將”、“期望”、“準備好” 等詞語或表達方式以及其他類似的詞語或表達方式。除現狀或歷史事實陳述外,所有陳述均爲前瞻性陳述,包括但不限於關於這些項目在未來勘探計劃中產生任何貴金屬的可能性以及公司開發其財產的能力的陳述。

Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is based on assumptions made in good faith and believed to have a reasonable basis. Such assumptions include the Company's ability to implement a drill program on the projects, that the Company will have sufficient funds available to it and that the Company will continue to be able to retain skilled personnel. Factors that could cause future results or events to differ materially from current expectations expressed or implied by the forward-looking statements include general business, economic, competitive, political and social uncertainties; the state of capital markets; there being no assurance that any future exploration program on the projects will result in mineral resources; the inability of the Company to raise sufficient funds and/or retain necessary personnel to conduct its operations; the impact on the business, operations and financial condition of the Company resulting from the announcement of the purchase of the projects; the impact that the recovery post COVID-19 may have on precious metals; failure to realize the anticipated benefits of the transaction described in this press release; other unforeseen events, developments, or factors causing any of the aforesaid expectations, assumptions, and other factors ultimately being inaccurate or irrelevant; and any risks associated with the ongoing COVID-19 pandemic.

如果公司表達或暗示對未來事件或業績的期望或信念,則此類期望或信念基於真誠做出的假設,並被認爲有合理的依據。這些假設包括公司有能力在這些項目上實施鑽探計劃,公司將有足夠的資金可用,以及公司將繼續能夠留住熟練的人才。可能導致未來業績或事件與前瞻性陳述所表達或暗示的當前預期存在重大差異的因素包括一般業務、經濟、競爭、政治和社會的不確定性;資本市場狀況;無法保證未來任何項目勘探計劃都會產生礦產資源;公司無法籌集足夠的資金和/或留住必要的人員來開展運營;對業務、運營和財務狀況的影響公司因宣佈收購這些項目;COVID-19 之後的復甦可能對貴金屬產生的影響;未能實現本新聞稿中描述的交易的預期收益;其他不可預見的事件、事態發展或導致上述任何預期、假設和其他因素最終不準確或無關的因素;以及與持續的 COVID-19 疫情相關的任何風險。

You can find further information with respect to these and other risks in filings made with the Canadian securities regulatory authorities that are available on the Company's SEDAR profile page at . The Company disclaims any obligation to update or revise these forward-looking statements, except as required by applicable law.

您可以在向加拿大證券監管機構提交的文件中找到有關這些風險和其他風險的更多信息,這些文件可在公司的SEDAR簡介頁面上找到。除非適用法律要求,否則公司不承擔任何更新或修改這些前瞻性陳述的義務。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論