share_log

Update on the Goldfields Drilling Program

Update on the Goldfields Drilling Program

金矿钻探计划的最新情况
Accesswire ·  2023/09/20 08:30

PIEDMONT, QC / ACCESSWIRE / September 20, 2023 / Goldflare Exploration Inc. (TSXV:GOFL) ("Goldflare" or "the Company") announces an update about the exploration work on its Goldfields property. The property contains a high density of historic drilled gold showings, hosted in the extension of the Porcupine-Destor fault. The company Iamgold Corporation is currently carrying out pit development of the Fayolle zone, located approximately 700 meters east of Goldflare's drilling program.

皮埃蒙特,QC/ACCESSWIRE/2023年9月20日/Goldflare Explore Inc.(多伦多证券交易所股票代码:GOFL)(“Goldflare”或“本公司”)宣布其金矿勘探工作的最新情况。该地产包含高密度的历史钻探金矿,位于豪猪-德斯特断层的延伸处。IamGold公司目前正在开发位于Goldflare钻探项目以东约700米的Fayolle区。

On May 31st, the Company announced a first high-grade gold result of 15.36 g/t over 7.05 meters including an interval of 103.86 g/t over 1 meter from drill hole AIG-23-13.

5月31日ST,该公司宣布了首个高品位黄金结果7.05米以上15.36g/吨,包括1米以上103.86克/吨的间隔从AIG-23-13号钻孔。

Following the delivery of a new drilling permit, the mobilization of the team is currently underway to carry out a new phase of prospecting near the AIG-23-13 drill hole, where exceptional free gold mineralization has been discovered during the last drilling campaign. Goldflare plans to begin this new phase with several holes totaling around 1,000 meters, spaced approximately 25 meters apart, in the immediate area of hole AIG 23-13.

在发放了新的钻探许可证后,目前正在动员该小组在AIG-23-13钻孔附近进行新阶段的勘探,上次钻探活动在该钻孔发现了异常自由的金矿化。Goldflare计划开始这一新阶段,在AIG 23-13号洞的紧邻区域内,有几个总计约1000米的洞,间隔约25米。

Upcoming results from this new and important drilling phase of the Goldfields project will be communicated as soon as they become available and are confirmed.

金田项目这一新的重要钻探阶段即将取得的结果将在可用并得到确认后立即公布。

The technical information contained in this press release has been reviewed by Martin Demers, P.Geo. (OGQ No. 770), consultant for Goldflare Exploration and qualified person under National Instrument 43-101 Disclosure of Mineral Projects

本新闻稿中包含的技术信息已由P.Geo的Martin Demers审阅。(OGQ编号770),金矿勘查顾问,国家仪器43-101矿产项目披露资质人员

-30-

-30-

For more information

了解更多信息

Ghislain Morin
CEO
819-354-9439
ghislainmorin@goldflare.ca

吉斯兰·莫兰
首席执行官
819-354-9439
邮箱:ghislainmorin@godflare.ca

Serge Roy
Chairman of the Board
819-856-8435
sergeroy@goldflare.ca

塞尔日·罗伊
董事会主席
819-856-8435
邮箱:sergeroy@godflare.ca

SOURCE: Goldflare Exploration Inc.

资料来源:Goldflare勘探公司。


View source version on accesswire.com:
在accesswire.com上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发