share_log

Liberty Gold Reports Q3 2023 Financial and Operating Results

Liberty Gold Reports Q3 2023 Financial and Operating Results

Liberty Gold 公佈 2023 年第三季度財務和經營業績
GlobeNewswire ·  2023/11/09 18:17

VANCOUVER, British Columbia, Nov. 09, 2023 (GLOBE NEWSWIRE) -- Liberty Gold Corp. (TSX:LGD; OTCQX:LGDTF) ("Liberty Gold" or the "Company"), is pleased to announce its financial and operating results for the nine months ended September 30, 2023. All amounts are presented in United States dollars unless otherwise stated.

不列顛哥倫比亞省溫哥華,2023年11月9日(GLOBE NEWSWIRE)——Liberty Gold Corp.(多倫多證券交易所:LGD;OTCQX: LGDTF)(“Liberty Gold” 或 “公司”)欣然宣佈其截至2023年9月30日的九個月的財務和經營業績。除非另有說明,所有金額均以美元列報。

THIRD QUARTER OF 2023 AND RECENT HIGHLIGHTS

2023 年第三季度及近期亮點

  • On September 15, 2023, closed a non-brokered private placement raising proceeds of $5.7 million, anchored by a $5.0 million strategic investment by Wheaton Precious Metals Corp. ("Wheaton")1.
  • On September 5, 2023, published second annual ESG report: Developing Gold Deposits in a Responsible and Sustainable Manner2.
  • On November 8, 2023, announced the appointment of Cal Everett as CEO and Jon Gilligan as President, effective November 10, 20233.
  • 2023年9月15日,完成了一項非經紀私募配售,籌集了570萬美元的收益,由惠頓貴金屬公司(“惠頓”)的500萬美元戰略投資支撐1
  • 2023 年 9 月 5 日,發佈了第二份年度 ESG 報告:以負責任和可持續的方式開發金礦2
  • 2023 年 11 月 8 日,宣佈任命卡爾·埃弗雷特爲首席執行官,喬恩·吉利根爲總裁,自 2023 年 11 月 10 日起生效3

At the Black Pine project ("Black Pine"), we:

在 Black Pine 項目(“Black Pine”)中,我們:

  • Announced on September 11, 2023 the purchase of the existing 0.5% Net Smelter Royalty ("NSR") at Black Pine, and the sale of a new 0.5% NSR to an affiliate of Wheaton which includes an option to reduce the NSR to 0.25% in the future1.
  • On September 6, 2023, announced the submission of a Mining Pre-Plan of Operations to US Federal Agencies, and the selection of M3 Consulting Ltd. as lead engineer for the pre-feasibility study ("PFS")4.
  • Published reverse circulation ("RC") exploration drill results from:
    Discovery Zone:
  • 0.77 grams per tonne ("g/t") gold ("Au") over 65.5 meters ("m") including 2.47 g/t Au over 10.7 m in LBP9327.
    Back Range Zone:
  • 3.40 g/t Au over 32.0 m, including 6.74g/t Au over 9.1 m LBP9455.
  • 1.41 g/t Au over 22.9 m, including 4.28 g/t Au over 6.1 m LBP9435.
  • 1.41 g/t Au over 30.5 m including 1.83 g/t Au over 13.7 m in LBP9267.
    Rangefront Zone:
  • 0.61 g/t Au over 76.2 m, including 2.47 g/t Au over 12.2 m in LBP9416.
  • 0.45 g/t Au over 73.2 m, including 1.50 g/t Au over 3.0 m in LBP9546.
    CD-Tallman Zone:
  • 0.86 g/t Au over 25.9 m including 1.80 g/t Au over 6.1 m in LBP9207.
  • Completed 2023 RC exploration drilling program as of September 30, 2023, for a total of 27,461 meters drilled.
  • 2023年9月11日宣佈收購Black Pine現有的0.5%淨冶煉廠特許權使用費(“NSR”),並將新的0.5%NSR出售給惠頓的子公司,其中包括將來將NSR降低至0.25%的選項1
  • 2023年9月6日,宣佈向美國聯邦機構提交採礦運營預計劃,並選擇M3諮詢有限公司作爲預可行性研究(“PFS”)的首席工程師4
  • 公佈的反循環(“RC”)勘探鑽探結果來自:
    探索區:
  • 超過 65.5 米(“m”)的每噸(“g/t”)金(“金”)0.77 克,包括 LBP932 中超過 10.7 米的 2.47 克/噸金7
    背部射程區域:
  • 32.0 m 以上 3.40 g/t Au,包括超過 9.1 m 的 6.74g/t Au LBP9455
  • 超過 22.9 m 的 1.41 g/t Au,包括超過 6.1 m 的 4.28 g/t Au LBP9435
  • 超過 30.5 m 的 1.41 g/t Au 包括 LBP926 中超過 13.7 m 的 1.83 g/t Au7
    Rangefront 區域:
  • 超過 76.2 m 的 0.61 g/t Au,包括 LBP941 中超過 12.2 m 的 2.47 g/t Au6
  • 超過 73.2 m 的 0.45 g/t Au,包括 LBP954 中超過 3.0 m 的 1.50 g/t Au6
    CD-Tallman Zone:
  • 超過 25.9 m 的 0.86 g/t Au 包括 LBP920 中超過 6.1 m 的 1.80 g/t Au7
  • 截至 2023 年 9 月 30 日,已完成 2023 年 RC 勘探鑽探計劃,共鑽探了 27,461 米。

SELECTED FINANCIAL DATA

精選財務數據

The following selected financial data is derived from our unaudited condensed interim consolidated financial statements and related notes thereto (the "Interim Financial Statements") for the nine months ended September 30, 2023, as prepared in accordance with International Accounting Standards – IAS 34: Interim Financial Statements.

以下精選財務數據來自我們根據國際會計準則——IAS 34:中期財務報表編制的截至2023年9月30日的九個月未經審計的簡明中期合併財務報表及其相關附註(“中期財務報表”)。

A copy of the Interim Financial Statements is available on the Company's website at or on SEDAR at .

中期財務報表的副本可在公司網站上查閱,網址爲SEDAR。

The information in the tables below is presented in $000s, except 'per share' data:

下表中的信息以千美元計,“每股” 數據除外:

Three months ended
September 30,
Nine months ended
September 30,
2023
2022
2023
2022
Attributable to shareholders:
Loss for the period $ 5,430 $ 6,347 $ 15,544 $ 14,531
Loss and comprehensive loss for the period $ 5,485 $ 8,327 $ 15,443 $ 17,234
Basic and diluted loss per share $ 0.02 $ 0.02 $ 0.05 $ 0.05
三個月已結束
9月30日
九個月已結束
9月30日
2023
2022
2023
2022
歸屬於股東:
該期間的損失 $ 5,430 $ 6,347 $ 15,544 $ 14,531
該期間的虧損和綜合損失 $ 5,485 $ 8,327 $ 15,443 $ 17,234
每股基本虧損和攤薄後虧損 $ 0.02 $ 0.02 $ 0.05 $ 0.05
As at September 30,
As at December 31,
2023 2022
Cash and short-term investments $ 11,609 $ 19,813
Working capital $ 9,852 $ 17,668
Total assets $ 39,994 $ 47,954
Current liabilities $ 2,340 $ 2,543
Non-current liabilities $ 2,775 $ 2,812
Shareholders' equity $ 31,431 $ 38,949
截至9月30日,
截至12月31日,
2023 2022
現金和短期投資 $ 11,609 $ 19,813
營運資金 $ 9,852 $ 17,668
總資產 $ 39,994 $ 47,954
流動負債 $ 2,340 $ 2,543
非流動負債 $ 2,775 $ 2,812
股東權益 $ 31,431 $ 38,949

ABOUT LIBERTY GOLD

關於自由金

Liberty Gold is focused on exploring for and developing open pit oxide deposits in the Great Basin of the United States, home to large-scale gold projects that are ideal for open-pit mining. This region is one of the most prolific gold-producing regions in the world and stretches across Nevada and into Idaho and Utah. We know the Great Basin and are driven to discover and advance big gold deposits that can be mined profitably in open-pit scenarios. Our flagship projects are Black Pine in Idaho and Goldstrike in Utah, both past- producing open-pit mines, where previous operators only scratched the surface.

Liberty Gold專注於在美國大盆地勘探和開發露天氧化物礦牀,該盆地是非常適合露天採礦的大型黃金項目的所在地。該地區是世界上產金最多的地區之一,橫跨內華達州,一直延伸到愛達荷州和猶他州。我們了解大盆地,並致力於發現和開發大型金礦,這些金礦可以在露天開採中獲利。我們的旗艦項目是愛達荷州的 Black Pine 和猶他州的 Goldstrike,這兩個項目都是過去生產露天礦山的,以前的運營商只能在那裏摸索地面。

For more information, visit libertygold.ca or contact:

欲了解更多信息,請訪問 libertygold.ca 或聯繫:

Susie Bell, Manager, Investor Relations
Phone: 604-632-4677 or Toll Free 1-877-632-4677
info@libertygold.ca

蘇西·貝爾,投資者關係經理
電話:604-632-4677 或免費電話 1-877-632-4677
info@libertygold.ca

Peter Shabestari, P.Geo., Vice-President Exploration, Liberty Gold, is the Company's designated Qualified Person for this news release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and has reviewed and validated that the information contained in the release is accurate.

根據國家儀器43-101礦業項目披露標準(“NI 43-101”),P.Geo.,Liberty Gold勘探副總裁彼得·沙貝斯塔裏是公司本新聞稿的指定合格人士,他已經審查並驗證了新聞稿中包含的信息是準確的。

This news release contains "forward-looking information" and "forward-looking statements" within the meaning of applicable securities laws, including statements or information concerning, future financial or operating performance of Liberty Gold and its business, operations, properties and condition; planned de-risking activities at Liberty Gold's mineral properties; the potential quantity, recoverability and/or grade of minerals; the potential size of a mineralized zone or potential expansion of mineralization; proposed exploration and development of Liberty Gold's exploration property interests; the results of mineral resource estimates and timing of preliminary economic assessments ("PEAs") or pre-feasibility studies; sufficiency of funds to meet exploration expenditure commitments through to the end of 2023; and the Company's anticipated expenditures.

本新聞稿包含適用證券法所指的 “前瞻性信息” 和 “前瞻性陳述”,包括有關Liberty Gold的未來財務或經營業績及其業務、運營、財產和狀況;計劃在Liberty Gold礦產中開展的降低風險活動;礦產的潛在數量、可回收性和/或品位;礦化區的潛在規模或礦化的潛在擴張;Liberty Gold的擬議勘探和開發的勘探財產權益;礦產資源估算結果和初步經濟評估(“PEA”)或預可行性研究的時間安排;在2023年底之前履行勘探支出承諾的資金是否充足;以及公司的預期支出。

Forward-looking information is often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "planned", "expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", and similar expressions, or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "should", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management at the date the statements are made including, among others, assumptions about future prices of gold, and other metal prices, currency exchange rates and interest rates, favourable operating conditions, political stability, obtaining governmental approvals and financing on time, obtaining renewals for existing licenses and permits and obtaining required licenses and permits, labour stability, stability in market conditions, availability of equipment, timing or results of the publication of any mineral resources, PEA or pre-feasibility study, the availability of drill rigs, successful resolution of disputes and anticipated costs and expenditures. Many assumptions are based on factors and events that are not within the control of Liberty Gold and there is no assurance they will prove to be correct.

前瞻性信息通常是通過使用諸如 “尋找”、“預測”、“計劃”、“繼續”、“計劃”、“期望”、“項目”、“預測”、“潛力”、“目標”、“打算”、“相信”、“潛力” 和類似的表達方式來識別前瞻性信息,或描述 “目標”,或此類詞語和短語的變體或陳述某些行動、事件或陳述結果 “可能”、“應該”、“可以”、“會”、“可能” 或 “將” 獲得、發生或實現。前瞻性信息不能保證未來的表現,它基於管理層在聲明發表之日的許多估計和假設,包括對黃金和其他金屬價格的未來價格、貨幣匯率和利率、有利的運營條件、政治穩定、按時獲得政府批准和融資、獲得現有執照和許可證的續期以及獲得所需的執照和許可證、勞動力穩定、市場條件的穩定性等假設,設備的可用性、時機 或結果 任何礦產資源的出版物 PE一個 或預可行性研究, 鑽機的可用性, 爭端的成功解決以及預期的成本和支出.許多假設基於Liberty Gold無法控制的因素和事件,無法保證它們會被證明是正確的。

Such forward-looking information, involves known and unknown risks, which may cause the actual results to be materially different from any future results expressed or implied by such forward-looking information, including, risks related to the interpretation of results and/or the reliance on technical information provided by third parties as related to the Company's mineral property interests; changes in project parameters as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery rates; the costs and timing of the development of new deposits; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; the timing and success of exploration activities generally; the timing or results of the publication of any mineral resources,PEAs or pre-feasibility studies; delays in permitting; possible claims against the Company; labour disputes and other risks of the mining industry;delays in obtaining governmental approvals, financing or in the completion of exploration as well as those factors discussed in the Annual Information Form of the Company dated March 28, 2023, in the section entitled "Risk Factors", under Liberty Gold's SEDAR profile at .

此類前瞻性信息涉及已知和未知的風險,可能導致實際業績與此類前瞻性信息所表達或暗示的任何未來業績存在重大差異,包括與業績解釋和/或依賴第三方提供的與公司礦產權益相關的技術信息相關的風險;隨着計劃的不斷完善,項目參數的變化;當前的經濟狀況;大宗商品的未來價格;品位或回收率可能出現的變化;開發新礦牀的成本和時機;設備或流程未能按預期運行;合同方未能履約;勘探活動的總體時間和成功;時機 或結果 任何礦產資源的出版物Pea 或預可行性研究;許可延遲;可能對公司提出的索賠;採礦業的勞資糾紛和其他風險;在獲得政府批准、融資或完成勘探方面的延遲,以及公司年度信息表中討論的因素 三月 28,2023在標題爲 “風險因素” 的部分中,在 Liberty Gold 的 SEDAR 簡介下,網址爲

Although Liberty Gold has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Liberty Gold disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise unless required by law.

儘管 Liberty Gold 試圖確定可能導致實際行爲、事件或結果與前瞻性信息中描述的存在重大差異的重要因素,但可能還有其他因素導致行動、事件或結果與預期、估計或預期不符。無法保證此類信息會被證明是準確的,因爲實際結果和未來事件可能與此類陳述中的預期存在重大差異。除非法律要求,否則Liberty Gold不打算或義務更新或修改任何前瞻性信息,無論是由於新信息、未來事件還是其他原因。


1See press release dated September 11, 2023
2See press release dated September 5, 2023
3See press release dated November 8, 2023
4See press release dated September 6, 2023
5See press release dated September 5, 2023
6See press release dated September 7, 2023
7See press release dated July 24, 2023

1參見 2023 年 9 月 11 日的新聞稿
2參見 2023 年 9 月 5 日的新聞稿
3參見 2023 年 11 月 8 日的新聞稿
4參見 2023 年 9 月 6 日發佈的新聞稿
5參見 2023 年 9 月 5 日的新聞稿
6參見 2023 年 9 月 7 日的新聞稿
7參見 2023 年 7 月 24 日的新聞稿


声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論