share_log

Ranchero Options Pinchi Lake Nickel Project in British Columbia, Canada

Ranchero Options Pinchi Lake Nickel Project in British Columbia, Canada

加拿大不列颠哥伦比亚省的Ranchero Options Pinchi Lake镍矿项目
GlobeNewswire ·  2023/11/21 04:30

VANCOUVER, British Columbia, Nov. 21, 2023 (GLOBE NEWSWIRE) -- Ranchero Gold Corp. ("Ranchero" or the "Company") (TSX.V: RNCH) is pleased to announce that it has entered into an option agreement (the "Option Agreement") with Recharge Resources Ltd. ("Recharge") whereby Ranchero can earn a 100% interest in the Pinchi Lake Nickel Project (the "Pinchi Project"), consisting of six mineral claims totaling 3,917 hectares, situated approximately 15 to 30 km northwest of Fort St. James and 120 km northwest of Prince George in central British Columbia.

不列颠哥伦比亚省温哥华,2023年11月21日(GLOBE NEWSWIRE)——Ranchero Gold Corp.(“Ranchero” 或 “公司”)(TSX.V:RNCH)欣然宣布,它已与Rechage Resources Ltd.(“Recharge”)签订期权协议(“期权协议”),根据该协议,Ranchero可以获得平池湖镍业项目(“平奇项目”)的100%权益”),包括六个矿产权,总面积为3,917公顷,位于不列颠哥伦比亚省中部圣詹姆斯堡西北约15至30公里处,乔治王子西北120公里处。

The Pinchi Project is a prospective nickel exploration project containing awaruite (Ni2Fe-Ni3Fe), a naturally-occurring alloy of nickel and iron which is approximately 75% nickel, 25% iron and 0% sulfur. A prior property holder completed a 1055 line-kilometre helicopter-borne high resolution survey on the Pinchi Project in 2011, as well as a geochemical sampling program. Recharge conducted further geochemical sampling in 2021. The Pinchi Project is subject to a pre-existing 2% net smelter returns royalty payable to a third party.

Pinchi 项目是一个含有 awaruite (Ni) 的前景镍矿勘探项目2Fe-Ni3Fe),一种天然存在的镍和铁合金,含镍量约为75%,铁含量约为25%,硫含量为0%。2011年,一位前财产持有人完成了对Pinchi项目的1055线千米直升机载高分辨率测量,并完成了一项地球化学采样计划。Recharge在2021年进行了进一步的地球化学采样。Pinchi Project需缴纳先前存在的2%的冶炼厂净回报特许权使用费,该特许权使用费应支付给第三方。

The key terms of the Option Agreement are that Ranchero may earn a 100% interest in the Pinchi Project, subject to a 1% net smelter returns royalty to be granted to Recharge, by:

期权协议的关键条款是,Ranchero可以通过以下方式获得Pinchi项目100%的权益,前提是向Recharge授予1%的净熔炼厂回报特许权使用费:

  • issuing 835,000 common shares in the capital of Ranchero to Recharge within five business days of Ranchero obtaining the approval of the TSX Venture Exchange to the Agreement;
  • making cash payments to Recharge of $25,000 by the first anniversary date of the Agreement; $2,000,000 by the second anniversary of the Agreement; and $3,000,000 by the third anniversary date of the Agreement; and
  • funding exploration and development work on the property of a total of $1,200,000 before November 30, 2026, of which at least $40,000 is required before June 30, 2024; a further $60,000 is required before November 30, 2024; and a further $100,000 is required before November 30, 2025.
  • 在Ranchero获得多伦多证券交易所风险交易所对协议的批准后的五个工作日内向Recharge发行83.5万股普通股;
  • 在协议签订一周年之前向Recharge支付25,000美元的现金;在协议签订两周年之前向Recharge支付200万美元;在协议签订三周年之前向Recharge支付3,000,000美元;以及
  • 在2026年11月30日之前,为该物业的勘探和开发工作提供总额为120万美元的资金,其中至少需要4万美元在2024年6月30日之前完成;在2024年11月30日之前还需要6万美元;在2025年11月30日之前还需要10万美元。

All figures are in Canadian dollars. The Option Agreement is subject to approval of the TSX Venture Exchange (the "TSXV").

所有数字均以加元为单位。期权协议需获得多伦多证券交易所风险交易所(“TSXV”)的批准。

Qualified Person

合格人员

Scientific and technical information in this news release has been reviewed and approved by Martyn Buttenshaw, a director of Ranchero, who is a "qualified person" as defined by NI 43-101.

本新闻稿中的科学和技术信息已经过Ranchero董事马丁·布滕肖的审查和批准,根据NI 43-101的定义,他是 “合格人士”。

About Ranchero Gold

关于 Ranchero Gold

Ranchero is a gold exploration and development company currently focused on its 100%-owned Santa Daniela project located in Sonora, Mexico. The Santa Daniela project consist of a large land package in excess of 22,200 hectares within Mexico's Sierra Madre Occidental – a newly emerging gold belt. The Santa Daniela project is also near a number of major gold mining operations in the region. Maíz Azul is the Company's most advanced prospect where exploration efforts are underway.

Ranchero是一家黄金勘探和开发公司,目前专注于其位于墨西哥索诺拉的100%持股的圣丹妮拉项目。Santa Daniela项目包括墨西哥西马德雷山脉(一个新兴的金带)内一块占地超过22,200公顷的大型土地。Santa Daniela项目也靠近该地区的许多主要金矿开采业务。Mai'z Azul是该公司最先进的勘探区,勘探工作正在进行中。

On behalf of the Board of Directors of the Company:

代表公司董事会:

Jesus Noriega
Interim Chief Executive Officer and Director
52 1 (662) 437 8520
info@rancherogold.com

天哪 Noriega
临时首席执行官兼董事
52 1 (662) 437 8520
info@rancherogold.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所风险投资交易所及其监管服务提供商(该术语在多伦多证券交易所风险投资交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

Cautionary Note Regarding Forward Looking Statements

关于前瞻性陈述的警示说明

This news release contains certain forward-looking statements. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects" or "does not expect", "is expected", "anticipates" or "does not anticipate" "plans", "estimates" or "intends" or stating that certain actions, events or results " may", "could", "would", "might" or "will" be taken, occur or be achieved), or that are not statements of historical fact, may be "forward-looking statements". Forward-looking statements contained in this news release include, but are not limited to, statements regarding the potential exercise of the option to acquire the Pinchi Project, and the acceptance of the TSXV to the Option Agreement.

本新闻稿包含某些前瞻性陈述。任何表达或涉及有关预测、期望、信念、计划、预测、目标、假设或未来事件或绩效的讨论的陈述(通常,但并非总是如此,使用诸如 “期望” 或 “不期望”、“预期” 或 “未预期” “计划”、“估计” 或 “打算” 之类的词语或短语,或指出某些行动、事件或结果 “可能”,“将”、“可能” 或 “将” 采取、发生或实现),或者不是历史事实陈述,都可能是 “前瞻性陈述”。本新闻稿中包含的前瞻性陈述包括但不限于有关可能行使收购Pinchi Project的期权的陈述,以及TSXV对期权协议的接受。

Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to materially differ from those reflected in the forward-looking statements. These risks and uncertainties include but are not limited to: risks related to regulatory approval, including the approval of the TSXV. There can be no assurance that forward-looking statement will prove to be accurate, and actual results and future events could differ materially from those anticipate in such statements. The Company undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking statements.

前瞻性陈述受各种风险和不确定性的影响,这些风险和不确定性可能导致实际事件或结果与前瞻性陈述中反映的事件或结果存在重大差异。这些风险和不确定性包括但不限于:与监管机构批准相关的风险,包括TSXV的批准。无法保证前瞻性陈述会被证明是准确的,实际业绩和未来事件可能与此类陈述中的预期存在重大差异。除非适用的证券法要求,否则如果情况或管理层的估计或意见发生变化,公司没有义务更新前瞻性陈述。提醒读者不要过分依赖前瞻性陈述。


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发