share_log

Baselode Ready to Start Drilling at Catharsis Uranium Project

Baselode Ready to Start Drilling at Catharsis Uranium Project

Baselode 准备开始在 Catharsis 铀项目进行钻探
newsfile ·  02/15 06:00
  • New video published detailing uranium targets planned for this drill program
  • Multiple untested targets will be drilled with this program
  • Drill and crews are on site, ready to start drilling
  • 发布的新视频详细介绍了该钻探计划中的铀目标
  • 该程序将钻探多个未经测试的目标
  • 钻探人员和工作人员已在现场,准备开始钻探

Toronto, Ontario--(Newsfile Corp. - February 15, 2024) - Baselode Energy Corp. (TSXV: FIND) (OTCQB: BSENF) ("Baselode" or the "Company") is pleased to provide details outlining drill plans for the Catharsis uranium project in northern Saskatchewan's Athabasca Basin area.

安大略省多伦多--(Newsfile Corp.,2024 年 2 月 15 日)——Baselode Energy Corp.(TSXV:FIND)(OTCQB:BSENF)(”Baselode“或者”公司“)很高兴提供详细资料,概述萨斯喀彻温省北部阿萨巴斯卡盆地地区的Catharsis铀项目的钻探计划。

"We have completed extensive work to define Tier 1 target areas that share characteristics with other world-class basement-hosted Athabasca uranium deposits, such as NexGen Energy Ltd. (TSX: NXE) and Denison Mines Corp. (TSX: DML) Arrow and Gryphon deposits, respectively. The Catharsis drill program is ready to start, and our focus is to fast-track discovery by drilling multiple target areas with helicopter support," stated James Sykes, CEO, President, and Director of Baselode.

“我们已经完成了大量工作,以确定与地下室托管的其他世界级阿萨巴斯卡铀矿床具有相同特征的一级目标区域,例如NexGen能源有限公司(多伦多证券交易所股票代码:NXE)和丹尼森矿业公司(多伦多证券交易所股票代码:DML)Arrow和Gryphon矿床。Catharsis钻探计划已准备就绪,我们的重点是通过在直升机支持下钻探多个目标区域来加快发现速度。” Baselode首席执行官、总裁兼董事James Sykes表示。

Please watch the Company's video (below) for more details about the drill program, including an explanation of target areas, exploration methodologies, and an overview of the Catharsis project.

请观看公司的视频(见下文),了解有关钻探计划的更多详细信息,包括目标区域的解释、勘探方法和Catharsis项目概述。

Catharsis 2024 Exploration Plans

Catharsis 2024 年勘探计划

Catharsis Drill Program Details
8 to 10 drill holes for 2,000 metres ("m") are planned within 4 to 5 different untested target areas (Figure 2). All support staff and equipment, such as diamond drill and helicopter, are on site and the program is ready to start. The Company has received the necessary permits to complete the program.

宣泄训练计划详情
8 到 10 个钻孔 2,000 米 (”m“)计划在 4 到 5 个不同的未测试目标区域内(图 2)。所有支持人员和设备,例如钻石钻机和直升机,都在现场,该计划已准备就绪,可以开始了。该公司已获得完成该计划的必要许可。

The logistics support for a high-resolution airborne magnetic and radiometric survey is underway. The survey is planned for over 10,000 line-km with flight lines 50 m apart.

高分辨率航空磁场和辐射测量的后勤支持正在进行中。该调查计划在超过10,000条线路公里范围内进行,飞行线相隔50米。

About Baselode Energy Corp.
Baselode controls 100% of approximately 272,804 hectares for exploration in the Athabasca Basin area of northern Saskatchewan, Canada. The land package is free of any option agreements or underlying royalties.

关于基洛德能源公司
加拿大萨斯喀彻温省北部阿萨巴斯卡盆地约272,804公顷的勘探用地,Baselode完全控制着。土地一揽子计划不含任何期权协议或基础特许权使用费。

The Company discovered the ACKIO near-surface, uranium prospect in September 2021. ACKIO measures greater than 375 m along strike, greater than 150 m wide, comprised of at least 9 separate uranium Pods, with mineralization starting as shallow as 28 m and 32 m beneath the surface in Pods 1 and 7, respectively, and down to approximately 300 m depth beneath the surface with the bulk of mineralization occurring in the upper 120 m. ACKIO remains open at depth, and to the north, south and east.

该公司于2021年9月发现了ACKIO近地表铀矿勘探区。ACKIO 的走向长度超过 375 米,宽度大于 150 米,由至少 9 个独立的铀舱组成,1 号和第 7 号舱的矿化区分别从地表以下 28 米和 32 米处开始,一直到地表下约 300 米的深度,大部分矿化发生在 120 米以上。ACKIO 在深度、向北、向南和向东仍处于开放状态。

Baselode's Athabasca 2.0 exploration thesis focuses on discovering near-surface, basement-hosted, high-grade uranium orebodies outside the Athabasca Basin. The exploration thesis is further complemented by the Company's preferred use of innovative and well-understood geophysical methods to map deep structural controls to identify shallow targets for diamond drilling.

Baselode的Athabasca 2.0勘探论文侧重于发现阿萨巴斯卡盆地以外的近地表、地下室托管的高品位铀矿体。该公司首选使用创新且广为人知的地球物理方法绘制深层结构控制图,以确定钻石钻探的浅层目标,进一步补充了勘探论点。

QP Statement
The technical information contained in this news release has been reviewed and approved by Cameron MacKay, P.Geo., Vice-President, Exploration & Development for Baselode Energy Corp., who is considered to be a Qualified Person as defined in "National Instrument 43-101, Standards of Disclosure for Mineral Projects."

QP 声明
本新闻稿中包含的技术信息已由Baselode Energy Corp. 勘探与开发副总裁P.Geo. 审查和批准,他被认为是 “国家仪器43-101,矿业项目披露标准” 中定义的合格人员。

For further information, please contact:

欲了解更多信息,请联系:

James Sykes, CEO, President and Director
Baselode Energy Corp.
jsykes@oregroup.ca
306-221-8717

James Sykes,首席执行官、总裁兼董事
Baselode Energy
jsykes@oregroup.ca
306-221-8717

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the TSX Venture Exchange policies) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所风险交易所及其监管服务提供商(该术语在多伦多证券交易所风险交易所政策中定义)均不对本新闻稿的充分性或准确性承担责任。

Certain information in this press release may contain forward-looking statements. This information is based on current expectations that are subject to significant risks and uncertainties that are difficult to predict. Actual results might differ materially from results suggested in any forward-looking statements. Baselode Energy Corp. assumes no obligation to update the forward-looking statements, or to update the reasons why actual results could differ from those reflected in the forward looking-statements unless and until required by securities laws applicable to Baselode Energy Corp. Additional information identifying risks and uncertainties is contained in the Company's filings with Canadian securities regulators, which filings are available under Baselode Energy Corp. profile at .

本新闻稿中的某些信息可能包含前瞻性陈述。这些信息基于当前的预期,这些预期受到难以预测的重大风险和不确定性的影响。实际结果可能与任何前瞻性陈述中建议的结果存在重大差异。除非适用于Baselode Energy Corp. 的证券法有要求,否则Baselode Energy Corp. 没有义务更新前瞻性陈述或更新实际业绩可能与前瞻性陈述中反映的结果不同的原因。其他识别风险和不确定性的信息包含在公司向加拿大证券监管机构提交的文件中,这些文件可在Baselode Energy Corp. 的简介下查阅。

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act") or any state securities laws and may not be offered or sold within the United States or to, or for the account or benefit of, U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws, unless an exemption from such registration is available.

本新闻稿不构成在美国出售或征求购买任何证券的要约。这些证券过去和将来都不会根据经修订的1933年《美国证券法》(“美国证券法”)或任何州证券法进行注册,除非根据美国证券法和适用的州证券法注册,否则不得在美国境内发行或出售,也不得向美国人发行或出售,或为美国人提供账户或利益,除非此类注册可获得豁免。

FIGURE 1 - Bear, Catharsis, Hook & Shadow projects location map. ACKIO uranium prospect identified by yellow circle

图 1-Bear、Catharsis、Hook & Shadow 项目位置图。用黄色圆圈确定了 ACKIO 铀矿前景

FIGURE 2 - Catharsis project and 2024 diamond drilling target areas A to D (white circles)

图 2-Catharsis 项目和 2024 年钻石钻探目标区域 A 至 D(白色圆圈)

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发