share_log

GT Resources Drills up to 0.9% Ni at Moshkinabi Intrusion, Tyko Ni - Cu Project

GT Resources Drills up to 0.9% Ni at Moshkinabi Intrusion, Tyko Ni - Cu Project

GT Resources 在 Moshkinabi Intrusion、Tyko Ni-Cu 項目中鑽探高達 0.9% 的鎳
newsfile ·  03/11 06:30

Toronto, Ontario--(Newsfile Corp. - March 11, 2024) - GT Resources Inc. (TSXV: GT) (OTCQB: NKORF) (FSE: 7N11) (the "Company" or "GT") is pleased to announce final results from the 2023 drill program on the Tyko II Property, which forms part of the larger Tyko Nickel-Copper Project in Ontario, Canada.

安大略省多倫多--(Newsfile Corp.-2024 年 3 月 11 日)- GT 資源公司 (TSXV: GT) (OTCQB: NKORF) (FSE: 7N11) (那個”公司“或”GT“)很高興地宣佈2023年Tyko II地產鑽探計劃的最終結果,該地產是加拿大安大略省更大的泰科鎳銅項目的一部分。

Highlights

亮點

  • Represents GT's first drill testing on the Tyko II Property.
  • Massive sulphide was intercepted at the base of the Moshkinabi intrusion thereby supporting the prospectivity for additional massive sulphide mineralization at Tyko II. Drilling returned:
    • 0.8% Ni, 0.6% Cu over 0.7 meters including 0.9% Ni, 0.6% Cu over 0.4 meters in hole TK23-141
  • Also intersected was disseminated copper-palladium-rich mineralization, within the Kejimalda Zone, which represents an additional style of mineralization and further supports the prospectivity of the area. Drilling returned:
    • 0.1% Cu, 0.33 g/t TPM ("Platinum + Palladium + Gold") over 24.3 meters including 0.23% Cu, 0.73 g/t TPM over 2.0 meters in hole TK23-142.
    • The Kejimalda Zone extends over a 3-kilometer strike length and ranges in width from a few meters up to 30 meters in width.
  • In Q4 2023, 3,028 meters were drilled in 22 diamond drill holes on the Tyko Project, twelve holes were drilled on the Tyko I Property and ten on the Tyko II Property which are detailed in this release.
  • The Gionet Zone has returned up to 0.38% Cu in soils coincident with VTEM ("Versatile Time Domain Electromagnetic") anomalies and remains to be drill tested following receipt of exploration drill permits.
  • 這是 GT 在 Tyko II 地產上的首次鑽探測試。
  • 在莫什基納比入侵底部截獲了塊狀硫化物,從而支持了在Tyko II進行更多塊狀硫化物礦化的前景。鑽探回來了:
    • 0.8% 鎳,0.6% 銅 超過 0.7 米,包括 0.9% 鎳,0.6% 銅 TK23-141 洞內超過 0.4 米
  • Kejimalda區內還出現了富含銅鈀的浸染礦化,這代表了另一種礦化形式,進一步支持了該地區的前景。鑽探回來了:
    • 0.1% 銅,0.33 g/t TPM (“鉑金 + 鈀金 + 金”)超過 24.3 米,包括 0.23% 銅,0.73 克/噸 TPM TK23-142 洞超過 2.0 米。
    • 凱吉馬爾達區域的打擊長度超過3千米,寬度從幾米到30米不等。
  • 2023年第四季度,泰科項目的22個鑽石鑽孔鑽探了3,028米,在Tyko I地產上鑽了12個孔,在Tyko II地產鑽了10個孔,在本新聞稿中對此進行了詳細介紹。
  • Gionet Zone在土壤中回收了高達0.38%的銅,與VTEM(“多功能時域電磁”)異常相吻合,並且在獲得勘探鑽探許可證後仍有待鑽探測試。

"The first drilling on the Tyko II property has returned encouraging results including up to 0.9% Ni in massive sulphide. The drill program was focused on the Moshkinabi intrusion which is the best mapped and hence understood part of the wider Faries-Moshkinabi mafic-ultramafic complex. Large parts of this intrusive complex remain untested, notably the Gionet Zone which has demonstrated strong copper and nickel soil anomalies coincident with VTEM anomalies. Plans are underway to further explore this large mafic-ultramafic complex once additional Exploration Permits are received," stated Derrick Weyrauch, President and CEO.

“對Tyko II地產的首次鑽探取得了令人鼓舞的結果,包括塊狀硫化物中鎳含量高達0.9%。該演習計劃側重於莫什基納比入侵事件,這是測繪效果最好,因此也是更廣泛的法里斯-莫什基納比黑鐵質-超鎂鐵複合體的一部分。這種侵入性建築群的大部分仍未經過測試,尤其是Gionet區域,該區域已顯示出強烈的銅和鎳土壤異常與VTEM異常相吻合。總裁兼首席執行官德里克·韋勞赫表示,一旦獲得額外的勘探許可,就計劃進一步勘探這個大型的鎂鐵-超鎂鐵複合體。

The 2023 drill program comprised 22 holes totalling 3,028 meters on both the Tyko I and Tyko II Properties. The program included twelve holes targeting the West Pickle area of Tyko I (see news release Feb 1, 2024) and ten drill holes on the Tyko II Property, primarily targeting the Moshkinabi intrusion. Drilling on the Moshkinabi intrusion targeted both massive and disseminated sulphides.

2023 年的鑽探計劃包括 Tyko I 和 Tyko II Properties 的 22 個鑽孔,總長 3,028 米。該計劃包括十二個針對泰科一號西皮克爾地區的鑽孔(見2024年2月1日的新聞稿)和在Tyko II地產上的十個鑽孔,主要針對莫什基納比的入侵。在莫什基納比入侵體上鑽探的目標是塊狀硫化物和浸染硫化物。

The primary drill target was massive sulphide mineralization along the base of the intrusion such as that found in a historic trench which returned grab samples up to 1.0% Ni, 0.2% Cu, 0.13% Co, 2.42 g/t Pd, and 0.15 g/t Pt (see news release November 21, 2023). A 2023 VTEMmax survey outlined several isolated conductors located near the base of the Moshkinabi intrusion which could represent additional massive sulphide accumulations (see news release September 28, 2023). Holes TK23-140 and 141 successfully intersected Ni-rich semi-massive and massive sulphide similar to the grab samples from the historic trench, however several other holes intersected highly deformed sulphide facies banded iron formation in the volcanic wall rock to the Moshkinabi intrusion. It is currently thought that many of these VTEM anomalies are due to this wall rock sulphide, however ~50% of the drill holes did not intersect any significant sulphide and these VTEM targets remain unexplained. The fact that the Moshkinabi intrusion has produced basal-style Ni-rich massive sulphides is highly encouraging and the presence of sulphide facies banded iron formation in the wall rock could also serve as a source of sulphur. This style of mineralization warrants additional follow up.

主要鑽探目標是入侵底部的大規模硫化物礦化,例如在一條歷史戰溝中發現的海溝,該戰溝返回的採集樣本直到 1.0% 鎳、0.2% 銅、0.13% 鈷、2.42 g/t Pd 和 0.15 g/t Pt (參見 2023 年 11 月 21 日的新聞稿)。2023年VTemMax的一項調查概述了位於莫什基納比入侵底部附近的幾種孤立導體,這可能意味着更多的大量硫化物積累(見2023年9月28日新聞稿)。TK23-140 和 141 號孔成功地穿透了富含鎳的半塊狀硫化物,類似於從歷史海溝中採集的樣本,但是其他幾個洞在火山壁巖中與高度變形的硫化物相交了帶狀鐵的形成,直至莫什基納比入侵。目前人們認爲,這些VTEM異常中有許多是由於這種壁巖硫化物造成的,但是大約50%的鑽孔沒有與任何重要的硫化物相交,這些VTEM目標仍然無法解釋。莫什基納比入侵產生了基底式富鎳塊狀硫化物,這一事實非常令人鼓舞,牆巖中硫化物相帶狀鐵的形成也可能成爲硫的來源。這種礦化方式值得采取進一步的後續行動。

The secondary target was disseminated Cu-Pd-rich mineralization higher up in the Moshkinabi intrusion belonging to the Kejimalda Zone, which has been defined by historical mapping and prospecting over three kilometers of strike length. Disseminated style mineralization was intersected in six holes with widths ranging from two to twenty-four meters. The disseminated style mineralization appears to parallel the lower contact of the intrusion, which dips shallowly the northeast, and could represent a reef-style system.

次要目標是屬於凱吉馬爾達帶的莫什基納比侵入體上方的富含銅鉛的礦化層,該地帶是通過歷史測繪和探礦長度超過三千米的勘探來確定的。播散式礦化在六個孔中相交,寬度從二到二十四米不等。播散型礦化似乎與入侵物的下部接觸平行,入侵體向東北偏淺地傾斜,可能代表礁石式系統。

The final hole of the program TK23-144 targeted an isolated VTEM anomaly and intersected semi-massive pyrrhotite-rich mineralization with minor chalcopyrite in highly deformed volcanics. It is thought to be volcanogenic massive sulphide ("VMS") style mineralization with potential similarities to the nearby world-class Geco mine that produced over 49.3 Mt of ore grading 1.85% Cu, 3.78% Zn, and 56.2 g/t Ag (Puumala et al., 2020).

TK23-144 程序的最後一個孔針對的是孤立的 VTEM 異常,在高度變形的火山岩中,將富含硫鐵礦的半塊狀礦化與少量黃銅礦相交。它被認爲是火山成因塊狀硫化物(“VMS”)式的礦化,可能與附近的世界一流的Geco礦有相似之處,該礦產量超過 49.3 公噸礦石品位爲 1.85% 銅、3.78% 鋅和 56.2 克/噸銀 (普馬拉等人,2020年)。


Figure 1. Simplified geology map of the Tyko II Property, showing grab samples from historic mineralized zones, and location of 2023 drill holes. Inset maps are of the Gionet Zone showing VTEM as the background and 2023 soil sampling results.


圖 1。 Tyko II 地產的簡化地質圖,顯示了歷史礦化帶的採集樣本以及 2023 年鑽孔的位置。插頁地圖是以VTEM爲背景的Gionet區域和2023年的土壤採樣結果。


Figure 2. Detailed geology map of the southwestern contact of the Moshkinabi Intrusion showing the location of 2023 drill holes.


圖 2。 莫什基納比入侵西南接觸點的詳細地質圖,顯示了2023年鑽孔的位置。


Figure 3. 2023 drill holes and VTEM anomalies with the outline of Moshkinabi intrusion (translucent brown).


圖 3。 2023 年鑽孔和帶有莫什基納比入侵輪廓的 VTEM 異常(半透明棕色)。

About Tyko Nickel - Copper Project
The Tyko Nickel - Copper Project, is located approximately 65 kilometers northeast of Marathon Ontario, Canada. Tyko is an early stage, high sulphide tenor, nickel - copper (2:1 ratio) project and with multiple mineralized zones spanning over a 20-kilometer strike length and demonstrating the potential for a new greenfield nickel - copper district.

關於 Tyko Nickel-銅項目
Tyko Nickel-Copper 項目位於加拿大安大略省馬拉松東北約 65 公里處。Tyko是一個早期階段、高硫化物含量、鎳銅(2:1 比例)的項目,其多個礦化區跨越了超過20千米的走向長度,這表明了新建鎳銅礦區的潛力。

Qualified Person
The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P. Geo., Vice President of Exploration and a director of the Company and the Qualified Person as defined by National Instrument 43-101.

合格人員
本新聞稿中的技術信息已由理學碩士、P. Geo.、勘探副總裁、公司董事兼National Instrument 43-101定義的合格人員Neil Pettigrew進行了審查和驗證。

Grant of Incentive Awards
GT Resources also announces that its board of directors has granted:

激勵獎勵的發放
GT Resources還宣佈,其董事會已批准:

  1. 650,000 restricted share units ("RSUs") to certain employees, advisors and consultants which vest in three years from the date of issue and have a term of 5-years;
  2. 3,000,000 deferred shares units ("DSUs") to certain officers and directors, which are exercisable upon departure from the Company and which vest immediately;
  3. 3,825,000 stock options to certain officers and directors, which are exercisable for five years at a price of $0.05 per common share with 1/3rd vesting immediately and 1/3rd every 6-months thereafter; and
  4. 725,000 stock options to certain employees, advisors and consultants, which are exercisable for five years at a price of $0.05 per common share with 1/3rd vesting immediately and 1/3rd every 6-months thereafter.
  1. 向某些員工、顧問和顧問提供65萬個限制性股票單位(“RSU”),自發行之日起三年內歸屬,期限爲5年;
  2. 向某些高級管理人員和董事提供3,000,000股遞延股份(“DSU”),這些股票可在離開公司時行使並立即歸屬;
  3. 向某些高級管理人員和董事提供3,825,000份股票期權,可按每股普通股0.05美元的價格行使五年,其中三分之一立即歸屬,此後每6個月三分之一歸屬;以及
  4. 向某些員工、顧問和顧問提供72.5萬份股票期權,可按每股普通股0.05美元的價格行使五年,其中三分之一立即歸屬,之後每6個月解除三分之一。

About GT Resources
GT Resources Inc. (TSXV: GT) is focused on discovering environmentally and socially conscious Critical Green Transportation Metals. A Canadian mineral exploration and development company, GT is targeting district scale, nickel - copper sulphide and platinum-group-element (PGE) deposits in Canada and Finland. The Läntinen Koillismaa (LK) Project in north-central Finland, is a PGE-copper-nickel project that has existing NI43-101 Mineral Resources, while both the Tyko and Canalask high-grade nickel-copper projects are located in Ontario and the Yukon, Canada, respectively. Follow GT Resources on LinkedIn, Twitter, and at .

關於 GT 資源
GT Resources Inc.(多倫多證券交易所股票代碼:GT)專注於發現環境和社會意識 關鍵的綠色運輸金屬。作爲一家加拿大礦產勘探和開發公司,GT的目標是加拿大和芬蘭的區域規模、硫化鎳銅和鉑族元素(PGE)礦牀。位於芬蘭中北部的Läntinen Koillismaa(LK)項目是一個PGE-銅鎳項目,現有的 NI43-101 礦產資源,而Tyko和Canalask的高品位鎳銅項目分別位於加拿大安大略省和育空地區。在領英、推特和網址上關注 GT Resources

ON BEHALF OF THE BOARD
"Derrick Weyrauch"
President & CEO, Director

代表董事會
“Derrick Weyrauch”
總裁兼首席執行官、董事

For further information contact:
Derrick Weyrauch, President & CEO
Email:
info@GTResourcesinc.com

欲了解更多信息,請聯繫:
德里克·韋勞赫,總裁兼首席執行官
電子郵件:
info@GTResourcesinc.com

Neither the TSX Venture Exchange nor its Market Regulator (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所風險交易所及其市場監管機構(該術語在多倫多證券交易所風險交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

This press release is not an offer or a solicitation of an offer of securities for sale in the United States of America. The common shares of GT Resources Inc. have not been and will not be registered under the U.S. Securities Act of 1933, as amended, and may not be offered or sold in the United States absent registration or an applicable exemption from registration.

本新聞稿不是在美利堅合衆國出售證券的要約或邀請。GT Resources Inc.的普通股過去和將來都沒有根據經修訂的1933年《美國證券法》進行註冊,如果沒有註冊或適用的註冊豁免,則不得在美國發行或出售。

Information set forth in this press release may contain forward-looking statements. Forward-looking statements are statements that relate to future, not past events. In this context, forward-looking statements often address a company's expected future business and financial performance, and often contain words such as "anticipate", "believe", "plan", "estimate", "expect", and "intend", statements that an action or event "may", "might", "could", "should", or "will" be taken or occur, or other similar expressions. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, risks associated with project development; the need for additional financing; operational risks associated with mining and mineral processing; fluctuations in mineral and commodity prices; title matters; environmental liability claims and insurance; reliance on key personnel; the absence of dividends; competition; dilution; the volatility of our common share price and volume; and the impact of governmental entities. Forward-looking statements are made based on management's beliefs, estimates and opinions on the date that statements are made and the Company undertakes no obligation to update forward-looking statements if these beliefs, estimates and opinions or other circumstances should change. Investors are cautioned against attributing undue certainty to forward-looking statements.

本新聞稿中列出的信息可能包含前瞻性陳述。前瞻性陳述是與未來而不是過去事件相關的陳述。在這種情況下,前瞻性陳述通常涉及公司預期的未來業務和財務業績,通常包含諸如 “預期”、“相信”、“計劃”、“估計”、“預期” 和 “打算” 之類的詞語,關於某項行動或事件 “可能”、“可能”、“應該” 或 “將” 採取或發生的陳述或其他類似的表述。就其性質而言,前瞻性陳述涉及已知和未知的風險、不確定性和其他因素,這些因素可能導致我們的實際業績、業績或成就或其他未來事件與此類前瞻性陳述所表達或暗示的任何未來業績、業績或成就存在重大差異。除其他外,這些因素包括與項目開發相關的風險;對額外融資的需求;與採礦和礦物加工相關的運營風險;礦產和商品價格的波動;所有權問題;環境責任索賠和保險;對關鍵人員的依賴;缺乏分紅;競爭;稀釋;普通股價格和交易量的波動;以及政府實體的影響。前瞻性陳述是根據管理層在陳述發表之日的信念、估計和意見做出的,如果這些信念、估計和意見或其他情況發生變化,公司沒有義務更新前瞻性陳述。提醒投資者不要將不當確定性歸因於前瞻性陳述。

Table 1: Assay Results: Tyko Project 2023 drill results from the Tyko II Property

表 1: 化驗結果:Tyko II 地產 2023 年 Tyko Project 的鑽探結果

Hole Rock Type From
(m)
To
(m)
Width
(m)
Ni
%
Cu
%
Co
%
TPM g/t
(Pd+Pt+Au)
Pd
g/t
Pt
g/t
Au
g/t
TK23-135 No Significant Mineralization
TK23-136 Gabbro 26.0 30.0 4.0 0.04 0.09 0.01 0.38 0.29 0.08 0.01
TK23-137 Gabbro 87.0 94.5 7.5 0.06 0.15 0.01 0.49 0.37 0.10 0.02
TK23-138 No Significant Mineralization
TK23-139 Gabbro 12.0 13.5 1.5 0.05 0.10 0.01 0.28 0.20 0.06 0.02
TK23-140 Semi-Massive Sulphide 8.8 12.9 4.1 0.20 0.47 0.02 1.00 0.79 0.21 0.00
TK23-141 Massive Sulphide 5.8 6.5 0.7 0.84 0.57 0.10 2.60 2.22 0.33 0.06
6.1 6.5 0.4 0.90 0.65 0.11 2.81 2.44 0.35 0.01
TK23-142 Gabbro 40.0 64.3 24.3 0.04 0.11 0.01 0.33 0.25 0.07 0.02
44.0 46.0 2.0 0.07 0.23 0.01 0.73 0.54 0.14 0.04
TK23-143 Gabbro 86.0 88.5 2.5 0.05 0.14 0.01 0.56 0.46 0.08 0.02
99.2 102.0 2.8 0.04 0.12 0.01 0.30 0.22 0.07 0.01
TK23-144 Volcanic 67.0 67.5 0.5 0.02 0.31 0.02 0.02 0.00 0.00 0.01
搖滾類型 來自
(m)

(m)
寬度
(m)
Ni
%

%
有限公司
%
TPM g/t
(鈀+鉑+金)
Pd
g/t
Pt
g/t
Au
g/t
TK23-135 沒有明顯的礦化
TK23-136 Gabbro 26.0 30.0 4.0 0.04 0.09 0.01 0.38 0.29 0.08 0.01
TK23-137 Gabbro 87.0 94.5 7.5 0.06 0.15 0.01 0.49 0.37 0.10 0.02
TK23-138 沒有明顯的礦化
TK23-139 Gabbro 12.0 13.5 1.5 0.05 0.10 0.01 0.28 0.20 0.06 0.02
TK23-140 半塊狀硫化物 8.8 12.9 4.1 0.20 0.47 0.02 1.00 0.79 0.21 0.00
TK23-141 塊狀硫化物 5.8 6.5 0.7 0.84 0.57 0.10 2.60 2.22 0.33 0.06
6.1 6.5 0.4 0.90 0.65 0.11 2.81 2.44 0.35 0.01
TK23-142 Gabbro 40.0 64.3 24.3 0.04 0.11 0.01 0.33 0.25 0.07 0.02
44.0 46.0 2.0 0.07 0.23 0.01 0.73 0.54 0.14 0.04
TK23-143 Gabbro 86.0 88.5 2.5 0.05 0.14 0.01 0.56 0.46 0.08 0.02
99.2 102.0 2.8 0.04 0.12 0.01 0.30 0.22 0.07 0.01
TK23-144 火山 67.0 67.5 0.5 0.02 0.31 0.02 0.02 0.00 0.00 0.01

(1) Reported widths are "drilled widths" not true widths.

(1) 報告的寬度是 “鑽孔寬度”,而不是真實寬度。

Table 2: Drill Hole Locations for assay results from this news release

表 2: 本新聞稿中化驗結果的鑽孔位置

Hole Azimuth Dip Length NAD83 z16 East NAD83 z16 North Elevation
TK23-135 255 -45 159.0 605223.1 5444267 40
TK23-136 222 -45 153.0 605489.9 5443376 44
TK23-137 169.6 -45 150.0 606280.3 5443071 57
TK23-138 125 -80 30.5 606197.1 5442929 73
TK23-139 190.2 -45 81.4 606195.4 5442913 48
TK23-140 227.9 -45 171.0 605600.3 5443025 54
TK23-141 166.1 -45 150.0 605610.1 5443011 24
TK23-142 175.1 -45 126.0 606668.3 5443074 101
TK23-143 194.8 -70.1 102.5 605806.8 5443076 92
TK23-144 134.4 -45 120.0 606040.7 5435975 32
方位角 長度 NAD83 z16 東方 NAD83 z16 北方 海拔
TK23-135 255 -45 159.0 605223.1 5444267 40
TK23-136 222 -45 153.0 605489.9 5443376 44
TK23-137 169.6 -45 150.0 606280.3 5443071 57
TK23-138 125 -80 30.5 606197.1 5442929 73
TK23-139 190.2 -45 81.4 606195.4 5442913 48
TK23-140 227.9 -45 171.0 605600.3 5443025 54
TK23-141 166.1 -45 150.0 605610.1 5443011 24
TK23-142 175.1 -45 126.0 606668.3 5443074 101
TK23-143 194.8 -70.1 102.5 605806.8 5443076 92
TK23-144 134.4 -45 120.0 606040.7 5435975 32
声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論