share_log

ATEX Announces Completion of ATXD25 Confirming Continuity of Mineralized Porphyry 200 Metres West of Previous Drilling and Between Central and Western Trends

ATEX Announces Completion of ATXD25 Confirming Continuity of Mineralized Porphyry 200 Metres West of Previous Drilling and Between Central and Western Trends

ATEX 宣布完成 ATXD25,证实了矿化斑岩在先前钻探以西 200 米处以及中西部趋势之间的连续性
newsfile ·  03/21 07:00

Toronto, Ontario--(Newsfile Corp. - March 21, 2024) - ATEX Resources Inc. (TSXV: ATX) ("ATEX" or the "Company") is pleased to announce the completion of ATXD25, the fourth hole from its Phase IV drill campaign at the Valeriano Copper-Gold Project ("Valeriano" or the "Project") located in Atacama Region, Chile.

安大略省多伦多--(Newsfile Corp.-2024 年 3 月 21 日)- ATEX Resources Inc.(多伦多证券交易所:ATX) (”ATEX“或者”公司“)很高兴地宣布 ATXD25 已经完成,这是其在瓦莱里亚诺铜金项目第四阶段钻探活动的第四个洞(”瓦莱里亚诺“或者”项目“) 位于智利阿塔卡马地区。

Highlights include:

亮点包括:

  • ATXD25 intersected mineralized Early Porphyry ("EP") from 1,550 metres downhole and remained in mineralized EP until the hole was terminated at 2,208.2 metres.

    • ATXD25 confirmed the presence of EP 200 metres west of the EP intersected in ATXD11B (1,342.5m of 0.73% Copper Equivalent "CuEq" (0.46% Cu, 0.31 g/t Au, 43 g/t Mo), see Company news dated March 30, 2023 "ATEX Intersects 0.73% CuEq over 1,342.5m in Longest Intersection to Date at Valeriano").

    • And confirmed continuity of mineralized EP in the gap between the Western and Central Trend (Figure 1 & Figure 2).

  • Additionally, ATXD17B was completed early at a depth of 1,671 metres after deviating further south than anticipated and intersecting bad ground. This resulted in the hole exiting the target corridor.

  • ATEX currently has three rigs actively drilling on the project with holes ATXD25A, ATXD26 and ATXD27 currently underway with the aim of testing for continuity of mineralized porphyry between the currently modelled EP trends and extending mineralization further along strike to the north (Figure 2).

  • Results for ATXD25 are expected in mid to late April.

  • ATXD25 从井下 1,550 米处穿过矿化的早期斑岩(“EP”),一直处于矿化极压中,直到钻孔在 2,208.2 米处终止。

    • ATXD25 证实了在 ATXD11B(铜当量为 0.73% 的 1342.5 米 “CueQ”)相交的 EP 以西 200 米处存在 EP (0.46% 铜,0.31 克/吨金,43 克/吨钼粉), 参见公司2023年3月30日的新闻 “ATEX在瓦莱里亚诺迄今为止最长的十字路口与0.73%的CUeQ相交,超过13.425米”)。

    • 并证实了西部和中部趋势之间的差距中矿化极压的连续性(图 1 和图 2)。

  • 此外,ATXD17B 在向南偏离的距离比预期更远并与糟糕的地面相交之后,很早就完成了 1,671 米的深度。这导致该洞离开目标走廊。

  • ATEX 目前有三台钻机正在该项目上积极钻探,其中 ATXD25A、ATXD26 和 ATXD27 钻孔目前正在进行中,目的是测试矿化斑岩在当前模拟的极压趋势之间的连续性,并沿着走向进一步向北延伸矿化(图 2)。

  • ATXD25 的结果预计将在 4 月中旬至下旬公布。

"Hole ATXD25 is an incredibly exciting hole for us," stated Raymond Jannas, President and CEO of ATEX. "It achieved three notable objectives: firstly confirming the continuity of mineralized EP to the west of existing drilling, secondly, closing in the gap between the Western and Central trend porphyry units, and thirdly, delivering 660 metres of continuous mineralized EP. We are excited to continue to expand on what we have learned from ATXD25 in ATXD25A and seek to expand this trend even further north and west in upcoming drilling."

ATEX总裁兼首席执行官雷蒙德·詹纳斯表示:“ATXD25 洞对我们来说是一个非常令人兴奋的洞。”“它实现了三个值得注意的目标:首先确认现有钻探以西的矿化极压的连续性;第二,缩小西部和中部趋势斑岩单元之间的差距;第三,交付660米的连续矿化极压。我们很高兴能继续扩展我们在 ATXD25A 中从 ATXD25 中学到的知识,并寻求在即将到来的钻探中将这一趋势进一步扩大到北部和西部。”

Figure 1. Cross-section through trends with 2023 MRE interpretation

图 1。利用 2023 年 MRE 解读纵览趋势

Figure 2. March, 2024: Evolving interpretation of NNW trending Early Porphyry corridor

图 2。2024 年 3 月:对 NNW 趋势的早期斑岩走廊的解释不断演变

QAQC

QAQC

Drill holes are collared with a PQ drill bit, reduced to HQ and, sequentially, to NQ as the drill holes progressed deeper. Drill core produced by the drill rigs was extracted from the core tubes by the drill contractor under the supervision of ATEX employees, marked for consistent orientation and placed in core boxes with appropriate depth markers added. Full core boxes were then sealed before being transported by ATEX personnel to the Valeriano field camp. Core at the field camp is processed, quick logged, checked for recovery, photographed, and marked for specific gravity, geotechnical studies and for assays. From camp, the core is transferred to a secure core-cutting facility in Vallenar, operated by IMG, a third-party consultant. Here, the core trays are weighed before being cut using a diamond saw under ATEX personnel oversight. ATEX geologists working at this facility double-check the selected two-metre sample intervals, placing the samples in seal bags and ensuring that the same side of the core is consistently sampled. Reference numbers are assigned to each sample and each sample is weighed. The core trays with the remaining half-core are weighed and photographed. Additionally, core logs are updated, and specific gravity and geotechnical samples are collected. The remaining core is stored in racks at the Company's secure facility in Vallenar.

钻孔用 PQ 钻头开孔,钻孔缩小到总部,随着钻孔的深入,依次缩减到 NQ。钻机生产的钻芯由钻探承包商在ATEX员工的监督下从岩心管中提取,标记方向一致,然后放入岩心盒中,并添加了适当的深度标记。然后,完整的核心箱被密封,然后由ATEX人员运送到瓦莱里亚诺野战营地。野战营地的岩心经过处理、快速记录、检查是否恢复、拍照,并标记用于比重、岩土工程研究和化验。核心资源从营地转移到位于瓦莱纳尔的一个安全的切芯设施,该设施由第三方顾问IMG运营。在这里,在ATEX人员的监督下使用金刚石锯切割岩芯托盘之前,先对芯盘进行称重。在该设施工作的ATEX地质学家仔细检查选定的两米采样间隔,将样品放入密封袋中,并确保岩心同一侧的采样始终如一。为每个样本分配参考编号,并对每个样本进行称重。对带有剩余半芯的核心托盘进行称重并拍照。此外,还更新了岩心日志,收集了比重和岩土工程样本。剩余的核心存储在公司位于瓦莱纳尔的安全设施的机架中。

From Vallenar samples are sent to an ALS preparation facility in La Serena. ALS is an accredited laboratory which is independent of the Company. The prepared samples were sent to the ALS assay laboratories in either Santiago, Chile and Lima, Peru for gold (Au-AA24), copper (Cu-AA62), molybdenum (Mo-AA62) and silver (Ag-AA62) assays as well as and multi-element ICP (ME-MS61) analysis. No data quality problems were indicated by the QA/QC program.

来自瓦莱纳尔的样本被送到拉塞雷纳的肌萎缩性侧索硬化症制备设施。ALS 是一家独立于公司的经认证的实验室。准备好的样本被送往智利圣地亚哥和秘鲁利马的肌萎缩性侧索硬化症分析实验室进行金(Au-AA24)、铜(cu-aa62)、钼(mo-aa62)和银(Ag-AA62)的测定以及多元素ICP(ME-MS61)分析。质量保证/质量控制计划未发现任何数据质量问题。

Qualified Person

合格人员

Mr. Ben Pullinger, P.Geo., registered with the Professional Geoscientists Ontario, is the Qualified Person, as defined by National Instrument 43-101 - Standards for Disclosure for Mineral Projects, for the Valeriano Copper Gold Porphyry Project. Mr. Pullinger is not considered independent under NI 43-101 as he is Senior Vice President Exploration and Business Development of ATEX. He has reviewed and approved the disclosure of the scientific and technical information contained in this press release.

根据国家仪器 43-101 的定义,在安大略省专业地球科学家协会注册的 P.Geo. Ben Pullinger 先生是合格人员- 矿产项目披露标准,用于瓦莱里亚诺铜金斑岩项目。根据NI 43-101,Pullinger先生不被视为独立人士,因为他是ATEX勘探和业务发展高级副总裁。他已审查并批准了本新闻稿中包含的科学和技术信息的披露。

About ATEX

关于 ATEX

ATEX is exploring the Valeriano Copper Gold Project which is located within the emerging copper gold porphyry mineral belt linking the prolific El Indio High-Sulphidation Belt to the south with the Maricunga Gold Porphyry Belt to the north. This emerging belt, informally referred to as the Link Belt, hosts several copper gold porphyry deposits at various stages of development including, Filo del Sol (Filo Mining), Josemaria (Lundin Mining), Los Helados (NGEX Minerals/JX Nippon), La Fortuna (Teck Resources/Newmont) and El Encierro (Antofagasta/Barrick Gold).

ATEX正在探索瓦莱里亚诺铜金项目,该项目位于新兴的铜金斑岩矿带内,将多产的埃尔印第奥高硫化带与北部的马里昆加金斑岩带连接起来。这个新兴的矿带被非正式地称为链接带,拥有多个处于不同开发阶段的铜金斑岩矿床,包括Filo del Sol(Filo Mining)、Josemaria(伦丁矿业)、洛斯赫拉多斯(NGEX Minerals/Jx Nippon)、La Fortuna(Teck Resources/Newmont)和El Encierro(Antofagasta/Barrick Gold)。

Valeriano hosts a large copper gold porphyry resource: 1.41 billion tonnes at 0.67% CuEq (0.50% Cu, 0.20 g/t Au, 0.96 g/t Ag and 63.80 g/t Mo), which includes a higher-grade core totaling 200 million tonnes at 0.84% CuEq (0.62% Cu, 0.29 g/t Au 1.25 g/t Ag and 55.7 g/t Mo), reported in September 20231.

瓦莱里亚诺拥有大量铜金斑岩资源:14.1亿吨,铜当量为 0.67%(0.50% 铜、0.20 克/吨金、0.96 克/吨银和 63.80 克/吨 Mo),其中包括总量为 0.84% cueQ(0.62% 铜、0.29 g/t Au、1.25 g/t Mo 和 55.7 g/t Mo)的更高品位岩心,2023 年 9 月公布1

For further information, please contact:
Raymond Jannas,
President and CEO
Email: rjannas@atexresources.com

欲了解更多信息,请联系:
雷蒙德·詹纳斯
总裁兼首席执行官
电子邮件:rjannas@atexresources.com

Ben Pullinger,
Senior Vice President of Exploration and Business Development
Email: bpullinger@atexresources.com

本·普林格,
勘探与业务发展高级副总裁
电子邮件:bpullinger@atexresources.com

1-647-287-3778
or visit ATEX's website at

1-647-287-3778
或者访问 ATEX 的网站,网址为

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS:

关于前瞻性陈述的警示性说明:

This news release contains forward-looking statements, including predictions, projections, and forecasts. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "planning", "expects" or "does not expect", "continues", "scheduled", "estimates", "forecasts", "intends", "potential", "anticipates", "does not anticipate", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, prediction, projection, forecast, performance or achievements expressed or implied by the forward-looking statements.

本新闻稿包含前瞻性陈述,包括预测、预测和预测。通常,前瞻性陈述可以通过使用 “计划”、“规划”、“期望” 或 “不期望”、“继续”、“计划”、“估计”、“预测”、“打算”、“潜在”、“预期”、“不预期” 等词语来识别,或者描述 “目标”,或者这些词汇和短语的变体或声明 “某些行动、事件或结果” 可以”、“可以”、“会”、“可以”、“可以”、“可以” 或 “将” 会被采取、发生或实现。前瞻性陈述涉及已知和未知的风险、未来事件、条件、不确定性和其他因素,这些因素可能导致实际业绩、业绩或成就与前瞻性陈述所表达或暗示的任何未来业绩、预测、预测、业绩或成就存在重大差异。

Such forward-looking statements include, among others: plans for the evaluation of exploration properties including the Valeriano Copper Gold Project; the success of evaluation plans; the success of exploration activities especially to the significant expansion of the high-grade corridor; mine development prospects; potential for future metals production; changes in economic parameters and assumptions; all aspects related to the timing and extent of exploration activities including the Phase IV drill program contemplated in this press release; timing of receipt of exploration results; the interpretation and actual results of current exploration activities and mineralization; changes in project parameters as plans continue to be refined; the results of regulatory and permitting processes; future metals price; possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; labour disputes and other risks of the mining industry; the results of economic and technical studies; delays in obtaining governmental and local approvals or financing or in the completion of exploration; timing of assay results; as well as those factors disclosed in ATEX's publicly filed documents.

此类前瞻性陈述包括:评估包括瓦莱里亚诺铜金项目在内的勘探财产的计划;评估计划的成功;勘探活动的成功,尤其是高品位走廊的大幅扩建的勘探活动的成功;矿山开发前景;未来金属生产的潜力;经济参数和假设的变化;与勘探活动时间和范围有关的所有方面,包括本新闻稿中考虑的第四阶段钻探计划;收到的时间安排勘探结果;对当前勘探活动和矿化的解释和实际结果;计划不断完善后项目参数的变化;监管和许可程序的结果;未来金属价格;品位或回收率可能的变化;设备或工艺未能按预期运行;采矿业的劳资纠纷和其他风险;经济和技术研究的结果;延迟获得政府和地方批准或融资或完成勘探时机;的化验结果;以及ATEX公开提交的文件中披露的那些因素。

Although ATEX has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

尽管ATEX试图确定可能导致实际行动、事件或结果与前瞻性陈述中描述的有重大差异的重要因素,但可能还有其他因素导致行动、事件或结果与预期、估计或预期不符。无法保证前瞻性陈述会被证明是准确的,因为实际结果和未来事件可能与此类陈述中的预期存在重大差异。因此,读者不应过分依赖前瞻性陈述。

Neither the TSX Venture Exchange nor its regulation services provider has reviewed or accepts
responsibility for the adequacy or accuracy of the content of this news release.

多伦多证券交易所风险交易所及其监管服务提供商均未审查或接受
对本新闻稿内容的充分性或准确性负责。


1 Please see NI 43-101 technical report titled "Independent Technical Report for the Valeriano Copper-Gold Project, Atacama Region, Chile" by Joled Nur, CCCRRM-Chile, and David Hopper, CGeol, with an effective date of September 1, 2023, available at and for additional details on the 2023 Mineral Resource Estimate for the Valeriano project.

1 请参阅智利CCCRRM的Joled Nur和CGeol的David Hopper撰写的题为 “智利阿塔卡马地区瓦莱里亚诺铜金项目独立技术报告” 的NI 43-101技术报告,生效日期为2023年9月1日,网址为 以及有关瓦莱里亚诺项目2023年矿产资源估算的更多详细信息。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发