Kuya Silver Provides Update on Mine Start-Up and Uncovers New Major Silver-Mineralized Vein Zone South of the Bethania Mine, Peru

Kuya Silver Provides Update on Mine Start-Up and Uncovers New Major Silver-Mineralized Vein Zone South of the Bethania Mine, Peru

Kuya Silver 提供了矿山启动的最新情况,并在秘鲁伯塔尼亚矿以南发现了新的主要银矿化矿脉带
newsfile ·  04/23 08:00

Kuya Targeting Commencement of Production at Bethania in H1 2024

Kuya 的目标是在 2024 年上半年在 Bethania 开始生产

Toronto, Ontario--(Newsfile Corp. - April 23, 2024) - Kuya Silver Corporation (CSE: KUYA) (OTCQB: KUYAF) (FSE: 6MR1) (the "Company" or "Kuya Silver") is pleased to discuss ongoing development and reconditioning of the underground workings of the Bethania Mine, Peru, in preparation for mine reopening, and to present high-grade silver assay results from the Tito PH area, a newly identified 630+ metre, strongly mineralized vein zone which is located 1.5 km south of the Bethania Mine.

安大略省多伦多--(Newsfile Corp.,2024 年 4 月 23 日)——Kuya Silver Corporation(CSE:KUYA)(场外交易代码:KUYAF)(FSE:6MR1)(the”公司“或”库亚·西尔弗“)很高兴讨论秘鲁贝塔尼亚矿地下作业的持续开发和修复,为矿山的重新开放做准备,并介绍铁托PH区的高品位银化验结果。铁托PH区是一个新发现的630多米的强矿化脉带,位于贝塔尼亚矿以南1.5公里处。

Highlights:

亮点:

  • Bethania Mine Prepares for Resumption of Operations
    • Underground development and reconditioning is progressing well and within budget with more than 550 m prepared for operation underground.
    • Significant improvements have been made to the above-ground infrastructure.
    • Bethania Mine progressing towards commencement of production in H1 2024
  • Bethania 矿为恢复运营做准备
    • 地下开发和修复进展顺利,预算范围之内,超过550米已准备好进行地下作业。
    • 对地上基础设施进行了重大改进。
    • Bethania 矿正朝着2024年上半年开始生产的方向迈进
  • Large, newly recognized vein system, known as Tito PH, is located 1.5 km south of the Bethania Mine and hosts at least 6 mineralized veins. A single vein was traced for 630 m in length and remains open along strike:
    • Widespread and high-grade mineralization identified in 39 grab samples of veins and blast pits
    • Up to 2,085 g/t Ag Eq in samples with 12 of 39 reporting more than 1,000 g/t AgEq* and
    • Tito PH appears to be comparable in size, grade and number of veins, with a similar structural setting to the Bethania Mine property
  • 新发现的大型矿脉系统,名为 Tito PH,位于 Bethania 矿以南 1.5 公里处,拥有至少 6 条矿化矿脉。追踪到一条长度为 630 m 的单条静脉,并在行进过程中保持开放状态:
    • 在 39 份矿脉和爆炸坑采集样本中发现了广泛的高品位矿化
    • 样本中银当量高达 2,085 g/t,39 个样本中有 12 个报告的银当量超过 1,000 g/t * 以及
    • 铁托 PH 矿脉的大小、等级和矿脉数量似乎相当,其结构设置与 Bethania Mine 地产相似
  • At Carmelitas Norte, an additional 35 samples have confirmed silver mineralization and identified high-grade gold mineralization
    • Up to 1,211 g/t silver equivalent, with 12 samples in excess of 500 g/t AgEq*
    • High-grade gold zone identified including 5.47 g/t and 5.07 g/t gold within a larger 50 m interval with all sampling >0.5 g/t gold along trend
  • 在 Carmelitas Norte,另有 35 个样本证实了银矿化并确定了高品位的金矿化
    • 高达 1,211 g/t 的银当量,12 个样品的年龄超过 500 g/t AgeQ*
    • 已确定的高品位金区包括较大的 50 m 间隔内的 5.47 g/t 和 5.07 g/t 的黄金,沿趋势所有采样均大于 0.5 g/t 的黄金
  • Kuya Silver to present a Bethania Mine update on Thursday, April 25th at 11:00 am PT / 2:00 pm ET.
    • Webinar Registration:
  • Kuya Silver 将于 4 月 25 日星期四发布 Bethania Mine 的最新消息第四 太平洋时间上午 11:00 /美国东部时间下午 2:00。
    • 网络研讨会注册:

Christian Aramayo, Kuya Silver's COO, commented: "We are very pleased with the progress made so far in redeveloping the Bethania Mine, which is advancing well and within budget (Figure 1). Our team in Peru is eager and excited to resume mining production in the coming months, which will be just the beginning for this project. Over the next year, we aim to incrementally ramp up production while prioritizing safety and targeting sustainable mining practices."

Kuya Silver首席运营官克里斯蒂安·阿拉马约评论说:“我们对迄今为止在重建Bethania矿方面取得的进展感到非常满意,该矿进展顺利,且在预算范围内(图1)。我们在秘鲁的团队渴望和兴奋地在未来几个月内恢复采矿生产,这将仅仅是该项目的开始。明年,我们的目标是逐步提高产量,同时将安全作为优先事项,以可持续采矿方式为目标。”

David Lewis, Kuya Silver's VP Exploration, remarked, "In conjunction with the Bethania mine work, our exploration efforts are reinforcing the district scale potential of this property (Figure 2). Early-stage work at our new Tito PH prospect is extremely encouraging, especially given the similar grades, dimensions and vein density to the Bethania mine site. Our current understanding suggests that the Tito PH zone is a parallel zone to the mineralization at the Bethania Mine, with potential for new mineralized veins between the two, and this updated understanding hints at a far larger mineralized system than the current mineral estimate at the Bethania Mine. I look forward to continued exploration work to expand the scale of silver mineralization in the Bethania district."

库亚·西尔弗勘探副总裁大卫·刘易斯表示:“结合贝塔尼亚矿山的工作,我们的勘探工作正在增强该地产的区域规模潜力(图2)。我们新的铁托PH勘探区的早期工作非常令人鼓舞,特别是考虑到其品位、尺寸和矿脉密度与Bethania矿址相似。我们目前的理解表明,铁托PH区与Bethania矿的矿化区平行地带,两者之间有可能出现新的矿化矿脉,而这种更新的理解表明,矿化系统比Bethania矿目前的矿物估计要大得多。我期待继续进行勘探工作,以扩大Bethania地区的银矿化规模。”


Figure 1: Photograph of underground rehabilitation work currently being done at the Bethania silver mine, Peru. Here, workers are transporting support timbers though a newly-reconditioned section of the mine.


图 1:秘鲁贝塔尼亚银矿目前正在进行的地下修复工作的照片。在这里,工人们正在通过矿山新修复的部分运送支撑木材。

Bethania Mine development and reconditioning progress

Bethania 矿山开发和修复进展

Reconditioning of the Bethania mine workings in preparation for production is progressing well, with 550 m of lateral workings on the 12 de Mayo vein system being the current focus (Figure 1). This work is being done in advance of mine development and new production, which is within budget, and targeting re-opening in the next few months. Development of access for stopes within the Española and Victoria vein systems will continue as production commences and ramps up. In addition to underground development, important progress has been made to improve surface infrastructure including warehouses, enhancement of accommodation facilities, optimizing connectivity and preparation of ancillary areas for production.

为生产做准备的 Bethania 矿井的修复进展顺利,目前的重点是在 12 de Mayo 矿脉系统上进行 550 m 的横向作业(图 1)。这项工作是在矿山开发和新生产之前完成的,这在预算范围内,并计划在未来几个月内重新开放。随着生产的开始和增加,将继续开发埃斯帕诺拉和维多利亚矿脉系统内的停靠点。除地下开发外,在改善地面基础设施,包括仓库、改善住宿设施、优化连通性和准备生产辅助区域方面也取得了重要进展。

Target
Area
Sample
ID
Sample
Location
Ag
g/t
Au
g/t
Cu
%
Pb
%
Zn
%
AgEq*
g/t
AgEq*
oz/t
Tito PH 1071 Blast pit/muckpile 195 0.05 0.2 7.6 12.5 794 25.5
1073 Blast pit/muckpile 632 0.04 0.0 >20.0** 3.2 1,212 39.0
1078 Vein 490 0.03 0.0 19.1 0.7 969 31.2
1081 Vein 338 0.09 0.6 8.7 20.8 1,267 40.7
1083 Blast pit/muckpile 167 0.15 0.2 8.4 >30.0** 1,334 42.9
1087 Blast pit/muckpile 883 0.47 0.3 19.9 2.7 1,511 48.6
1088 Blast pit/muckpile 837 0.16 0.3 >20.0** 8.6 1,622 52.2
1090 Vein 94 0.06 0.1 7.3 16.7 803 25.8
1091 Blast pit/muckpile 241 0.09 0.1 18.6 24.6 1,464 47.1
1092 Blast pit/muckpile 94 0.13 0.2 4.2 21.3 886 28.5
1093 Blast pit/muckpile 183 0.06 0.3 8.3 20.2 1,042 33.5
1096 Blast pit/muckpile 629 0.23 0.8 >20.0** 5.7 1,385 44.5
1099 Blast pit/muckpile 712 0.07 0.1 >20.0** 7.2 1,422 45.7
1108 Blast pit/muckpile 352 0.15 0.2 9.6 18.3 1,189 38.2
1109 Blast pit/muckpile 906 0.11 0.7 >20.0** 20.0 2,085 67.0
1110 Blast pit/muckpile >1,500** 0.08 0.1 >20.0** 1.4 2,038 65.5
Carmelitas
Norte
1116 Vein 143 5.07 0.0 1.5 4.1 738 23.7
1117 Vein 145 5.47 0.0 0.6 2.6 702 22.6
1121 Vein 232 0.82 0.0 2.6 7.4 594 19.1
1122 Vein 419 0.00 0.0 3.6 7.8 750 24.1
1124 Blast pit/muckpile 398 0.01 0.0 2.4 13.4 874 28.1
1126 Vein 741 0.00 0.0 4.9 11.2 1,211 38.9
1127 Vein 319 0.88 0.1 5.4 9.7 836 26.9
1128 Vein 377 0.12 0.0 1.5 6.4 623 20.0
1129 Vein 80 0.01 0.0 5.8 9.1 502 16.1
1140 Vein 324 0.04 0.0 3.1 6.6 606 19.5
1142 Vein 334 0.23 0.0 2.2 6.7 615 19.8
1144 Vein 143 0.20 0.0 0.9 13.0 588 18.9
目标
区域
示例
身份证
示例
地点
Ag
g/t
Au
g/t

%
Pb
%

%
AgeQ*
g/t
AgeQ*
盎司/吨
铁托 PH 1071 爆炸坑/垃圾堆 195 0.05 0.2 7.6 12.5 794 25.5
1073 爆炸坑/垃圾堆 632 0.04 0.0 >20.0** 3.2 1,212 39.0
1078 静脉 490 0.03 0.0 19.1 0.7 969 31.2
1081 静脉 338 0.09 0.6 8.7 20.8 1,267 40.7
1083 爆炸坑/垃圾堆 167 0.15 0.2 8.4 >30.0** 1,334 42.9
1087 爆炸坑/垃圾堆 883 0.47 0.3 19.9 2.7 1,511 48.6
1088 爆炸坑/垃圾堆 837 0.16 0.3 >20.0** 8.6 1,622 52.2
1090 静脉 94 0.06 0.1 7.3 16.7 803 25.8
1091 爆炸坑/垃圾堆 241 0.09 0.1 18.6 24.6 1,464 47.1
1092 爆炸坑/垃圾堆 94 0.13 0.2 4.2 21.3 886 28.5
1093 爆炸坑/垃圾堆 183 0.06 0.3 8.3 20.2 1,042 33.5
1096 爆炸坑/垃圾堆 629 0.23 0.8 >20.0** 5.7 1,385 44.5
1099 爆炸坑/垃圾堆 712 0.07 0.1 >20.0** 7.2 1,422 45.7
1108 爆炸坑/垃圾堆 352 0.15 0.2 9.6 18.3 1,189 38.2
1109 爆炸坑/垃圾堆 906 0.11 0.7 >20.0** 20.0 2,085 67.0
1110 爆炸坑/垃圾堆 >1,500** 0.08 0.1 >20.0** 1.4 2,038 65.5
卡梅利塔斯
Norte
1116 静脉 143 5.07 0.0 1.5 4.1 738 23.7
1117 静脉 145 5.47 0.0 0.6 2.6 702 22.6
1121 静脉 232 0.82 0.0 2.6 7.4 594 19.1
1122 静脉 419 0.00 0.0 3.6 7.8 750 24.1
1124 爆炸坑/垃圾堆 398 0.01 0.0 2.4 13.4 874 28.1
1126 静脉 741 0.00 0.0 4.9 11.2 1,211 38.9
1127 静脉 319 0.88 0.1 5.4 9.7 836 26.9
1128 静脉 377 0.12 0.0 1.5 6.4 623 20.0
1129 静脉 80 0.01 0.0 5.8 9.1 502 16.1
1140 静脉 324 0.04 0.0 3.1 6.6 606 19.5
1142 静脉 334 0.23 0.0 2.2 6.7 615 19.8
1144 静脉 143 0.20 0.0 0.9 13.0 588 18.9

Table 1: Assay data for grab samples of veins and vein material from blast pits, Tito PH and Carmelitas Norte area. *Silver Equivalency (AgEq) was calculated using silver ($28.30 USD/troy oz), gold ($2,383.70 USD/troy oz), copper ($9,582.50 USD/tonne), lead ($2,155.50 USD/tonne) and zinc ($2,839.00 USD/tonne) values, obtained on April 18, 2024, and do not consider metal recovery. **Samples were processed with overlimit ranges of >200 to 1,500 g/t silver, >10 to 20% lead, and >10 to 30% zinc; some grab samples exceeded these new limits and were not processed further. See Quality Assurance and Quality Control section for further details.

表 1:从爆炸坑、Tito PH 和 Carmelitas Norte 地区采集静脉和静脉物质样本的化验数据。*白银等价物(AgeQ)是使用2024年4月18日获得的银(28.30美元/金衡盎司)、黄金(2,383.70美元/金衡盎司)、铜(9,582.50美元/吨)、铅(2,155.50美元/吨)和锌(2,839.00美元/吨)价值计算得出的,不考虑金属回收。**样品的处理超限范围为>200至1,500克/吨银,>10%至20%的铅,>10%至30%的锌;一些抽取样本超过了这些新限值,未经进一步处理。有关更多详细信息,请参阅 “质量保证和质量控制” 部分。

Tito PH Prospect Signficantly Expands Known Mineralization in the Bethania District

Tito PH Prospect 显著扩大了 Bethania 地区的已知矿化范围

Mapping and sampling was done on two target areas (Tito PH and Carmelitas Norte) near the Bethania Mine. The grades, dimensions and density of veins at both of these target areas are extremely promising, as they are comparable to the Bethania mine site. Interestingly, the Bethania/Tito PH and Carmelitas Main/Norte targets appear to be mirrored mineralized structures within the larger 7 by 15 km Bethania volcanic basin.

在伯塔尼亚矿附近的两个目标区域(铁托PH和北卡梅利塔斯)进行了测绘和采样。这两个目标区域的矿脉等级、尺寸和密度都非常有希望,因为它们与伯塔尼亚矿场相当。有趣的是,Bethania/Tito PH和Carmelitas Main/Norte的目标似乎是更大的7 x 15千米的贝塔尼亚火山盆地内的镜像矿化结构。

The Tito PH zone was previously documented by Peruvian government geologists and hosts some artisanal workings, including trenching, blast pits and two small adits, but was only recently identified as an exploration target by Kuya Silver. Six mineralized veins were traced and sampled on surface, with the longest vein being traced for 630 m and remaining open along strike (note that the entire Bethania mineral resource occupies a strike length of approximately 500 m; see news release dated January 6, 2022). Veins and vein material from blast pits were sampled and assay data is presented in Table 1, with 16 of 39 samples yielding in excess of 500 g/t AgEq*. The area appears to host a series of relatively tightly spaced (300-400 m) parallel faults with associated veins (Figure 2), which may host additional undiscovered veins. Very importantly, early-stage work suggests that these mineralizing faults repeat across strike to the north and are part of a larger system that includes the Bethania mine site.

秘鲁政府地质学家此前曾记录过铁托PH区,这里有一些手工作业,包括挖沟、爆炸坑和两个小型通道,但直到最近才被Kuya Silver确定为勘探目标。在地表追踪了六条矿化矿脉并进行了采样,其中最长的矿脉追踪了630米,并且沿着走向一直保持开放状态(请注意,整个伯塔尼亚矿产资源的走向长度约为500米;见2022年1月6日的新闻稿)。对爆炸坑中的静脉和静脉物质进行了采样,分析数据如表 1 所示,39 个样本中 16 个样本的产量超过 500 g/t AgeQ*。该区域似乎存在一系列间隔相对紧密(300-400 m)的平行断层以及相关的静脉(图 2),这些断层可能存在其他未被发现的静脉。非常重要的是,早期研究表明,这些矿化断层向北反复出现,是包括Bethania矿址在内的更大系统的一部分。

Mineralization was first documented at the Carmelitas Norte target zone by Kuya Silver geologists in 2022 (see November 17, 2022 news release), but mapping and sampling did not fully characterize the surface expression of veins. This area was mapped and sampled in more detail (Figure 2), and 12 of 35 samples yielded in excess of 500 g/t AgEq* (Table 1).

Kuya Silver的地质学家于2022年首次记录了北方卡梅利塔斯目标区的矿化情况(见2022年11月17日新闻稿),但测绘和采样并未完全描述矿脉的表面表达。对该区域进行了更详细的测绘和采样(图 2),在 35 个样本中,有 12 个样本的产量超过 500 g/t AgeQ*(表 1)。


Figure 2: Regional map of the Bethania Project area, with detailed maps of recent sampling at the Tito PH and Carmelitas Norte areas.


图 2:Bethania Project 区域的区域地图,包括最近在 Tito PH 和 Carmelitas Norte 地区采样的详细地图。

Bethania Mine Webinar

Bethania 矿山网络研讨会

The Company is also pleased to announce that President and CEO, David Stein, and COO, Christian Aramayo, will be presenting the latest update from the Bethania Mine in a live webinar taking place on Thursday, April 25th at 11 am PT / 2 pm ET. To register for the event please click the link below.

公司还高兴地宣布,总裁兼首席执行官戴维·斯坦和首席运营官克里斯蒂安·阿拉马约将在太平洋时间4月25日星期四上午11点/美国东部时间下午2点举行的网络研讨会直播中介绍伯塔尼亚矿的最新情况。要注册该活动,请点击下面的链接。

Registration:

注册:

Quality Assurance and Quality Control

质量保证和质量控制

A total of 74 grab samples (plus QA/QC) were collected in January and February 2024. The coordinates of the locations of each sample were measured by handheld GPS and the samples dispatched to the ALS Peru S.A. laboratory in Lima for geochemical analysis. The analyses were carried out using the following methods: ME-OG61a - Multi-acid digestion and ICP-AES detection for 33 elements, Au-AA23 - Fire Assay, and Ag-OG62 - four acid digestion and ICP-AES for overlimit silver. ALS Peru S.A. laboratory in Lima has international certifications OHSAS 18001, ISO 14001 and ISO 9001 and is accredited by INACAL under the NTP-ISO / IEC 17025.

2024年1月和2月,共收集了74份抽样样本(加上质量保证/质量控制)。使用手持式全球定位系统测量了每个样本位置的坐标,并将样本送往位于利马的ALS Peru S.A. 实验室进行地球化学分析。这些分析是使用以下方法进行的:me-OG61a——对33种元素进行多酸消化和ICP-AES检测,Au-AA23——火试验,ag-OG62——四酸消化和ICP-AES检测超限银。位于利马的 ALS 秘鲁 S.A. 实验室拥有 OHSAS 18001、ISO 14001 和 ISO 9001 国际认证,并获得了 INACAL 在 NTP-ISO/IEC 17025 下的认证。

All QA/QC standards were acceptable and within two standard deviations of certified values.

所有质量保证/质量控制标准均可接受,且与认证值相差不超过两个标准差。

*Silver Equivalency (AgEq) was calculated using silver ($28.30 USD/troy oz), gold ($2,383.70 USD/troy oz), copper ($9,582.50 USD/tonne), lead ($2,155.50 USD/tonne) and zinc ($2,839.00 USD/tonne) values, obtained on April 18, 2024, and do not consider metal recovery.

*白银等价物(AgeQ)是使用2024年4月18日获得的银(28.30美元/金衡盎司)、黄金(2,383.70美元/金衡盎司)、铜(9,582.50美元/吨)、铅(2,155.50美元/吨)和锌(2,839.00美元/吨)价值计算得出的,不考虑金属回收。

** Samples were processed with overlimit ranges of >200 to 1,500 g/t silver, >10 to 20% lead, and >10 to 30% zinc and some grab samples exceeded these new limits and were not processed further. As these samples were early-stage grab samples and do not include details on vein width, they are not fully representative of total vein mineralization. Channel saw sampling, which will be deployed in subsequent programs and which will sample the entire width of vein, is more representative of mineralization.

** 样品的处理超限范围为>200至1,500克/吨银,>10%至20%,锌含量>10%至30%,一些抽取样品超过了这些新限值,未经进一步处理。由于这些样本是早期采集样本,不包括矿脉宽度的细节,因此它们不能完全代表矿脉总矿化。通道锯采样将在后续计划中部署,并将对矿脉的整个宽度进行采样,它更能代表矿化。

National Instrument 43-101 Disclosure

国家仪器 43-101 披露

The technical content of this news release has been reviewed and approved by Mr. David Lewis, P.Geo., Vice President Exploration of Kuya Silver and a Qualified Person as defined by National Instrument 43-101.

本新闻稿的技术内容已由P.Geo大卫·刘易斯先生、Kuya Silver勘探副总裁和National Instrument 43-101定义的合格人员的审查和批准。

About Kuya Silver Corporation

关于 Kuya Silver 公司

Kuya Silver is a Canadian‐based mineral exploration and development company with a focus on acquiring, exploring, and advancing precious metals assets in Peru and Canada.

Kuya Silver 是一家总部位于加拿大的矿产勘探和开发公司,专注于收购、勘探和开发秘鲁和加拿大的贵金属资产。

For more information, please contact:

欲了解更多信息,请联系:

David Stein, President and Chief Executive Officer
Telephone: (604) 398‐4493
info@kuyasilver.com

大卫·斯坦,总裁兼首席执行官
电话:(604) 398-4493
info@kuyasilver.com

Reader Advisory

读者咨询

This news release contains statements that constitute "forward-looking information," including statements regarding the plans, intentions, beliefs, and current expectations of the Company, its directors, or its officers with respect to the future business activities of the Company. The words "may," "would," "could," "will," "intend," "plan," "anticipate," "believe," "estimate," "expect," "must," "next," "propose," "new," "potential," "prospective," "target," "future," "verge," "favourable," "implications," and "ongoing," and similar expressions, as they relate to the Company or its management, are intended to identify such forward-looking information. Investors are cautioned that statements including forward-looking information are not guarantees of future business activities and involve risks and uncertainties, and that the Company's future business activities may differ materially from those described in the forward-looking information as a result of various factors, including but not limited to fluctuations in market prices, successes of the operations of the Company, continued availability of capital and financing, and general economic, market, and business conditions. There can be no assurances that such forward-looking information will prove accurate, and therefore, readers are advised to rely on their own evaluation of the risks and uncertainties. The Company does not assume any obligation to update any forward-looking information except as required under the applicable securities laws.

本新闻稿包含构成 “前瞻性信息” 的陈述,包括有关公司、其董事或高级管理人员对公司未来业务活动的计划、意图、信念和当前预期的陈述。“可能”、“将”、“可能”、“将”、“打算”、“计划”、“预测”、“相信”、“估计”、“期望”、“必须”、“下一步”、“提议”、“新”、“潜在”、“目标”、“未来”、“边缘”、“有利”、“影响” 和 “持续” 等词语以及类似的表述,与公司或其管理层有关的,旨在识别此类前瞻性信息。投资者请注意,包括前瞻性信息在内的陈述不能保证未来的业务活动,涉及风险和不确定性,由于各种因素,包括但不限于市场价格的波动、公司经营的成功、资本和融资的持续可用性以及总体经济、市场和业务状况,公司的未来业务活动可能与前瞻性信息中描述的业务活动存在重大差异。无法保证此类前瞻性信息会被证明是准确的,因此,建议读者依靠自己对风险和不确定性的评估。除非适用的证券法要求,否则公司不承担任何更新任何前瞻性信息的义务。

Neither the Canadian Securities Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for the adequacy or accuracy of this release.

加拿大证券交易所和加拿大投资行业监管组织均不对本新闻稿的充分性或准确性承担责任。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发