share_log

First Phosphate Confirms Another High Grade Intersect of 11.85% Igneous Phosphate Across 84 Metres Starting From Surface at Its Begin-Lamarche Project in Saguenay-Lac-St-Jean, Quebec, Canada

First Phosphate Confirms Another High Grade Intersect of 11.85% Igneous Phosphate Across 84 Metres Starting From Surface at Its Begin-Lamarche Project in Saguenay-Lac-St-Jean, Quebec, Canada

First Phosphate证实了其位于加拿大魁北克省萨格奈-圣让湖的Begin-Lamarche项目从地表开始跨越84米的又一个高品位的11.85%的火成磷酸盐相交点
newsfile ·  05/14 08:40

Saguenay, Quebec--(Newsfile Corp. - May 14, 2024) - First Phosphate Corp. (CSE: PHOS) (OTC: FRSPF) (FSE: KD0) ("First Phosphate" or the "Company") is pleased to report results from another 29 drill holes at its Bégin-Lamarche project located in Saguenay-Lac-St-Jean, Quebec, Canada. The Company's 25,929 m drill program was completed ahead of schedule on April 29, 2024. To date, 4,557 assays have been received representing 16,468 m of drilling. A remaining 1,775 assays are expected to be delivered by the end of May.

魁北克萨格奈--(Newsfile Corp.,2024年5月14日)——第一磷酸盐公司(CSE:PHOS)(场外交易代码:FRSPF)(FSE:KD0)(”第一磷酸盐“或者”公司“)很高兴地报告其位于加拿大魁北克省萨格奈-圣让湖的Begin-Lamarche项目又有29个钻孔的结果。该公司的25,929米钻探计划已于2024年4月29日提前完成。迄今为止,已经收到了4,557份化验报告,相当于16,468米的钻探。剩余的1,775份化验结果预计将在5月底之前交付。

Highlights:

亮点:

  • Phosphate Mountain Zone:
  • 磷酸盐山区:
    • Drill hole BL-24-67 intersected 11.85% P2O5 (phosphate) over 84.0 m starting at a surface depth of 3.0 m. Drilling in the Phosphate Mountain Zone revealed a thick 90 m layer of phosphate bearing nelsonite rock outcropping at surface with numerous other high grade intersects grading at over 10% P2O5.

    • Drill hole BL-24-82 returned a sub-intersection of 20.51% P2O5 over 9.75 m within a 77.7 phosphate intersect grading at 11.07% P2O5. This sub-section also contains a 2.1 m massive apatite vein that returned 30.73% P2O5.

  • Southern Zone:
    • 钻孔 BL-24-67 与 11.85% P 相交2O5 (磷酸盐)超过 84.0 米,表面深度为 3.0 米。在磷酸盐山区的钻探显示,地表露出了一层 90 米厚的含磷酸盐尼尔森岩石,还有许多其他高品位交叉点的品位超过 10% P2O5

    • 钻孔 BL-24-82 返回了 20.51% P 的子交叉点2O5 在 77.7 的磷酸盐交叉点内超过 9.75 m,坡度为 11.07%2O5。该子部分还包含一个 2.1 m 的巨大磷灰石矿脉,其返回 30.73% P2O5

  • 南部区域:
    • Drill hole BL-24-60 intersected 5.21% P2O5 over 194.0 m from a surface depth of 4.0 m and drill hole BL-24-83 intersected 5.81% P2O5 over 216.1 m starting at surface.

    • Drilling revealed many phosphate layers over 10% P2O5 at he base of the main phosphate layer.

    • Drill hole BL-24-84 intersected 8.41% P2O5 over 77.1 m starting at 6.0 m. Results demonstrate that high grade phosphate layers also occur in the Southern Zone.

    • 钻孔 BL-24-60 与 5.21% P 相交2O5 从 4.0 m 的表面深度超过 194.0 m,钻孔 BL-24-83 与 5.81% P 的相交2O5 从水面起点超过 216.1 米。

    • 钻探发现许多磷酸盐层超过 10% P2O5 在主要磷酸盐层的底部。

    • 钻孔 BL-24-84 与 8.41% P 相交2O5 从 6.0 m 开始超过 77.1 m。结果表明,南部地区也存在高品位的磷酸盐层。

"We are pleased with the continued high grade phosphate results encountered across the 3 km strike zone at our Bégin-Lamarche project," said First Phosphate CEO, John Passalacqua. "The drill program is now completed and we begin preparations for a 43-101 resource estimate followed immediately by a Preliminary Economic Assessment ("PEA")."

第一磷酸盐首席执行官约翰·帕萨拉夸说:“我们对我们的Begin-Lamarche项目在3公里长的打击区内持续获得高品位的磷酸盐结果感到满意。”“钻探计划现已完成,我们开始为43-101的资源估算做准备,随后立即进行初步经济评估(“PEA”)。”

Phosphate Mountain Zone

磷酸盐山区

A total of 23 drill holes have been completed to date in the Phosphate Mountain Zone while results from 14 drill holes have been received to date. Data received from these 14 drill holes shows grades of over 10% P2O5 over widths ranging from 7 m to 92 m. The Phosphate Mountain Zone has been drilled for a total length of 250 m to date. This zone is beginning to merge (from the southeast) with the Northern Zone where a 500 m thick phosphate mineralized envelope exists, one which has delineated up to 5 individual layers ranging from 60 m to 100 m in thickness starting at surface and continuing down to a depth of 300 m. The overall strike length of the Phosphate Mountain Zone and the Northern Zone is approximately 600 m.

迄今为止,磷酸盐山区共完成了23个钻孔,而迄今为止,已经收到了14个钻孔的结果。从这 14 个钻孔收到的数据显示 P 的品位超过 10%2O5 宽度从 7 米到 92 米不等。迄今为止,磷酸盐山区的钻探总长度为 250 米。该区域已开始(从东南方向开始)与北部地区合并,那里存在厚度为500米的磷酸盐矿化包层,该包膜从地表开始,一直延伸到300米,深度为300米。磷酸盐山区和北区的总走向长度约为600米。

Drill hole BL-24-67 intersected 11.85% P2O5 (phosphate) over 84.0 m starting at a surface depth of 3.0 m. Drilling in the Phosphate Mountain Zone revealed a thick 90 m layer of phosphate bearing nelsonite rock outcropping at surface with numerous other high grade intercepts grading at over 10% P2O5. Drill hole BL-24-82 returned a sub-intersection of 20.51% P2O5 over 9.75 m within a 77.7 phosphate intersection grading at 11.07% P2O5. This sub-section contains a 2.1 m massive apatite vein that returned 30.73% P2O5. (See Table 1).

钻孔 BL-24-67 与 11.85% P 相交2O5 (磷酸盐)起始深度为3.0米,表面深度超过84.0米。在磷酸盐山区的钻探显示,地表露出了一层厚厚的含磷酸盐的尼尔森石岩层,还有许多其他高品位截距的P2O5品位超过10%。钻孔 BL-24-82 返回了 20.51% P 的子交叉点2O5 在 77.7 的磷酸盐交叉点内超过 9.75 米,坡度为 11.07%2O5。该分段包含 2.1 m 的巨大磷灰石矿脉,返回 30.73% P2O5。(参见表 1)。

Table 1 - Drill Results for the Phosphate Mountain Zone

表 1-磷酸盐山区的钻探结果

Hole From (m) To (m) Length1 (m) P2O5 (%) TiO2 (%) Fe2O3T (%)
BL-24-59 6.55 59.4 52.85 12.44 5.65 33.60
BL-24-59 71.0 88.0 17.0 10.68 4.58 23.33
BL-24-59 123.0 145.0 22.0 11.61 2.52 20.20
including 132.0 145.0 13.0 16.45 2.56 21.18
BL-24-59 150.35 166.4 16.05 7.98 1.13 11.13
BL-24-62 3.8 48.0 44.2 11.37 4.65 22.77
BL-24-62 69.0 144.65 75.65 9.97 3.66 20.71
including 69.0 128.3 59.3 11.04 4.30 23.55
BL-24-62 156.0 160.0 4.0 14.40 4.90 26.34
BL-24-64 3.0 42.0 39.0 9.06 4.11 25.45
including 3.0 26.0 23.0 12.04 5.40 34.63
BL-24-64 75.0 126.5 51.5 7.20 2.64 16.44
including 102.0 120.9 18.9 10.67 4.13 20.59
BL-24-67 3.00 87.0 84.0 11.85 5.09 32.49
BL-24-67 117.0 152.0 35.0 9.86 3.22 18.88
including 117.0 143.0 26.0 11.85 3.95 22.03
BL-24-69 2.4 10.43 8.03 13.81 5.07 31.14
BL-24-69 28.0 65.1 37.1 9.55 3.17 21.76
including 28.0 39.75 11.75 16.70 6.20 32.09
BL-24-74 11.5 21.4 9.9 9.81 3.65 22.68
48.0 57.0 9.0 6.25 2.96 16.14
82.0 102.3 20.3 10.30 4.28 19.01
66.8 102.3 35.6 8.78 3.49 16.44
BL-24-76 49.0 64.25 15.3 11.27 4.40 24.29
BL-24-78 50.55 62.1 11.55 11.88 4.90 29.82
including 47.55 102.7 55.15 8.72 3.18 19.87
including 82.4 102.7 20.3 10.04 3.53 19.32
BL-24-82 6.0 83.7 77.7 11.07 3.28 18.63
including 6.0 36.0 30.0 13.21 4.82 24.31
including 54.0 63.75 9.75 20.51 3.87 16.59
BL-24-82 102.0 119.1 17.1 9.96 2.78 14.97
从 (m) 到 (m) 长度1 (m) P2O5 (%) TiO2 (%) 2O3T (%)
BL-24-59 6.55 59.4 52.85 12.44 5.65 33.60
BL-24-59 71.0 88.0 17.0 10.68 4.58 23.33
BL-24-59 123.0 145.0 22.0 11.61 2.52 20.20
包括 132.0 145.0 13.0 16.45 2.56 21.18
BL-24-59 150.35 166.4 16.05 7.98 1.13 11.13
BL-24-62 3.8 48.0 44.2 11.37 4.65 22.77
BL-24-62 69.0 144.65 75.65 9.97 3.66 20.71
包括 69.0 128.3 59.3 11.04 4.30 23.55
BL-24-62 156.0 160.0 4.0 14.40 4.90 26.34
BL-24-64 3.0 42.0 39.0 9.06 4.11 25.45
包括 3.0 26.0 23.0 12.04 5.40 34.63
BL-24-64 75.0 126.5 51.5 7.20 2.64 16.44
包括 102.0 120.9 18.9 10.67 4.13 20.59
BL-24-67 3.00 87.0 84.0 11.85 5.09 32.49
BL-24-67 117.0 152.0 35.0 9.86 3.22 18.88
包括 117.0 143.0 26.0 11.85 3.95 22.03
BL-24-69 2.4 10.43 8.03 13.81 5.07 31.14
BL-24-69 28.0 65.1 37.1 9.55 3.17 21.76
包括 28.0 39.75 11.75 16.70 6.20 32.09
BL-24-74 11.5 21.4 9.9 9.81 3.65 22.68
48.0 57.0 9.0 6.25 2.96 16.14
82.0 102.3 20.3 10.30 4.28 19.01
66.8 102.3 35.6 8.78 3.49 16.44
BL-24-76 49.0 64.25 15.3 11.27 4.40 24.29
BL-24-78 50.55 62.1 11.55 11.88 4.90 29.82
包括 47.55 102.7 55.15 8.72 3.18 19.87
包括 82.4 102.7 20.3 10.04 3.53 19.32
BL-24-82 6.0 83.7 77.7 11.07 3.28 18.63
包括 6.0 36.0 30.0 13.21 4.82 24.31
包括 54.0 63.75 9.75 20.51 3.87 16.59
BL-24-82 102.0 119.1 17.1 9.96 2.78 14.97

1 Lengths are measured along the core. True widths are estimated to be between 70 and 90% of the core interval.

1 长度是沿着核心测量的。实际宽度估计在核心间隔的70%至90%之间。

Southern Zone

南部区域

The Southern Zone has been drilled at 100 m spaced sections over a strike length of 1,600 m. Results to date from the Southern Zone show continuous widths of over 100 m of phosphate mineralization. Drill hole BL-24-60 intersected 5.21% P2O5 over 194.0 m from a surface depth of 4.0 m and drill hole BL-24-83 intersected 5.81% P2O5 over 216.1 m from surface. Drilling also revealed many phosphate layers over 10% P2O5 at he base of the main phosphate layer. Drill hole BL-24-84 intersected 8.41% P2O5 over 77.1 m. Results demonstrate that high grade phosphate layers also occur in the Southern Zone.

南区已在间隔100米的部分钻探,钻探长度为1,600 m。迄今为止,南部区域的结果显示,磷酸盐矿化的连续宽度超过100 m。钻孔 BL-24-60 与 5.21% P 相交2O5 从 4.0 m 的表面深度超过 194.0 m,钻孔 BL-24-83 与 5.81% P 的相交2O5 距离地面超过 216.1 米。钻探还发现了许多超过 10% P 的磷酸盐层2O5 在主要磷酸盐层的底部。钻孔 BL-24-84 与 8.41% P 相交2O5 超过 77.1 m。结果表明,南部地区也存在高品位的磷酸盐层。

Table 2 - Drill Results for the Southern Zone

表 2-南部地区的钻探结果

Hole From (m) To (m) Length1 (m) P2O5 (%) TiO2 (%) Fe2O3T (%)
BL-24-58 81.0 144.0 63.00 4.02 3.46 18.82
including 81.0 102.0 21.00 7.09 4.50 25.47
176.55 185.7 9.15 9.55 4.72 26.28
195.0 212.4 17.40 6.51 3.88 18.85
including 206.3 212.4 6.10 11.96 5.01 26.27
BL-24-60 3.7 197.7 194.00 5.21 3.81 22.50
BL-24-61 No significant results
BL-24-63 37.7 297.0 259.3 5.21 3.80 21.65
including 37.7 60.0 22.3 8.02 5.07 30.02
including 240.0 285.0 45.0 7.57 4.54 26.60
BL-24-65 12.5 19.5 7.0 4.27 3.09 17.72
49.2 63.3 14.1 9.44 5.19 30.12
144.7 162.5 17.8 10.37 5.40 31.00
223.4 235.4 12.0 11.61 5.61 28.72
BL-24-66 6.0 97.0 91.0 5.35 4.43 26.85
BL-24-68 13.0 46.65 33.65 5.64 4.02 22.83
81.8 92.0 10.20 3.92 3.90 17.92
BL-24-70 73.6 148.0 74.40 4.27 3.49 20.55
BL-24-71 73.3 174.9 101.6 4.76 3.52 19.60
193.5 238.2 44.7 6.52 4.98 26.00
261.0 272.0 11.0 6.27 4.42 24.32
292.7 304.0 11.3 7.75 3.85 30.68
BL-24-72 196.0 305.0 109.0 4.72 3.70 21.26
including 278.35 305.0 26.65 7.46 5.29 27.45
BL-24-73 154.0 180.5 26.5 5.43 4.07 23.85
195.2 366.0 170.8 5.23 4.13 22.38
including 309.0 366.0 57.0 7.07 5.15 27.34
BL-24-75 118.2 135.0 16.8 6.01 4.34 26.65
BL-24-75 208.5 219.4 10.9 6.32 4.15 29.74
BL-24-77 174.0 360.0 186.0 4.53 3.23 19.64
including 2.4 288.0 114.0 5.39 3.63 21.54
BL-24-79 No significant results
BL-24-80 2.4 74.55 72.15 6.59 2.37 16.23
including 2.4 12.55 10.15 9.35 4.25 27.10
including 25.25 52.5 27.25 10.27 3.24 19.77
BL-24-81 190.15 265.3 75.15 5.05 3.61 20.30
285.0 291.0 6.00 8.44 4.93 27.02
BL-24-83 5.0 216.6 211.6 5.81 3.52 24.00
including 46.5 61.45 14.95 11.37 4.99 35.52
including 117.0 157.3 40.3 8.49 4.66 32.83
BL-24-83 287.2 313 25.8 6.53 5.38 28.50
BL-24-84 177.85 193.55 15.7 7.46 3.69 22.45
205.9 283.0 77.1 8.41 4.14 22.75
BL-24-86 9.3 44.55 35.25 6.24 4.46 23.61
102.6 116.85 14.25 5.50 3.66 19.90
168.0 189.2 21.2 6.33 3.21 18.89
BL-24-87 173.6 198.0 24.4 7.12 5.57 28.79
从 (m) 到 (m) 长度1 (m) P2O5 (%) TiO2 (%) 2O3T (%)
BL-24-58 81.0 144.0 63.00 4.02 3.46 18.82
包括 81.0 102.0 21.00 7.09 4.50 25.47
176.55 185.7 9.15 9.55 4.72 26.28
195.0 212.4 17.40 6.51 3.88 18.85
包括 206.3 212.4 6.10 11.96 5.01 26.27
BL-24-60 3.7 197.7 194.00 5.21 3.81 22.50
BL-24-61 没有显著的结果
BL-24-63 37.7 297.0 259.3 5.21 3.80 21.65
包括 37.7 60.0 22.3 8.02 5.07 30.02
包括 240.0 285.0 45.0 7.57 4.54 26.60
BL-24-65 12.5 19.5 7.0 4.27 3.09 17.72
49.2 63.3 14.1 9.44 5.19 30.12
144.7 162.5 17.8 10.37 5.40 31.00
2234 235.4 12.0 11.61 5.61 28.72
BL-24-66 6.0 97.0 91.0 5.35 4.43 26.85
BL-24-68 13.0 46.65 33.65 5.64 4.02 22.83
81.8 92.0 10.20 3.92 3.90 17.92
BL-24-70 73.6 148.0 74.40 4.27 3.49 20.55
BL-24-71 73.3 174.9 101.6 4.76 3.52 19.60
193.5 238.2 44.7 6.52 4.98 26.00
261.0 272.0 11.0 6.27 4.42 24.32
292.7 304.0 11.3 7.75 3.85 30.68
BL-24-72 196.0 305.0 109.0 4.72 3.70 21.26
包括 278.35 305.0 26.65 7.46 5.29 27.45
BL-24-73 154.0 180.5 26.5 5.43 4.07 23.85
195.2 366.0 170.8 5.23 4.13 22.38
包括 309.0 366.0 57.0 7.07 5.15 27.34
BL-24-75 118.2 135.0 16.8 6.01 4.34 26.65
BL-24-75 208.5 219.4 10.9 6.32 4.15 29.74
BL-24-77 174.0 360.0 186.0 4.53 3.23 19.64
包括 2.4 288.0 114.0 5.39 3.63 21.54
BL-24-79 没有显著的结果
BL-24-80 2.4 74.55 72.15 6.59 2.37 16.23
包括 2.4 12.55 10.15 9.35 4.25 27.10
包括 25.25 52.5 27.25 10.27 3.24 19.77
BL-24-81 190.15 265.3 75.15 5.05 3.61 20.30
285.0 291.0 6.00 8.44 4.93 27.02
BL-24-83 5.0 216.6 211.6 5.81 3.52 24.00
包括 46.5 61.45 14.95 11.37 4.99 35.52
包括 117.0 157.3 40.3 8.49 4.66 32.83
BL-24-83 287.2 313 25.8 6.53 5.38 28.50
BL-24-84 177.85 193.55 15.7 7.46 3.69 22.45
205.9 283.0 77.1 8.41 4.14 22.75
BL-24-86 9.3 44.55 35.25 6.24 4.46 23.61
102.6 116.85 14.25 5.50 3.66 19.90
168.0 189.2 21.2 6.33 3.21 18.89
BL-24-87 173.6 198.0 24.4 7.12 5.57 28.79

1 Lengths are measured along the core. True width is estimated to be between 60% and 90% of the core interval.

1 长度是沿着核心测量的。实际宽度估计在核心间隔的60%至90%之间。

The technical parameters of the drill holes being released in this press release are shown in Table 3 below and their location is shown in Figure 1 below. A summary of the mineralized intersections from the 2024 drilling program is presented in Table 4.

本新闻稿中发布的钻孔的技术参数如下表3所示,其位置如下图1所示。表 4 概述了 2024 年钻探计划的矿化交叉点。

Table 3 - Parameters for the Current Drill Holes Being Released

表 3-当前发布的钻孔参数

Hole_ID Easting Northing Azimuth Dip Depth Zone
BL-24-58 326371 5403264 125 -45 228 Southern
BL-24-59 326899 5403859 150 -60 216 Mountain
BL-24-60 325894 5402244 305 -50 200.5 Southern
BL-24-61 326173 5403280 125 -45 312 Southern
BL-24-62 326922 5403891 150 -45 201 Mountain
BL-24-63 325866 5402145 305 -70 300 Southern
BL-24-64 326933 5403801 150 -45 180 Mountain
BL-24-65 325712 5402131 125 -45 285 Southern
BL-24-66 326281 5403201 125 -45 150 Southern
BL-24-67 326931 5403802 330 -45 161 Mountain
BL-24-68 326400 5403111 125 -45 126 Southern
BL-24-69 326894 5403856 0 -90 201 Mountain
BL-24-70 326345 5403160 125 -45 201 Southern
BL-24-71 325660 5402170 125 -45 354 Southern
BL-24-72 326228 5403145 125 -45 315 Southern
BL-24-73 325606 5402214 125 -45 375 Southern
BL-24-74 326960 5403846 150 -45 201 Mountain
BL-24-75 326126 5403222 130 -45 300 Southern
BL-24-76 326993 5403785 150 -45 175.5 Mountain
BL-24-77 325604 5402214 125 -60 366 Southern
BL-24-78 326993 5403785 330 -45 250 Mountain
BL-24-79 326126 5403222 130 -60 250 Southern
BL-24-80 326921 5403897 0 -90 213 Southern
BL-24-81 325560 5402121 125 -45 306 Southern
BL-24-82 326921 5403897 150 -67 201 Mountain
BL-24-83 326168 5403167 125 -45 327 Southern
BL-24-84 325615 5402080 125 -45 301.3 Southern
BL-24-86 325675 5402034 125 -45 293.5 Southern
BL-24-87 325655 5401926 305 -45 210 Southern
BL-24-88 326226 5403248 125 -45 366 Mountain
hole_ID 向东 北方 方位角 深度 区域
BL-24-58 326371 5403264 125 -45 228 南方
BL-24-59 326899 5403859 150 -60 216
BL-24-60 325894 5402244 305 -50 200.5 南方
BL-24-61 326173 5403280 125 -45 312 南方
BL-24-62 326922 5403891 150 -45 201
BL-24-63 325866 5402145 305 -70 300 南方
BL-24-64 326933 5403801 150 -45 180
BL-24-65 325712 5402131 125 -45 285 南方
BL-24-66 326281 5403201 125 -45 150 南方
BL-24-67 326931 5403802 330 -45 161
BL-24-68 326400 5403111 125 -45 126 南方
BL-24-69 326894 5403856 0 -90 201
BL-24-70 326345 5403160 125 -45 201 南方
BL-24-71 325660 5402170 125 -45 354 南方
BL-24-72 326228 5403145 125 -45 315 南方
BL-24-73 325606 5402214 125 -45 375 南方
BL-24-74 326960 5403846 150 -45 201
BL-24-75 326126 5403222 130 -45 300 南方
BL-24-76 326993 5403785 150 -45 175.5
BL-24-77 325604 5402214 125 -60 366 南方
BL-24-78 326993 5403785 330 -45 250
BL-24-79 326126 5403222 130 -60 250 南方
BL-24-80 326921 5403897 0 -90 213 南方
BL-24-81 325560 5402121 125 -45 306 南方
BL-24-82 326921 5403897 150 -67 201
BL-24-83 326168 5403167 125 -45 327 南方
BL-24-84 325615 5402080 125 -45 301.3 南方
BL-24-86 325675 5402034 125 -45 293.5 南方
BL-24-87 325655 5401926 305 -45 210 南方
BL-24-88 326226 5403248 125 -45 366

Table 4 - Other Previously Released Results for the 2024 Drill Campaign

表 4-先前公布的 2024 年演习活动的其他结果

Hole_ID From (m) To (m) Length (m) P2O5 (%) TiO2 (%) Fe2O3T (%)
BL-24-22 195.00 259.50 64.50 5.80 2.94 21.04
BL-24-23 21.00 175.10 154.10 7.02 4.40 27.34
BL-24-24 61.30 190.90 129.60 5.22 3.63 22.32
BL-24-25 74.20 117.00 42.80 9.89 3.54 28.65
BL-24-26 6.90 96.00 89.10 9.44 3.92 27.59
BL-24-27 138.00 189.00 51.00 4.41 3.05 20.62
BL-24-28 73.25 152.20 78.95 5.48 4.07 24.68
BL-24-29 99.00 276.00 177.00 4.46 3.63 22.85
BL-24-30 33.00 78.65 45.65 4.28 2.97 19.83
BL-24-31 119.85 213.80 93.95 7.16 3.49 18.76
BL-24-32 159.00 228.00 69.00 5.51 3.82 24.60
BL-24-33 3.80 110.00 106.20 5.00 3.70 21.19
BL-24-34 93.00 192.00 99.00 6.34 2.74 20.09
BL-24-35 212.50 253.70 41.20 6.25 3.44 19.55
BL-24-36 234.0 342.0 108.0 6.83 4.33 28.34
BL-24-37 84.0 126.0 42.0 6.03 4.47 28.57
BL-24-39 102.0 150.0 48.0 5.51 2.20 16.64
BL-24-43 111.0 369.0 258.0 5.41 4.33 22.19
BL-24-44 192.4 283.0 90.6 7.48 3.38 23.64
BL-24-47 153.0 304.0 151.0 3.89 3.36 19.51
BL-24-48 32.0 39.65 7.65 15.01 2.59 19.17
BL-24-49 72.5 105.5 33.0 8.65 3.77 24.05
BL-24-50 4.2 93.0 88.8 5.90 4.14 23.62
BL-24-51 70.0 111.0 41.0 7.72 1.88 16.09
BL-24-52 204.0 247.7 43.7 7.04 3.62 24.50
BL-24-53 70.1 132.4 62.3 9.50 4.12 28.45
BL-24-53 154.1 246.0 91.9 6.92 3.50 20.08
BL-24-54 61.1 101.1 40.0 9.18 4.80 28.16
BL-24-55 4.0 194.8 190.8 4.60 3.64 19.83
BL-24-56 6.5 99 92.5 11.82 5.29 30.96
BL-24-56 123 162 39.0 8.43 3.18 17.56
BL-24-57 183.9 194.0 10.1 6.58 3.86 22.58
hole_ID 从 (m) 到 (m) 长度 (m) P2O5 (%) 二氧化钛 (%) Fe2O3T (%)
BL-24-22 195.00 259.50 64.50 5.80 2.94 21.04
BL-24-23 21.00 175.10 154.10 7.02 4.40 27.34
BL-24-24 61.30 190.90 129.60 5.22 3.63 22.32
BL-24-25 74.20 117.00 42.80 9.89 3.54 28.65
BL-24-26 6.90 96.00 89.10 9.44 3.92 27.59
BL-24-27 138.00 189.00 51.00 4.41 3.05 20.62
BL-24-28 73.25 152.20 78.95 5.48 4.07 24.68
BL-24-29 99.00 276.00 177.00 4.46 3.63 22.85
BL-24-30 33.00 78.65 45.65 4.28 2.97 19.83
BL-24-31 119.85 213.80 93.95 7.16 3.49 18.76
BL-24-32 159.00 228.00 69.00 5.51 3.82 24.60
BL-24-33 3.80 110.00 106.20 5.00 3.70 21.19
BL-24-34 93.00 192.00 99.00 6.34 2.74 20.09
BL-24-35 212.50 253.70 41.20 6.25 3.44 19.55
BL-24-36 234.0 342.0 108.0 6.83 4.33 28.34
BL-24-37 84.0 126.0 42.0 6.03 4.47 28.57
BL-24-39 102.0 150.0 48.0 5.51 2.20 16.64
BL-24-43 111.0 369.0 258.0 5.41 4.33 22.19
BL-24-44 192.4 283.0 90.6 7.48 3.38 23.64
BL-24-47 153.0 304.0 151.0 3.89 3.36 19.51
BL-24-48 32.0 39.65 7.65 15.01 2.59 19.17
BL-24-49 72.5 105.5 33.0 8.65 3.77 24.05
BL-24-50 4.2 93.0 88.8 5.90 4.14 23.62
BL-24-51 70.0 111.0 41.0 7.72 1.88 16.09
BL-24-52 204.0 247.7 43.7 7.04 3.62 24.50
BL-24-53 70.1 132.4 62.3 9.50 4.12 28.45
BL-24-53 154.1 246.0 91.9 6.92 3.50 20.08
BL-24-54 61.1 101.1 40.0 9.18 4.80 28.16
BL-24-55 4.0 194.8 190.8 4.60 3.64 19.83
BL-24-56 6.5 99 92.5 11.82 5.29 30.96
BL-24-56 123 162 39.0 8.43 3.18 17.56
BL-24-57 183.9 194.0 10.1 6.58 3.86 22.58

Detailed results from the 2024 drill program are available at:

2024 年钻探计划的详细结果可在以下网址获得:

April 2, 2024:
March 19, 2024:
April 23, 2024:

2024 年 4 月 2 日:
2024 年 3 月 19 日:
2024 年 4 月 23 日:

Results for the earlier 4,661 m drill program conducted in 2023 can be found in the June 5, 2023 press release available at: .

早些时候在2023年进行的4,661米钻探计划的结果可以在2023年6月5日的新闻稿中找到,该新闻稿可在以下网址获得:。

Quality Assurance / Quality Control

质量保证/质量控制

The sampling of, and assay data from, the drill core is monitored through the Company's implementation of a quality assurance - quality control (QA-QC) program designed to the CIM Mineral Exploration Best Practices Guidelines.

通过公司实施根据CIM矿产勘探最佳实践指南设计的质量保证-质量控制(QA-QC)计划,对钻芯的采样和化验数据进行监测。

A formal chain-of-custody procedure was adopted for security of samples until their delivery at the laboratory. Drill core (NQ size) is logged and samples are selected by Laurentia Exploration Inc. geologists and sawn in half with a diamond saw at the project site. Half of the core is retained at the site for reference purposes. Sample intervals may vary from 0.5 to 3 metres in length depending on the geological observations. A blank and a standard are inserted at the beginning of each sample batch, usually one complete hole, and a blank and a standard are then inserted alternatively each 10 samples. Half-core samples are packaged and sent by ground transportation in sealed rice bags to an independent laboratory, Activation Laboratories Ltd. of Ancaster, Ontario (ISO/IEC 17025:2005 with CAN-P-1579). The core samples are crushed up to 80% passing 2mm (10 mesh), riffle split 250 g and pulverized (mild steel) to 95% passing -200 mesh. Each sample is analyzed for whole rock analysis (code 4B) for 10 major oxides and 7 trace elements by lithium metaborate/tetraborate fusion of 3g of material and analyze by ICP-OES. The laboratory has its own QA/QC protocols.

为确保样本在实验室交付之前的安全,采用了正式的监管链程序。Laurentia Exploration Inc. 的地质学家会记录钻芯(NQ 尺寸)并选择样品,并在项目现场用金刚石锯切成两半。一半的核心保留在现场以供参考。根据地质观测结果,采样间隔的长度可能从0.5到3米不等。在每个样品批次的开头插入一个空白和一个标准品,通常是一个完整的孔,然后每10个样品交替插入一个空白和一个标准。半核样本被包装并用密封的米袋通过地面运输发送到安大略省安卡斯特的活化实验室有限公司(使用 CAN-P-1579 的 ISO/IEC 17025:2005)。通过2毫米(10个网格),岩心样品被压碎至多80%,裂缝分裂250克,粉碎(低碳钢)至95%,通过-200目筛选。通过3g材料的偏硼酸锂/四硼酸盐融合,对每个样品进行全岩分析(代码为4B),分析10种主要氧化物和7种微量元素,并由ICP-OES进行分析。该实验室有自己的质量保证/质量控制协议。

Qualified Person

合格人员

The scientific and technical disclosure for First Phosphate included in this news release has been reviewed and approved by Gilles Laverdière, P.Geo. Mr. Laverdière is Chief Geologist of First Phosphate and a Qualified Person under National Instrument 43-101 - Standards of Disclosure of Mineral Projects ("NI 43-101").

本新闻稿中包含的第一磷酸盐的科学和技术披露已由P.Geo的Gilles Laverdieère审查和批准。Laverdieère 先生是 First Phosphate 的首席地质学家,也是 National Instrument 43-101 的合格人员- 矿业项目披露标准 (“NI 43-101”)。

About First Phosphate Corp.

关于第一磷酸盐公司

First Phosphate is a mineral development company fully dedicated to extracting and purifying phosphate for the production of cathode active material for the Lithium Iron Phosphate ("LFP") battery industry. First Phosphate is committed to producing at high purity level, at full ESG standard and with low anticipated carbon footprint. First Phosphate plans to vertically integrate from mine source directly into the supply chains of major North American LFP battery producers that require battery grade LFP cathode active material emanating from a consistent and secure supply source. First Phosphate holds over 1,500 sq. km of royalty-free district-scale land claims in the Saguenay-Lac-St-Jean Region of Quebec, Canada that it is actively developing. First Phosphate properties consist of rare anorthosite igneous phosphate rock that generally yields high purity phosphate material devoid of high concentrations of harmful elements.

First Phosphate是一家矿物开发公司,致力于为磷酸铁锂(“LFP”)电池行业生产正极活性物质的磷酸盐,完全致力于提取和纯化磷酸盐。First Phosphate致力于生产高纯度水平、完全符合ESG标准且预期碳足迹较低的产品。First Phosphate计划将矿产直接垂直整合到北美主要LFP电池生产商的供应链中,这些生产商需要来自稳定和安全的供应来源的电池级LFP正极活性材料。First Phosphate在加拿大魁北克省萨格奈-圣让湖地区拥有超过1,500平方公里的免版税地区规模土地所有权,目前正在积极开发这些土地。首先,磷酸盐特性由稀有的正长岩火成磷酸盐岩组成,这些岩石通常会产生不含高浓度有害元素的高纯度磷酸盐材料。

-30-

-30-

For additional information, please contact:

欲了解更多信息,请联系:

Bennett Kurtz, CFO
bennett@firstphosphate.com
Tel: +1 (416) 200-0657

首席财务官 Bennett Kurtz
bennett@firstphosphate.com
电话:+1 (416) 200-0657

Investor Relations: investor@firstphosphate.com
Media Relations: media@firstphosphate.com
Website:

投资者关系:investor@firstphosphate.com
媒体关系:media@firstphosphate.com
网站:

Follow First Phosphate:

关注第一磷酸盐:

Twitter:
LinkedIn:

推特:
领英:

Forward-Looking Information and Cautionary Statements

前瞻性信息和警示声明

This news release contains certain statements and information that may be considered "forward-looking statements" and "forward-looking information" within the meaning of applicable securities laws. In some cases, but not necessarily in all cases, forward-looking statements and forward-looking information can be identified by the use of forward-looking terminology such as "plans", "targets", "expects" or "does not expect", "is expected", "an opportunity exists", "is positioned", "estimates", "intends", "assumes", "anticipates" or "does not anticipate" or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might", "will" or "will be taken", "occur" or "be achieved" and other similar expressions. In addition, statements in this news release that are not historical facts are forward-looking statements, including, among other things, the Company's planned exploration and production activities, the properties and composition of any extracted phosphate, the Company's plans for vertical integration into North American supply chains, statements relating to the Company's planned exploration activities, including its drill target strategy and next steps for the Bégin-Lamarche Property; and the Company's interpretations and expectations about the results on the Bégin-Lamarche Property.

本新闻稿包含某些陈述和信息,根据适用的证券法,这些陈述和信息可能被视为 “前瞻性陈述” 和 “前瞻性信息”。在某些情况下,但不一定在所有情况下,前瞻性陈述和前瞻性信息可以通过使用前瞻性术语来识别,例如 “计划”、“目标”、“预期” 或 “不期望”、“预期”、“机会存在”、“有定位”、“估计”、“打算”、“假设” 或 “不预期” 或 “相信”,或此类词语和短语的变体或声明 “可能”、“可能”、“将”、“可能”、“将” 或 “将采取”、“发生” 或 “实现” 等行动、事件或结果类似的表情。此外,本新闻稿中非历史事实的陈述均为前瞻性陈述,除其他外,包括公司计划的勘探和生产活动、任何提取的磷酸盐的特性和成分、公司纵向整合北美供应链的计划、与公司计划勘探活动(包括其钻探目标战略和Begin-Lamarche地产的下一步行动)有关的陈述;以及公司对结果的解释和预期那个 Be`gin-Lamarche地产。

These statements and other forward-looking information are based on assumptions and estimates that the Company believes are appropriate and reasonable in the circumstances, including, without limitation, expectations of the Company's long term business outcomes given its short operating history; expectations regarding revenue, expenses and operations; the Company having sufficient working capital and ability to secure additional funding necessary for the exploration of the Company's property interests; expectations regarding the potential mineralization, geological merit and economic feasibility of the Company's projects; expectations regarding drill programs and the potential impacts successful drill programs could have on the life of the mine and the Company; mineral exploration and exploration program cost estimates; expectations regarding any environmental issues that may affect planned or future exploration programs and the potential impact of complying with existing and proposed environmental laws and regulations; receipt and timing of exploration and exploitation permits and other third-party approvals; government regulation of mineral exploration and development operations; expectations regarding any social or local community issues that may affect planned or future exploration and development programs; expectations surrounding global economic trends and technological advancements; and key personnel continuing their employment with the Company.

这些陈述和其他前瞻性信息基于公司认为在当时情况下适当和合理的假设和估计,包括但不限于对公司长期业务成果的预期;对收入、支出和运营的预期;公司有足够的营运资金和能力获得勘探公司财产权益所需的额外资金;对潜在矿化的预期,公司项目的地质价值和经济可行性;对钻探计划的预期以及成功的钻探计划可能对矿山和公司寿命产生的潜在影响;矿产勘探和勘探计划成本估算;对可能影响计划或未来勘探计划的任何环境问题以及遵守现行和拟议环境法律法规的潜在影响的预期;勘探和开采许可证以及其他第三方批准的接收和时间;政府对矿产勘探和开发业务的监管;对可能影响计划或未来勘探和开发计划的任何社会或地方社区问题的预期;对全球经济趋势和技术进步的预期;以及继续在公司工作的关键人员。

There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include: limited operating history; high risk of business failure; no profits or significant revenues; limited resources; negative cash flow from operations and dependence on third-party financing; the uncertainty of additional funding; no dividends; risks related to possible fluctuations in revenues and results; insurance and uninsured risks; litigation; reliance on management and key personnel; conflicts of interest; access to supplies and materials; dangers of mineral exploration and related liability and damages; risks relating to health and safety; government regulation and legal uncertainties; the company's exploration and development properties may not be successful and are highly speculative in nature; dependence on outside parties; title to some of the Company's mineral properties may be challenged or defective; Aboriginal title and land claims; obtaining and renewing licenses and permits; environmental and other regulatory risks may adversely affect the company; risks relating to climate change; risks related to infrastructure; land reclamation requirements may be burdensome; current global financial conditions; fluctuation in commodity prices; dilution; future sales by existing shareholders could cause the Company's share price to fall; fluctuation and volatility in stock exchange prices; and risks related to market demands. There can be no assurance that any opportunity will be successful, commercially viable, completed on time or on budget, or will generate any meaningful revenues, savings or earnings, as the case may be, for the Company. In addition, the Company will incur costs in pursuing any particular opportunity, which may be significant.

无法保证此类陈述会被证明是准确的,实际结果和未来事件可能与此类陈述中的预期存在重大差异。可能导致实际业绩与公司预期存在重大差异的重要因素包括:运营历史有限;业务失败风险高;没有利润或可观的收入;资源有限;运营产生的负现金流和对第三方融资的依赖;额外资金的不确定性;没有分红;与收入和业绩可能波动相关的风险;保险和未投保风险;诉讼;对管理层和关键人员的依赖;利益冲突;供应和材料的获取;危险矿产勘探及相关责任和损失;与健康和安全有关的风险;政府监管和法律的不确定性;公司的勘探和开发地产可能不成功,本质上具有高度投机性;对外部的依赖;公司某些矿产的所有权可能受到质疑或存在缺陷;原住民所有权和土地索赔;获得和续订执照和许可证;环境和其他监管风险可能对公司产生不利影响;与气候变化有关的风险;与气候变化相关的风险基础设施;土地开垦要求可能很繁重;当前的全球金融状况;大宗商品价格的波动;稀释;现有股东未来的销售可能导致公司股价下跌;证券交易所价格的波动和波动;以及与市场需求相关的风险。无法保证任何机会都会成功、商业上可行、按时或按预算完成,也无法保证会为公司带来任何有意义的收入、储蓄或收益。此外,公司在追求任何特定机会时都会产生成本,这些成本可能很大。

These factors and assumptions are not intended to represent a complete list of the factors and assumptions that could affect the Company and, though they should be considered carefully, should be considered in conjunction with the risk factors described in the Company's other documents filed with the Canadian securities authorities, including without limitation the "Risk Factors" section of the Company's Annual Information Form dated November 29, 2023 which is available on SEDAR at . Although the Company has attempted to identify factors that would cause actual actions, events or results to differ materially from those disclosed in the forward-looking information or information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

这些因素和假设并非旨在代表可能影响公司的因素和假设的完整清单,尽管应仔细考虑,但应与公司向加拿大证券当局提交的其他文件中描述的风险因素一起考虑,包括但不限于2023年11月29日公司年度信息表中的 “风险因素” 部分,该部分可在SEDAR上查阅。尽管公司试图确定可能导致实际行动、事件或结果与前瞻性信息或信息中披露的内容存在重大差异的因素,但可能还有其他因素导致行动、事件或结果不符合预期、估计或预期。除非根据适用的证券法,否则公司不承诺更新任何前瞻性信息。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息