share_log

ATEX Discovers New High-Grade Mineralization at Valeriano Intersecting 68 Metres of 2.02% CuEq Within a Broader Intercept of 356 Metres of 0.98% CuEq

ATEX Discovers New High-Grade Mineralization at Valeriano Intersecting 68 Metres of 2.02% CuEq Within a Broader Intercept of 356 Metres of 0.98% CuEq

ATEX 在瓦萊里亞諾發現了新的高品位礦化區,在 0.98% CueQ 的 356 米寬截距內與 2.02% CueQ 相交
newsfile ·  05/15 07:00

Identifies New, Late-Stage, High-Grade, Overlapping Hydrothermal System Above Porphyry Target and Along Northwest Trending High-Grade Corridor - The Valeriano System Remains Open in All Directions

在西北走向的高品位走廊上,識別了新的、後期的、高品位的、重疊的熱液系統,位於斑岩目標上方和沿着高品位甬道 - Valeriano系統在所有方向上均處於未開發狀態。

Toronto, Ontario--(Newsfile Corp. - May 15, 2024) - ATEX Resources Inc. (TSXV: ATX) ("ATEX" or the "Company") is pleased to announce complete assay results for drill holes ATXD26 and ATXD17B, the fifth and sixth holes from its Phase IV drill campaign at the Valeriano Copper-Gold Project ("Valeriano" or the "Project") located in Atacama Region, Chile.

安大略省多倫多-(新聞稿Corp。-2024年5月15日)- ATEX資源公司(TSXV:ATX)("ATEX"或"公司宣佈了Valeriano銅金項目(“Valeriano”)第四階段鑽探活動的第五和第六個鑽探孔ATXD26和ATXD17B的完整化驗結果。瓦萊里亞諾"或"項目位於智利阿塔卡馬地區(")

Highlights include:

亮點包括:

  • ATXD26 intersected 68.0 metres of 2.02% CuEq (1.39% Cu, 0.60 g/t Au, 3.81 g/t Ag and 473 g/t Mo) from 1,100 metres downhole, within longer intervals of 356.0 m of 0.98% CuEq (0.7% Cu, 0.29 g/t Au, 1.49 g/t Ag and 180 g/t Mo) and 978.0 metres of 0.75% CuEq (0.54% Cu, 0.21 g/t Au, 1.26 g/t Ag and 145 g/t Mo) from 586.0 meters.

    • A high-grade, copper, gold and silver enriched low sulphidation epithermal system, overprinting existing mineralization has been intersected above the projected porphyry target in ATXD26 from 1,108m to 1,208m downhole.

    • ATXD26 was drilled between the Central and Western Trends, and along the northwest striking high-grade trend from ATXD16A in the southeast to ATXD26 in the northwest and remains open along strike.

    • The overprinting high-grade epithermal mineralization is hosted in silicified breccias made up of clasts composed of wall rock and porphyry fragments including Early Porphyry ("EP") fragments. This suggests the presence of mineralized EP below the current hole extents (hole concluded at 1,565.4m) and will be followed up in Phase V.

    • The hole ended in grades of 1.5% CuEq and was terminated 400m above the planned depth.

    • Mineralization intersected in ATXD26 is open at depth and along strike in both directions and is a priority for follow up in Phase V.

  • Additionally, ATXD17B ended at 1,254.0 metres and intersected 504.0m of 0.56% CuEq (0.42% Cu, 0.17 g/t Au, 0.96 g/t Ag and 51 g/t Mo).

    • Sporadic high grades associated with chalcopyrite bearing potassic alteration were intersected in the upper part of the hole from approximately 800m to 1,200m indicates the potential to intersect mineralized EP below and along the southeast continuation of the high-grade mineralization intersected in ATXD16A (594m grading 0.92% CuEq (0.67% Cu, 0.32 g/t Au, 1.13 g/t Ag and 71 g/t Mo) within EP from 1,168m and 112m of 1.42% CuEq (1.01% Cu, 0.57 g/t Au, 2.06 g/t Ag and 46 g/t Mo) from 1,616m). (See Company news dated Feb 22, 2024).

  • ATEX is also pleased to announce it has received an additional CAD$2,170,000 in total proceeds from the exercise of common share purchase warrants ("Warrants") between March 10, 2024, and May 14, 2024. During this period, an aggregate of 6,907,824 Warrants were exercised.

  • ATXD26在鑽孔下1,100米處相交68.0米2.02% CuEq(1.39% Cu,0.60克/噸Au,3.81克/噸Ag和473克/噸Mo),更長時段的間隔爲在下鑽586.0米處的978.0米0.75% CuEq(0.54% Cu,0.21克/噸Au,1.26克/噸Ag和145克/噸Mo)和在1,100.0米獲得的356.0米0.98% CuEq(0.7% Cu,0.29克/噸Au,1.49克/噸Ag和180克/噸Mo)。

    • 在ATXD26的預測斑岩目標以上,在鑽孔下深度1,108米至1,208米之間遇到了高品位、含銅、金和銀的低硫化脈石型熱液系統,並與現有礦化相互融合。

    • ATXD26是在中央和西部趨勢之間鑽探的,在從東南ATXD16A到西北ATXD26的向西北走向的高品位趨勢沿線,仍沿着行程未開發。

    • 石英化角礫岩中的超打變質礦化是由壁巖和斑岩碎屑組成的破碎層,包括早期斑岩("EP")碎屑。這表明目前孔位(孔深爲1,565.4米)下方存在礦化的EP,並將在第五階段跟進。

    • 孔底爲1.5% CuEq,深度比計劃深度淺400米。在ATXD26中,礦化物在深度和走向上均未開發,是第五階段跟進的優先事項。

    • 此外,ATXD17B在1,254.0米處結束,相交504.0米0.56% CuEq(0.42% Cu,0.17克/噸Au,0.96克/噸Ag和51克/噸Mo)。

  • 在孔的上部,從大約800m到1,200m處交錯着與含黃銅黃銅石脈有關的散在高品位區域,並表明了在東南方向的高品位礦化物的接續之下可能會有礦化的EP形成。

    • (594米,0.92% CuEq(0.67% Cu,0.32克/噸Au,1.13克/噸Ag和71克/噸Mo)在1,168米處,以及1,616米處的112米1.42% CuEq(1.01% Cu,0.57克/噸Au,2.06克/噸Ag和46克/噸Mo)。 (請參見2024年2月22日公司新聞)。剛果民主共和國馬塔迪項目於4月21日停工,由於剛果礦業部門正式發出的有關到社區中控室和會議室下令停工的通知(從1,168m的EP獲得0.92%CuEq(0.67%Cu,0.32 g/t Au,1.13 g/t Ag和71 g/t Mo)的594m,以及從1,616m獲得1.42%CuEq(1.01%Cu,0.57 g/t Au,2.06 g/t Ag和46 g/t Mo)的112m)。(請參閱2024年2月22日公司新聞)。

  • ATEX還很高興地宣佈,自2024年3月10日至2024年5月14日期間從普通股購買認股權利("權利證")中獲得了額外的加元2,170,000。在這期間,總計行權了6,907,824份權證。ATEX的總裁兼首席執行官Ben Pullinger表示: "孔ATXD26超出了我們的預期,突顯了更多高品位化礦化物的潛力,並首次證明了在ATXD16A到ATXD26成長高品位趨勢沿線上有多個重疊的系統存在,代表着一個長度約爲700m的走向並在兩個方向上未開發,深度也有所進展,並指出只要階段IV計劃中尚未定義的系統的限制條件。此外,該計劃繼續返回到目前爲止在項目中看到的最高品位,併爲階段V提供了一個令人興奮的跳板。"權證在2024年3月10日至2024年5月14日期間行使了總共6,907,824份認股權證(“Warrants”)。

"Hole ATXD26 exceeded our expectations and highlights the potential for more high-grade mineralization and provides first evidence for the presence of multiple overlapping systems yielding higher grades along the growing high-grade trend from ATXD16A through to ATXD26 representing a strike length of approximately 700m and open along strike in both directions, and at depth," stated Ben Pullinger, President and CEO of ATEX. "Equally exciting is that our understanding of the shape and size of the Valeriano Porphyry system and higher-grade EP component has increased dramatically through the Phase IV program. All holes so far in Phase IV have continued to intersect significant mineralized intervals within the yet to be defined limits of the system. Additionally, this program continues to return the highest grades seen at the Project to date and provides an exciting springboard to launch from in Phase V."

表1— ATXD26和ATXD17B的摘要結果

Table 1 - Summary Results for ATXD26 and ATXD17B

表1 - ATXD26和ATXD17B的總結結果

Hole ID From To Interval Cu Au Ag Mo CuEq %
MRS
(1)
% g/t g/t g/t
ATXD17B(2) 750.0 1,254.0 504.0 0.42 0.17 0.96 51 0.56
ATXD26**(2) 586.0 1,564.0 978.0 0.54 0.21 1.26 145 0.75
Incl. 1,010.0 1,366.0 356.0 0.70 0.29 1.49 180 0.98
And Incl. 1,086.0 1,208.0 122.0 1.11 0.49 2.71 348 1.60
And Incl. 1,100.0 1,168.0 68.0 1.39 0.60 3.81 473 2.02
(1) CuEq calculated using recoveries assumed in 2023 MRE (90% Cu, 70% Au, 80% Ag and 60% Mo) (See Company news dated September 12, 2023) using the formula stated below:
Copper Equivalent (CuEq) is calculated using the formula CuEq % = Cu % + (6,481.488523 * Au g/t /10,000) + (94.6503085864* Ag g/t /10,000) + (4.2328042328 * Mo g/t /10,000).
*CuEq values reported in historical releases use metals reported in-situ (100% basis). Recoveries for these metals as assumed in the NI 43-101 technical report titled:
"Independent Technical Report for the Valeriano Copper-Gold Project, Atacama Region, Chile" with an effective date of September 1, 2023, available at and are 90% Cu, 70% Au, 80% Ag and 60% Mo.
(2) ATXD17B and ATXD26 were composited at a cut-off of 0.3% CuEq.
**Includes intervals of 22.2m from 804.3m to 826.5m and 8.0m from 854.7m to 862.7m where no core was recovered due to use of a directional drilling tool and 50m of intervals with a below cut-off grade of 0.25% CuEq(1).
孔ID 起點 區間 黃金 Mo 銅當量%
MRS
(1)
% 克/噸 克/噸 克/噸
ATXD17B(2) 750.0 1,254.0 504.0 0.42 0.17 0.96 51 0.56
ATXD26**(2) 586.0 1,564.0 978.0 0.54 0.21 1.26 145 固定費用覆蓋率
包括。 1,010.0 1,366.0 356.0 0.70 0.29 1.49 180 0.98
包括 1,086.0 1,208.0 122.0 1.11 0.49 2.71 348 1.60
包括 1,100.0 1,168.0 68.0 1.39 0.60 3.81 473 2.02
(1)CuEq計算使用2023年MRE所假定的回收率(90% Cu,70% Au,80% Ag和60% Mo)(請參見公司新聞,日期爲2023年9月12日)使用以下公式:
CuEq當量(%)計算公式爲CuEq% = Cu% + (6,481.488523 * Au g/t /10,000) + (94.6503085864* Ag g/t /10,000) + (4.2328042328 * Mo g/t /10,000)。
*歷史發佈的CuEq值使用的是在位金屬報告的值(100%計算)。這些金屬的回收率是按照名爲NI 43-101的技術報告中假設的來計算的。
"Valeriano 銅-黃金項目技術獨立報告,智利Atacama 地域板塊,有效日期爲2023年9月1日,可在 上獲取,銅爲90%,金爲70%,銀爲80%,鉬爲60%。"
(2)ATXD17B和ATXD26以0.3% CuEq爲截止值合成。
** 包括從804.3m到826.5m的22.2m間隔和從854.7m到862.7m的8.0m間隔,由於使用定向鑽進工具而未恢復任何岩心,還有50m的間隔低於0.25%的銅當量切割賺。(1).

Due to the early onset of seasonal storms in the region, the Phase IV program has been concluded totalling approximately 12,000m of diamond drilling. Through utilizing directional drilling allowing for the completion of daughter holes out of existing parent holes drilled from surface, ATEX has been able to realize an effective total of 20,100m drilled in the event all holes had been drilled from surface. ATEX has announced assay results for six complete holes, ATXD16A, ATXD17A, ATXD12A ATXD25, AXTD17B and ATXD26 totalling approximately 9,400m and has three more partial holes, totalling approximately 2,600m to be announced.

由於在該地域早期的季節性暴風雨,第四階段計劃已經完成了大約12,000 m的金剛石鑽探。通過利用方向鑽進允許完成從地表鑽孔出去的子孔位,ATEX已經能夠實現總共20,100 m的鑽進,即使所有孔都是從地表鑽探的情況下。ATEX已經宣佈了六個完整的孔的化驗結果,包括ATXD16A,ATXD17A,ATXD12A,ATXD25,AXTD17B和ATXD26,其中總計約爲9,400m,並且還有三個局部孔,總計約爲2,600m等待公佈。

Results

結果

Three diamond drill holes were underway when the program was suspended including ATXD25A ((end of hole "EOH") at 1,454.2m), ATXD26A a daughter hole starting at 792m from ATXD26, (EOH 925.5m) and ATXD27 (EOH 944.3m). These holes were testing for continuity of mineralized porphyry between the currently modelled EP trends and extending mineralization further along strike to the northwest (Figure 2). ATXD25A is a daughter hole from ATXD25 and is testing the continuity of mineralization north-west of ATXD23 (964.0m of 0.68% CuEq (0.48% Cu, 0.24 g/t Au, 78 g/t Mo), see Company news dated June 5, 2023 "ATEX Intersects 0.70% CuEq over 964 metres in a 200m Step-Out Along the Recently Discovered High-Grade Western Porphyry Trend"). The hole was shut down at 1,454.2m in potassic altered and mineralized wall rock (Figure 1 & 2).

程序中有三個鑽進孔正在進行,包括ATXD25A(孔底"的末端,在1,454.2m處),ATXD26A,一個從ATXD26開始的子孔(EOH 925.5m)和ATXD27(EOH 944.3m)。這些孔是爲了測試當前模擬的EP趨勢與向西北方向延伸礦化的連續性(圖2)。ATXD25A是ATXD25的子孔,正在測試ATXD23以北(964.0m)的礦化連續性,爲0.68%的銅當量(0.48%的銅,0.24 g/t Au,78 g/t Mo),請參見2023年6月5日的公司新聞"ATEX在最近發現的高品位西側斑岩區域沿着200m步進距離交叉點上交叉0.70%CuEQ長達964米"。孔在石英砂岩中止於1,454.2m處(圖1&2)。EOHATXD26和ATXD26A是一個父與子的孔,用於測試中心和西部趨勢之間EP的連續性。

  • ATXD26 and ATXD26A are a parent and daughter hole testing the continuity of EP between the northern extents of the Central and Western Trends.

    • ATXD26 intersected mineralized porphyritic units and mineralized hydrothermal breccias from approximately 1,100m downhole confirming the potential for mineralized EP below the current hole bottom and in the gap.

    • A newly discovered zone of overprinting hydrothermal mineralization has been intersected in ATXD26, above the porphyry target. This breccia hosted mineralization includes clasts of EP and is associated with enriched, gold, silver and bismuth grades. This zone remains open in all directions and will be a priority for exploration and definition in Phase V.

    • ATXD26 was abandoned, due to in hole conditions, at a depth of 1,565m. (Figure 1 & 2) ATXD26A is a daughter hole being drilled out of ATXD26, to the south. Starting at a depth of 792m it is targeting the extension of the high-grade mineralization intersected in ATXD24 (670.0m of 0.84% CuEq (0.60% Cu, 0.24 g/t Au, 101 g/t Mo including 312m of 1.00% CuEq (0.73% Cu, 0.3 g/t Au and 77 g/t Mo)), see Company news dated July 13, 2023 "ATEX Intersects 0.84% CuEq over 670 metres Widening the Central High-Grade Trend in the Last Drill Hole of Phase III Program.") (Figure 1 & 2).

  • ATXD27 tested the northern extent of mineralization along the Western Trend Porphyry to the north-east of ATXD23 (Figure 2).

  • The three uncompleted drill holes (ATXD25A, ATXD26A and ATXD27) will be extended in the next drilling season.

  • ATXD26從孔底開始,約在1,100 m以下與斑岩狀巖體和熱液角礫岩相交,證實了礦化EP在目前孔底以下和間隙中的潛力。

    • 在靠近斑岩靶區上方的ATXD26中發現了一個新發現的超打印熱液礦化區。這個角礫岩寄主化礦包括EP碎屑,並且與富集的金,銀和鉍礦化形成關係。這一區域在所有方向上仍然開放,並將是第V階段勘探和定義的重點。

    • 由於在孔內環境的原因,ATXD26在深度爲1,565m處被遺棄。(圖1&2)ATXD26A是從ATXD26向南鑽出的一個子孔,從深度792m開始,旨在針對在ATXD24中發現的高品位礦化的延伸進行測試,這是0.84%的銅當量(0.60%的銅,0.24 g/t Au,101g/t Mo,包括312m的1.00%的CuEQ(0.73%的Cu,0.3g/t Au和77g/t Mo))(請參閱2023年7月13日的公司新聞"ATEX對第III期計劃的最後一鑽孔進行了670米,交叉向中心高品位趨勢擴大了中央高品位趨勢"))(圖1&2)。

    • ATXD27測試了西部趨勢斑岩礦化的北部極限,位於ATXD23東北部(圖2)。

  • 三個未完成的鑽孔(ATXD25A,ATXD26A和ATXD27)將在下一個鑽探季節中延長。

  • 圖1. 穿越趨勢的截面圖,顯示2023年MRE解釋 圖2. 2024年5月:NNW trending早期斑岩走廊的不斷演化解釋


Figure 1. Cross-section through trends with 2023 MRE interpretation


表2 - ATXD17B和ATXD26的詳細結果 CuEq % MRS 銅當量% 在原處 銅當量%


Figure 2. May 2024: Evolving interpretation of NNW trending Early Porphyry corridor


圖2. 2024年5月:NNW走向的早期斑岩走廊演化解釋

Table 2 - Detailed Results for ATXD17B and ATXD26

銅當量% MRS 銅當量% 原位 銅當量%

Hole ID From To Interval Cu Au Ag Mo CuEq %
MRS
(1)
CuEq %
In Situ
(2)
CuEq %
Met
(3)
% g/t g/t g/t
ATXD17B(4) 750.0 1,254.0 504.0 0.42 0.17 0.96 51 0.56 0.61 0.60
ATXD26**(4) 586.0 1,564.0 978.0 0.54 0.21 1.26 145 0.75 0.82 0.81
Incl. 1,010.0 1,366.0 356.0 0.70 0.29 1.49 180 0.98 1.07 1.05
And Incl. 1,086.0 1,208.0 122.0 1.11 0.49 2.71 348 1.60 1.77 1.73
And Incl. 1,100.0 1,168.0 68.0 1.39 0.60 3.81 473 2.02 2.23 2.19
(1) CuEq calculated using recoveries assumed in 2023 MRE (90% Cu, 70% Au, 80% Ag and 60% Mo) (See Company news dated September 12, 2023) using the formula stated below:
Copper Equivalent (CuEq) is calculated using the formula CuEq % = Cu % + (6,481.488523 * Au g/t /10,000) + (94.6503085864* Ag g/t /10,000) + (4.2328042328 * Mo g/t /10,000).
(2) CuEq reported in-situ assuming 100% recovery for component metals assuming metal prices of US$1,800 /oz Au, US$3.15 /lb Cu, US$23 /oz Ag, and US$20.00 /lb Mo and using the formula stated below:
Copper Equivalent (CuEq) is calculated using the formula CuEq % = (((Cu % * 3.15 * 22.0462)) + (Au g/t * (1,800/31.1034768))+(Ag g/t * (23/31.1034768)) + ((Mo g/t / 10,000) * (20*22.0462))) / (3.15*22.0462).
(3) CuEq calculated using recoveries reported from metallurgical test work results reported in Company news dated October 18, 2023 (95% Cu, 94% Au, 89% Ag and 83% Mo) using the formula stated below:
Copper Equivalent (CuEq) is calculated using the formula CuEq % = (((Cu % * 3.15 * 22.0462)) + ((0.94/0.95 * Au g/t) * (1,800/31.1034768)) + ((0.89/0.95 * Ag g/t) * (23/31.1034768)) + ((0.83/0.95 * Mo g/t / 10000) * (20*22.0462))) / (3.15*22.0462).
(4) ATXD17B and ATXD26 were composited at a cut-off of 0.3% CuEq.
*CuEq values reported in historical releases use metals reported in-situ (100% basis). Recoveries for these metals as assumed in the NI 43-101 technical report titled "Independent Technical Report for the Valeriano Copper-Gold Project, Atacama Region, Chile" with an effective date of September 1, 2023, available at and are 90% Cu, 70% Au, 80% Ag and 60% Mo.
**Includes intervals of 22.2m from 804.3m to 826.5m and 8.0m from 854.7m to 862.7m where no core was recovered due to use of a directional drilling tool.
孔ID 起點 區間 黃金 Mo 銅當量%
MRS
(1)
銅當量%
原位
(2)
銅當量%
完成
(3)
% 克/噸 克/噸 克/噸
ATXD17B(4) 750.0 1,254.0 504.0 0.42 0.17 0.96 51 0.56 0.61 0.60
ATXD26**(4) 586.0 1,564.0 978.0 0.54 0.21 1.26 145 固定費用覆蓋率 0.82 0.81
包括。 1,010.0 1,366.0 356.0 0.70 0.29 1.49 180 0.98 1.07 1.05
包括 1,086.0 1,208.0 122.0 1.11 0.49 2.71 348 1.60 1.77 1.73
包括 1,100.0 1,168.0 68.0 1.39 0.60 3.81 473 2.02 2.23 2.19
(1)CuEq計算使用2023年MRE所假定的回收率(90% Cu,70% Au,80% Ag和60% Mo)(請參見公司新聞,日期爲2023年9月12日)使用以下公式:
CuEq當量(%)計算公式爲CuEq% = Cu% + (6,481.488523 * Au g/t /10,000) + (94.6503085864* Ag g/t /10,000) + (4.2328042328 * Mo g/t /10,000)。
(2)CuEq報告就地估算,假定組分金屬的100%回收率,假定金屬價格爲1,800美元/盎司Au,每磅3.15美元的Cu,每盎司23美元的Ag和每磅20.00美元的Mo,並使用以下公式:
CuEq當量(%)計算公式爲CuEq% = (((Cu% * 3.15 * 22.0462)) + (Au g/t * (1,800/31.1034768))+(Ag g/t * (23/31.1034768)) + ((Mo g/t / 10,000) * (20*22.0462))) / (3.15*22.0462)。
(3)CuEq計算使用公司於2023年10月18日報道的冶金試驗結果所報告的回收率(95% Cu,94% Au,89% Ag和83% Mo)使用以下公式:
銅當量(CuEq)的計算公式爲CuEq % = (((Cu % * 3.15 * 22.0462)) + ((0.94/0.95 * Au g/t) * (1,800/31.1034768)) + ((0.89/0.95 * Ag g/t) * (23/31.1034768)) + ((0.83/0.95 * Mo g/t / 10000) * (20*22.0462))) / (3.15*22.0462).
(4)ATXD17B和ATXD26以0.3% CuEq爲截止值合成。
*歷史發佈的CuEq值採用原位金屬數據(100%基礎)。這些金屬的回收率在NI 43-101技術報告中假定爲"瓦萊里亞諾銅金礦項目獨立技術報告,智利阿塔卡馬地區",有效日期爲2023年9月1日,可在和 上獲得,分別爲90% Cu、70% Au、80% Ag和60% Mo。
**包括804.3m至826.5m間隔的22.2m和854.7m至862.7m間隔的8.0m沒取到取心,是由於使用定向鑽進工具的原因。

Outlook

展望

With the early onset of seasonal storms affecting many operators in the region, ATEX is currently executing a staged shut down of the Phase IV program to safely demobilize personnel and equipment, marking the end of the Phase IV program. The Phase V program, which will follow on from the success of Phase IV, is anticipated to commence in H2 2024.

受季節性風暴的早期影響,該地區的許多操作商目前正在執行計劃關閉IV期項目,以安全地解體人員和設備,標誌着IV期項目的結束。接下來的V期項目,將繼續IV期項目的成功,預計將於2024年下半年開始。

Final drill results from the remaining Phase IV drill holes are expected to be released through June of 2024. These results and the associated geological information will be integrated into planning for Phase V. The success of this drill program has positively impacted the Company's understanding of the Valeriano Porphyry system. Specifically, results from the Phase IV program have led to an increase in the target size for the EP component through demonstrating continuity along a 1.2 km strike length and proving that the three previously modelled trends are likely to be connected. The Phase V program is expected to focus on drilling within the EP trend to confirm continuity of the higher-grade corridor within the larger EP target and on significant step-outs to the northwest and southeast where the EP trend remains open. ATEX believes this program could continue to grow the deposit significantly and provide the foundation for an eventual preliminary economic study.

預計將通過2024年6月公佈剩餘第IV階段鑽孔的最終鑽探結果。這些結果以及相關的地理信息將被整合到第V階段的規劃中。本鑽探計劃的成功,對公司了解Valeriano斑岩系統產生了積極的影響。具體來說,第IV階段計劃的結果通過展示1.2公里的走向連續性,證明了三個先前建模的趨勢可能相互連接,導致了EP成分目標的增加。預計第V階段的計劃將專注於在EP趨勢內進行鑽探,以確認EP目標內高品位走廊的連續性,並在EP趨勢仍然開放的西北和東南方向進行重大跨步。ATEX認爲,本計劃有望繼續顯著擴大存入資金併爲最終的初步經濟研究奠定基礎。

QAQC

QAQC

Drill holes are collared with a PQ drill bit, reduced to HQ and, sequentially, to NQ as the drill holes progressed deeper. Drill core produced by the drill rigs was extracted from the core tubes by the drill contractor under the supervision of ATEX employees, marked for consistent orientation and placed in core boxes with appropriate depth markers added. Full core boxes were then sealed before being transported by ATEX personnel to the Valeriano field camp. Core at the field camp is processed, quick logged, checked for recovery, photographed, and marked for specific gravity, geotechnical studies and for assays. From camp, the core is transferred to a secure core-cutting facility in Vallenar, operated by IMG, a third-party consultant. Here, the core trays are weighed before being cut using a diamond saw under ATEX personnel oversight. ATEX geologists working at this facility double-check the selected two-metre sample intervals, placing the samples in seal bags and ensuring that the same side of the core is consistently sampled. Reference numbers are assigned to each sample and each sample is weighed. The core trays with the remaining half-core are weighed and photographed. Additionally, core logs are updated, and specific gravity and geotechnical samples are collected. The remaining core is stored in racks at the Company's secure facility in Vallenar.

鑽孔用PQ鑽頭打板,鑽孔越深,逐漸減小到HQ和NQ大小。由鑽機生產的鑽芯由鑽承包商在ATEX職員的監督下從鑽芯管中取出,標記爲統一的方向,並放在帶有適當深度標記的鑽芯箱中。鑽芯箱完整封閉後,由ATEX職員運往瓦萊里亞諾野外營地。營地的岩心將被加工、快速日誌記錄、檢查回收率、拍照並標記爲比重、地質研究和化驗樣品。岩石芯樣從野外營地轉移到IMG運營的瓦連納一個安全的岩心切割設施。空芯盤在稱重後,由ATEX職員監督下使用金剛石鋸進行切割。在這個設施工作的ATEX地質學家將兩米的樣品間隔再次檢查,並將樣品放入密封袋中,並確保樣品始終採樣相同的側面。爲每個樣品分配參考編號,並稱重每個樣品箱。剩餘的半芯核心將被稱重並拍照。此外,核心日誌將更新,並收集比重和岩土技術樣品。其餘芯巖在ATEX的瓦連納安全設施中存放。

From Vallenar samples are sent to an ALS preparation facility in La Serena. ALS is an accredited laboratory which is independent of the Company. The prepared samples were sent to the ALS assay laboratories in either Santiago, Chile and Lima, Peru for gold (Au-AA24), copper (Cu-AA62), molybdenum (Mo-AA62) and silver (Ag-AA62) assays as well as and multi-element ICP (ME-MS61) analysis. No data quality problems were indicated by the QA/QC program.

從巴倫納爾開始,樣品將被送往位於拉塞雷納的ALS製備設施。ALS是一家獲得認證的獨立實驗室,與公司無關。製備好的樣品被送往ALS的化驗實驗室,分別在智利聖地亞哥和秘魯利馬進行金(Au-AA24)、銅(Cu-AA62)、鉬(Mo-AA62)和銀(Ag-AA62)化驗以及多元素ICP(ME-MS61)分析。QA/QC程序沒有發現數據質量問題。

Qualified Person

合格人士

Mr. Ben Pullinger, P.Geo., registered with the Professional Geoscientists Ontario, is the Qualified Person, as defined by National Instrument 43-101 - Standards for Disclosure for Mineral Projects, for the Valeriano Copper Gold Porphyry Project. Mr. Pullinger is not considered independent under NI 43-101 as he is President and CEO of ATEX. He has reviewed and approved the disclosure of the scientific and technical information contained in this press release.

貝·普林格(Ben Pullinger)先生是安大略省專業地質科學家註冊人員,是《國家43-101號法規》的合格人,《銅金斑岩項目獨立技術報告,智利阿塔卡馬地區》(有效日期爲2023年9月1日),因爲他是ATEX總裁兼首席執行官,所以不被視爲獨立人士。他已經審查並批准了本新聞稿所包含的科學技術信息的披露。礦產項目披露的標準關於Valeriano銅黃金斑岩項目。Pullinger先生因爲是ATEX的總裁兼CEO,不符合NI 43-101的獨立要求。他已經查閱並批准了本新聞稿中包含的科學技術信息的披露。

About ATEX

瓦萊里亞諾是一個大型銅金斑岩資源:14.10億噸,銅當量爲0.67%(銅爲0.50%,金爲0.20 g/t,銀爲0.96 g/t,鉬爲63.80 g/t),其中包括高品位核心,總計2.00億噸,銅當量爲0.84%(銅爲0.62%,金爲0.29 g/t,銀爲1.25 g/t,鉬爲55.7 g/t),報告時間爲2023年9月

ATEX is exploring the Valeriano Copper Gold Project which is located within the emerging copper gold porphyry mineral belt linking the prolific El Indio High-Sulphidation Belt to the south with the Maricunga Gold Porphyry Belt to the north. This emerging belt, informally referred to as the Link Belt, hosts several copper gold porphyry deposits at various stages of development including, Filo del Sol (Filo Mining), Josemaria (Lundin Mining), Los Helados (NGEX Minerals/JX Nippon), La Fortuna (Teck Resources/Newmont) and El Encierro (Antofagasta/Barrick Gold).

本·普林格(Ben Pullinger)

Valeriano hosts a large copper gold porphyry resource: 1.41 billion tonnes at 0.67% CuEq (0.50% Cu, 0.20 g/t Au, 0.96 g/t Ag and 63.80 g/t Mo), which includes a higher-grade core totaling 200 million tonnes at 0.84% CuEq (0.62% Cu, 0.29 g/t Au 1.25 g/t Ag and 55.7 g/t Mo), reported in September 20231.

總裁兼首席執行官 Email:bpu1.

For further information, please contact:

如需更多信息,請聯繫:

Ben Pullinger,
President and CEO
Email: bpullinger@atexresources.com

本·普林格
總裁兼首席執行官
電子郵件:bpullinger@atexresources.com

Aman Atwal,
Vice President, Business Development and Investor Relations
Email: aatwal@atexresources.com

Aman Atwal,業務發展和投資者關係副總裁。發送郵件至:aatwal@atexresources.com,或訪問ATEX網站。
業務發展和投資者關係副總裁
電子郵件:aatwal@atexresources.com

1-647-287-3778
or visit ATEX's website at

1-647-287-3778
或訪問ATEX的網站

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS:

關於前瞻性聲明的警告:本新聞稿包含前瞻性聲明,包括預測、投影和預測。通常,但並非總是如此,前瞻性聲明可以通過使用諸如“計劃”、“計劃”、“預計”或“不預期”、“持續”、“定期”、“估計”、“預測”、“意圖”、“潛在”、“預計”、“不預計”或描述“目標”的單詞或短語的變化或表明將採取某些行動、事件或結果“可能”、“可能”、“將”被採取、發生或實現。前瞻性聲明涉及已知和未知的風險、未來事件、條件、不確定性和其他因素,它們可能導致實際結果、績效或成就與任何未來結果、預測、投影、績效或成就不同,這些結果、預測、投影、績效或成就是前瞻性聲明所表達的或暗示的。

This news release contains forward-looking statements, including predictions, projections, and forecasts. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "planning", "expects" or "does not expect", "continues", "scheduled", "estimates", "forecasts", "intends", "potential", "anticipates", "does not anticipate", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, prediction, projection, forecast, performance or achievements expressed or implied by the forward-looking statements.

本新聞稿包含對未來的預測、投射和預測的前瞻性聲明。通常,但並非總是,可以通過使用“計劃”、“計劃”、“預計”或“不預期”、“繼續”、“計劃”、“估計”、“預測”、“意圖”、“潛在”、“預期”、“不預期”或描述“目標”的單詞或這樣的單詞和短語的變化或說明某些行動、“事件”或“結果”“可能”、“可能”、“可能”或“將要”被採取、發生或實現來識別前瞻性聲明。前瞻性聲明涉及已知和未知風險、未來事件、條件、不確定因素和其他可能導致實際結果、預測、投射、預測、表現或成就與前瞻性陳述所表達或暗示的任何未來結果、預測、投射、預測、表現或成就實質上不同的因素。這些前瞻性聲明包括,但不限於:在行使股票期權或結算RSUs,包括任何歸屬權益方面,發行普通股或進行現金支付;以及ATEX的公開文件中披露的因素。

Such forward-looking statements include, among others: plans for the evaluation of exploration properties including the Project; the success of evaluation plans; the success of exploration activities especially to the significant expansion of the high-grade corridor; mine development prospects; potential for future metals production; changes in economic parameters and assumptions; all aspects related to the timing and extent of exploration activities including the Phase IV and Phase V drill programs contemplated in this press release; the timing or nature of a preliminary economic study; timing of receipt of exploration results; the interpretation and actual results of current exploration activities and mineralization; changes in project parameters as plans continue to be refined; the results of regulatory and permitting processes; future metals price; possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; labour disputes and other risks of the mining industry; the results of economic and technical studies; delays in obtaining governmental and local approvals or financing or in the completion of exploration; timing of assay results; as well as those factors disclosed in ATEX's publicly filed documents.

這些前瞻性聲明包括,但不限於:評估勘探性質的計劃,包括該項目,計劃的成功,勘探活動的成功,特別是對高品位廊道的顯著擴展,開採前景,未來金屬生產的潛力,經濟參數和假設的變化,所有與計劃中的勘探活動相關的方面,包括本新聞稿中提到的IV期和V期鑽孔計劃的時間和程度;初步經濟學研究的時間或性質,接收勘探結果的時間,對當前勘探活動和礦化的解釋和實際結果的變化,隨着計劃的繼續逐步完善而產生的項目參數的變化,監管和許可程序結果,未來的金屬價格,可能的品位或回收率變化;設備或進程不能按預期操作導致的故障;礦業勞工爭議和礦業行業其他風險;經濟和技術研究的結果;獲得政府和當地批准或融資或勘探完成的延遲,評估結果的時間;以及ATEX公開披露文件披露的那些因素。

Although ATEX has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

TSX Venture Exchange及其監管服務提供商未審核或接受本新聞稿內容的充分性或準確性。

Neither the TSX Venture Exchange nor its regulation services provider has reviewed or accepts
responsibility for the adequacy or accuracy of the content of this news release.

TSX 創業公司交易所及其監管服務提供者未審查或審核本新聞發佈中內容的充分性或準確性。
對於本新聞發佈中內容的充分性或準確性,TSX 創業公司交易所及其監管服務提供商不承擔任何責任。


1 Please see NI 43-101 technical report titled "Independent Technical Report for the Valeriano Copper-Gold Project, Atacama Region, Chile" by Joled Nur, CCCRRM-Chile, and David Hopper, CGeol, with an effective date of September 1, 2023, available at and for additional details on the 2023 Mineral Resource Estimate for the Valeriano project.

1請參閱NI 43-101技術報告,題爲"銅金斑岩項目獨立技術報告,智利阿塔卡馬地區",由Joled Nur、CCCRRM-Chile和David Hopper、CGeol編寫,有效日期爲2023年9月1日,詳細了解瓦萊里亞諾項目2023年礦產資源估計。該報告可在和 上獲得。

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論