share_log

Mako Mining Files Amended San Albino Technical Report

Mako Mining Files Amended San Albino Technical Report

马科矿业提交修改后的圣阿尔比诺技术报告
Accesswire ·  06/13 20:07

VANCOUVER, BC / ACCESSWIRE / June 13, 2024 / Mako Mining Corp. (TSXV:MKO)(OTCQX:MAKOF) ("Mako" or the "Company") announces that, in connection with comments received from the British Columbia Securities Commission with respect to a technical compliance review, it has filed an amended technical report dated as of June 10, 2024, with an effective date of October 11, 2023 titled "Amended Technical Report and Estimate of Mineral Resources for the San Albino Project Comprised of the San Albino and Las Conchitas Deposits, Nueva Segovia, Nicaragua" (the "Amended Technical Report").

温哥华,卑诗省 / ACCESSWIRE / 2024年6月13日/ Mako Mining Corp. (tsxv: mko) (otcqx: makof)(以下简称“Mako”或“公司”)宣布,在接受英属哥伦比亚证券委员会技术合规审查的评论后,已提交了一份“修订后的技术报告和对尼加拉瓜新塞哥维亚州 San Albino 项目中的 San Albino 和 Las Conchitas 矿床进行矿物资源估量的修订后的技术报告”,文件日期为2024年6月10日,生效日期为2023年10月11日。

The key amendments, in addition to certain other amendments as are outlined in the Amended Technical Report, include the addition of Sections 16 through 21 of Form 43-101F1 under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") in respect of the San Albino Project's mining and recovery methods, project infrastructure, market studies, environmental studies, and capital and operating costs. The additional Sections 16 through 21 address disclosure requirements under 43-101F1 pertaining to an "advanced property", which is defined under NI 43-101 as a property that has mineral reserves or mineral resources where the potential economic viability is supported by a pre-feasibility or a feasibility study, or mineral resources supported by a preliminary economic assessment. The Company submitted the technical report in 2023 without sections 16-21 following guidance given at the time. The Company has included this additional disclosure in respect of the San Albino Project, as a fully operational mine, at the BCSC's request.

除了在修订后的技术报告中概述的某些其他修订外,主要修订还添加了国家证券委员会43-101号法规下表格16至21的附录,以便概述尼加拉瓜新塞哥维亚州的San Albino项目的采矿和恢复方法、项目基础设施、市场研究、环境研究,资本和运营成本。16至21号附录概述了国家证券委员会43-101号法规下针对"先进资产"的披露要求。先进资产在NI 43-101中定义为具有矿产储量或矿产资源的资产,在该资产的潜在经济可行性由可行性研究或概念研究支持,而概念研究是对可能存在的矿床进行的研究和评估。公司在2023年提交的技术报告中没有包含16-21号附录,这是当时给出的指导建议。公司已按BCSC要求将这份附加披露纳入关于全面运营矿山的San Albino项目。遵守矿业项目披露标准("NI 43-101")后,在SEDAAR+上对Bilboes硫化物金项目("项目")的单阶段开发进行了初步经济评估报告。PEA的拷贝题为"Bilboes Gold Project Preliminary Economic Assessment",有效日期为2024年5月30日,由DRA Projects(Pty)Ltd("DRA")编制,反映本公告中所包含的摘要信息,同时也将在公司的网站上提供。所有金额均以美元计算。这些补充的第16至21部分涉及43-101F1下针对 an "advanced property" 的披露要求,这在NI 43-101中被定义为具有矿产储量或矿产品资源的资产,其中该资产的潜在经济可行性由可行性研究或概念研究支持,或者矿产资源由初步经济评估支持。公司在2023年提交了没有16-21号附录的技术报告,这是在当时给出的指导建议。公司已经根据BCSC的要求将这种额外的披露纳入关于San Albino项目作为一个全面运营矿山的。

No changes were made to the resource estimates for the San Albino Project in the Amended Technical Report.

修订后的技术报告没有对San Albino项目的资源估计做出任何更改。

Since the Effective Date, the Company's resource model predicted that the Company would mine 26,940 oz Au, whereas the Company actually mined 32,567 oz Au, recovered 25,087 oz Au, and sold 25,106 oz Au during the period November 1st, 2023 through May 31st, 2024.

自生效日期以来,公司的资源模型预测公司将开采26,940盎司Au,而公司实际开采了32,567盎司Au,并在2023年11月1日至5月31日期间回收了25,087盎司Au,出售了25,106盎司Au。21世纪医疗改革法案自生效日期以来,公司的资源模型预测公司将开采26,940盎司Au,而公司实际开采了32,567盎司Au,并在2023年11月1日至5月31日期间回收了25,087盎司Au,出售了25,106盎司Au。21世纪医疗改革法案

Akiba Leisman, CEO of Mako states, "San Albino is a deposit that requires extensive drilling to develop reserves. The resource model has performed well with mined ounces exceeding predicted ounces by over 20% since the Effective Date. This additional disclosure now reflects a mining operation that has been in commercial production for 3 years."

Mako的CEO Akiba Leisman表示:"San Albino项目需要广泛的钻探才能发展储量。资源模型表现良好,开采的盎司数超过了生效日期的预测盎司数20%以上。这项额外的披露现在反映了一个已经商业运营3年的采矿操作。"

The Amended Technical Report was prepared by Mine Development Associates, a division of RESPEC, out of Reno, Nevada, in accordance with NI 43-101 and can be found on the Company's website at or under the Company's issuer profile at . The Amended Technical Report supersedes the previously filed report dated October 25, 2023.

修订后的技术报告是由位于内华达州雷诺市的Mine Development Associates公司的RESPEC分部根据NI 43-101编制的,并可在公司的网站上查询,或在公司的发行人档案下查看。修订后的技术报告取代了之前于2023年10月25日提交的报告。

Qualified Persons

合格人员

Steven Ristorcelli, C.P.G., is the independent qualified person, as defined under NI 43-101, who has reviewed the scientific and technical information in this press release, except as noted below.

Steven Ristorcelli是根据NI 43-101定义的独立合格人员,他已经审查了本新闻稿中的科学和技术信息,除了下面注明的内容。

Jordan Anderson, RM SME, is the independent qualified person, as defined under NI 43-101, who has reviewed the reconciliation of the ounces predicted in the resource model to the ounces mined during the period November 1st, 2023, through May 31st, 2024.

Jordan Anderson,RM中小板,是根据NI 43-101定义的独立合格人员,他已经审查了从2023年11月1日至5月31日期间资源模型预测的盎司与开采的盎司的调和情况。21世纪医疗改革法案自生效日期以来,公司的资源模型预测公司将开采26,940盎司Au,而公司实际开采了32,567盎司Au,并在2023年11月1日至5月31日期间回收了25,087盎司Au,出售了25,106盎司Au。21世纪医疗改革法案

On behalf of the Board,

代表董事会,

Akiba Leisman
Chief Executive Officer

Akiba Leisman
首席执行官

About Mako

关于Mako

Mako Mining Corp. is a publicly listed gold mining, development and exploration company. The Company operates the high-grade San Albino gold mine in Nueva Segovia, Nicaragua, which ranks as one of the highest-grade open pit gold mines globally. Mako's primary objective is to operate San Albino profitably and fund exploration of prospective targets on its district-scale land package.

瑪克黃金礦業有限公司是一家公開上市的黃金採礦公司,其業務包括開發和勘探等。該公司在尼加拉瓜新塞哥維亞擁有高品位的聖阿爾比諾金礦,位列全球最高品位的露天金礦之一。Mako的主要目標是盈利營運聖阿爾比諾金礦,同時為其區域規模的土地包裡的具有潛力的目標進行探索勘查。

For further information: Mako Mining Corp., Akiba Leisman, Chief Executive Officer, Telephone: 917-558-5289, E-mail: aleisman@makominingcorp.com or visit our website at and SEDAR .

如需了解更多信息: Mako Mining Corp.,总裁兼首席执行官Akiba Leisman,电话: 917-558-5289,电子邮件: aleisman@makominingcorp.com 或登录官网和SEDAR。

Forward-Looking Information: Some of the statements contained herein may be considered "forward-looking information" within the meaning of applicable securities laws. Forward-looking information can be identified by words such as, without limitation, "estimate", "project", "believe", "anticipate", "intend", "expect", "plan", "predict", "may" or "should" or variations thereon or comparable terminology. The forward-looking information contained herein reflects the Company's current beliefs and expectations, based on management's reasonable assumptions, and includes, without limitation Mako's primary objective to operate San Albino profitably and fund exploration of prospective targets in Nicaragua. Such forward-looking information is subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking information, including, without limitation, changes in the Company's exploration and development plans and growth parameters; unanticipated costs; the current U.S. Treasury Department sanctions measures imposed in Nicaragua on October 24, 2022 having impacts on business operations not currently expected, or new sanctions being imposed by the U.S. Treasury Department or other government entity in Nicaragua in the future; and other risks and uncertainties as disclosed in the Company's public disclosure filings on SEDAR+ at . Such information contained herein represents management's best judgment as of the date hereof, based on information currently available. Mako does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

前瞻性信息:本文中可能包含的“前瞻性信息”应视为适用证券法规的含义。前瞻性信息可根据无限制诸如"估计", "项目", "相信", "预计", "有意", "期望", "计划", "预测", "可能"或"应该 "等用语进行识别。本文中包含的前瞻性信息反映了公司目前的信念和期望,基于管理层的合理假设,包括但不限于Mako的主要目标是盈利地运营San Albino,并资助尼加拉瓜前景有望的勘探目标。这种前瞻性信息可能面临各种风险和不确定性,可能使实际事件或结果与前瞻性信息所反映的事件或结果有所不同,包括但不限于公司的勘查和开发计划和增长参数发生变化;未预期的成本;2022年10月24日对尼加拉瓜实施的当前美国财政部制裁措施对商业业务造成的影响超出预期,或者将来由美国财政部或其他政府实体在尼加拉瓜实施的新的制裁措施;以及披露在公司在SEDAR+上的公开披露文件中的其他风险和不确定性。此类信息所包含的资料代表了本文中所述的最好的判断,截至此日期,基于目前可用的信息。Mako不承担更新任何前瞻性信息的责任,除非根据适用证券法规进行更新。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

tsxv的监管服务提供商(在其政策中定义该术语)对本公告的充分性或准确性不承担责任。

SOURCE: Mako Mining Corp.

消息来源:Mako Mining Corp。


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发