Austral Gold Provides Operational Update
Austral Gold Provides Operational Update
Sydney, Australia--(Newsfile Corp. - June 18, 2024) - Established gold producer Austral Gold Limited (ASX: AGD) (TSXV: AGLD) (OTCQB: AGLDF) (Austral or the Company) advises that although the high-pressure grinding roll equipment (HRC 800) was initially expected to be operational at the Company's Heap Reprocessing Project in May 2024, as reported in Q1 2024, repairs have taken longer than anticipated. Consequently, the installation of the equipment is now projected to occur near the end of June 2024.
澳大利亚悉尼 - (Newsfile Corp. - 2024年6月18日) - 成立的黄金生产商澳洲黄金有限公司(ASX:AGD)(tsxv:agld)(OTCQB:AGLDF) (Austral或公司)建议,尽管高压磨辊设备(HRC800)最初预计将于2024年5月在公司的堆浸再处理项目中运行,如2024年第一季度所报道的,但维修时间超出预期。因此,设备的安装现在预计将在2024年6月底左右进行。
Due to this delay, production for Q2 2024 has been lower than expected, leading to a revision of production guidance for 2024 from 24,000-28,000 gold equivalent ounces (GEOs) to 18,000-20,000 GEOs.
由于这一延迟,2024年第二季度的产量低于预期,导致2024年生产指导从24,000-28,000金当量盎司(GEOs)下调至18,000-20,000 GEOs。
To address the cash shortfall resulting from reduced production, during Q2 2024 the Company sold a portion of its minority equity investments in public mining companies, generating proceeds of US$2.27M. Additionally, the Company is exploring various alternatives to source further cash to mitigate the impact of the delay, including the sale of non-core assets.
为了解决由于生产减少导致的现金短缺问题,在2024年第二季度,公司出售了其公开矿业公司少数股权投资的一部分,获得了227万美元的收益。此外,公司正在探索各种替代方案以获得更多现金,以缓解延迟的影响,包括出售非核心资产。
About Austral Gold
关于澳大利亚黄金
Austral Gold is a growing gold and silver mining producer building a portfolio of quality assets in the Americas based on three strategic pillars: production, exploration and equity investments. Austral continues to lay the foundation for its growth strategy by advancing its attractive portfolio of producing and exploration assets.
澳大利亚黄金是一个发展中的金银矿产生产商,基于生产,勘探和股权投资三个战略支柱来建立美洲优质资产的投资组合。澳大利亚继续通过推进其吸引人的生产和勘探资产组合为其增长战略奠定基础。
For more information, please visit the Company's website at .
欲了解更多信息,请访问该公司的网站。
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
TSX创业公司交易所及其监管服务提供方(该术语定义在TSX创业公司政策中)不对此发布的充分性或准确性承担任何责任。
Release approved by the Company's Chief Executive Officer of Austral Gold, Stabro Kasaneva.
该新闻稿经澳大利亚黄金公司首席执行官斯塔布罗·卡萨涅瓦批准。
For additional information please contact:
如需更多信息,请联系:
Stabro Kasaneva
Chief Executive Officer
Austral Gold Limited
stabro.kasaneva@australgold.com
+56 9 9822 3563
Stabro Kasaneva
首席执行官
澳洲黄金股份有限公司
stabro.kasaneva@australgold.com
这份新闻稿中的陈述并非历史事实,而是前瞻性陈述。前瞻性陈述不是历史事实,主要包括预测 - 关于未来计划,期望和发展的声明。例如,"预计","打算","计划","可能","可能","潜在","应该","预期","有可能","相信"等类似的措辞倾向于表明前瞻性声明。本新闻稿中的前瞻性陈述包括:设备的安装现在预计将在2024年6月底左右进行,2024年生产指导从24,000-28,000金当量盎司(GEOs)下调至18,000-20,000 GEOs,公司正在探索各种替代方案以获得更多现金,以缓解延迟的影响,包括出售非核心资产,澳大利亚继续通过推进其吸引人的生产和勘探资产组合为其增长战略奠定基础。
Jose Bordogna
Chief Financial Officer
Austral Gold Limited
jose.bordogna@australgold.com
+61 466 892 307
Jose Bordogna
致富金融
澳洲黄金股份有限公司
jose.bordogna@australgold.com
所有这些前瞻性陈述都受到各种已知和未知风险,不确定因素以及其他因素的影响,这些因素可能导致实际事件或结果与表达或暗示的事件或结果不同,包括但不限于勘探项目,开发计划和成本估算的不确定性,商品价格波动;政治或经济不稳定和监管变化;货币波动,资本市场状况尤其是考虑到新冠状病毒的影响,以及有关矿业物业勘察的其他风险和危险以及资本的可用性。您应该注意到,上述列表并非涵盖所有可能使用的因素和假设。澳大利亚无法保证实际事件,表现或结果与这些前瞻性陈述一致,管理层的假设可能被证明是不正确的。澳大利亚的前瞻性陈述反映了对未来事件和运营业绩的当前预期,并且仅截至此处,并且澳大利亚不会假定任何义务更新前瞻性陈述,除非适用法律要求。由于上述原因,您不应过多地依赖前瞻性声明
Forward-Looking Statements
前瞻性声明
Statements in this news release that are not historical facts are forward-looking statements. Forward-Looking statements are statements that are not historical, and consist primarily of projections - statements regarding future plans, expectations and developments. Words such as "expects", "intends", "plans", "may", "could", "potential", "should", "anticipates", "likely", "believes" and words of similar import tend to identify forward-looking statements. Forward-Looking statements in this news release include installation of the equipment is now projected to occur near the end of June 2024, revision of production guidance for 2024 from 24,000- 28,000 gold equivalent ounces (GEOs) to 18,000-20,000 GEOs, the Company is exploring various alternatives to source further cash, including the sale of non-core assets and Austral continues to lay the foundation for its growth strategy by advancing its attractive portfolio of producing and exploration assets.
所有板块的资产
All of these forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied, including, without limitation, uncertainty of exploration programs, development plans and cost estimates, commodity price fluctuations; political or economic instability and regulatory changes; currency fluctuations, the state of the capital markets especially in light of the effects of the novel coronavirus, uncertainty in the measurement of mineral resources and reserves and other risks and hazards related to the exploration of a mineral property, and the availability of capital. You are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Austral cannot assure you that actual events, performance or results will be consistent with these forward-looking statements, and management's assumptions may prove to be incorrect. Austral's forward-looking statements reflect current expectations regarding future events and operating performance and speak only as of the date hereof and Austral does not assume any obligation to update forward-looking statements if circumstances or management's beliefs, expectations or opinions should change other than as required by applicable law. For the reasons set forth above, you should not place undue reliance on forward-looking statement
策略