share_log

Sitka Announces Expansion of RC Gold Project With Acquisition of Victoria Gold's Clear Creek Property, Yukon

Sitka Announces Expansion of RC Gold Project With Acquisition of Victoria Gold's Clear Creek Property, Yukon

Sitka宣布通过收购Victoria Gold的Clear Creek物业在育空地区扩大了RC黄金项目。
Accesswire ·  06/24 08:00
  • New property acquisition from Victoria Gold completes amalgamation of contiguous district-scale gold camp at RC Gold Project in Yukon
  • Victoria Gold now a significant shareholder with an initial 8% interest in Sitka Gold
  • Adds four high-priority targets for intrusion related gold deposits
  • Historical drill results of up to 20.46 g/t Au over 10.7 metres (Contact), 1.87 g/t Au over 42.6 metres (Bear Paw), 1.03 g/t Au over 67.1 metres (Rhosgobel) and 1.20 g/t Au over 10.0 metres (Pukelman)
  • Newly identified mineralized corridor from Blackjack gold deposit projects over 5 kms through intrusions located on the newly acquired property
  • 从维多利亚黄金公司收购的新房产完成了育空地区RC黄金项目连续地区规模金矿营地的合并
  • 维多利亚黄金现在是大股东,最初持有锡特卡黄金8%的权益
  • 为入侵相关的黄金矿床增加了四个高优先级目标
  • 历史钻探结果显示,10.7 米(接触面)上金含量高达 20.46 g/t Au,超过 42.6 米(Bear Paw),1.03 g/t Au,超过 67.1 米(Rhosgobel),1.20 g/t Au,10.0 米以上(Pukelman)
  • 新发现的矿化走廊来自二十一点金矿项目超过5公里的矿化走廊,该走廊位于新收购的房产上

VANCOUVER, BC / ACCESSWIRE / June 24, 2024 / Sitka Gold Corp. ("Sitka" or the "Company") (TSXV:SIG)(FSE:1RF)(OTCQB:SITKF) announces that the Company has executed a definitive asset purchase agreement (the "Purchase Agreement") with Victoria Gold Corp. (the "Vendor") dated June 24, 2024 in connection with the acquisition (the "Acquisition") of a 100% interest in the Clear Creek property (the "Property"), located adjacent to the Company's RC Gold Project, (see Figures 1 and 2). The Clear Creek Property claims adjoin Sitka Gold's road accessible RC Gold Project ("RC Gold" or the "Project"), located approximately 100 kilometres east of Dawson City, Yukon and cover the southern portion of the Clear Creek Intrusive Complex. The Property encompasses several regions of intrusion-related gold mineralization that have undergone various levels of exploration, including historical reverse circulation and diamond drilling.

不列颠哥伦比亚省温哥华/ACCESSWIRE/2024年6月24日/锡特卡黄金公司(“锡特卡” 或 “公司”)(多伦多证券交易所股票代码:SIG)(FSE: 1RF)(OTCQB: SITKF)宣布,公司已于2024年6月24日与维多利亚黄金公司(“供应商”)签署了与收购(“收购”)有关的最终资产购买协议(“收购协议”)位于公司RC黄金项目附近的Clear Creek房产(“物业”)的100%权益(见图1和2)。Clear Creek Property索赔毗邻锡特卡黄金的道路无障碍RC黄金项目(“RC Gold” 或 “项目”),该项目位于育空地区道森市以东约100公里处,覆盖Clear Creek侵入式建筑群的南部。该地产包括多个与入侵相关的金矿化区域,这些区域经历了不同程度的勘探,包括历史上的反循环和钻石钻探。

"We are very pleased to complete the purchase of the Clear Creek Property and to welcome Victoria Gold as a major new shareholder of the Company," said Cor Coe, Director and CEO of Sitka Gold. "The purchase of Victoria Gold's Clear Creek Property marks a significant milestone in the evolution of the RC Gold Project as it consolidates the entire Clear Creek Intrusive Complex under one owner. The newly acquired property has an excellent road network accessing the target areas allowing Sitka to effectively use capital to conduct low cost drilling within this newly discovered high-grade Reduced Intrusion Related Gold System. The potential for this area, including the newly acquired Clear Creek Property, to host several multi-million ounce intrusion related gold deposits is becoming more evident as we continue to systematically explore the region.

“我们很高兴完成对Clear Creek房产的收购,并欢迎维多利亚黄金成为公司的主要新股东,” Sitka Gold董事兼首席执行官Cor Coe说。 “收购维多利亚金业旗下的Clear Creek地产标志着RC黄金项目演变中的一个重要里程碑,因为该项目将整个Clear Creek侵入式建筑群整合到一个所有者之下。新收购的物业拥有通往目标区域的良好道路网络,使西特卡能够有效地利用资金,在这个新发现的高等级 “减少入侵相关金矿系统” 内进行低成本钻探。随着我们继续系统地勘探该地区,包括新收购的Clear Creek Property,该地区拥有数百万盎司入侵相关金矿的潜力越来越明显。

"Sitka's recent discovery of the Blackjack and Eiger deposits has proven that the district hosts very significant gold deposits, with the higher-grade, Blackjack gold deposit being the cornerstone to develop the potential of the region with an initial inferred 900,000 ounce resource from surface grading 0.83 g/t gold (see news release dated January 19, 2023). With the entire Clear Creek Intrusive Complex now under Sitka's 100% ownership we will be pushing to unlock value in this target rich area as we pursue additional discoveries while expanding these wide open deposits."

锡特卡最近发现的二十一点和艾格矿床证明该地区拥有非常重要的金矿床,而更高品位的二十一点金矿床是开发该地区潜力的基石,其最初从地表品位为0.83克/吨的黄金中推断出90万盎司的资源(见2023年1月19日的新闻稿)。现在,整个Clear Creek侵入式综合体归Sitka的100%所有权所有,我们将努力在这一目标富集区释放价值,同时我们在扩大这些开阔的矿床的同时寻求更多发现。”

"We have been impressed with the exploration success that Sitka has demonstrated at its RC Gold Project," stated John McConnell, President and CEO of Victoria Gold. "Combining the RC Gold Project and Victoria's Clear Creek Property consolidates this new Yukon gold camp. Sitka has a strong exploration team with decades of experience in Yukon. We expect Sitka will have further success exploring the combined project and Victoria will benefit as a significant Sitka shareholder."

“Sitka在其RC黄金项目中取得的勘探成功给我们留下了深刻的印象,“维多利亚黄金总裁兼首席执行官约翰·麦康奈尔说。 “将RC黄金项目和维多利亚州的Clear Creek地产合并在一起,巩固了育空地区这个新的黄金阵营。Sitka拥有一支强大的勘探团队,在育空地区拥有数十年的经验。我们预计,锡特卡将在探索合并后的项目方面取得进一步成功,维多利亚州将作为锡特卡的重要股东受益。”

Figure 1 - RC Property prior to acquisition of Victoria Gold's Clear Creek Project.
图 1-收购维多利亚黄金公司的 Clear Creek 项目之前的 RC 地产。
Figure 2 - Consolidated RC Gold Project after acquisition of Victoria Gold's Clear Creek Property. The RC Gold Project now encompasses the entire Clear Creek Intrusive Complex, a cluster of known gold-bearing intrusions in the heart of the Tombstone Gold Belt.
图2-收购维多利亚黄金公司的Clear Creek地产后的合并RC黄金项目。RC Gold 项目现在包括整个 Clear Creek 侵入性建筑群,这是一群位于墓碑金带中心地带的已知含金入侵体。

Historical work in the Clear Creek district has mainly focused on the southern Clear Creek Intrusive Complex. In 1992 Noranda conducted the first drilling in the area targeting "Fort Knox" type mineralization with six holes testing the Pukelman Intrusion (See Table 1, Figure 3), Eiger Intrusion and Saddle area. The drilling in the Pukelman intrusion intersected sheeted quartz veining within megacrystic quartz monzonite which returned values of 1.02 g/t gold over 10.0 m from 26.0 m in RC-92-1 and 0.68 g/t gold over 16.0 m from 78.0 m in RC-92-1. In 1995, Kennecott conducted wide spaced shallow reverse circulation drilling on the Rhosgobel intrusion (See Table 1, Figure 3), identifying an east-west trending zone of sheeted quartz-tourmaline veining within megacrystic quartz monzonite, 1200 metres long, 200 metres wide, and 65 metres deep. No drilling has been conducted since Kennecott's initial drilling of this target. Highlights from Kennecott's drilling include CCRC95-15 which intersected mineralization over its entire 74.7m length grading 0.83 g/t gold, including 1.57 g/t gold over 6.1 m at the bottom of the hole. CCRC95-16 intersected 1.03 g/t gold over its entire length of 67.1 m including 1.43 g/t gold over the final 30 metres of the hole. In 1999, the Bear Paw Breccia Zone (See Table 1, Figure 3), a hydrothermal quartz breccia, was discovered by Redstar Resources with hole BP99-1, which intersected 26.7 m grading 2.00 g/t gold. In 2010 and 2011 Golden Predator drilled several zones on the property including the Contact Zone (See Table 1, Figure 3) intersecting 42.7 m of 1.87 g/t gold and 10.7 m of 20.46 g/t gold within sheeted veining hosted in metasediments and associated with an east-northeast trending structure and intrusive dykes along the southeast margin of the Pukelman intrusion. No drilling has been conducted on the Property since the 2011 program.

Clear Creek地区的历史工作主要集中在南部的Clear Creek侵入性建筑群上。1992 年,诺兰达在该地区进行了首次钻探,目标是 “诺克斯堡” 型矿化,共有六个孔测试了普克尔曼入侵(见表 1,图 3)、艾格入侵和萨德尔区域。在普克尔曼侵入体中的钻探与巨晶石英蒙佐尼特内的石英脉络相交,在 RC-92-1 中,从 26.0 米处返回了 10.0 米以上的金值 1.02 g/t,从 RC-92-1 的 78.0 m 返回超过 16.0 米的 0.68 g/t 金。1995 年,Kennecott 在 Rhosgobel 入侵体上进行了宽间距浅层反循环钻探(见表 1,图 3),确定了巨晶石英单子岩中片状石英碧玺脉状的东西向趋势区域,长 1200 米,宽 200 米,深 65 米。自肯纳科特首次钻探该目标以来,没有进行过任何钻探。肯纳科特钻探的亮点包括 CCRC95-15,该钻探在其整个 74.7 米长的长度上横穿了矿化层,金品位为 0.83 克/吨,包括钻孔底部超过 6.1 米处的 1.57 克/吨黄金。CCRC95-16 在其 67.1 米的整个长度上与 1.03 克/吨的金相交,其中在洞的最后 30 米处与 1.43 克/吨的金相交。1999 年,Redstar Resources 发现了 Bear Paw Breccia Zone(见表 1,图 3),这是一种热液石英角砾岩,上面有 BP99-1 孔,该洞横穿了 26.7 米,金品位为 2.00 克/吨。2010年和2011年,Golden Predator在该地产上钻探了多个区域,包括接触区(见表1,图3),在化沉积物中的板状脉中与42.7米的1.87克/吨黄金和10.7米的20.46克/吨金相交,与普克尔曼入侵东南缘的东北趋势结构和侵入性堤坝有关。自2011年计划以来,没有在该物业上进行过任何钻探。

A large database of geological, geochemical, and geophysical information exists for the Property. The database of information combined with the increased understanding of the controls on mineralization developed by Sitka Gold suggests there is significant potential for the discovery of additional intrusion related gold deposits. A prime example is the recent drilling by Sitka that has identified a north-south trending structural corridor hosting higher-grade mineralization within the Blackjack deposit. The corridor trends southward from the Blackjack deposit through the Pukelman West intrusion and along the western margin of the Rhosgobel intrusion (see Figure 4) located on the Property. This structural corridor linking these intrusions appears to extend for over 10 kilometres and represents a significant exploration target.

该物业有一个包含地质、地球化学和地球物理信息的大型数据库。信息数据库加上对Sitka Gold开发的矿化控制措施的进一步了解,表明存在发现更多与入侵相关的金矿床的巨大潜力。一个典型的例子是Sitka最近的钻探,该钻探确定了一条南北走向的结构走廊,二十一点矿床内有更高品位的矿化区。该走廊从二十一点矿床向南延伸,穿过普克尔曼西部的入侵点,然后沿着位于该物业上的罗斯戈贝尔入侵的西部边缘(见图4)向南延伸。这条连接这些入侵的结构走廊似乎延伸了10多公里,是一个重要的勘探目标。

Figure 3: Location of zones of gold mineralization that have had limited historical drilling within the newly acquired Clear Creek Property.
图 3:新收购的 Clear Creek 地产内历史钻探有限的金矿化区的位置。
Figure 4: Plan map showing multiple priority target areas on the newly acquired Clear Creek Property and the newly identified Blackjack Mineralized Corridor that extends for over 10 kilometres through the Saddle, Pukelman West and Rhosgobel Intrusive Stocks.
图4:规划图显示了新收购的Clear Creek地产和新确定的二十一点矿化走廊的多个优先目标区域,该走廊穿过萨德尔、普克尔曼西部和罗斯戈贝尔侵入性股票延伸了10多公里。

Table 1: Significant drill hole results from the Clear Creek Property

表 1:Clear Creek 地产的显著钻孔结果

*Intervals are drilled core length, as insufficient drilling has been completed at this time to determine true widths

*间隔是钻孔的岩芯长度,因为目前尚未完成足够的钻孔以确定真实宽度

Table References

表格引用

  1. Robinson, S.D. and R. A. Doherty, 1988. Geological, Geochemical, Geophysical and Diamond Drilling 1988 Summary Report on the Rum, Rye and Roll Claims ((assessment report 092748)
  2. Feulgen, S. and J.C. Stephen, 1989, Initial Diamond Drilling Report on the Rain, Wind, Sleet Claims, Left Clear Creek, Yukon (assessment report 092752)
  3. Bidwell, G., 1993. Clear Creek Project, 1992 Reverse Circulation Drill Program (assessment report 093097)
  4. Coombes, S., 1995. 1995 Assessment Report on the Clear Creek Option; prepared by Kennecott Canada Inc. (assessment report 093372).
  5. Stammers, M.A., 2000. 1999 Geochemical and Diamond Drilling Assessment Report on the Clear Creek Property (assessment report 094058)
  6. Weeks, S. and R. Falls, 2001, 2000 Geological, Geochemical and Diamond Drilling Assessment Report on the Clear Creek Property (assessment report 94165)
  7. O'Brien, 2010;Assessment Report, 2010 Diamond Drilling Program, Clear Creek Property (Assessment report 095539)
  8. Shutty, 2011; Assessment Report, 2011 Exploration Program, Clear Creek Property (Assessment Report 095984)
  1. 南达科他州罗宾逊和 R. A. Doherty,1988 年。1988 年地质、地球化学、地球物理和钻石钻探关于朗姆酒、黑麦和轧辊索赔的摘要报告(评估报告 092748)
  2. Feulgen、S. 和 J.C. Stephen,1989 年,《关于雨、风、雨夹雪索赔的初步钻石钻探报告》,Left Clear Creek,育空地区(评估报告 092752)
  3. Bidwell,G.,1993 年。Clear Creek 项目,1992 年反向循环钻探计划(评估报告 093097)
  4. 库姆斯,S.,1995年。《1995年Clear Creek期权评估报告》;由加拿大肯尼科特公司编写(评估报告093372)。
  5. Stammers,M.A.,2000。1999 年 Clear Creek 地产地球化学和钻石钻探评估报告(评估报告 094058)
  6. Weeks、S. 和 R. Falls,2001、2000 年 Clear Creek 地产地质、地球化学和钻石钻探评估报告(评估报告 94165)
  7. O'Brien,2010 年;Clear Creek Property 2010 年钻石钻探计划评估报告(评估报告 095539)
  8. Shutty,2011 年;Clear Creek Property 2011 年勘探计划评估报告(评估报告 095984)

Transaction Terms

交易条款

Pursuant to the Purchase Agreement, the Company issued to Vendor an aggregate of 21,843,401 common shares in the capital of the Company (the "Shares") as an initial payment, representing 8% of the issued and outstanding shares of Sitka after giving effect to the issuance of the Shares. In order to complete the Acquisition, the Company is required to make the following additional payments (each a "Deferred Payment"):

根据购买协议,公司向卖方共发行了公司资本中的21,843,401股普通股(“股份”),作为首次付款,占Sitka在股票发行生效后已发行和流通股份的8%。为了完成收购,公司需要支付以下额外款项(每笔款项均为 “延期付款”):

  • $2,000,000 on or before August 30, 2025;
  • $3,000,000 on or before June 24, 2026; and
  • $6,000,000 on or before June 24, 2027.
  • 2025 年 8 月 30 日当天或之前为 2,000,000 美元;
  • 2026 年 6 月 24 日当天或之前 3,000,000 美元;以及
  • 2027 年 6 月 24 日当天或之前为 6,000,000 美元。

During the term of the Purchase Agreement while the Deferred Payments are pending, Sitka will act as operator of the Clear Creek Property and have control over its work programme. The Company may, in its sole discretion, satisfy any Deferred Payment in cash or through the issuance of such number of Shares as is equal to the amount of the applicable Deferred Payment based on the volume weighted average price of the Shares on the TSX Venture Exchange (the "Exchange") (or such other exchange upon which the Shares are then listed) for the 20 consecutive trading days immediately prior to the due date of the applicable Deferred Payment, provided however that in the event that any such Share issuance would result in the Vendor holding greater than 19.9% of the issued and outstanding Shares of the Company, the Company must first obtain: (i) the written consent of the Vendor to receive such Shares; and (ii) approval of the shareholders of the Company in accordance with Exchange policies.

在购买协议期限内,在延期付款待定期间,Sitka将担任Clear Creek物业的运营商,并控制其工作计划。公司可自行决定在适用延期付款到期日之前的连续20个交易日内,根据多伦多证券交易所风险交易所(“交易所”)(或股票上市的其他交易所)股票的交易量加权平均价格,以现金或发行等于适用的延期付款金额的股票数量来支付任何延期付款,但前提是如果出现以下情况:任何此类股票的发行都将导致供应商的持股量超过在公司已发行和流通股份的19.9%中,公司必须首先获得:(i)卖方的书面同意才能获得此类股份;以及(ii)根据交易所政策获得公司股东的批准。

As additional consideration, upon completion of the Acquisition, the Company will grant to the Vendor a 5.0% net smelter return royalty on the Property (the "NSR Royalty"). The Company shall have the right at any time following the grant of the NSR Royalty to purchase from the Vendor 60% of the NSR Royalty by way of a one-time cash payment of $10,000,000.

作为额外对价,收购完成后,公司将向卖方授予该物业5.0%的冶炼厂净回报特许权使用费(“NSR特许权使用费”)。在授予NSR特许权使用费后,公司有权随时以一次性现金支付10,000,000美元的方式向供应商购买NSR特许权使用费的60%。

In the event that the Company publicly delineates proven and probable mineral reserves (within the meaning of National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") of 2,000,000 ounces or more of gold or gold equivalent on the Property, then the Company shall make an additional payment of $10,000,000 in cash to the Vendor within 60 business days of such public delineation. In the event that the Company has not made such public delineation before the fifth anniversary of the Purchase Agreement, then the Vendor shall have the right to cause an evaluation by an independent qualified person (within the meaning of NI 43-101) to be conducted as to the extent of the mineral resources on the Property, and, in the event such qualified person determines the existence of measured and/or indicated resources (within the meaning of NI 43-101) of 2,000,000 ounces or more of gold or gold equivalent on the Property, then the Company shall make the $10,000,000 cash payment to the Vendor within 60 business days.

如果公司公开描述了该物业中已探明和可能的矿产储量(根据National Instrument 43-101——矿产项目披露标准(“NI 43-101”)的定义,则公司应在公开划定后的60个工作日内向供应商额外支付1,000万美元现金或黄金等价物。如果公司在购买协议签订五周年之前没有公开描述此类内容,则卖方有权要求独立合格人员(在北爱尔兰43-101的含义范围内)对该物业的矿产资源范围进行评估,如果该合格人员确定存在2,000,000盎司的计量和/或指示资源(在北爱尔兰43-101的含义范围内)或更多财产上的黄金或黄金等价物,则公司应赚取美元在 60 个工作日内向供应商付款 10,000,000 笔现金。

In connection with the Purchase Agreement, the parties have entered into an investor rights agreement pursuant to which, among other things: (i) at any time in which the Vendor shall have beneficial ownership of at least 15% of the issued and outstanding Shares of the Company, the Vendor shall have the right to nominate one director to the board of directors of the Company; and (ii) the Vendor has been granted certain customary anti-dilution and registration rights.

关于购买协议,双方签订了投资者权利协议,根据该协议,除其他外:(i) 在卖方拥有公司已发行和流通股份至少15%的实益所有权的任何时候,卖方都有权提名一名董事进入公司董事会;(ii) 卖方已被授予某些惯常的反稀释和注册权。

About the flagship RC Gold Project

关于旗舰 RC Gold 项目

The RC Gold Project consists of a 431 square kilometre contiguous district-scale land package located in the heart of Yukon's Tombstone Gold Belt. The project is located approximately 100 kilometres east of Dawson City, which has a 5,000 foot paved runway, and is accessed via a secondary gravel road from the Klondike Highway which is usable year-round and is an approximate 2 hour drive from Dawson City. It is the largest consolidated land package strategically positioned mid-way between Victoria Gold's Eagle Gold Mine - Yukon's newest gold mine which reached commercial production in the summer of 2020 - and Victoria Gold's former producing Brewery Creek Gold Mine.

RC黄金项目由位于育空地区墓碑金带中心地带的431平方公里的连续地区规模土地组成。该项目位于道森市以东约100公里处,该市有一条5,000英尺的铺装跑道,可通过克朗代克高速公路的次要碎石路进入,该公路全年开放,距离道森市约2小时车程。它是最大的综合用地计划,其战略位置位于维多利亚黄金公司的鹰金矿(育空地区最新的金矿,于2020年夏天实现商业化生产)和维多利亚黄金公司以前生产的Brewery Creek金矿之间。

On January 19, 2023 Sitka Gold announced an Initial Mineral Resource Estimate prepared in accordance with National Instrument 43-101 ("NI 43-101") guidelines for the RC Gold Property of 1,340,000 ounces of gold(1). The road accessible, pit constrained Mineral Resource is classified as inferred and is contained in two zones: The Blackjack and Eiger deposits. Both of these deposits are at/near surface, are potentially open pit minable and amenable to heap leaching, with initial bottle roll tests indicating that the gold is not refractory and has high gold recoveries of up to 94% with minimal NaCN consumption (see News Release July 13, 2022). The Mineral Resource estimate is presented in the following table at a base case cut-off grade of 0.25 g/t Au:

2023年1月19日,锡特卡黄金宣布了根据国家仪器43-101(“NI 43-101”)134万盎司黄金地产指导方针编制的初步矿产资源估算(1)。道路通行、矿坑受限的矿产资源被归类为推断矿产资源,分为两个区域:二十一点和艾格矿床。这两个矿床都位于地表/地表附近,可能是露天矿开采的,易于堆洗,最初的瓶轧测试表明,金不耐火,金回收率高达94%,NaCN消耗量最低(见2022年7月13日新闻稿)。下表列出了矿产资源估算值,基本案例临界品位为0.25 g/t Au:

RC Gold Inferred Mineral Resource Estimate

RC 黄金推断矿产资源估算

Notes

注意事项

1. Mineral resource estimate prepared by Ronald G. Simpson of GeoSim Services Inc. with an effective date of January 19, 2023. Mineral Resources are classified using the 2014 CIM Definition Standards.
2. The cut-off grade of 0.25 g/t Au is believed to provide a reasonable margin over operating and sustaining costs for open-pit mining and processing
3. Mineral resources are constrained by an optimised pit shell using the following assumptions: US$1800/oz Au price; a 45° pit slope; assumed metallurgical recovery of 85%; mining costs of US$2.00 per tonne; processing costs of US$8.00 per tonne; G&A of US$1.50/t.
4. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
5. Totals may not sum due to rounding.

1。矿产资源估算由GeoSim Services Inc.的罗纳德·G·辛普森编制,生效日期为2023年1月19日。矿产资源使用 2014 年 CIM 定义标准进行分类。
2。据信,0.25 g/t Au的临界品位比露天采矿和加工的运营和维持成本提供了合理的利润
3.矿产资源受到基于以下假设的优化矿壳的限制:1800美元/盎司的金价;45°的矿坑斜率;假设冶金回收率为85%;采矿成本为每吨2.00美元;加工成本为每吨8.00美元;G&A为1.50美元/吨。
4。矿产资源不是矿产储量,没有显示出经济可行性。
5。由于四舍五入,总数可能不相和。

To date, 56 diamond drill holes have been drilled into this system for a total of approximately 19,962 metres including 16 drill holes totalling 6,515 metres completed in 2023 focused on expanding the initial resource. The drilling in 2023 produced results of up to 219.0 m of 1.34 g/t gold including 124.8 m of 2.01 g/t gold and 55.0 m of 3.11 g/t gold in drill hole DDRCCC-23-047 at Blackjack (see news release dated September 26, 2023). The Company recently completed two drill holes totalling 1,085 metres during the winter phase of a planned 15,000 metre diamond drilling program at the RC Gold Project for 2024.

迄今为止,已在该系统中钻探了56个金刚石钻孔,总长约19,962米,其中包括于2023年完成的16个钻孔,总长度为6,515米,重点是扩大初始资源。2023 年的钻探产生了高达 219.0 m 的 1.34 g/t 黄金,其中包括 124.8 m 的 2.01 g/t 的黄金,在 Blackjack 的 DDRCCC-23-047 钻孔中产生 55.0 米 3.11 克/吨的黄金(见 2023 年 9 月 26 日的新闻稿)。该公司最近在计划于2024年在RC黄金项目进行的15,000米金刚石钻探计划的冬季阶段完成了两个总长1,085米的钻孔。

(1) Simpson, R. January 19, 2023. Clear Creek Property, RC Gold Project, NI 43-101 Technical Report, Dawson Mining District, Yukon Territory

(1) 辛普森,R. 2023 年 1 月 19 日。Clear Creek Property,RC 黄金项目,NI 43-101 技术报告,育空地区道森矿区

RC Gold Deposit Model

RC 黄金存款模型

Exploration on the Property has mainly focused on identifying an intrusion-related gold system ("IRGS"). The property is within the Tombstone Gold Belt which is the prominent host to IRGS deposits within the Tintina Gold Province in Yukon and Alaska. Notable deposits from the belt include: Fort Knox Mine in Alaska with current Proven and Probable Reserves of 230 million tonnes at 0.3 g/t Au (2.471 million ounces; Sims 2018)(1); Eagle Gold Mine with current Measured and Indicated Resources of 233 million tonnes at a grade of 0.57 g/t Au at the Eagle Main Zone (4.303 million ounces; Harvey et al, 2022)(2); the Brewery Creek deposit with current Indicated Mineral Resource of 22.2 million tonnes at a gold grade of 1.11 g/t (0.789 million ounces; Hulse et al. 2020)(3); the Florin Gold deposit, located adjacent to Sitka's RC Gold project, with a current Inferred Mineral Resource of 170.99 million tonnes grading 0.45 g/t (2.47 million ounces; Simpson 2021)(4) and the AurMac Project with an Inferred Mineral Resource of 347.49 million tonnes grading 0.63 gram per tonne gold (7.00 million ounces)(5).

对该物业的勘探主要集中在确定与入侵相关的黄金系统(“IRGS”)上。该物业位于墓碑金带内,该地带是育空地区和阿拉斯加丁蒂纳金省内IRGS矿床的主要所在地。该地带的重要矿床包括:阿拉斯加的诺克斯堡矿,目前的探明和可能储量为2.3亿吨,金含量为0.3克/吨(247.1万盎司;Sims 2018)(1);位于伊格尔主区的鹰金矿目前的测定和指示资源为2.33亿吨,金品位为0.57 g/t Au(430.3万盎司;Harvey等人,2022年)(2);Brewery Creek矿床,目前指示矿产资源为2,220万吨,黄金品位为1.11克/吨(78.9万盎司;Hulse等人,2020年)(3);弗洛林金矿床位于锡特卡的 RC Gold 项目附近,目前推断矿产资源量为 1.7099 亿吨,品位为 0.45 g/t(247 万盎司;Simpson 2021)(4) 以及推断矿产资源为3.4749亿吨的AurMac项目,黄金品位为每吨黄金0.63克(70万盎司)(5)

(1) Sims J. Fort Knox Mine Fairbanks North Star Borough, Alaska, USA National Instrument 43-101 Technical Report. June 11, 2018.

(1) Sims J. Fort Knox Mine Fairbanks North Star Borough,阿拉斯加,美国国家仪器 43-101 技术报告。2018 年 6 月 11 日。

(2) Harvey N., Gray P., Winterton J., Jutras M., Levy M.,Technical Report for the Eagle Gold Mine, Yukon Territory, Canada. Victoria Gold Corp. December 31, 2022.

(2) Harvey N.、Gray P.、Winterton J.、Jutras M.、Levy M.,加拿大育空地区鹰金矿技术报告。维多利亚黄金公司 2022年12月31日。

(3) Hulse D, Emanuel C, Cook C. NI 43-101 Technical Report on Mineral Resources. Gustavson Associates. May 31, 2020.

(3) Hulse D、Emanuel C、Cook C. NI 43-101《矿产资源技术报告》。古斯塔夫森协会。2020 年 5 月 31 日。

(4) Simpson R. Florin Gold Project NI 43-101 Technical Report. Geosim Services Inc. April 21, 2021. d=4984158

(4)北卡罗来纳州辛普森·弗洛林黄金项目43-101技术报告。Geosim 服务公司。2021 年 4 月 21 日。d=4984158

(5) Banyan Gold News Release Dated February 7, 2023 (Technical Report to be filed within 45 days of news release)

(5) 2023年2月7日悦榕金新闻稿(技术报告将在新闻发布后45天内提交)

Upcoming Events

即将举行的活动

Sitka Gold will be attending and/or presenting at the following events*:

Sitka Gold 将参加和/或出席以下活动*:

  • Yukon Mining Alliance Property Tours, Dawson City, Yukon: June 20 - 26, 2024
  • Takestock Investor Forum, Stampede Event, Calgary, Alberta: July 3, 2024
  • Precious Metals Summit, Beaver Creek, Colorado: September 10 - 13, 2-024
  • 育空矿业联盟房地产之旅,育空地区道森市:2024年6月20日至26日
  • Takestock 投资者论坛,Stampede 活动,艾伯塔省卡尔加里:2024 年 7 月 3 日
  • 贵金属峰会,科罗拉多州比弗克里克:2024 年 9 月 10 日至 13 日

*All events are subject to change.

*所有活动可能会发生变化。

About Sitka Gold Corp.

关于锡特卡黄金公司

Sitka Gold Corp. is a well-funded mineral exploration company headquartered in Canada. The Company is managed by a team of experienced industry professionals and is focused on exploring for economically viable mineral deposits with its primary emphasis on gold, silver and copper mineral properties of merit. Sitka is currently exploring its flagship RC Gold Project within the Tombstone Gold Belt in the Yukon Territory with a 15,000 metre diamond drill program planned for 2024. The company is also advancing the Alpha Gold Project in Nevada and currently has drill permits for its Burro Creek Gold and Silver Project in Arizona and the Coppermine River Project in Nunavut.

锡特卡黄金公司是一家资金充足的矿产勘探公司,总部位于加拿大。该公司由一支经验丰富的行业专业人员组成的团队管理,专注于勘探经济上可行的矿床,主要重点是具有价值的金、银和铜矿物特性。锡特卡目前正在育空地区的墓碑金带内探索其旗舰RC金矿项目,计划于2024年进行15,000米的钻石钻探计划。该公司还在推进内华达州的阿尔法金矿项目,目前已获得亚利桑那州伯罗溪金银项目和努纳武特铜矿河项目的钻探许可。

*For more detailed information on the underlying properties please visit our website at

*有关标的物业的更多详细信息,请访问我们的网站

The scientific and technical content of this news release has been reviewed and approved by Cor Coe, P.Geo., Director and CEO of the Company, and a Qualified Person (QP) as defined by National Instrument 43-101.

本新闻稿的科学和技术内容已由公司董事兼首席执行官Cor Coe、P.Geo. 以及National Instrument 43-101定义的合格人员(QP)的审查和批准。

ON BEHALF OF THE BOARD OF DIRECTORS OF

代表董事会

SITKA GOLD CORP.

锡特卡黄金公司

"Donald Penner"

唐纳德·彭纳

President and Director

总裁兼主任

For more information contact:

欲了解更多信息,请联系:

Donald Penner
President & Director
778-212-1950
dpenner@sitkagoldcorp.com

唐纳德·彭纳
总裁兼董事
778-212-1950
dpenner@sitkagoldcorp.com

or

要么

Cor Coe
CEO & Director
604-817-4753
ccoe@sitkagoldcorp.com

核心代码
首席执行官兼董事
604-817-4753
ccoe@sitkagoldcorp.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所风险投资交易所及其监管服务提供商(该术语在多伦多证券交易所风险投资交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

Cautionary and Forward-Looking Statements

警示和前瞻性陈述

This release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements relate to future events or future performance and reflect the expectations or beliefs of management of the Company regarding future events. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would" or "occur". This information and these statements, referred to herein as "forward‐looking statements", are not historical facts, are made as of the date of this news release and include without limitation, statements regarding discussions of future plans, estimates and forecasts and statements as to management's expectations and intentions with respect to, among other things, the Company's anticipated work programs; the anticipated benefits of the Acquisition; the expected completion of the Acquisition and the timing thereof; the consideration payable pursuant to the Acquisition and the timing thereof; and expectations regarding exploration on the Company's mineral properties.

本新闻稿包括某些陈述和信息,这些陈述和信息可能构成适用的加拿大证券法所指的前瞻性信息。前瞻性陈述与未来事件或未来业绩有关,反映了公司管理层对未来事件的期望或信念。通常,前瞻性陈述和信息可以通过使用诸如 “打算” 或 “预期” 之类的前瞻性术语来识别,或者某些行为、事件或结果 “可能”、“应该”、“将” 或 “发生” 的此类词语和短语的变体或陈述。这些信息和这些陈述,在本文中被称为 “前瞻性陈述”,不是历史事实,是截至本新闻发布之日作出的,包括但不限于关于未来计划、估计和预测讨论的声明,以及关于管理层对公司预期工作计划的预期和意图的陈述;收购的预期收益;收购的预期完成及其时间;应付的对价到收购及其时机;以及对公司矿产勘探的预期。

In making the forward-looking statements in this news release, the Company has applied several material assumptions, including without limitation, that the benefits of the Acquisition will be as expected; that the Acquisition will be completed on the timing anticipated; that the Company will complete its proposed work programs; and that exploration results on the Company's mineral properties will be anticipated.

在本新闻稿中发表前瞻性陈述时,公司运用了多项重大假设,包括但不限于收购的收益将如预期;收购将在预期的时间内完成;公司将完成其拟议的工作计划;以及公司矿产的勘探结果将是预期的。

These forward‐looking statements involve numerous risks and uncertainties and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things, market uncertainty; the results of the Company's anticipated work programs; the risk that the Acquisition will not close on the timetable anticipated or at all; risks related to reliance on technical information; risks related to exploration and potential development of the Company's projects; business and economic conditions in the mining industry generally; fluctuations in commodity prices and currency exchange rates; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; the need to obtain additional financing to develop properties and uncertainty as to the availability and terms of future financing; the possibility of delay in exploration or development programs and uncertainty of meeting anticipated program milestones; and uncertainty as to timely availability of permits and other governmental and stock exchange approvals.

这些前瞻性陈述涉及许多风险和不确定性,实际结果可能与任何前瞻性陈述中建议的结果存在重大差异。除其他外,这些风险和不确定性包括市场不确定性;公司预期工作计划的结果;收购无法按预期时间表完成或根本无法完成的风险; 与依赖技术信息相关的风险;与公司项目的勘探和潜在开发相关的风险;采矿业的总体商业和经济状况;大宗商品价格和货币汇率的波动;与钻探结果解释以及矿床地质、连续性和品位有关的不确定性;开发地产需要获得额外融资以及未来融资供应和条款的不确定性;延迟勘探或开发的可能性计划和实现预期计划里程碑的不确定性; 以及及时获得许可证和其他政府和证券交易所批准的不确定性.

Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial out-look that are incorporated by reference herein, except in accordance with applicable securities laws. We seek safe harbor.

尽管公司管理层试图确定可能导致实际业绩与前瞻性陈述或前瞻性信息中包含的业绩存在重大差异的重要因素,但可能还有其他因素导致业绩与预期、估计或预期不符。无法保证此类陈述会被证明是准确的,因为实际结果和未来事件可能与此类陈述中的预期存在重大差异。因此,读者不应过分依赖前瞻性陈述和前瞻性信息。提醒读者,依赖此类信息可能不适合用于其他目的。除非根据适用的证券法,否则公司不承诺更新此处以引用方式纳入的任何前瞻性陈述、前瞻性信息或财务展望。我们寻求安全港。

SOURCE: Sitka Gold Corp

来源:锡特卡黄金公司


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发