share_log

High Tide Resources Announces Changes to the Board of Directors

High Tide Resources Announces Changes to the Board of Directors

High Tide资源宣布董事会变更
Accesswire ·  06/25 07:00

Adds Significant Capital Markets Strength

增加了重要的资本市场实力

TORONTO, ON / ACCESSWIRE / June 25, 2024 / High Tide Resources Corp. ("High Tide" or the "Company") (CSE:HTRC) announces the appointment of Jean-François Meilleur to the Board of Directors ("the Board") replacing Serge Pelletier who is stepping down from the Board, effective immediately, but will remain with the Company as an Advisor.

TORONTO,ON / ACCESSWIRE / June 25,2024 / High Tide Resources Corp.(“High Tide”或“公司”)(CSE:HTRC)宣布任命让·弗朗索瓦·梅耶(Jean-François Meilleur)为董事会成员(“董事会”),接替辞去董事会的Serge Pelletier,立即生效,但仍将继续担任公司顾问。

Steve Roebuck, Director & Interim CEO of High Tide states: We're excited to have Jean-François join our Board of Directors. His extensive capital markets experience and hands-on involvement in successful ventures within the junior exploration space make him a valuable addition to the team. Additionally, we express our gratitude to Serge for his significant contributions to High Tide since its inception and wish him all the best in his future endeavors."

High Tide董事和代理首席执行官Steve Roebuck表示:我们很高兴让·弗朗索瓦加入我们的董事会。他在资本市场方面的丰富经验和在初创勘探领域内成功创业的实践经历使他成为团队中宝贵的补充。此外,我们对Serge在High Tide成立以来作出的重大贡献表示感谢,并祝他在未来的事业中一切顺利。

Jean-François Meilleur, Director of High Tide states: "I'm excited to join the High Tide team and contribute to advancing our Labrador West Iron Ore Project and low-carbon green-steel initiative. This reminds me of my early days at Critical Elements Corporation, when the lithium industry had a small audience. Today, there's no doubt about the demand and future growth in the lithium space. I'm confident our green-steel vision will lead us to similar success."

High Tide董事Jean-François Meilleur表示:“我很高兴加入High Tide团队,并为推进我们的拉布拉多西部铁矿石项目和低碳绿色钢铁计划做出贡献。这让我想起了我在Critical Elements Corporation的早期日子,当时锂矿行业的受众很少。如今,锂矿空间的需求和未来增长毫无疑问。我相信我们的绿色钢铁愿景将引领我们取得类似的成功。

Jean-François Meilleur graduated from HEC Montréal in 2003 with a bachelor's degree in finance. For the past 18 years, he has been a Managing Director at P.E. Partners, a small-cap Capital Market boutique, supporting entrepreneurs in navigating the capital markets. In that role, he has worked with dozens of junior explorers and taken on significant executive roles with Critical Elements, Quebec Precious Metals, and Soma Gold Corp.

Jean-François Meilleur于2003年从HEC Montréal获得金融学学士学位。在过去的18年中,他一直是P.E. Partners的董事总经理,这是一家支持企业家在资本市场中航行的小型资本市场精品公司。在这个角色中,他与许多初创公司合作,并在Critical Elements,Quebec Precious Metals和Soma Gold Corp担任重要的执行角色。

About High Tide

关于High Tide

High Tide is focused on and committed to the development of mineral projects critical to infrastructure development using industry best practices combined with a strong social license from local communities. High Tide owns a 100% interest in the Labrador West Iron Project which hosts a NI 43-101 Inferred iron resource of 654.9 Mt @ 28.84% Fe and is located adjacent to IOCC's Carol Lake Mine in Labrador City, NL. This resource is exposed at surface and was pit constrained for an open-pit mining scenario. The Technical Report was filed on SEDAR on April 6, 2023 and was authored by Ryan Kressall M.Sc., P. Geo, Matthew Herrington, M.Sc., P. Geo, Catharine Pelletier, P. Eng. and Jeffrey Cassoff P. Eng.

High Tide专注于并致力于使用最佳实践结合当地社区的强大社会许可证开发对基础设施发展至关重要的矿业项目。High Tide拥有100%的Labrador West Iron项目权益,该项目拥有一个654.9Mt@28.84%Fe的NI 43-101推断铁矿资源,位于纽芬兰与拉布拉多省的Labrador City附近,靠近IOCC的Carol Lake Mine。该资源暴露在地面上,并针对露天矿山场景进行了限制。技术报告于2023年4月6日在SEDAR上提交,并由Ryan Kressall M.Sc.,P. Geo,Matthew Herrington M.Sc.,P. Geo,Catharine Pelletier,P. Eng。和Jeffrey Cassoff P. Eng.所撰写。

The Company also owns a 100% interest in the Lac Pegma copper-nickel-cobalt deposit located 50 kilometres southeast of Fermont, Quebec.

该公司还拥有位于魁北克省Fermont以东50公里处的Lac Pegma铜-镍-钴矿床的100%权益。

Further details on the Company, including a NI 43-101 technical report on the Labrador West Iron property can be found on the Company's website at .

公司的更多详细信息,包括有关Labrador West Iron资产的NI 43-101技术报告,请访问公司的网站。

Iron Ore and the Labrador Trough Infrastructure Advantage

铁矿石和Labrador槽基础设施优势

The Labrador Trough of western Labrador and adjoining Quebec constitutes Canada's primary iron producing district and is host to world-class deposits that have been mined for more than sixty years. The high quality of the deposits in the region allows for a wide range in product diversity, which includes premium fines, concentrate and pellet grades. Importantly, the low-carbon emission future will require Direct Reduction quality concentrate and pellets, two products that the Trough is producing and is considered to have significant growth potential to help support a "Green Iron and Steel" future.

西部Labrador和邻近的魁北克阿迪郎杜克地堡构成加拿大主要的铁矿生产区,是世界级矿床的宿主已经开采了60多年。该地区沉积物的高质量可实现广泛的产品多样性,包括优质细粉,浓缩物和球团级别。重要的是,低碳排放的未来将需要直接还原质量的浓缩和球团,这是槽生产并被认为具有支持“绿色铁和钢”未来的显着增长潜力的两种产品。

The Property (see location map appended to this press release) is strategically located near the mining communities of Wabush and Labrador City in the province of Newfoundland & Labrador and Fermont in Quebec. The area is home to Champion Iron Ore's Bloom Lake Mine, ArcelorMittal's Mont-Wright Mine, Tacora Resources' Scully Mine, and Rio Tinto IOC's Carol Lake Mine.

该资产(请参阅附加到此新闻稿的位置图)位于纽芬兰与拉布拉多省的Wabush和Labrador City矿业社区以及魁北克省的Fermont。该地区是Champion Iron Ore的Bloom Lake Mine,ArcelorMittal的Mont-Wright Mine,Tacora Resources的Scully Mine和Rio Tinto IOC的Carol Lake Mine的所在地。

The Wabush and Labrador City region is very well served with skilled labour, a highway, as well as access to abundant low-cost hydroelectricity and a common carrier railway. The railway has an estimated ~80 million tonnes per year of capacity for transport of iron products to the deep-water port of Sept Isles, Quebec, which provides year-round access to global markets.

Wabush和Labrador City地区的熟练劳动力、公路以及充足的廉价水电和普通运输铁路的服务非常好。该铁路的装载量估计约为每年80万吨,可将铁制品运往魁北克的Sept Isles深水港,为全年访问全球市场提供便利。

Qualified Person

合格人士

The technical information contained in this news release has been approved by Michael Zurowski, P.Eng., Executive Vice President of High Tide, who is a Qualified Person as defined in "National Instrument 43-101, Standards of Disclosure for Mineral Projects."

此新闻稿中的技术信息已获得High Tide执行副总裁Michael Zurowski,P.Eng.的批准,他是“公开披露矿物项目的国家43-101标准”中定义的合格人士。

For further information, please contact:

如需更多信息,请联系:

Steve Roebuck, P. Geo
Director, President & Interim CEO
Mobile: (905) 741-5458
Email: sroebuck@hightideresources.com
Michael Zurowski, P. Eng
Executive Vice President
Mobile: (416) 357-9753
Email: mtz@hightideresources.com
Steve Roebuck,P. Geo
董事,总裁兼代理首席执行官
移动电话:(905)741-5458
电子邮件:sroebuck@hightideresources.com
Michael Zurowski,P. Eng
执行副总裁
电话:(416)357-9753
电子邮件:mtz@hightideresources.com

Neither Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this news release.

加拿大证券交易所及其监管服务提供者(如加拿大证券交易所政策中所定义的)不对本新闻稿的充分性或准确性承担责任。

Forward looking information

本新闻稿中包含的某些声明可能构成"前瞻性信息"。前瞻性信息一般可以通过语言如"预期"、"期望"、"估计"、"预测"、"计划"或类似词语表达其对未来结果或事件的暗示。前瞻性信息基于管理层目前的预期,然而,它受到已知和未知风险、不确定性和其他因素的影响,这些风险、不确定性和其他因素可能导致本新闻稿中的前瞻性信息与实际情况不符,其中包括但不限于与认购的完成、超额认购选择权的行使以及认购结束日期有关的声明。请注意,本新闻稿中的前瞻性信息基于许多关键的预期和假设,包括但不限于公司将继续实现其声明的业务目标,以及公司能够筹集额外资本以继续前进。虽然公司管理层试图确定可能导致实际结果与本新闻稿中前瞻性信息不符的重要因素,但可能有其他因素会导致结果与预期、估计或意图不符。对于公司的前瞻性信息,读者应保持谨慎,公司不承担就执行与之相应的任何义务。阅读者应该注意,依赖这种信息可能不适用于其他用途。有关风险和不确定性的补充信息请参见公司截至2023年11月30日的管理讨论和分析,以及公司截至2023年11月30日的年度信息表,拷贝可在SEDAR+上获得。

This news release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, developing the Labrador West Iron Project into the next producer , the acquisition of low cost and potentially high reward lithium projects, the ability to keep exploration costs low, expected access to regional lithium processing hubs, the Company's objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to: the ability to anticipate and counteract the effects of COVID-19 pandemic on the business of the Company, including without limitation the effects of COVID-19 on the capital markets, commodity prices supply chain disruptions, restrictions on labour and workplace attendance and local and international travel, failure to receive requisite approvals in respect of the foregoing, failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, inability to fulfill the duty to accommodate First Nations and other indigenous peoples, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

本新闻稿包含某些“前瞻性声明”,不包含历史事实。前瞻性声明包括描述公司未来计划、目标或目标的估计和陈述,包括表明公司或管理层预期出现某种状态或结果的词语。前瞻性声明可能会被识别为“相信”、“预测”、“期望”、“估计”、“可能”、“可能”、“将”或“计划”等术语。由于前瞻性声明是基于假设并涉及未来事件和状况,因其本质的风险和不确定性而自然存在。尽管这些声明基于目前对公司的信息,但公司无法保证实际结果将符合管理层的预期。因涉及前瞻性信息的风险、不确定性和其他因素可能导致实际事件、结果、表现、前景和机会与该前瞻性信息所表达或暗示的情况有所不同。本新闻稿中的前瞻性信息包括但不限于将Labrador West Iron项目开发为下一个生产者,获得成本低廉、潜在回报高的锂项目,保持探勘成本低廉,预期获得区域锂加工中心的接入以及公司的目标、计划、陈述、探勘结果、潜在矿化、矿物资源估计、探勘和矿山开发计划、运营开始时间和市场条件估计。可能导致实际结果与此类前瞻性信息有所不同的因素包括但不限于:预测和抵消COVID-19大流行对公司业务的影响的能力,包括但不限于COVID-19对资本市场、商品价格、供应链中断、劳动力和工作场所出勤以及本地和国际旅行的影响,在上述方面未收到必要批准,未能识别矿物资源,未能将估计的矿物资源转化为储量,未能完成建议产品决策的可行性研究,冶金测试结果初步性质,延迟获得或未能获得所需的政府、环境或其他项目批准,政治风险,未能履行须容纳第一民族和其他土著人民的责任,有关未来所需的融资的可用性和成本的不确定性,股权市场的变化,通货膨胀,汇率变化,商品价格波动,项目开发延迟,成本和运营成本与估计值相差很大,以及矿业探勘和开发行业所涉及的其他风险,以及在SEDAR提交的公司公共文件中所列的那些风险。尽管公司认为本新闻稿中提供的前瞻性信息的假设和因素是合理的,但不应将过度的依赖放在该信息上,因为它仅适用于本新闻稿发布之日,并且不能保证此类事件将在披露的时间范围内或根本发生。除法律规定外,公司不承担任何更新或修订任何前瞻性信息的意向或义务。

Labrador West Iron Ore Deposit Location Map

Labrador West铁矿石存储位置地图

SOURCE: High Tide Resources Corp.

来源:High Tide Resources Corp.


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发