Toronto, Ontario--(Newsfile Corp. - July 9, 2024) - Torex Gold Resources Inc. (the "Company" or "Torex") (TSX: TXG) reports Q2 2024 gold production of 113,822 ounces ("oz") and gold sold of 113,513 oz. With strong production of 229,316 oz through the first half of the year, the Company is on track to achieve annual gold production guidance of 400,000 to 450,000 oz.
TABLE 1: PRELIMINARY SECOND QUARTER 2024 OPERATIONAL RESULTS
| | Q2 2024 |
Mining | | |
ELG Open Pits - Ore tonnes mined per day | tpd | 17,822 |
ELG Open Pits - Waste tonnes mined per day | tpd | 77,440 |
ELG Open Pits - Strip ratio | waste:ore | 4.3 |
ELG Underground - Ore tonnes mined per day | tpd | 2,145 |
Processing | | |
Average plant throughput | tpd | 13,214 |
Average gold recovery | % | 90.5 |
Average gold grade of ore processed | gpt | 3.34 |
Gold produced | oz | 113,822 |
Gold sold | oz | 113,513 |
Operational results are preliminary in nature and subject to final reconciliation. Financial and operational results for Q2 2024 will be released after market close on Wednesday August 7, 2024. A conference call hosted by senior management will be held the following day at 9:00 AM ET.
Jody Kuzenko, President & CEO of Torex, stated:
"ELG continues to deliver safe, strong operational results. With second quarter gold production of 113,822 oz and 229,316 oz through the first half of the year, we're well on pace to deliver on production guidance for the sixth year in a row. The performance of the processing plant continues to impress, with recoveries above 90% for the second straight quarter and throughput rates remaining above 13,000 tonnes per day ("tpd") for the sixth consecutive quarter.
"As expected, the strip ratio of the open pits decreased compared to Q1 and the level of waste mined is expected to decline further through the balance of the year as the pits reach the end of their mine life mid-2025. Given the remaining life of the open pits, very little of this cost will be capitalized. Mining rates at ELG Underground returned above their steady state level of 2,000 tpd, averaging 2,145 tpd for the quarter.
"I'm proud of the work that the team at ELG is doing to safely deliver the results that our stakeholders have come to expect from us. In this period of sustained higher gold prices, the solid cash flow generation from ELG will see us confidently through the final months of the Media Luna build, quickly repaying the modest level of net debt we expect to accumulate and returning to strong free cash flow around this time next year. With operational results delivering to plan, the finish line at Media Luna quickly approaching, and exploration results that point to further resource expansion, Morelos has laid the foundation for us to grow our business in Mexico and beyond."
SECOND QUARTER 2024 CONFERENCE CALL AND WEBCAST DETAILS
Torex plans to release its second quarter financial and operational results after market close on Wednesday, August 7, 2024. A conference call and webcast hosted by senior management will be held on Thursday, August 8, 2024, at 9:00 AM ET.
Telephone Access
For expedited access to the conference call, registration is open to obtain an access code in advance, which will allow participants to join the call directly at the scheduled time. Alternatively, dial-in details are as follows:
Please dial in approximately ten minutes prior to the scheduled start time if using the dial-in details above and request to join the Torex Gold Resources conference call.
オンタリオ州トロント--(Newsfile Corp.-2024年7月9日)-Torex Gold Resources Inc.(以下「当社」または「Torex」)(TSX: TXG)は、2024年第2四半期の金の生産量が113,822オンス(「オンス」)、金の販売量が113,513オンスだったと報告しています。上半期まで229,316オンスの好調な生産量を記録し、当社は好調に推移しています年間金生産量の目標である40万〜45万オンスを達成する見込みです。
表1:2024年第2四半期の暫定経営成績
| | 2024 第 2 四半期 |
鉱業 | | |
ELGオープンピット-1日あたりの採掘量は鉱石トンです | tpd | 17,822 |
ELGオープンピット-1日あたりに採掘される廃棄物のトン数 | tpd | 77,440です |
ELG オープンピット-ストリップ比 | 廃棄物:もっと | 4.3 |
ELGアンダーグラウンド-1日あたりの採掘量は鉱石トンです | tpd | 2,145 |
処理中 | | |
プラントの平均スループット | tpd | 13,214 |
平均金回収率 | % | 90.5 |
処理された鉱石の平均ゴールドグレード | gpt | 3.34 |
ゴールドプロデュース | オンス | 113,822 |
金は売れました | オンス | 113,513 |
運用結果は暫定的なものであり、最終的な調整の対象となります。2024年第2四半期の財務および経営成績は、2024年8月7日水曜日の市場終了後に発表されます。上級管理職主催の電話会議は、翌日の午前9時(東部標準時)に開催されます。
Torexの社長兼最高経営責任者であるジョディ・クゼンコは次のように述べています。
「ELGは引き続き安全で好調な業績を上げています。上半期までの第2四半期の金の生産量は113,822オンスと229,316オンスで、6年連続で生産ガイダンスを発表する準備は順調に進んでいます。加工工場の業績は引き続き好調で、2四半期連続で回収率が90%を超え、処理能力は6四半期連続で1日あたり13,000トン(「tpd」)を上回っています。
「予想通り、露天掘りの採掘率は第1四半期と比較して減少し、採掘される廃棄物のレベルは、2025年半ばに鉱山寿命が近づくにつれて、今年の残りの期間を通じてさらに減少すると予想されます。オープンピットの残りの寿命を考えると、この費用のうち、資産計上されるのはほとんどありません。ELGアンダーグラウンドの鉱業料金は、当四半期の平均で1日あたり2,145トン/日で、定常状態の水準である2,000tpdを上回りました。
「利害関係者が私たちに期待するようになった結果を安全に届けるために、ELGのチームが行っている仕事を誇りに思います。金価格が持続的に上昇しているこの時期に、ELGによる堅調なキャッシュフローの創出により、メディアルナビルドの最後の数か月間は自信を持って取り組み、蓄積すると予想される適度な水準の純負債を迅速に返済し、来年のこの時期に堅調なフリーキャッシュフローに戻るでしょう。経営成績が計画通りに進み、メディアルナのフィニッシュラインが間近に迫り、探査結果がさらなる資源拡大を示している中で、モレロスはメキシコ国内外で事業を成長させるための基礎を築いてくれました。」
2024年第2四半期の電話会議とウェブキャストの詳細
Torexは、2024年8月7日水曜日の市場終了後に、第2四半期の財務および経営成績を発表する予定です。上級管理職主催の電話会議とウェブキャストが、2024年8月8日木曜日の午前9時(東部標準時)に開催されます。
電話アクセス
電話会議に迅速にアクセスするには、事前に登録してアクセスコードを取得してください。これにより、参加者は予定された時間に直接電話会議に参加できます。または、ダイヤルインの詳細は次のとおりです。
上記のダイヤルイン情報を使用する場合は、予定開始時刻の約10分前にダイヤルインして、Torex Gold Resourcesの電話会議への参加をリクエストしてください。