share_log

*ST中程(300208.SZ):印尼BMU子公司采矿工作计划和预算成本已获审批,2024年镍矿最高产量20万吨

*ST Zhongcheng (300208.SZ): The mining work plan and budget costs of its Indonesian BMU subsidiary have been approved, and the maximum output of nickel ore will be 0.2 million tons by 2024.

Gelonghui Finance ·  Jul 31 18:14

On July 31st, Gelunhui reported that *ST Zhongcheng (300208.SZ) announced that its Indonesian subsidiary PT.Bumi Morowali Utama (hereinafter referred to as "BMU") recently received notification from the Indonesian Ministry of Energy and Mineral Resources (hereinafter referred to as "MEMR") that its 2024-2026 mining plan and budget application (hereinafter referred to as "RKAB") has been approved.

The Indonesian subsidiary BMU of the company recently received approval for the PT Bumi Morowali Utama 2024-2026 project RKAB IUP (number: T-1186/MB.04/DJB.M/2024) from the Indonesian Ministry of Energy and Mineral Resources. According to the documents, MEMR approved the production capacity of BMU's RKAB from 2024 to 2026 based on its evaluation of the documents provided by BMU, namely: (1) maximum nickel production in 2024 is 200,000 tons; (2) maximum nickel production in 2025 is 0 tons; (3) maximum nickel production in 2026 is 0 tons.

Disclaimer: This content is for informational and educational purposes only and does not constitute a recommendation or endorsement of any specific investment or investment strategy. Read more
    Write a comment