share_log

Kraken Energy Provides Corporate Update

Kraken Energy Provides Corporate Update

Kraken能源公司提供公司更新
newsfile ·  08/15 08:00

Vancouver, British Columbia--(Newsfile Corp. - August 15, 2024) - Kraken Energy Corp. (CSE: UUSA) (OTCQB: UUSAF) (FSE: F2C) (the "Company" or "Kraken") is pleased to announce that, in partnership with optioned partner Atomic Minerals Corporation ("Atomic Minerals") (TSXV: ATOM), it has completed their application for submission to the Bureau of Land Management ("BLM") for drilling permits for up to fifteen holes at the Harts Point Uranium Property ("Harts Point" or the "Property") in San Juan County, Utah.

Newsfile Corp. -2024年8月15日-加拿大卑诗省温哥华 - 宙斯能源公司(CSE:UUSA)(OTCQB:UUSAF)(FSE:F2C)("公司"或"宙斯")很高兴宣布,其与期权合作伙伴Atomic Minerals Corporation("Atomic Minerals") (TSXV: ATOM) 成为合作方,完成文件申请,向美国土地管理局("BLM")提交拟在犹他州圣胡安县的Harts Point铀矿产权("Harts Point"或"Property")进行最多15个钻孔的钻探许可证。

"With confirmation of radiometric anomalies over significant widths on our maiden drilling program at Harts Point, we are excited to continue moving forward on the property at our earliest opportunity," stated CEO Matthew Schwab. "We are excited to move forward jointly with the expertise of the team at Atomic Minerals, and while the rest of 2024 will be focused on Kraken's flagship Apex property in Nevada, we aim to be permitted and prepared to move forward again with Harts Point in early 2025."

“在Harts Point进行的首个钻探项目证实了放射性异常的存在,我们很高兴有最早的机会继续加紧开发该矿权,”首席执行官Matthew Schwab说道。“我们很高兴能与Atomic Minerals团队一起推动 Hodges Point 项目的进行。虽然2024年大部分精力将放在宙斯在内华达州的主力项目Apex上,但我们仍希望在2025年初获得许可并准备好继续开发Hodges Point。”

The planned drilling program aims to explore and evaluate the potential uranium mineralization within the favorable uranium bearing sandstone units of the Chinle Formation at Harts Point, building on a previous successful Phase I drilling campaign. This collaboration with Atomic Minerals underscores both companies' commitment to advancing exploration and development projects in this promising region.

计划的钻探项目旨在探索和评估犹他州 Harts Point 地区 Chinle Formation 有利的铀砂岩层内的铀矿化潜力,建立在先前成功的一期钻探活动基础上。这与Atomic Minerals的合作凸显了两家公司推动该有前景的地区勘探和开发项目的承诺。

Harts Point Property Highlights:

Harts Point物业亮点:

  • World class uranium jurisdiction: located in the center of the Colorado Plateau, which has produced over 590 million ("M") pounds ("lbs") U3O8 at 0.2 to 0.4% U3O8 since the 1950s1,5-8.
  • Property consists of 324 lode mining claims on Bureau of Land Management ("BLM") ground that covers an area of 2,622 hectares ("ha") (6,480 acres).
  • Harts Point Anticline is Analogous to the Lisbon Valley Anticline: where the Lisbon Valley Uranium District hosted 17 large uranium mines which produced approximately 80M lbs U3O8 at 0.34% U3O8 from 1948 to 19882.
  • 世界级铀区域:位于科罗拉多高原中心地带,自1950年以来以0.2到0.4%U3O8的等级产出超过5900万磅("M")("lbs")U3O81,5-8。
  • 该矿权由324个荒山地的采矿权申请组成,占据2,622公顷("ha")(6,480英亩)的面积。
  • Harts Point Anticline类似于Lisbon Valley Anticline:Lisbon Valley 铀区最初设有17个铀矿并以0.34%的U3O8产生了约8000万磅U3O8。

The dimensions of these tabular sandstone-hosted uranium deposits range from 2 to 13 m (7 to 43 feet) thick, 100 to 3,048 m (328 to 10,000 feet) long, and 31 to 427 m (100 to 1,400 feet) wide3.

这些带状的铀砂岩源铀矿床的尺寸范围从2到1300万(7至43英尺)厚,100到304800万(328至10,000英尺)长,31至42700万(100至1,400英尺)宽3。

  • Significant Historic Uranium Production:
  • 重要的铀历史产出:距离Harts Point Property 11公里(7英里)的几处历史遗址曾生产约280,000磅U3O8,且该矿床以0.3%的U3O8等级为主4。

Several historic mines located 11 km (7 miles) west of the Harts Point Property produced approximately 280,000 lbs U3O8 at 0.3% U3O8 from the favorable Chinle Formation host rock4.

Lisbon Valley Anticline距离Harts Point铀矿产权31公里(19英里),总共产出约8000万磅U3O8,以0.34%的U3O8等级为主。

The Lisbon Valley Anticline is located 31 km (19 miles) to the east of the Harts Point Property produced approximately 80M lbs U3O8 0.34% U3O82.

卓越的基础设施:距离白色石材铀加工厂(White Mesa uranium processing facility)大约64公里(40英里)。

  • Excellent Infrastructure: located approximately 64 km (40 miles) north of the White Mesa uranium processing facility.
  • 矿权位置交通便捷,位于福克斯市(Fort which is situated 45 km (28 miles) from the town of Monticello, Utah)。

There is also excellent access throughout the Property, which is situated 45 km (28 miles) from the town of Monticello, Utah.

图1:Harts Point铀矿产权。


Figure 1: Harts Point Property


定向增发:与其新闻发布会的日期是2024年6月28日的新闻一致,公司将不会继续进行非经纪人定向增发发行的最后一笔交易。

Private Placement:

定向增发:

The Company also announces that, further to its news release dated June 28th, 2024, it will not be proceeding with the final tranche of the non-brokered private placement offering.

公司还宣布,奉上次2024年6月28日发布的资讯,公司不会进行非经纪人私募股份发行的最后一笔交易。

References

参考

1 Holger Albrethsen, Jr. and Frank E. McGinley (1982). Summary History of Domestic Procurement Under U.S. Atomic Energy Commission Contracts, September 1982.
2 Chenoweth, W.L. (1990). Lisbon Valley, Utah's Premier Uranium Area, a Summary of Exploration and Ore Production. Utah Geological Survey Open File Report 188, July 1990.
3 Gordon W. Weir and Willard P. Puffett (1981). Incomplete manuscript on stratigraphy and structural geology and uranium-vanadium and copper deposits of the Lisbon Valley area, Utah-Colorado. Open-File Report 81-39. Pages 153 to 163. United States Department of the Interior
Geological Survey.
4 Chenoweth, W.L. (1993): The geology and Production History of the Uranium deposits in the White Canyon Mining District, San Juan County, Utah, Utah Geological Survey Miscellaneous Publication 93-3.
5 Mills, Stephanie E. and Bear Jordan (2021). Uranium and Vanadium Resources of Utah: An Update in the Era of Critical Minerals and Carbon Neutrality, Open File Report 735, Utah Geological Survey.
6 Chenoweth, William L. (1981). The Uranium - Vanadium Deposits of the Uravan Mineral Belt and Adjacent Areas, Colorado and Utah, New Mexico Geological Society Guidebook, 32nd Field Conference, Western Slope Colorado.
7 McLemore, Virginia T. and Willam L. Chenoweth (1989). Uranium Resources in New Mexico, Resource Map 18, New Mexico Bureau of Mines and Mineral Resources.
8 Chenoweth, William L. and Virginia T. McLemore (1989). Uranium Resources on the Colorado Plateau in Energy Frontiers in the Rockies, Albuquerque Geological Society.

1 Holger Albrethsen, Jr., Frank E. McGinley(1982):美国原子能委员会合同下的国内采购概述历史,1982年9月。
2 Chenoweth,W.L.(1990年)。犹他州Lisbon Valley:探索和矿石生产概述。犹他地质调查局公开文件报告188,1990年7月。
3 Gordon W. Weir和Willard P. Puffett(1981年)。Lisbon Valley区的地层和构造地质学以及铀-钒和铜矿床的不完整手稿。开放文件报告81-39。美国内政部地质调查。
地质调查。
4 Chenoweth,W.L.(1993年):圣胡安县白峡谷采铀矿床的地质和生产历史,犹他州地质调查局杂志出版物93-3。
5 Mills,Stephanie E.和Bear Jordan(2021).犹他州的铀和钒资源:在关键矿物和碳中和时代的更新,公开文件报告735,犹他州地质调查。
6 Chenoweth,William L.(1981年)。乌拉凡矿产带和科罗拉多州和犹他州相邻地区的铀-钒矿床,新墨西哥地质学会指南,第32次野外会议,科罗拉多西部斜坡。
7 McLemore,Virginia t.和Willam L. Chenoweth(1989)。新墨西哥的铀资源,资源地图18,新墨西哥矿业和矿产资源局。
8 Chenoweth,William L.和Virginia t. McLemore(1989)。犹他州高原上的铀资源在落基山脉的能源前沿,阿尔布开克地质学会。

Technical Information

技术信息

All scientific and technical information in this news release has been prepared by or reviewed and approved by Matthew Schwab, P.Geo., President and CEO of the Company, and Garrett Ainsworth, P.Geo., Chairman of the Company. Each of Mr. Schwab and Mr. Ainsworth is a Qualified Person for the purposes of National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

本新闻发布中的所有科学和技术信息均由本公司的总裁兼首席执行官Matthew Schwab和董事长Garrett Ainsworth审查和批准。 Schwab先生和Ainsworth先生均为符合国家43-101号法规的资格人员。

The data disclosed in this news release is related to historical drilling results. Kraken has not undertaken any independent investigation of the sampling, nor has it independently analyzed the results of the historical exploration work in order to verify the results. Kraken considers these historical drill results relevant as the Company is using this data as a guide to plan exploration programs. The Company's current and future exploration work includes verification of the historical data through drilling.

本文公布的数据涉及历史钻探结果。Kraken没有进行任何独立调查采样,也没有独立分析历史勘探工作的结果以验证结果。Kraken认为这些历史钻探结果是相关的,因为本公司正在使用这些数据来策划勘探计划。公司目前和未来的勘探工作包括通过钻探验证历史数据。

About the Harts Point Property

关于哈茨角质产权

Harts Point is located in the center of the Colorado Plateau, referred to by some as "the Athabasca Basin of the US" and is 64 kilometers ("km") (40 miles) north of the White Mesa Uranium Mill, the only fully licensed and operating conventional uranium mill in the United States. The Property consists of 324 lode mining claims on Bureau of Land Management ("BLM") ground and drill permits are in place for up to 20 exploration drill holes.

哈茨角质产权位于科罗拉多高原中心,常被称为“美国的阿萨巴斯卡盆地”,距离美国唯一一个已完全获得许可并在运营的传统铀矿厂White Mesa Uranium Mill有64公里(40英里),该产权由土地管理局的324个矿区申请组成,可进行20个勘探钻孔的钻探许可。

About Kraken Energy Corp.

关于Kraken Energy公司

Kraken Energy Corp. is an energy company advancing its portfolio of high-grade uranium properties in the Unites States. The Company is advancing its 100%-owned Apex Uranium Property, located 280 km (174 miles) east from Reno, Nevada which is recognized as Nevada's largest past-producing uranium mine. The Company has additionally entered into an option agreement to earn 100% of the Garfield Hills Uranium Property. The past-producing Garfield Hills Uranium Property covers 1,238 ha (3,060 acres) and is located 19 km (12 miles) east of Hawthorne in Mineral County, Nevada. Kraken has also staked the Huber Hills Uranium Property, located 136 km (85 miles) north of Elko, Nevada which covers 1,044 ha (2,580 acres) and encompasses the historic Race Track open pit mine. The Company has also entered into an option agreement to earn 75% of the Harts Point Uranium Property. The Harts Point Uranium Property covers 2,622 ha (6,480 acres) and is located 49 km (30 miles) northwest of Monticello in San Juan County, Utah.

Kraken Energy Corp.是一家专注于美国高品位铀物业的能源公司。该公司正在推进其100%拥有的Apex Uranium物业,该物业位于内华达州雷诺市东部280公里(174英里)处,是内华达州最大的已生产过铀矿。公司还签订了一项选择协议,以获得Garfield Hills Uranium Property的100%所有权。过去的Garfield Hills Uranium Property占地1,238公顷(3,060英亩),位于内华达州矿物县(Mineral County)霍桑市以东19公里(12英里)。Kraken还标志了Huber Hills Uranium Property,位于内华达州埃尔科(Elko)以北136公里(85英里),占地1,044公顷(2,580英亩),包括历史悠久的赛车场露天矿。该公司还签署了一项选择协议,以获取哈茨角(Harts Point)铀物业的75%所有权。哈茨角铀物业占地2,622公顷(6,480英亩),位于犹他州圣胡安县Monticello市西北49公里(30英里)的地方。

For more information about the Company, please visit; .

有关公司的更多信息,请访问;。

On Behalf of the Board of Kraken Energy Corp.

代表Kraken Energy Corp.董事会发表此新闻稿。

Matthew Schwab
President & Chief Executive Officer

Matthew Schwab
董事长兼首席执行官

Corporate Office:
Suite 907 - 1030 West Georgia Street
Vancouver, British Columbia
V6E 2Y3

公司地址: Suite 907 - 1030 West Georgia Street
电话:(604)628-2669
V6C 3E8(主要执行办公室的地址)
V6E 2Y3

T: (604) 628-2669

有关投资人关系的查询,请联系:

For investor relations inquiries, contact:
Kin Communications Inc.
T: (604) 684-6730
E: uusa@kincommunications.com

有关投资者关系的查询,请联系:
Kin Communications公司。
电话:(604)684-6730
电子邮件:uusa@kincommunications.com

This news release contains forward-looking information which is subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ from those projected in the forward-looking statements. Forward-looking statements in this press release include our plans for exploration at the properties. These forward-looking statements are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. Risks that could change or prevent these statements from coming to fruition include changing costs for mining and processing; increased capital costs; the timing and content of upcoming work programs; geological interpretations based on drilling that may change with more detailed information; potential process methods and mineral recoveries assumption based on limited test work and by comparison to what are considered analogous deposits that with further test work may not be comparable; the availability of labour, equipment and markets for the products produced; and despite the current expected viability of the project, conditions changing such that the minerals on our property cannot be economically mined, or that the required permits to build and operate the envisaged mine can be obtained. The forward-looking information contained herein is given as of the date hereof and the Company assumes no responsibility to update or revise such information to reflect new events or circumstances, except as required by law.

本新闻稿包含前瞻性信息,受各种风险、不确定性和其他可能使实际事件或结果与前瞻性陈述所述不同的因素的影响。本新闻稿中的前瞻性陈述包括我们在物业上的勘探计划。这些前瞻性陈述受各种风险、不确定性和其他可能使实际事件或结果与前瞻性信息所述不同的因素的影响。可能会改变或阻止这些陈述实现的风险包括采矿和加工的成本变化;增加的资本成本;即将到来的工作计划的时间和内容;基于钻探的地质解释可能随着更详细的信息而改变;可能假设了洛卡的潜在过程方法和矿物回收率,这是基于有限的测试工作和与认为类似的沉积物比较的假设,经过进一步的测试工作可能不可比拟;为生产的产品提供的人工、设备和市场的可用性;并且尽管目前预期该项目是可行的,但条件可能会改变,使我们物业上的矿物无法被经济开采,或者可能获得必要的许可证来建造和运营所设想的采矿场。本文中的前瞻性信息是根据目前信息在此发布日期作出的,本公司不承担更新或修订该信息以反映新事件或情况的责任,除非法律要求。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发