share_log

1Moz Reserve Allows Catalyst to Double Production for A$31m

1Moz Reserve Allows Catalyst to Double Production for A$31m

1Moz的储量使得催化剂能够以3100万澳元的价格将产量翻倍
PR Newswire ·  09/13 06:29

Growth plan transitions Plutonic to new, virgin, ore sources

增长计划将Plutonic转变为新的、未经开采的矿石来源

  • A 105% growth in Reserves over the last 12-months has allowed Catalyst to provide three-year production guidance, increasing annual gold production from 100koz to 200koz
  • Encouragingly, Catalyst's existing infrastructure enables this production growth for only A$31m
  • The low capital intensity of this growth, allows Catalyst to commit greater funds to exploration in FY2025 – A$25m has been committed to exploration with the opportunity to allocate more should exploration results justify it
  • After generating A$54m of free cash flow in FY2024, with cash and bullion today of A$44m, Catalyst is well placed to fund these plans over the coming 12 to 18 months
  • Upon conclusion of the 18-month program, Plutonic plans to be mining four different virgin ore sources, feeding a single centralised processing plant
  • In so doing, Catalyst intends to create a strong foundation for the Company's future, whether that be inorganic growth or exploration only on the Plutonic Gold Belt
  • 在过去12个月中,催化剂的储量增长了105%,使其能够提供为期三年的生产指导,将年黄金产量从100koz增加到200koz
  • 令人鼓舞的是,催化剂现有的基础设施只需花费3100万澳元即可实现这一生产增长
  • 这种增长的低资本密集度使得催化剂能够将更多资金投入到2025财年的勘探工作中——已经承诺用于勘探的资金为2500万澳元,如果勘探结果证明合理,还有可能增加分配
  • 在2024财年产生了5400万澳元的自由现金流后,催化剂现在拥有4400万澳元的现金和金块,因此有足够的资金来支持未来12至18个月的计划
  • 在18个月计划结束后,Plutonic计划采矿四个不同的未经开采的矿石来源,供给一个集中式的加工厂
  • 通过这样做,催化剂打算为公司的未来打下坚实基础,无论是通过非有机增长还是仅在Plutonic黄金带进行勘探

PERTH, Australia, Sept. 13, 2024 /PRNewswire/ - Catalyst Metals Limited (Catalyst or the Company) (ASX: CYL) is pleased to provide its three-year production guidance and announce an update of its Group Ore Reserve Estimate (ORE).

澳大利亚珀斯,2024年9月13日/ PRNewswire / — Catalyst Metals Limited(下称Catalyst或公司)(ASX: CYL)很高兴提供其为期三年的生产指导,并宣布其集团矿石储量估计(ORE)的更新。

Catalyst's Ore Reserves now total 1Moz of gold. Importantly, these Reserves provide the foundation for Catalyst's three-year production guidance, growing production from 100koz to 200koz.

Catalyst的矿石储量现在总共达到1Moz黄金。重要的是,这些储量为Catalyst的三年生产目标奠定了基础,将产量从100koz增长到200koz。

Figure 1: Plutonic Gold Belt (CNW Group/Catalyst Metals LTD.)
图1:巨灵金腰带(CNW Group/Catalyst金属有限公司)
Catalyst Three-Year Production and Cost Guidance - Figure 2: Three year mine plan production and costs (CNW Group/Catalyst Metals LTD.)
Catalyst三年生产和成本指引 - 图2:三年矿山计划的产量和成本(CNW Group/Catalyst金属有限公司)
Figure 3: Nine new areas identified after analysing +40 years of historical drilling showing mineralisation extending into these areas (CNW Group/Catalyst Metals LTD.)
图3:经过分析40多年的历史钻探后,发现了九个新地区,显示矿化物延伸到了这些地区(CNW Group/Catalyst金属有限公司)
Figure 4: Zone F is the first of nine areas of in-mine exploration at Plutonic. With recent positive results, Catalyst believes it will delineate a new mining area, offering clean new virgin ore sources to Plutonic. (CNW Group/Catalyst Metals LTD.)
图4:区域F是巨灵金腰带内首个九个勘探区之一。根据最近的积极结果,Catalyst相信其将划定一个新的采矿区,为巨灵金腰带提供清洁的新矿石来源(CNW Group/Catalyst金属有限公司)
Figure 5: Plutonic East's mine plan showing mineralisation immediately adjacent to planned work areas. This area is the subject of a drill program aimed at extending the mine's life out to five years. (CNW Group/Catalyst Metals LTD.)
图5:巨灵东部的矿山计划显示矿化物直接邻近计划工作区域。该地区是钻探计划的目标,以将矿山的寿命延长到五年(CNW Group/Catalyst金属有限公司)
Figure 6: K2 showing potential extensions to the current mine life (CNW Group/Catalyst Metals LTD.)
图6:K2显示了当前矿山生命周期的潜在延伸(CNW Group/Catalyst金属有限公司)
Figure 7: Trident long section showing inferred material targeted for resource conversion and mine life extension (CNW Group/Catalyst Metals LTD.)
图7:Trident长剖面显示推测材料,目标是资源转化和矿山寿命延长(CNW Group/Catalyst金属有限公司)
Figure 8: Henty Underground long section showing Mineral Resource and exploration zones. (CNW Group/Catalyst Metals LTD.)
图8:亨蒂地下长剖面图,显示涉矿概念和勘探区域。(CNW集团/催化金属有限公司)
声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发