Atomic Minerals Corporation Updates Harts Point Uranium Project Drill Permitting Process in Partnership With Kraken Energy Corp.
Atomic Minerals Corporation Updates Harts Point Uranium Project Drill Permitting Process in Partnership With Kraken Energy Corp.
Vancouver, British Columbia--(Newsfile Corp. - September 30, 2024) - Atomic Minerals Corporation (TSXV: ATOM) ("ATOMIC MINERALS" or the "Company") is pleased to provide an update on ongoing drill permitting for its 6,500-acre Harts Point Uranium Project ("Harts Point") in San Juan County, Utah. This update is in partnership with Kraken Energy Corp. (CSE: UUSA) ("Kraken"), the Company's optionee partner, and the operator for the upcoming exploration program.
Vancouver, British Columbia--(Newsfile Corp. - September 30, 2024) - Atomic Minerals Corporation (TSXV: ATOM) ("ATOMIC MINERALS" or the "Company") is pleased to provide an update on ongoing drill permitting for its 6,500-acre Harts Point Uranium Project ("Harts Point") in San Juan County, Utah. This update is in partnership with Kraken Energy Corp. (CSE: UUSA) ("Kraken"), the Company's optionee partner, and the operator for the upcoming exploration program.
The August 2024 permit application has now been reviewed by the Monticello Field Office of the Bureau of Land Management ("BLM") with comments provided to Kraken. The partners are currently addressing the comments. Kraken plans to conduct exploratory drilling across fifteen (15) proposed sites targeting the basal Moss Back member of the Chinle formation for uranium mineralization at depths of + 1500 feet (457 metres).
The August 2024 permit application has now been reviewed by the Monticello Field Office of the Bureau of Land Management ("BLM") with comments provided to Kraken. The partners are currently addressing the comments. Kraken plans to conduct exploratory drilling across fifteen (15) proposed sites targeting the basal Moss Back member of the Chinle formation for uranium mineralization at depths of + 1500 feet (457 metres).
The next phase of drilling is aimed at building on the successful Phase I drilling campaign at Harts Point. This collaboration with Kraken Energy underscores both companies' commitment to advancing exploration and development projects in this promising region. As described in the Company's permit applications, these permits will facilitate the execution of a thorough drilling and exploration program, designed to unlock the potential of the uranium-rich Harts Point Property.
The next phase of drilling is aimed at building on the successful Phase I drilling campaign at Harts Point. This collaboration with Kraken Energy underscores both companies' commitment to advancing exploration and development projects in this promising region. As described in the Company's permit applications, these permits will facilitate the execution of a thorough drilling and exploration program, designed to unlock the potential of the uranium-rich Harts Point Property.
Clive Massey, President & CEO of Atomic Minerals, commented, "We are excited to be advancing the Harts Point Uranium Project alongside our partners at Kraken Energy. With the feedback received from the BLM on our permitting application, we are well-positioned to move forward with our exploration program. This step brings us closer to unlocking the significant potential of Harts Point, located in one of the most promising uranium regions in the U.S. We are confident that the upcoming drill program will help validate historical data and provide valuable insights into the property's resource potential."
Clive Massey, President & CEO of Atomic Minerals, commented, "We are excited to be advancing the Harts Point Uranium Project alongside our partners at Kraken Energy. With the feedback received from the BLm on our permitting application, we are well-positioned to move forward with our exploration program. This step brings us closer to unlocking the significant potential of Harts Point, located in one of the most promising uranium regions in the U.S. We are confident that the upcoming drill program will help validate historical data and provide valuable insights into the property's resource potential."
On May 23, 2023, Atomic Minerals executed a definitive agreement with Kraken Energy Corp., granting Kraken the option to acquire up to a 75% interest in Harts Point. Harts Point was identified as Moss Back member Chinle formation uranium target based on off-scale radioactivity readings from downhole gamma ray probes of three historic oil and gas holes in the area, which were spaced 2.8 miles apart. The partners believe Harts Point is analogous to Lisbon Valley.
On May 23, 2023, Atomic Minerals executed a definitive agreement with Kraken Energy Corp., granting Kraken the option to acquire up to a 75% interest in Harts Point. Harts Point was identified as Moss Back member Chinle formation uranium target based on off-scale radioactivity readings from downhole gamma ray probes of three historic oil and gas holes in the area, which were spaced 2.8 miles apart. The partners believe Harts Point is analogous to Lisbon Valley.
Lisbon Valley encompasses the Big Indian mining district, which produced 77.9 million pounds of uranium oxide ("U3O8") and 19 million pounds of vanadium from 16 large mines between 1952 and 1988 from the Triassic Chinle and Permian Cutler Formations from relatively shallow depths to more than 2,550 feet. This production represents more than 80 percent of the uranium ore mined in Utah during this time period. Ore grades averaged 0.34 percent U3O8, making these the highest grade and thickest mineable widths of all the large uranium mining districts discovered in the United States.1
里斯本山谷包括大印第安礦區,在1952年至1988年間,從三疊紀錢勒和二疊紀卡特勒地層中生產了7790萬磅的氧化鈾(「U3O8」)和1900萬磅的釩,這來自16座大型礦山,深度相對較淺,超過2550英尺。這一產量代表了猶他州在此期間開採的鈾礦石的80%以上。礦石品位平均爲0.34%的U3O8,使其成爲美國發現的所有大型鈾礦區中品位最高、可採寬度最大的礦區之一。
Harts Point Property Highlights:
Harts Point物業亮點:
World class uranium jurisdiction: located in the center of the Colorado Plateau, which has produced over 328 million ("M") pounds ("lbs") U3O8 at 0.2 to 0.4% U3O8 since the 1950s.2
Property consists of 324 lode mining claims on Bureau of Land Management ("BLM") ground that covers an area of 2,622 hectares ("ha") (6,480 acres).
世界一流的鈾礦區:位於科羅拉多高原中心,自1950年代以來已產出超過32800萬磅的U3O8,品位爲0.2至0.4%的U3O8。
該礦權由324個荒山地的採礦權申請組成,佔據2,622公頃("ha")(6,480英畝)的面積。
-
Harts Point Anticline is Analogous to the Lisbon Valley Anticline: where the Lisbon Valley Uranium District hosted 17 large uranium mines which produced approximately 80M lbs U3O8 at 0.34% U3O8 from 1948 to 1988.3
The dimensions of these tabular sandstone-hosted uranium deposits range from 2 to 13 meters ("m") (7 to 43 feet) thick, 100 to 3,048 m (328 to 10,000 feet) long, and 31 to 427 m (100 to 1,400 feet) wide.
-
哈茨角背斜類似於里斯本山谷角背斜:里斯本山谷鈾礦區有17座大型鈾礦,從1948年至1988年生產了大約8000萬磅的U3O8,品位爲0.34%的U3O8。
這些板狀砂岩寄主鈾礦牀的尺寸範圍爲2至13米(7至43英尺)厚,長度爲100至304800萬英尺(328至10,000英尺),寬度爲31至42700萬英尺(100至1,400英尺)。
-
Significant Historic Uranium Production:
Several historic mines located 11 km (7 miles) west of the Harts Point Property produced approximately 280,000 lbs U3O8 at 0.3% U3O8 from the favorable Chinle Formation host rock. 4
The Lisbon Valley Anticline is located 31 km (19 miles) to the east of the Harts Point Property produced approximately 80M lbs U3O8 0.34% U3O8.5
-
重要的鈾歷史產出:距離Harts Point Property 11公里(7英里)的幾處歷史遺址曾生產約280,000磅U3O8,且該礦牀以0.3%的U3O8等級爲主4。
哈茨點背斜礦區類似於里斯本山谷背斜礦區:位於哈茨點物業西側11公里(7英里)處的幾座歷史悠久的礦山,從有利的錢勒地層母巖中生產了約280,000磅的U3O8,品位爲0.3%的U3O8。
里斯本山脈背斜位於哈茨角產權以東31公里(19英里),產出約8000萬磅U3O8 0.34% U3O8.5。
-
Historic Exploration: Three wide-spaced historic oil and gas wells on the Property along the east flank of the Harts Point Anticline show 'off-scale' radioactivity within the favorable Chinle Formation host rock.
Drilled between 1953 and 1980, historic drill holes 43-037-10438, 43-037-30109, and 43-037-30623 showed off-scale radioactivity readings between 2.1 to 3.7 m thickness (7 to 12 feet) from depths of 390 to 417 m (1,280 to 1,368 feet).
-
歷史勘探:產權東側哈茨角背斜上的三口間隔較大的歷史石油和天然氣鑽井展示了優勢奇納勒組母巖中的「超標」放射性。
歷史鑽探:1953年至1980年間,歷史鑽孔43-037-10438、43-037-30109和43-037-30623顯示出介於2.1到370萬厚度(7到12英尺)範圍內的超標放射性讀數,深度從390到41700萬英尺(1,280到1,368英尺)。
-
Excellent Infrastructure: located approximately 64 km (40 miles) north of the White Mesa uranium processing facility.
There is also excellent access throughout the Property, which is situated 45 km (28 miles) from the town of Monticello, Utah.
-
礦權位置交通便捷,位於福克斯市(Fort which is situated 45 km (28 miles) from the town of Monticello, Utah)。
圖1:Harts Point鈾礦產權。
Figure 1: Harts Point Claim Group, San Juan County, Utah
圖1:猶他州聖胡安縣哈茨角索賠團地
Qualified Person
合格人士
Mr. R. Tim Henneberry, P.Geo. (BC), an advisor to the Company, is the "Qualified Person" under National Instrument 43-101 responsible for the technical contents of this news release and has approved the disclosure of the technical information contained herein.
R. Tim Henneberry先生,P.Geo.(BC),公司顧問,是根據43-101國家規定負責本新聞發佈中技術內容的「合格人員」,並已批准在此處披露技術信息。
Atomic cautions investors that the presence of uranium mineralization at Lisbon Valley is not necessarily indicative of similar mineralization at Harts Point.
Atomic提醒投資者,里斯本谷鈾礦化的存在未必代表哈茨角存在類似的礦化。
Technical Information
技術信息
The drilling results referenced in this release are from historical data, which Atomic Minerals is utilizing as a guide for current and future exploration efforts. The Company has not independently verified the sampling or analysis of this historical data. The planned drilling program at Harts Point will aim to validate the historical results, advancing the Company's understanding of the uranium potential at the site.
本公告中提到的鑽探結果來自歷史數據,Atomic Minerals將其作爲當前和未來勘探工作的指導。公司尚未獨立驗證這些歷史數據的取樣或分析。哈茨角的計劃鑽探項目將旨在驗證歷史結果,推進公司對該地點鈾潛力的理解。
About the Harts Point Property
關於哈茨角質產權
Harts Point is located in the heart of the Colorado Plateau, an area often referred to as "the Athabasca Basin of the U.S." due to its rich uranium resources. The property is situated 64 kilometers (40 miles) north of the White Mesa Uranium Mill, the only fully licensed and operational conventional uranium mill in the United States. Harts Point consists of 324 lode mining claims on BLM land, with drill permits secured for up to 20 exploration drill holes.
哈茨角位於科羅拉多高原核心地帶,該地區常被稱爲美國的「阿薩巴斯卡盆地」,因其豐富的鈾資源。該地產位於距美國唯一完全持牌和運營的傳統鈾礦廠-白墨薩鈾礦廠北部64公里(40英里)處。哈茨角包括在BLm土地上的324個礦權申請,已獲得多達20口勘探鑽孔的鑽探許可。
About the Company
關於公司
Atomic Minerals Corp. is a publicly listed exploration company on the TSX Venture Exchange, trading under the symbol ATOM, led by a highly skilled management and technical team with a proven track record in the junior mining sector. Atomic Minerals' objective is to identify exploration opportunities in regions that have been previously overlooked but are geologically similar to those with previous uranium discoveries. These underexplored areas hold immense potential and are in stable geopolitical and economic environments.
Atomic Minerals Corp.是一家在TSX Venture Exchange上公開上市的勘探公司,在高技能的管理和技術團隊帶領下,具有初創採礦板塊方面的良好記錄,其證券代碼爲ATOm。Atomic Minerals的目標是確定先前被忽視但地質環境與已發現鈾礦區相似的區域的勘探機會。這些未充分開發的區域具有巨大潛力,並處於穩定的地緣政治和經濟環境中。
Atomic Minerals' property portfolio contains uranium projects in three locations within North America, all of which have significant technical merit and or are known for hosting uranium production in the past. Three of the properties are located on the Colorado Plateau, an area which has previously produced 597 million pounds of U3O8; Three others are in the prolific Athabasca Basin region and nine uranium projects are located Northern Saskatchewan, encompassing a total exploration area of 6,495 hectares.
Atomic Minerals的資產組合包括北美三個地點的鈾項目,所有這些項目都具有重要的技術優勢並且在過去都承載鈾生產。其中三個位於科羅拉多高原地區,該地區以前曾產出597萬磅的U3O8;另外三個在多產的Athabasca盆地地區,而九個鈾項目則位於薩斯喀徹溫北部,總勘探面積爲6495公頃。
For additional information about the Company and its projects, please visit our website at .
有關公司及其項目的更多信息,請訪問我們的網站。
ON BEHALF OF THE BOARD OF DIRECTORS
董事會代表
"Clive Massey"
Clive H. Massey
President & CEO
"Clive Massey"
Clive H. Massey
總裁兼首席執行官
For further information, please contact:
info@atomicminerals.ca
(604) 341-6870
如需更多信息,請聯繫:
info@atomicminerals.ca
(604) 341-6870
Neither TSX Venture Exchange nor their Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
TSX Venture Exchange及其監管服務供應商(如在TSX Venture Exchange的政策中定義)對此發佈的充分性或準確性概不負責。
Forward-Looking Statements:
前瞻性聲明:
This news release contains certain statements that may be deemed "forward-looking" statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although Atomic Minerals Corporation believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of Atomic Minerals Corporation management on the date the statements are made. Except as required by law, Atomic Minerals Corporation undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.
此新聞發佈涉及某些被視爲「前瞻性」的聲明。前瞻性聲明是指那些並非歷史事實並且通常但並非總是被識別爲「期望」、「計劃」、「預計」、「相信」、「意圖」、「估計」、「項目」、「潛力」及類似表述,或者事件或條件將會,「將」、「可能」、「會」、「可能會」或者「應該」發生的聲明。儘管Atomic Minerals Corporation認爲此類前瞻性聲明是基於合理的假設,但這些聲明不是未來表現的保證,實際結果可能會與前瞻性聲明中的結果有所不同。前瞻性聲明基於Atomic Minerals Corporation管理層在發佈聲明的日期上的信仰、估計和意見。Atomic Minerals Corporation除法律要求外,在管理層的信仰、估計或意見或其他因素髮生變化時,不承擔更新這些前瞻性聲明的任何義務。
###
###
1 Source: Chenoweth, W.L. (1990). Lisbon Valley, Utah's Premier Uranium Area, a Summary of Exploration and Ore Production. Utah Geological Survey Open File Report 188, July 1990.
2 Source: Holger Albrethsen, Jr. and Frank E. McGinley (1982). Summary History of Domestic Procurement Under U.S. Atomic Energy Commission Contracts, September 1982.
3 Source: Gordon W. Weir and Willard P. Puffett (1981). Incomplete manuscript on stratigraphy and structural geology and uranium-vanadium and copper deposits of the Lisbon Valley area, Utah-Colorado. Open-File Report 81-39. Pages 153 to 163. United States Department of the Interior Geological Survey.
4 Source: Chenoweth, W.L. (1993): The geology and Production History of the Uranium deposits in the White Canyon Mining District, San Juan County, Utah, Utah Geological Survey Miscellaneous Publication 93-3.
5 Source: Chenoweth, W.L. (1990). Lisbon Valley, Utah's Premier Uranium Area, a Summary of Exploration and Ore Production. Utah Geological Survey Open File Report 188, July 1990.
來源:Chenoweth,W.L.(1990)。「利斯本谷,猶他州首要鈾礦區,勘探和礦石生產總結」。猶他州地質調查局188號公開文件報告,1990年7月。
來源:Holger Albrethsen, Jr.和Frank E. McGinley(1982年)。「美國原子能委員會合同下國內採購歷史摘要」,1982年9月。
來源:Gordon W. Weir和Willard P. Puffett(1981年)。關於利斯本谷地區(猶他州-科羅拉多州)地層學、構造地質學、鈾-釩和銅礦牀的不完整手稿。開放文件報告81-39。第153至163頁。美國內政部地質調查局。
來源:Chenoweth,W.L.(1993年):「白峽谷礦區鈾礦牀的地質和生產歷史」,猶他州聖胡安縣,猶他州地質調查局綜合出版物93-3。
資料來源:Chenoweth,W.L.(1990年)。 萊索爾瓦利,猶他州最重要的鈾區,勘探和礦石生產摘要。 猶他州地質調查局188號公開文件報告,1990年7月。