share_log

CopAur Reviews Kinsley Mountain Oxide Gold Production History and Evaluates Restarting Production

CopAur Reviews Kinsley Mountain Oxide Gold Production History and Evaluates Restarting Production

CopAur對Kinsley Mountain氧化金產量歷史進行評估,並評估重新啓動生產
newsfile ·  10/15 09:00

Vancouver, British Columbia--(Newsfile Corp. - October 15, 2024) - CopAur Minerals Inc. (TSXV: CPAU) (OTCQX: COPAF) ("CopAur" or the "Company") is pleased to provide a summary of historic gold mining activities at the Company's flagship Kinsley Mountain Gold Project (the "Kinsley Mountain Project" or "Kinsley Mountain") in Elko County, Nevada.

溫哥華,不列顛哥倫比亞-(資訊公司-2024年10月15日)-CopAur Minerals Inc.(tsxv: CPAU)(OTCQX: COPAF)("CopAur"或"公司")很高興地概述了該公司旗艦Kinsley Mountain Gold Project(「Kinsley Mountain Project」或「Kinsley Mountain」)在內華達州埃爾科縣的歷史黃金開採活動。

The Kinsley Project hosts current mineral resources that CopAur is working to upgrade and expand. The Kinsley project is a historical past producer that yielded 138,000 ounces of open-pit gold mined by Alta Gold Co. (Alta) between 1995 and 1997, when mining was suspended.

Kinsley項目託管當前的礦產資源,CopAur正在努力提升和擴展。Kinsley項目是一個歷史上的生產者,於1995年至1997年由Alta Gold Co.(Alta)開採的138,000盎司露天黃金,當時停止了開採。

Gold at Kinsley Mountain was first discovered in 1984, by the U.S. Mineral Exploration Co. (USMX) geologists. USMX formed a joint venture with Cominco Exploring the project with surface geochemical, geophysical surveys and extensive reverse circulation (RC) drilling through 1991. Hecla Mining Company then optioned the Project from Cominco for a single year completing a large RC drilling campaign. Alta picked up the Kinsley Mountain option in 1994 and put the Project into production in 1995.

Kinsley Mountain的黃金首次於1984年被美國礦產勘探公司(USMX)的地質學家發現。 USMX與Cominco合作開發該項目,進行地表化學、地球物理調查和直循環(RC)鑽探,直至1991年。隨後赫克拉礦業公司從Cominco手中取得了該項目的期權,進行了一年的大規模直循環鑽井活動。 Alta於1994年收購了Kinsley Mountain的期權,並於1995年投入項目生產。

Alta filed for bankruptcy in 1999, and the Kinsey claims were subsequently allowed to lapse. Alta was formed in 1962, and at the peak of its operations had 215 employees, operating three Nevada mines: the Olinghouse Mine near Reno, Griffon Mine near Ely, in addition to Kinsley Mountain. In March 1999 Alta reported that production fell at Olinghouse, and revenues were hurt by low gold prices. A month later Alta filed for Chapter 11 bankruptcy protection citing over $30 million in debt.

Alta於1999年申請破產,並隨後允許Kinsey索賠作廢。 Alta成立於1962年,運營高峰期有215名員工,經營着內華達州的三座礦山:雷諾附近的奧林豪斯礦山,埃利附近的格里芬礦山,以及Kinsley Mountain。 1999年3月,Alta報告稱奧林豪斯的產量下降,收入受低黃金價格影響。 一個月後,Alta申請破產保護第11章,稱債務超過3000萬美元。

CopAur acquired the Kinsley Project in 2022, through an acquisition of New Placer Dome Gold Corp., consolidating a 79.99% interest in the project shortly thereafter, and a 100% interest in 2024 with the co-operation of a very strategic and helpful investor.

CopAur於2022年通過收購New Placer Dome Gold Corp.獲得了Kinsley項目,隨後在與一個非常戰略性和有幫助的投資者合作之後,迅速合併了該項目的79.99%的利益,並在2024年完全擁有100%的利益。

The Kinsley Project hosts current mineral resources comprising the high-grade sulphide Western Flank Zone and near surface oxide of 418,000 indicated ounces gold at 2.63 grams-per-tonne (g/t) gold, and 117,000 inferred ounces gold at 1.51 g/t gold. Indicated resources are inclusive of 302,000 ounces averaging 6.11 g/t gold hosted within the Secret Canyon Shale at the Western Flank Zone1 (Figure 1).

Kinsley項目託管着當前的礦產資源,包括高品位硫化物Western Flank區域和表層氧化金,其中包括418,000盎司黃金(每噸2.63克/噸金)的指示資源和117,000盎司黃金(每噸1.51克/噸金)的推斷資源。指示資源包括Western Flank區域的Secret Canyon Shale內承載的302,000盎司平均金量爲6.11克/噸金(圖1)。

It is important to note that after completion of the resource estimate there has been over 20,000 metres of diamond core and RC drilling in 59 holes completed by CopAur. Much of this drilling focused on the Main Pit North area that has yielded multiple near surface high-grade intercepts extending 150 metres outside the current pit shell that are expected to be key resource expansion drivers. Recent Main Pit oxide gold intercepts include: 7.6 metres averaging 9.8 g/t Au (KMR20-030); 25.9 metres averaging 2.22 g/t Au, including 10.7 metres averaging 4.2 g/t Au (KMR23-03); and 7.6 metres averaging 2.0 g/t Au2 (KMR23-04) (Figure 2).

值得注意的是,在資源評估完成後,CopAur已進行了超過20,000米的金剛石芯和RC鑽探,共完成了59個鑽孔。其中大部分鑽探集中在主坑北區,產生了多個近地表高品位截獲,延伸至當前坑殼之外的約150米,預計將成爲主要資源擴展驅動因素。最近的主坑氧化金截獲包括:7.6米,平均9.8克/噸金(KMR20-030);25.9米,平均2.22克/噸金,包括10.7米,平均4.2克/噸金(KMR23-03);以及7.6米,平均2.0克/噸金(KMR23-04)(圖2)。

These higher-grade near surface holes are the reason that CopAur is exploring the idea of restarting production. The project successfully operated at an average per ounce gold price of under $400 dollars per Ounce from 1995 to 1997 it makes sense for Copaur to explore these options considering the recent price move in gold.

這些更高品位的近地表孔是CopAur考慮重新開採的原因。該項目從1995年至1997年每盎司黃金平均價格低於400美元,考慮到黃金最近的價格波動,Copaur探討這些選項是合理的。

Jeremy Yaseniuk, Copaur CEO, commented. "We have asked The Metals Group and our various consultants to assist CopAur to update the resource estimate to include the recent drilling, assist in any engineering studies that may be needed and engaged Thorne Solutions LLC in Reno, Nevada to assist in the process for the permitting of 'NEW' production, should the reports indicate a positive direction. Further, management is looking at various options for non dilutive financing if a production decision is made."

Copaur首席執行官Jeremy Yaseniuk評論道:「我們已請求金屬集團和各種顧問協助CopAur更新資源評估以包括最近的鑽探,在可能需要的任何工程研究上提供幫助,並與內華達雷諾的Thorne Solutions LLC合作,協助批准『新』生產的過程,如果報告指示出積極方向將進一步進行。此外,管理層正在考慮各種非稀釋融資選項,如果做出生產決定。」


Figure 1. Kinsley Mountain Main Pit Area Cross Section


圖1. Kinsley Mountain主坑區橫截面


Figure 2. Main Pit North KMR23-05 and KMR23-07 Cross Section (looking north)


圖2. 主坑北KMR23-05和KMR23-07橫截面(向北看)

Qualified Person

合格人士

The scientific and technical information contained in this news release has been reviewed and approved by Kristopher J. Raffle, P.Geo. (BC), Principal and Consultant of APEX Geoscience Ltd. of Edmonton, AB, a "Qualified Persons" as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects. Mr. Raffle has verified the data disclosed which includes a review of the sampling, analytical and test data underlying the information and opinions contained herein.

本新聞稿中包含的科學和技術信息已由APEX Geoscience Ltd.的主要顧問之一Kristopher J. Raffle,P.Geo(BC)審核和批准,後者是《加拿大43-101號國家標準》披露礦產項目的定義爲「有資格人士」。 Raffle先生已經驗證所披露的數據,包括審核此處包含的信息和意見的取樣、分析和測試數據。

About CopAur
CopAur is an exploration company focused on developing projects within the emerging, mineral-rich mining regions of Nevada. The Company is backed by a dynamic and experienced team of resource professionals advancing its projects in Nevada with the flagship project being Kinsley Mountain gold property, a Carlin-style project located 90 kilometres south of the Long Canyon mine (currently in production under the Newmont/Barrick joint venture, Nevada Gold Mines).

關於CopAur
CopAur是一家專注於在內華達州新興的礦產豐富的採礦區內開發項目的勘探公司。該公司由一支充滿活力和經驗豐富的資源專業人士團隊支持,在內華達州推進其項目,旗艦項目是金斯利山金礦物業,該項目是一項類似卡林式的項目,位於長峽谷礦山(目前在紐曼公司/巴里克合資企業內 Nevada Gold Mines 下)以南90公里的地方。

For more information, please contact:

更多信息,請聯繫:

CopAur Minerals Inc.

CopAur Minerals Inc。

Jeremy Yaseniuk, Chief Executive Officer & Director
Tel: +1 (604) 773-1467
Email: jeremyy@copaur.com

首席執行官兼董事Jeremy Yaseniuk
電話:+1(604)773-1467
電子郵件:jeremyy@copaur.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

TSX Venture交易所及其監管服務提供方(如TSX Venture Exchange的政策所定義的)對此新聞發佈的充分性或準確性不負任何責任。

Forward Looking Information

前瞻性信息

This news release contains forward-looking statements. These statements relate to future events or the Company's plans or future performance. All such statements involve substantial known and unknown risks, uncertainties and other factors which may cause the actual plans and results to vary from those expressed or implied by such forward-looking including the potential for advancing the oxide gold deposit at Kinsely towards production or at all, the initiation of and timing to prepare technical studies including a PEA, PFS or FS on the Kinsley Mountain Project, the ability of the Company to evaluate or advance financing options for the Company. Forward-looking statements involve significant risks and uncertainties including the price of gold which may negatively affect the economic feasibility of the Company's mineral projects, making a production decision, the costs associated with the construction and operation of any production facility, the financing requirements associated with advancing any mineral project to production and various other factors and uncertainties. Forward Looking Statements should not be read as indications, assurances or guarantees of future plans or performance or results and they will not necessarily be accurate indications of whether or not any decisions will be made or that such results will be or can be achieved. Actual results could differ materially from those anticipated due to various factors and risks. Although the forward-looking statements contained in this news release are based upon what management of the Company believes are reasonable assumptions or plans on the date of this news release, the Company cannot assure investors that its actual plans or results will be consistent with these forward-looking statements. The forward-looking statements contained in this press release are made as of the date hereof and the Company disclaims any intention or obligation to update or revised any forward-looking statements whether as a result of new information, future events or otherwise, except as required under applicable securities regulations.

這則新聞稿包含前瞻性聲明。這些聲明涉及未來事件或公司的計劃或未來績效。所有這些聲明均涉及重大已知和未知的風險、不確定因素和其他因素,可能導致實際計劃和結果與這些前瞻性聲明所表達或暗示的有所不同,包括金斯利氧化金礦牀的向生產推進或完全推進的潛力,準備技術研究(如PEA、PFS或FS)的初始階段和時間表,以及評估或推進公司融資選項的能力。前瞻性聲明涉及重大風險和不確定性,包括金價可能對公司礦產項目的經濟可行性產生負面影響、做出生產決策、與生產設施的建設和運營相關的成本、將任何礦產項目推進至生產所需的融資需求,以及各種其他因素和不確定性。前瞻性聲明不應被視爲未來計劃、績效或結果的指示、保證或擔保,並不一定準確指示是否會做出任何決定或這樣的結果將會實現。由於各種因素和風險,實際結果可能會明顯不同。儘管本新聞稿中包含的前瞻性聲明是基於公司管理層相信的合理假設或計劃於本新聞稿日期,《公司不能向投資者保證其實際計劃或結果將與這些前瞻性聲明一致。本新聞稿中包含的前瞻性聲明截至發稿日期,並且公司否認任何故意或義務更新或修訂任何前瞻性聲明,除非按照適用證券法規的要求。"

1 Technical Report on the Kinsley Project, Elko County, Nevada, U.S.A., dated June 21, 2021, with an effective date of May 5, 2021, and prepared by Michael M. Gustin and Gary L. Simmons, and filed under CopAur Minerals Inc. issuer profile on SEDAR ().
2 See CopAur Minerals Inc. news releases dated April 6, 2021, and November 11, 2023.

關於美國內華達州埃爾科縣金斯利項目的技術報告,日期爲2021年6月21日,有效日期爲2021年5月5日,由邁克爾·M·古斯汀和加里·L·西蒙斯準備,並在CopAur Minerals Inc. SEDAR上的發行人檔案中提交。
參閱CopAur Minerals Inc. 發佈的分別日期爲2021年4月6日和2023年11月11日的新聞。

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論