share_log

Sienna Closes Placement With One Strategic Investor

Sienna Closes Placement With One Strategic Investor

Sienna與一家戰略投資者完成配售
newsfile ·  10/30 15:01

Vancouver, British Columbia--(Newsfile Corp. - October 30, 2024) - Sienna Resources Inc. (TSXV: SIE) (OTC Pink: SNNAF) (FSE: A1XCQ0) ("Sienna" or the "Company") is pleased to announce that Sienna has closed its financing consisting of 5,555,555 flow-through shares for gross proceeds of $250,000. No warrants were issued in the financing. An aggregate finders' fee of $15,000 was paid in connection with the private placement. All the securities issued in connection with this private placement have a hold period that expires on March 3, 2025. Proceeds will be used towards the Company's existing projects in Ontario and or Saskatchewan. The private placement is subject to final approval of the TSX Venture Exchange and was originally announced on October 21, 2024.

溫哥華,不列顛哥倫比亞省 - (Newsfile公司 - 2024年10月30日) - Sienna Resources Inc.(TSXV:SIE)(OTC Pink:SNNAF)(FSE:A1XCQ0)("Sienna"或"公司")很高興宣佈,Sienna已經完成了由555,555股流通股組成的融資,募集總額爲250,000美元。在融資中沒有發行認股權證。與定向增發相關的一筆合計15,000美元的中介費已支付。與這次定向增發相關發行的所有證券都有一個到期日,到2025年3月3日爲止。籌集的資金將用於公司在安大略省和/或薩斯喀徹溫現有項目。該定向增發需獲得TSX創業板的最終批准,並最初於2024年10月21日宣佈。

Jason Gigliotti, President of Sienna Resources Inc. stated, "We are very pleased to have closed this placement with one strategic investor. This will enable Sienna to commence operations on at least one of our Canadian projects while preserving our hard dollars for our USA project and marketing. The junior market is starting to show strong signs of recovery and this is great time to restart operations."

Sienna Resources Inc.總裁Jason Gigliotti表示:「我們非常高興與一位戰略投資者完成了這筆融資。這將使Sienna能夠啓動我們加拿大項目中至少一個的運營,同時保留我們的美國項目和市場的現金。初級市場開始顯示覆蘇的強烈跡象,現在是重啓運營的好時機。」

About Sienna Resources Inc.

Sienna Resources Inc.是一家採掘和勘探公司。Sienna收購了約13,300英畝的黃金前景地的「Stonesthrow Gold Project」。Sienna還最近收購了安大略省Larder Lake Mining的「Case Lake West Cesium和Spodumene Pegmatite Project」,這個項目直接毗鄰擁有Cesium和Pegmatites的Power Metals Corp的(PWM)Case Lake。 Sienna還剛剛收購了10357英畝的「Uranium Town Project」,毗鄰Denison Mines Corporation(DML,DNN),10845英畝的「Dragon Uranium Project」,毗鄰Cameco Corporation(CCO,CCJ)及世界聞名的Saskatchewan Athabasca盆地的55440英畝的「The Atomic Uranium Project」。此外,Sienna最近還擴大了內華達州埃爾科鎮的「Elko Lithium Project」。該項目大約包括1840英畝,直接毗鄰Surge Battery Metals'(NILI)「內華達北部鋰項目」。Surge Battery Metals'宣佈了全美最高品位鋰儲量。 Sienna還是克萊頓谷內華達州最大的土地持有人之一,Sienna的克萊頓谷項目包括Blue Clay Lithium Project,Silver Peak South Project和Clayton Valley Deep Basin Lithium Project。克萊頓谷是北美唯一的鋰生產基地,是阿爾百馬公司(NYSE:ALB)銀峯礦的所在地。該項目也靠近特斯拉(Nasdaq:TSLA)在內華達州的超級工廠。2021年3月18日, Schlumberger New Energy Venture(NYSE:SLB)在與Pure Energy(TSXV:PE)達成戰略合作後,宣佈在克萊頓谷成立了一個鋰提取試點工廠,NeoLith Energy。NeoLith Energy 可持續的方式使用差異化的直接鋰提取(DLE)過程,從而實現高純度的電池級鋰材料生產,同時將生產時間從一年多縮短到數週。預計2024年能從這個試點工廠獲得結果,並可能對Clayton Valley Nevada內的池鹽前景產生重大影響,因爲Sienna位於這個池鹽沉積的最深部部分。

Sienna has significantly increased acreage of the "Stonesthrow Gold Project", consisting now of approximately 31,718 contiguous acres prospective for gold. Sienna has also recently acquired the "Case Lake West Cesium and Spodumene Pegmatite Project" in Larder Lake Mining division of Ontario, Canada roughly 100 km north of Kirkland Lake, NE Ontario. This project consists of approximately 7,850 contiguous acres prospective for Cesium and Spodumene Pegmatites. Sienna has also just acquired the 10,357 acre "Uranium Town Project" bordering Denison Mines Corporation (DML, DNN) , the now 23,134 contiguous acre "Dragon Uranium Project" bordering Cameco Corporation (CCO, CCJ) and the 55,440 acre "Atomic Uranium Project" in the world renowned Athabasca Basin of Saskatchewan. Also, Sienna has the "Elko Lithium Project" in Elko County, Nevada consisting of approximately 1830 contiguous acres directly bordering Surge Battery Metals' (NILI) "Nevada North Lithium Project" in Elko County, Nevada who announced the highest grade lithium deposit in the USA. Sienna is also one of the larger landholders in Clayton Valley Nevada. Sienna's Clayton Valley projects include the Blue Clay Lithium Project, the Silver Peak South Project, and the Clayton Valley Deep Basin Lithium Project. Clayton Valley is home to the only lithium production in North America, being Albemarle Corp's (NYSE: ALB) Silver Peak deposit. This project is also near Tesla Motors Inc.'s (Nasdaq: TSLA) Gigafactory in Nevada. On March 18, 2021, Schlumberger New Energy Venture (NYSE: SLB) announced the development of a lithium extraction pilot plant with a strategic partnership with Pure Energy (TSX.v: PE). On September 10, 2024, SLB announced that the "Nevada demonstration plant integrates direct lithium extraction (DLE), concentration and conversion technologies to sustainably produce lithium at scale with integrated technology solution produces lithium from brine 500 times faster than conventional methods while using significantly less land, water and chemical reagents with a verified results confirm recovery rate of 96% lithium from brine at operational rates." The success that SLB achieved could have a significant future impact on the brine prospects within Clayton Valley Nevada as Sienna is located in the deepest section of this brine deposit.

Sienna大幅增加了「Stonesthrow Gold Project」的面積,目前潛在面積約爲31,718英畝。Sienna最近還收購了位於加拿大安大略省Larder Lake礦區,以金基石和鋰輝石項目「Case Lake West Cesium and Spodumene Pegmatite Project」,距科克蘭湖(Kirkland Lake)北約100公里的約7,850英畝潛在面積。該項目潛在面積約爲銫和鋰輝石構造巖。Sienna還剛剛收購了與Denison礦業公司(DML,DNN)接壤的10,357英畝「Uranium Town Project」,以及與Cameco公司(CCO,CCJ)接壤的現在23,134英畝的「Dragon Uranium Project」和世界著名的薩斯喀徹溫Athabasca Basin的55,440英畝的「Atomic Uranium Project」。此外,Sienna在內華達州Elko縣擁有「Elko Lithium Project」,約1830英畝,與Surge Battery Metals(NILI)的「內華達北部鋰項目」毗鄰,後者宣佈在內華達州擁有最高品位的鋰礦牀。Sienna還是內華達州克萊頓谷地最大的土地持有者之一。Sienna的克萊頓谷地項目包括藍泥鋰項目、Silver Peak South項目和Clayton Valley深水盆鋰項目。克萊頓谷地是北美唯一的鋰生產基地,奧爾巴馬公司(NYSE:ALB)的Silver Peak礦牀就位於此。該項目也靠近特斯拉汽車股份有限公司(納斯達克:TSLA)在內華達州的超級工廠。 2021年3月18日,斯倫貝謝新能源公司(紐交所:SLB)宣佈與Pure Energy(TSX.v:PE)達成戰略合作伙伴關係,開發鋰萃取試驗工廠。 2024年9月10日,SLB宣佈該「內華達示範工廠整合了直接鋰萃取(DLE)技術、濃縮和轉化技術,可可以可持續的方式大規模生產鋰,集成技術解決方案比常規方法快500倍,同時使用的土地、水和化學試劑明顯更少,驗證結果證實了從滷水中可持續產出96%的鋰的操作收率。」SLB取得的成功成果可能會對克萊頓谷地內滷水前景產生重大影響,因爲Sienna位於該滷水儲量的最深處。

Qualified Person:

本新聞稿所含的科學技術信息已由Serigne Dieng博士,M.Sc.評審並批准,他是國家43-101--礦產項目披露標準("NI 43-101")的資格人員,澳大利亞地質學家學會(AIG)會員(MAIG,# 8095),該公司獨立地質顧問。

Mr. Frank Bain, PGeo, a qualified person as defined by National Instrument 43-101 has reviewed and approved the scientific and technical disclosure contained within this news release.

Frank Bain先生(PGeo)按照43-101國家儀器定義的合格人員資格已經審閱和批准了本新聞稿中包含的科學和技術披露內容。

If you would like to be added to Sienna's email list, please email info@siennaresources.com for information or join our twitter account at @SiennaResources.

如果您想被添加到Sienna的電子郵件列表中,請發送電子郵件至info@siennaresources.com以獲取信息或加入我們的Twitter賬號@SiennaResources。

Contact Information
Tel: 1.604.646.6900
Fax: 1.604.689.1733

info@siennaresources.com

聯繫信息
電話:1.604.646.6900
傳真:1.604.689.1733

info@siennaresources.com

"Jason Gigliotti"
President, Director
Sienna Resources Inc.

"Jason Gigliotti"
總裁,董事
Sienna Resources Inc.是一家採掘和勘探公司。

NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR DISSEMINATION IN THE UNITED STATES.

不得向美國新聞社或在美國傳播。

Statements in this news release that are not historical facts are forward-looking statements. Forward-looking statements are statements that are not historical, and consist primarily of projections - statements regarding future plans, expectations and developments. Words such as "expects", "intends", "plans", "may", "could", "potential", "should", "anticipates", "likely", "believes" and words of similar import tend to identify forward-looking statements. Forward-looking statements in this news release include uncertainty of exploration and development plans regarding the property; commodity price fluctuations; political or economic instability and regulatory changes; currency fluctuations, the state of the capital markets; uncertainty in the measurement of mineral reserves and resource estimates; the Company's ability to attract and retain qualified personnel and management; potential labour unrest; reclamation and closure requirements for mineral properties and the availability of capital to fund the Company's projects, as well as other risks and uncertainties identified under the heading "Risk Factors" in the Company's continuous disclosure documents filed on SEDAR. You are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. The Company cannot assure you that actual events, performance or results will be consistent with these forward-looking statements, and management's assumptions may prove to be incorrect. These forward-looking statements reflect current expectations regarding future events and operating performance and speak only as of the date hereof and the Company does not assume any obligation to update forward-looking statements if circumstances or management's beliefs, expectations or opinions should change other than as required by applicable law. For the reasons set forth above, you should not place undue reliance on forward-looking statements.

本新聞稿中非歷史事實性聲明屬於前瞻性聲明。 前瞻性聲明是指非歷史的聲明,主要由投射組成-關於未來計劃,期望和發展的聲明。像「預計」,「有意」,「計劃」,「可能」,「可能有」,「潛在」,「應該」,「預測」,「可能」,「相似」的語言趨向於識別前瞻性聲明。本新聞稿中的前瞻性陳述包括與財產的勘探和開發計劃的不確定性有關的陳述;商品價格波動;政治或經濟不穩定和監管變化;貨幣波動,資本市場的狀態;在衡量礦產儲量和資源估計時的不確定性;公司吸引和留住優秀人才和管理層的能力;潛在的勞動爭議;礦產財產的復墾和關閉要求和獲得資金來資助公司的項目,以及在SEDA上文件上識別的「風險因素」下標識的其他風險和不確定性。 您應該注意,上述列表並不包含所有可能使用的因素和假設。公司不能保證實際事件、表現或結果與這些前瞻性聲明一致,管理層的假設可能被證明是不正確的。這些前瞻性聲明反映了關於未來事件和運營績效的當前期望,並僅截至此時此刻,並且公司不承擔除適用法律所要求的外的任何更新前瞻性聲明的義務。由於上述原因,您不應過分依賴前瞻性陳述。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

TSX Venture Exchange及其監管服務提供商(如TSX Venture Exchange政策中所定義)對本新聞稿的充分性或準確性不承擔責任。

NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR DISSEMINATION IN THE UNITED STATES.

不得向美國新聞通訊社分發或在美國發布。

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論