share_log

Red Pine Commences 2024-25 Drilling Program at the Wawa Gold Project

Red Pine Commences 2024-25 Drilling Program at the Wawa Gold Project

Red Pine开始在Wawa黄金项目进行2024-25年钻探计划
GlobeNewswire ·  2024/11/12 20:30

TORONTO, Nov. 12, 2024 (GLOBE NEWSWIRE) -- Red Pine Exploration Inc. (TSXV: RPX, OTCQB: RDEXF) ("Red Pine" or the "Company") announces the beginning of its fully funded 25,000 metre ("m") drilling program for 2024 and 2025 at the Wawa Gold Project.

2024年11月12日,多伦多 (GLOBE NEWSWIRE) — 红松勘探公司 (tsxv: RPX, OTCQB: RDEXF) ("红松" 或 "公司") 宣布在Wawa黄金项目开始为期25,000米的全资基金25,000米 ("m") 钻探项目,该项目覆盖了2024年和2025年。

The primary objective of the drilling program is to extend the zones of gold mineralization in the already sizeable gold system of the Wawa Gold Project beyond the 2024 Mineral Resource Estimate ("MRE") by focusing on:

钻探项目的主要目标是通过以下方面扩大Wawa黄金项目已相当规模的黄金矿化带,超越2024年的矿产资源估算 ("MRE"),具体包括:

  • the down-plunge, underground potential of the Jubilee Shear where limited drilling has returned results of up to 14.87 grams per tonne ("g/t") gold over 5.20 m (core length), 8.89 g/t gold over 3.75 m (core length) and 120.88 g/t gold over 0.30 m (core length; Jubilee South)
  • the down dip potential beneath the reported pit shell for the Jubilee Shear that remains untested (Jubilee Central)
  • the northern extension of the Jubilee Shear in the Jubilee/Cooper area where recent prospecting has returned encouraging results (Jubilee North and Jubilee/Cooper)
  • the recently discovered faulted extension of the Jubilee Shear on the southern side of the Parkhill Fault (Jubilee Ext.)
  • 深究反洪愁断裂带的向下矿藏潜力,在受限钻探中已获得最高14.87克每吨 ("g/t") 黄金,核心长度520万;8.89 g/t 黄金,核心长度375万;120.88克/t 黄金,核心长度30万; 北露面 (反洪愁南)
  • 测试反洪愁断裂带已报告露天矿坑外的向下潜在矿藏(千禧中心)
  • 测试刚成功勘察的反洪愁断裂带在Jubilee / Cooper地区的北部延伸,取得鼓舞人心的结果 (反洪愁北和反洪愁/库珀)
  • 测试新发现的商山断层的反洪愁断裂带延伸,位于Parkhill断层的南侧 (反洪愁延伸)

(See (Figures 1 and 2)).

(见图表1和2)

The 2024 MRE is described in the National Instrument 43-101 Technical Report dated September 30, 2024 (with a resource effective date of August 28, 2024) entitled "National Instrument 43-101 Technical Report for the Wawa Gold Project".

2024年MRE详述在2024年9月30日的《National Instrument 43-101 Wawa金矿项目技术报告》中(资源有效日期为2024年8月28日)。

In each of the target areas, numerous mineralized zones are planned to be concurrently tested with the Jubilee Shear. This will include some of the more regional targets identified based on the results of the 2024 prospecting program and the reevaluation of exploration targets on the property. The Company anticipates being able to report the preliminary results of the program in Q1 2025.

在每个目标区域,计划同时测试许多带有矿化带的区域,其中包括2024年勘探计划结果和物业上勘探目标重新评估所确认的一些更加区域性的目标。公司预计在2025年第一季度能够报告该计划的初步结果。

Michael Michaud, President and CEO of Red Pine commented: "We are very excited to recommence exploration drilling at the Wawa Gold Project after delivering on several of our goals for 2024 including completing a successful field program with the discovery of a number of new targets, updating our geological model, increasing our mineral resource estimate by 150% within a conceptual pit shell, and raising the necessary funds for this drilling program. The drilling contractor was selected as part of a competitive tender process.

Red Pine总裁兼首席执行官Michael Michaud评论道:“我们非常高兴在完成2024年的一些目标后,包括成功完成现场工作计划、发现多个新目标、更新我们的地质模型、在概念矿坑边界内将矿产资源估算提高了150% ,并为这项钻井计划筹集了必要资金后,重新开始对Wawa金矿项目的勘探钻探工作。钻探承包商是通过竞争性招标程序选定的。

We believe that this well-rounded and bold exploration program, designed to show a "line of sight" to future increases to the mineral resource, will mark an important step in our plan to add value to Red Pine. As the program includes a significant portion of both extension drilling of known zones and exploration in untested areas to discover new mineralized zones, it is intended to demonstrate the potential of the property to host a significantly larger open pit and underground mineral resource. Additionally, more limited drilling will be designed to test several new conceptual targets and more regional targets discovered during the recent surface prospecting.

我们相信这个全面而大胆的勘探计划,旨在展示对未来增加矿产资源的"前景",将成为我们增加Red Pine价值计划中的重要一步。由于该计划包括对已知区域进行大量延伸钻探以及对未经测试的区域进行勘探以发现新的含矿区,旨在展示该地产有能力容纳更大规模的露天矿坑和地下矿产资源的潜力。此外,还将设计更有限的钻探用于测试几个新的概念目标以及在最近地表考察中发现的更多区域目标。

The results of this drilling program will dictate the next steps for the project and allow for a more formal assessment of various mining and processing scenarios."

这一钻探计划的结果将决定该项目的下一步,为各种采矿和处理方案进行更正式评估提供可能。

Quality Assurance/Quality Control ("QA/QC") Measures

质量保证/质量控制("QA / QC")措施:

Drill core samples are transported in security sealed bags for preparation and analyses to Activation Laboratories Ltd. ("Actlabs") in Ancaster, Ontario. Individual samples are labelled, placed in plastic sample bags and sealed. Sample batches are then placed into durable rice bags and shipped. NQ or HQ size core (drilled previously) and NQ size core (current drill program) assays were obtained by 50-gram fire-assaying with a AA finish or by 1-kilogram screen fire assay. The 1-kilogram screen assay method is selected for samples anticipated to contain coarse gold and when the fire-assay-AA finish return results greater or equal to 2.25 g/t gold.

钻芯样品被运送到安大略省Ancaster的Activation Laboratories Ltd.("Actlabs")进行准备和分析,放在安全密封袋中。每个样品都贴有标签,放入塑料样品袋中并加密封。然后,样品批次被放入耐用的大米袋中并运送。之前钻探的NQ或HQ尺寸岩心以及当前钻探计划的NQ尺寸岩心的检测是通过50克火试金法进行的,采用AA表面处理或1千克筛分火试金法。当预计样品含有粗金属,并且火试金法-AA表面处理返回结果大于或等于2.25克/吨黄金时,会选择1千克筛分试金法。

As part of its updated and independently reviewed QA/QC program, Red Pine inserts external gold standards (low to high grade) and blanks every 20 samples, and routinely inserts blanks immediately after samples with visible gold. Quarter core duplicates are routinely inserted to evaluate the natural variability of gold mineralization. Assay certificates are sent to at least two members of the senior management team and are directly accessible from the WebLIMS portal of Actlabs. Red Pine has also initiated third party umpire testing of approximately 5% of the primary samples assayed at Actlabs at Bureau Veritas Canada Inc. in Vancouver, British Columbia.

为了更新并独立审核QA/QC方案,Red Pine每20个样本插入外部黄金标准(低到高品位)和空白样本,通常在可见黄金的样本之后立即插入空白样本。季度岩心重复样本被定期插入以评估黄金矿化的自然变异性。检测报告将发送至至少两名高级管理团队成员,并可直接从Actlabs的WebLIMS门户访问。Red Pine还已启动在温哥华不列颠哥伦比亚省的Bureau Veritas Canada Inc.对Actlabs分析的主要样本中约5%进行第三方仲裁测试。

Qualified Person

合格人士

Jean-Francois Montreuil, P.Geo. and Vice President, Exploration of Red Pine and the Qualified Person, as defined by National Instrument 43-101, has reviewed and approved the technical information contained in this news release.

Red Pine公司的勘探副总裁、P.Geo. Jean-Francois Montreuil作为根据43-101国家规定所定义的合格人员,已审核并批准了本新闻稿中包含的技术信息。

About Red Pine Exploration Inc.

关于Red Pine Exploration Inc。

Red Pine Exploration Inc. is a gold exploration company headquartered in Toronto, Ontario, Canada. The Company's shares trade on the TSX Venture Exchange under the symbol "RPX" and on the OTCQB Markets under the symbol "RDEXF".

Red Pine Exploration Inc.是一家总部位于加拿大安大略省多伦多的黄金勘探公司。该公司的股票在TSX Venture Exchange交易,股票代码为"RPX",在OTCQB Markets交易,股票代码为"RDEXF"。

The Wawa Gold Project is in the Michipicoten Greenstone Belt of Ontario, a region that has seen major investment by several producers in the last five years. The Company's land package hosts numerous historic gold mines and is over 7000 hectares in size. Red Pine is building a strong position as a major mineral exploration and development player in the Michipicoten region.

Wawa黄金项目位于安大略省的米奇皮科滕绿岩带,这是一个过去五年来受到几家生产商重大投资的地区。公司的土地包覆盖了许多历史悠久的金矿,并且总面积超过7000公顷。Red Pine正在成为米奇皮科滕地区重要的矿产勘探和开发参与者。

For more information about the Company, visit

有关公司的更多信息,请访问

Or contact:

或联系:

Michael Michaud, President and Chief Executive Officer, at (416) 364-7024 or mmichaud@redpineexp.com

总裁兼首席执行官迈克尔·米肖 (Michael Michaud) 电话:(416) 364-7024 或电邮:mmichaud@redpineexp.com

Or

或者

Carrie Howes, Director Corporate Communications, at (416) 644-7375 or chowes@redpineexp.com

请联络董事Carrie Howes,电话为(416)644-7375或电子邮件chowes@redpineexp.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX创业公司交易所及其监管服务提供者(如TSX创业公司政策所定义)均不承担本发布信息充分性或准确性的责任。

Cautionary Note Regarding Forward-Looking Information

关于前瞻性信息的注意事项

This news release contains statements which constitute "forward-looking information" within the meaning of applicable securities laws, including statements regarding the plans, intentions, beliefs and current expectations of the Company with respect to future business activities and operating performance.

本新闻稿包含构成适用证券法律意义下的"前瞻性信息"的声明,包括关于公司对未来业务活动和运营绩效的计划、意图、信仰和当前期望的声明。

Forward-looking information is often identified by the words "may", "would", "could", "should", "will", "intend", "plan", "anticipate", "believe", "estimate", "expect" or similar expressions. Forward-looking information contained in this news release includes, but may not be limited to, statements regarding the Company's goal of extending the zones of gold mineralization beyond the 2024 MRE, the mineralized zones the Company plans to test, the Company reporting the preliminary results of the program in Q1 2025, and the program demonstrating the potential of the property to host a significantly larger open pit and underground mineral resource. Investors are cautioned that forward-looking information is not based on historical facts but instead reflects management's expectations, estimates or projections concerning future results or events based on the opinions, assumptions and estimates of management considered reasonable at the date the statements are made. Such opinions, assumptions and estimates are inherently subject to a variety of risks and uncertainties that could cause actual events or results to differ materially from those projected and undue reliance should not be placed on such information, as unknown or unpredictable factors could have material adverse effects on future results, performance or achievements. Among the key factors that could cause actual results to differ materially from those projected in the forward-looking information are: the Company's expectations in connection with the projects and exploration programs being met, the impact of general business and economic conditions, global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future conditions, fluctuating gold prices, currency exchange rates (such as the Canadian dollar versus the United States Dollar), variations in ore grade or recovery rates, changes in accounting policies, changes in the Company's mineral reserves and resources, changes in project parameters as plans continue to be refined, changes in project development, construction, production and commissioning time frames, the possibility of project cost overruns or unanticipated costs and expenses, higher prices for fuel, power, labour and other consumables contributing to higher costs and general risks of the mining industry, failure of plant, equipment or processes to operate as anticipated, unexpected changes in mine life, seasonality and weather, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, and limitations on insurance.

前瞻信息通常以"可能","将","可能","应该","将","打算","计划","预期","相信","估计","期望"或类似表达方式来识别。本新闻稿中包含的前瞻信息可能包括但不限于,关于公司目标将黄金矿化区域延伸至2024勘探和评估报告之外、公司计划测试的矿化区域、公司计划在2025年第一季度报告项目的初步结果,项目展示该区域具有承载更大露天和地下矿产资源的潜力。投资者应注意,前瞻信息并非基于历史事实,而是反映管理层对未来结果或事件的期望、估计或投影,基于管理层在发表这些声明时认为合理的意见、假设和估计。这些意见、假设和估计固有地受到各种可能导致实际事件或结果与预期不符的风险和不确定性的影响,不应过度依赖此类信息,因为未知或不可预测的因素可能对未来结果、表现或成就产生重大不利影响。可能导致实际结果与前瞻信息中所预测结果不符的主要因素包括:公司与项目和勘探计划有关的期望是否得以实现、一般业务和经济状况、全球流动性和信贷可用性对现金流量的时间和资产负债值以基于预期未来条件的影响、金价波动、汇率波动(如加币与美元之间的汇率)、矿石品位或回收率的变化、会计政策的变化、公司矿产储量和资源的变化、随着计划不断完善而进行的项目参数变化、项目发展、施工、生产和投产的时间框架的变化、项目成本超支或意外成本和费用的可能性、燃料、电力、劳动力和其他消耗品价格上涨导致成本上升、矿业行业的一般风险、工厂、设备或流程未能按预期运行、矿山寿命意外变化、季节性和天气、新矿床开发的成本和时间、勘探活动的成功、许可时间表、政府对采矿活动的监管、环境风险、不可预期的复垦费用、所有权纠纷或主张,以及保险限制。

This information contained in this news release is qualified in its entirety by cautionary statements and risk factor disclosure contained in filings made by the Company, including the Company's financial statements and related MD&A for the years ended July 31, 2023 and July 31, 2024, and the interim financial reports and related MD&A for the periods ended January 31, 2024 and April 30, 2024, filed with the securities' regulatory authorities in certain provinces of Canada and available at .

本新闻稿中包含的信息在其整体上由公司提交的文件中的警示性声明和风险因素披露所限制,包括公司截至2023年7月31日和2024年7月31日的财务报表及相关的管理讨论与分析,以及截至2024年1月31日和2024年4月30日的中期财务报告及相关的管理讨论与分析,在加拿大某些省份的证券监管机构备档,并可在网站查阅。

Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking information prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, believed, estimated or expected. Although the Company has attempted to identify important risks, uncertainties and factors which could cause actual results to differ materially, there may be others that cause results not to be as anticipated, estimated or intended. The Company does not intend, and does not assume any obligation, to update this forward-looking information except as otherwise required by applicable law.

如果其中一个或多个这些风险或不确定性发生,或前瞻性信息的基本假设被证明不正确,则实际结果可能与拟定、计划、预期、信赖、估计或预期的结果有所不同。尽管公司已试图确定导致实际结果与前瞻性信息所反映的预期差异的重要风险、不确定性和可能的因素,但可能仍有其他因素导致结果不如拟定、预计或意图的那样。公司没有意图,并且不承担任何义务,根据适用法律以外的其他方面更新此前瞻性信息。

Figure 1 - Location of Planned Diamond Drilling

图1 - 计划金刚石钻探地点

Figure 2- Photograph of Surface drill at site

图2- 现场钻井设备照片


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发