RFHRF: Renforth Resources advancing Parbec Open-Pit Gold Project & District-Scale Surimeau Nickel-Copper-Zinc Project. Parbec is on track for an updated NI 43-101 Resource Estimate that will significa

RFHRF: Renforth Resources advancing Parbec Open-Pit Gold Project & District-Scale Surimeau Nickel-Copper-Zinc Project. Parbec is on track for an updated NI 43-101 Resource Estimate that will significa

RFHRF:瑞福斯资源推进帕贝克露天金矿项目和地区规模的苏里莫镍铜锌项目。Parbec正在进行更新的NI 43-101资源评估,该评估将具有重要意义
Benzinga Real-time News ·  2021/09/28 09:24

By Steven Ralston, CFA

史蒂文·拉尔斯顿(Steven Ralston),CFA

OTC:RFHRF | CSE:RFR

场外交易:RFHRF|CSE:RFR

Renforth Resources (OTC:RFHRF) (CSE:RFR) is a junior exploration & development mining company advancing both an Open-Pit Gold Project (Parbec) and a District-Scale Nickel-Copper-Zinc Project (Surimeau), both situated in the southern margin of the Abitibi Greenstone Belt in western part of the Province of Quebec. These two and the company's other lower profile properties are wholly-owned.

瑞福斯资源公司(场外交易代码:RFHRF)(CSE:RFR)是初级勘探开发矿业公司既提高了效率,又提高了工作效率露天矿金矿项目(Parbec)和a区级规模镍铜锌项目(Surimeau),两者都位于魁北克省西部Abitibi绿岩带的南缘。这两家公司以及该公司其他较低调的物业都是全资拥有的。

The company's flagship Parbec Project is situated on Canada's most prolific geological gold structure (Cadillac Larder Lake–Cadillac Fault Zone aka the Cadillac Break), which is associated with significant gold deposits, particularly those of the O'Brien, Canadian Malartic, Sigma and Lamaque mines. An updated NI 43-101-compliant Mineral Resource Estimate on the Parbec Gold Project was completed in the first half of 2020. Another updated Resource Estimate is expected to be completed by the end of 2021. Management believes that the assay data from the 2020/2021 drilling campaign at Parbec will at least double the 2020 Resource Estimate due to a multitude of factors detailed later in this article.

该公司的旗舰产品帕贝克项目该金矿位于加拿大最多产的地质金矿构造(凯迪拉克拉德湖-凯迪拉克断裂带,又称凯迪拉克断裂带)上,与大量金矿有关,特别是O‘Brien、加拿大马拉蒂克、西格玛和拉马克金矿。最新的符合NI 43-101标准的Parbec金矿项目矿产资源评估已于2020年上半年完成。另一次更新的资源估计预计将在2021年底完成。管理层认为,由于本文后面详述的多种因素,帕贝克2020/2021年钻探活动的化验数据将至少是2020年资源估计的两倍。

The Surimeau Property is a polymetallic discovery stage project which holds the potential to host a district-scale nickel-copper-zinc resource. A small, shallow 194m drill program in late 2020 and a follow-up 3,456m 15-hole survey drill program in the spring of 2021 have revealed sub-surface occurrences of both ultramafic nickel sulfide and copper-zinc VMS (Volcanogenic Massive Sulfide) over a 5km strike (Victoria West) on the western end of a 20km geophysical magnetic anomaly. Assay results are still being received due to COVID-related laboratory processing delays.

这个苏里莫财产是一种多金属发现阶段项目有潜力拥有地区规模的镍铜锌资源。2020年末的一项小型浅水194米钻探计划,以及2021年春季的后续3,456米15孔勘测钻探计划,都揭示了这两个项目的地下产状。超镁硫化镍铜锌VMS(火山成因块状硫化物)在20公里地球物理磁异常的西端超过5公里的走向(维多利亚西)。由于与COVID相关的实验室处理延迟,目前仍在收到化验结果。

At Surimeau, management is currently focusing on Victoria West. This fall, Renforth will be conducting a chipping/stripping/trenching exploration program and a drone-enabled aerial magnetic survey.

在Surimeau,管理层目前专注于维多利亚·韦斯特。今年秋天,雷福斯将进行一场切屑/剥离/挖沟勘探计划以及一个无人机航磁测量.

Nickel is a strategic raw material in the EV (Electric Vehicle) battery industry. There are growing concerns of a disruption in the supply of nickel, which is crucial to the wide-scale adoption of electric vehicles and power grids. Due to growing stainless steel production and the significant incremental demand from the adoption of EVs, the nickel industry is expected to experience significant supply shortages starting in 2023. Some companies (mining, EV battery producers and EV corporations) are expanding into and/or financing the development of the nickel resources that will be needed to implement the migration to electric vehicles. 

镍是电动汽车电池行业的战略原材料。。对镍供应中断的担忧与日俱增,镍供应对电动汽车和电网的广泛采用至关重要。由于不锈钢产量不断增长,以及电动汽车的采用带来了巨大的增量需求,镍行业预计将从2023年开始出现严重的供应短缺。一些公司(矿业、电动汽车电池生产商和电动汽车公司)正在扩张和/或资助镍资源的开发,这些资源将是实施向电动汽车迁移所需的资源。

Management's strategy is to acquire prospective mineral properties, and then through exploration & development (the company's core competencies), prove-up the assets for monetization. Management does not have an interest in pursuing the dilutive process of becoming a small-scale, producing mining company.

管理战略是收购潜在的矿产,然后通过勘探和开发(公司的核心能力),证明这些资产是货币化的。管理层没有兴趣追求成为一家小规模、生产型矿业公司的稀释过程。

An example is the New Alger Property, formerly known as the Thompson Cadillac Mine Property. In January 2013, Renforth Resources acquired a 100% interest in the property, and subsequently proved-up the assets, culminating in a robust updated Resource Estimate in June 2020. On August 31, 2020, Renforth sold New Alger to Radisson Mining Resources (TSX.V:RDS) (OTC:RMRDF) for CDN$4.34 million in securities and cash plus potential future payments.

一个示例新的Alger属性,前身为汤普森凯迪拉克矿场物业(Thompson Cadillac Mine Property)。2013年1月,Renforth Resources收购了该物业的100%权益,随后对这些资产进行了证实,最终在2020年6月发布了强劲的更新资源估计。2020年8月31日,Renforth将New Alger以434万加元的证券和现金加上潜在的未来付款出售给Radisson Mining Resources(TSX.V:RDS)(场外交易代码:RMRDF)。

Select M&A Milestones Achieved

选择已实现的并购里程碑

April 2006     JV established with Cadillac Ventures for New Alger Property

2006年4月与凯迪拉克风险投资公司成立合资公司新阿尔及尔属性

January 2013      Renforth Resources acquired 100% of New Alger Property

2013年1月,Renforth Resources收购了100%的新阿尔及尔属性

January 2015      Renforth acquired option to purchase 100% of Parbec Property from Globex Mining

2015年1月,Renforth收购了100%购买以下股份的选择权帕贝克来自Globex Mining的财产

March 2019      Renforth Resources acquired 100% of Parbec Property

2019年3月,瑞福斯资源公司100%收购了帕贝克属性

August 2020      Renforth sold New Alger Property for CDN$4.34 million in securities & cash

2020年8月雷福斯售出新阿尔及尔财产价值434万加元的证券和现金

Management's plan is to monetize the Parbec Project (after updating the Estimated Resource this year) and utilize the proceeds to prove up the company's Surimeau Property. The net proceeds would be employed to fund exploration activities at Surimeau in order to help prove up the district-scale Ni-Cu-Zn Surimeau Property. Considering the breadth of the recently completed drilling campaign at Parbec, the upcoming Resource Estimate update should deliver a significant increase in the estimated gold resource.

管理层的计划就是把帕贝克项目(在今年更新估计资源之后),并利用所得资金证明该公司的Surimeau地产。净收益将用于资助苏里莫的勘探活动,以帮助证明区域尺度的Ni-Cu-Zn Surimeau性质。考虑到最近在Parbec完成的钻探活动的广度,即将发布的资源估计更新应该会大幅增加估计的黄金资源量。

Management has reached out to potential buyers, the most interesting being the owners of the Canadian Malartic Mine, which has a looming ore inventory dilemma and is contiguous to Parbec with the Canadian Malartic super pit being located approximately 5km southeast of Parbec on trend with the Cadillac Break structure.

管理层已与潜在买家接洽,其中最令人感兴趣的是加拿大马拉蒂克矿(Canada Malartic Mine)的所有者,该矿的矿石库存困境迫在眉睫,毗邻帕贝克(Parbec),加拿大马拉蒂克超级矿坑位于帕贝克东南约5公里处,凯迪拉克Break结构顺势而为。

Parbec Project

帕贝克项目

The Parbec Open-Pit Gold Project is adjacent and on strike with the Agnico Eagle (NYSE:AEM) (TSX:AEM) - Yamana Gold (NYSE:AUY) (TSX:YRI) Canadian Malartic open-pit mine, Canada's largest operating gold mine. The current NI 43-101 Open Pit Constrained Resource Estimate (dated June 23, 2020) is 104,500 toz Au at 1.78 g/t in the Indicated category and 177,300 toz Au at 1.77 g/t Inferred.

这个帕贝克露天金矿项目Agnico Eagle(纽约证券交易所股票代码:AEM)(多伦多证券交易所股票代码:AEM)-Yamana Gold(纽约证券交易所股票代码:AUY)(多伦多证券交易所股票代码:YRI)是加拿大最大的露天金矿。目前的NI 43-101露天矿受限资源估算(日期为2020年6月23日)为指示类别中104,500盎司Au,1.78克/吨推算出1.77g/t的17.7300toz Au。

In March 2021, a 15,596m drilling campaign was completed which better defined the resource within the planned pit walls and proved additional mineralization at depth and immediately adjacent to the pit through both down-dip and step-out drilling, respectively. The Parbec Project is in the latter portion of the Resource Definition stage, with an updated Resource Estimate expected later in 2021.

2021年3月,完成了15,596米的钻探活动,更好地定义了资源在计划中的坑壁内已探明的额外矿化在深井和紧邻矿坑的地方,分别采用下倾钻进和步进钻进。帕贝克项目在资源定义阶段的后半部分,并带有预计2021年晚些时候更新的资源估计.

The Parbec property has the infrastructure to support exploration activities and mining operations: roads that offer access to the project site, green hydroelectric power lines on the property, nearby railroad facilities of the Canadian National Railway and a skilled labor pool in an established mining area with mineral processing and smelting facilities. In addition, the Trans-Canada Highway (Québec Highway 117) passes within three (3) kilometers of the property. Renforth Resources owns 100% of the Parbec Property; however, the property is subject to a 3% Gross Metal Royalty.

这个帕贝克属性具有基础设施为了支持勘探活动和采矿作业:通往项目现场的道路、矿产上的绿色水电线路、附近的加拿大国家铁路(Canada National Railway)铁路设施以及位于具有选矿和冶炼设施的成熟矿区内的熟练劳动力池。此外,横贯加拿大的高速公路(魁北克117号高速公路)距离酒店不到三(3)公里。Renforth Resources拥有Parbec地产100%的股份,但该地产需缴纳3%的总金属特许权使用费。

Recent Exploration at Parbec

帕贝克的最新探索

Between September 2020 and March 2021, Renforth Resources conducted a drill campaign at Parbec, which ultimately was comprised of 49 drill holes for a total of 15,596m drilled. The campaign was initially composed of two programs, a fall phase with original expectations that 7,000m would be completed by the Christmas break and a 5,080m winter program to be begun early in 2021. The campaign had several components:

在2020年9月至2021年3月期间,Renforth Resources进行了一次帕贝克的演习活动,它最终由以下部分组成49个钻孔总共有钻进15,596米。这场运动最初是由两个程序组成这是一个秋季阶段,最初的预期是7000米将在圣诞节假期前完成,5080米的冬季计划将于2021年初开始。这项活动有几个组成部分:

1) infill drilling designed to prove the continuity of gold mineralization for the resource model by targeting gap zones in prior resource model

1)加密钻井旨在通过对原有资源模型中的空白区进行定位来证明资源模型中金矿化的连续性。

2) drilling down dip by undercutting previous holes in order to begin to test the deposit at depth

2) 向下钻入倾角通过在以前的孔中凿出底孔,以便开始在深度测试沉积物

3) twin drilling to enable the consideration of 13,000m of historic holes drilled between 1986 and 1993 in the upcoming update to the resource estimate

3) 孪生钻进要启用对13000米历史钻孔的思考在即将更新的资源估计数中进行了1986至1993年间的钻探

The number of drill holes and meters drilled exceeded plan with the fall drill program (September-December 2020) completing 27 drill holes (9,644m) and the winter program (February – March 2021) completing 22 drill holes (5,925m).

这个超过计划的钻孔数和仪表数秋季钻探计划(2020年9月至12月)完成27个钻孔(9644米),冬季计划(2021年2月至3月)完成22个钻孔(5925米)。

Recent Parbec Exploration Milestones Achieved

帕贝克地区近期取得的勘探里程碑

Sept. 2020      Commenced 12,070m diamond drill campaign at Parbec Gold Project

9月2020年在帕贝克黄金项目开始了10.07亿美元的钻石钻探活动

• Planned to be composed of a 7,000m fall and a 5,070m winter program

·计划由7000米秋季项目和5070米冬季项目组成

Dec. 2020       Completed 9,644m fall drill program (27 drill holes)

2020年12月完成9644米落地钻计划(27个钻孔)

Feb. 5, 2021       Commenced 5,070m winter drill program at Parbec Gold Project

2021年2月5日开始在帕贝克黄金项目进行5070米冬季演练

March 2021        Completed 5,925m winter program (22 drill holes)

2021年3月完成5925米冬季项目(22个钻孔)

Highlights of the campaign include the following Top Ten assay results, along drill hole PAR-20-105 that discovered of gold mineralization outside the existing resource model. The discovery hole is located in the Pontiac sediments to the south of the Cadillac Break.

这场运动的亮点包括以下内容十大化验结果,沿PAR-20-105钻孔在现有资源模式之外发现金矿化。这个发现洞位于卡迪拉克断裂带以南的庞蒂亚克沉积物中。

In addition, the longest mineralized interval was drill hole PAR-20-116 with 49.6m assaying at 1.46 g/t Au, while the richest interval was PAR-20-112 with 21.45m grading at 5.57 g/t Au. However, the highest assay was a sub-interval in PAR-21-133 with 0.35m grading at 118.7 g/t, which was drilled to twin the historical hole of PAR-88-44. The long intervals have a high probability of increasing the current resource.

此外,最长矿化间隔钻孔PAR-20-116与49.6m Au的含量为1.46g/t,而最丰富区间是标准杆-20-112杆,21.45m等级5.57克/吨Au。然而,最高的检测是PAR-21-133中的一个亚区间,等级为0.35m118.7克/吨,这是为了在历史上的PAR-88-44洞中钻成两个洞而钻成的。较长的间隔具有增加当前资源的高概率。

The assay work on the Parbec samples has been slow due to impact of COVID-19 on Canadian laboratories, which caused the company to issue assay results in tranches throughout 2021. The delay in being able to report assay results continues, though the results of only six drill holes are still pending.

由于新冠肺炎对加拿大实验室的影响,帕贝克样本的化验工作一直很缓慢,这导致该公司在2021年全年分批发布化验结果。尽管只有6个钻孔的结果仍悬而未决,但报告化验结果的延迟仍在继续。

Management believes that the assay data from the 2020/2021 drilling campaign at Parbec will be able to at least double the 281,800 Au toz estimate of the NI 43-101 completed last year. For reference, the October 2018 Resource Estimate was 37,224 toz Au at 3.47 g/t in the Indicated category and 656,875 toz Au at 2.3 g/t Inferred, which included historical drilling results that were not considered in the 2020 Estimate. The twinning of historical drill holes should bolster the upcoming resource estimate closer to the 2018 estimate. One also should consider that the potential impact of the down dip drilling, since the deepest point of the 2020 open pit-constrained resource is only 225m compared to commercial 400m depth of the nearby open pit at the operating Canadian Malartic Mine.

管理层相信,来自帕贝克2020/2021年钻探活动的化验数据将至少是去年完成的NI 43-101估计的281,800 AU toz的两倍。作为参考,2018年10月的资源估计为37,224盎司Au,指示类别为3.47克/吨,推断为656,875 TOZ Au,推断为2.3克/吨,其中包括2020年估计中未考虑的历史钻探结果。历史钻孔的结合应该会提振即将到来的资源估计,更接近2018年的估计。人们还应该考虑到向下倾斜钻探的潜在影响,因为2020年露天矿资源受限的最深处只有225米,而附近正在运营的加拿大马拉提克(Malartic)矿的商业露天矿深度为400米。

Given the results of the twin, infill and down-dip drilling, management expectations ought to be met and possibly exceeded. Once all the assay data is available, Renforth will rebuild Parbec's geological model and deliver it, along with the drilling data, for an updated Resource Estimate.

考虑到双井、加密和下倾钻井的结果,管理层的预期应该会达到,甚至有可能超过。一旦所有化验数据可用,Renforth将重建Parbec的地质模型,并将其与钻探数据一起提供,以更新资源估计。

Surimeau Project

苏里莫项目

The 260-km2Surimeau District Project encompasses six areas of historic polymetallic mineral occurrences, including (from west to east) Huston, Surimau, Victoria West, Lalonde, Fouillac and Colonie, which are noted by the blue balls on the image below. Management is initially concentrating advanced exploration efforts on Victoria West, the western 5km of a 20km geological intrusive complex with high magnetic geophysical anomalies. Furthermore, a 30km trend in the north of the property hosting mineralization is highly prospective.

260公里2苏里莫地区项目包括六个具有历史意义的多金属矿产区包括(从西到东)休斯顿、苏里莫、维多利亚·韦斯特、拉隆德、富伊拉克和科隆尼,下图中的蓝色球标出了这些城市。管理层最初将先进的勘探努力集中在维多利亚·韦斯特,位于20 km地质侵入杂岩的西侧5 km处,具有高磁地球物理异常。此外,矿化赋存地块北部30公里的走向具有很高的远景。

Select M&A Milestones Achieved

选择已实现的并购里程碑

June 2020     Renforth staked 128 claims south of Malartic West and also transferred some claims from Malartic West (which included Victoria West, Lalonde and Colonie) to form the initial 70-km2Surimeau Property

2020年6月,Renforth在马拉蒂克西部以南划出了128个主权主张,并转移了马拉蒂克西部(包括维多利亚·韦斯特、拉隆德和科隆尼)的一些主权主张,形成了最初的70公里2苏里莫财产

Nov. 2020      Renforth staked 219 new claims to the south & acquired claims to the west (which included Huston and Surimau) expanding Surimeau to 215-km2

2020年11月,Renforth对南部提出了219项新的主权主张,并对西部(包括休斯顿和苏里莫)提出了不断扩大的主权主张苏里莫至215公里2

April 2021      Surimeau expanded from 215-km2 to 260-km2 with the addition of 81 claims to the west, including the Huston target

2021年4月苏里莫从215公里扩展到2260公里2包括休斯顿目标在内,向西增加了81个主权主张

Over the last 15 months, management has accumulated the Surimeau claims in a cost-efficient manner through staking and acquiring a number of claims. Prior exploration efforts concentrated on assessing the potential for gold. Though assays, chip sampling and geological formations have indicated the presence of base metals, the previous owners did not pursue the potential of the occurrences of nickel, copper and zinc mineralization.

在过去15个月中,管理层通过标注和获得一些索赔,以具有成本效益的方式积累了Surimeau索赔。之前的勘探工作集中在评估黄金的潜力上。尽管化验、芯片取样和地质构造表明存在贱金属,但之前的矿主并未追查镍、铜和锌矿化的可能性。

Based on historic data and the company's field work, the district-sized package hosts nickel, copper, zinc and gold occurrences, thus far identified in two mineralized systems, one approximately 30kms in length in the north and the other roughly 20kms in the central area, both of which were on the Malartic West claims that were part of the formation of the Surimeau Property. At the time, the company was aware of these two ultramafic magnetic features, including the elevated nickel and zinc occurrences situated at the east (Victoria West) and west (Colonie) of the 20km-system. During this prospecting stage, separate nickel sulfide and zinc-rich VMS systems (which are juxtaposed against each other in the same location) were identified along both mineralized arms through grab sampling on surface, particularly during the reconnaissance sampling program conducted in the summer of 2020.

根据历史数据和该公司的野外工作,这个地区大小的包裹中含有镍、铜、锌和金矿,到目前为止,已发现镍、铜、锌和金矿两个成矿系统一个在北部长约30公里,另一个在中部约20公里,这两个地方都位于马拉蒂克西部主张,这是苏里莫财产形成的一部分。当时,该公司意识到了这两个超镁铁磁性特征,包括位于20公里系统东部(维多利亚西部)和西部(科隆尼)的高镍和锌矿体。在本勘探阶段,通过地表抓取采样,特别是在2020年夏季进行的勘察采样计划期间,在两个矿化支脉沿线发现了独立的硫化镍和富锌VMS系统(它们在同一地点相互并置)。

Discovery Stage (Abbreviated Drill Program at Surimeau in November 2020)

发现阶段(缩写为2020年11月在苏里莫的演习计划)

Initially, management is targeting the 5km west-end of the 20km central anomaly known as Victoria West, where in November 2020, Renforth deployed a mobile, one-man, track-mounted drill to commence al drill program. The planned 1,000m program ended after 2.5-holes (194m) due to pre-mature equipment failure. However, the core samples from the first two holes (SUR-20-001 & SUR-20-002 situated roughly 220m from each other) visually demonstrated the presence of massive and semi-massive sulfides in the form of sphalerite (zinc sulfide) and chalcopyrite (copper sulfide). Assay results, which were received in 2021, confirmed the presence of nickel sulfide and other metals, in addition to copper and zinc. The hole SUR-20-003 returned values of 0.156% Ni over 13m (including 0.483% Ni over 1m) while SUR-20-001 returned 1.16% Zn and 0.132% Cu over 4.0m followed by 0.147% Ni over 7.9m.

最初,管理层瞄准了被称为维多利亚西(Victoria West)的20公里中心异常点西端5公里处,2020年11月,雷福斯在那里部署了一台移动式单人履带式钻机,开始了一项钻探计划。计划中的1000米项目在以下情况下结束2.5孔(194米)由于早熟设备故障。然而,岩心样品从前两个洞(相距约220米的SUR-20-001和SUR-20-002)直观地展示了大块和半大块硫化物的存在以闪锌矿(硫化锌)和黄铜矿(硫化铜)的形式存在。2021年收到的化验结果证实存在硫化镍以及其他金属,除了铜和锌。孔SUR-20-003返回值为超过13M的0.156%镍(包括超过1M的0.483%镍),同时返回SUR-20-0014.0m以上的1.16%锌和0.132%铜紧随其后的是0.147%镍超过7.9m.

This mere 2.5-hole drill program validated the presence of surface and sub-surface Cu-Ni-Zn mineralization and served as the breakthrough discovery which not only confirmed the presence of zinc-rich VMS system and nickel sulfide deposits, but also, importantly, confirmed that the mineralization correlated well with geophysical anomalies in historic EM surveys. Prior historic drill test holes were not situated near the geophysical anomalies (see EM image below), but were presumably based on surface visuals.

这个仅2.5孔的钻探计划验证了地表和地下Cu-Ni-Zn矿化的存在,并充当了突破性发现这不仅证实了富锌VMS系统硫化镍矿床,但重要的是,也证实了在历史EM调查中,矿化与地球物理异常有很好的相关性。以前的历史钻探测试孔并不位于地球物理异常附近(见下图),但推测是基于地表的视觉效果。

Surimeau Exploration Efforts at Victoria West

维多利亚西的苏里莫勘探努力

Summer 2020        Field work confirmed presence of historically identified surface mineralization

2020年夏季野外工作证实存在历史上已确定的地表矿化

November 2020        Completed 194m (2.5 drill holes) of planned 4-hole 300m drilling program

2020年11月完成了计划中的4孔300米钻井计划的194米(2.5个钻孔)

March-April 2021        Completed 3,456m 15-hole) drilling program at Victoria West

2021年3月至4月在维多利亚西完成了3456米(15孔)的钻井计划

June-July 2021        Completed 775m (4 holes) of planned 4-hole 1000m drilling program

2021年6-7月完成775米(4孔)计划中的4孔1000米钻井计划

Spring Drill Program at Surimeau (March – April 2021)

苏里莫春季演练计划(2021年3月至4月)

In March 2021, Renforth followed up with a 3,456m 15-hole survey drill program over 2.2 kilometers of the approximate 5km strike of the Victoria West target. All 15 holes visually demonstrated the presence of mineralization (chalcopyrite, sphalerite and pyrrhotite). The drill program proved that the mineralization associated with the EM anomaly is up to 250m in width.

2021年3月,雷福斯跟进了一项3456米15孔测量钻探方案维多利亚西区目标的大约5公里的打击距离超过2.2公里。所有15个孔都直观地显示了矿化的存在。(黄铜矿、闪锌矿和磁黄铁矿)。钻探方案证明,与EM异常有关的矿化宽度可达250m。

The assay data also confirmed management's interpretation that the central anomaly is composed of nickel sulfide ultramafic bodies that occur coincident, and at times intermingled, with copper-zinc VMS occurrences similar to the Outokumpu deposit in eastern Finland.

化验数据也证实了管理层的解读中央异常是由硫化镍超镁铁质岩体发生的事情重合,而且有时混杂在一起,出现铜-锌VMS与乌托昆普矿床相似在芬兰东部。

In preparing for this drill program, the company relied upon historic data from exploration programs (trenching and shallow drilling) conducted between 1940 and1980, along with a high-resolution helicopter-borne geophysical survey completed in 2012 (100m line spacing flown at 40m elevation).

在准备这项钻探计划时,该公司依赖于1940至1980年间进行的勘探项目(挖沟和浅层钻探)的历史数据,以及2012年完成的高分辨率直升机搭载的地球物理调查(在40米高空飞行的100米线距)。

Summer Drill Program at Surimeau (June – July 2021)

苏里莫夏季演练计划(2021年6月至7月)

In June 2021, management decided to accelerate the exploration of Victoria West with a 1,000m drill program in order to test for deeper intercepts of mineralization. Utilizing the drill pads prepared for the March/April program, a one-man tracked rig drilled four 300m holes at a 45-degree dip, undercutting previously completed 200m holes. All the holes intersected visible nickel, copper and zinc sulfides. The first hole (SUR-21-19) encountered the highest concentration of visible copper intersected to date while the second hole (SUR-21-20) encountered the highest concentration of visible nickel intersected to date. It is interesting that the mineralization apparently appears more robust at depth, portending that assay results, which are expected later in the fall, might be the highest yet.

2021年6月,管理层决定通过1000米钻探计划加快维多利亚西的勘探测试更深层次的矿化截获。利用为3月/4月计划准备的钻垫,一台单人履带式钻机在45度倾斜的情况下钻了4个300米的孔,低于之前完成的200米的孔。所有的洞都与可见的镍、铜和锌硫化物相交。第一个洞(SUR-21-19)遇到了迄今为止相交的最高浓度的可见铜,而第二个洞(SUR-21-20)遇到了最高浓度的可见铜到目前为止已经相交了。有趣的是,矿化显然在深度上看起来更强劲,这预示着预计将在秋季晚些时候公布的化验结果可能是迄今为止最高的。

Simultaneously, field prospecting was conducted targeting outcrops along the 20km central geophysical magnetic anomaly between Victoria West and Colonie, along with Lalonde (which is situated approximately 3kms north of Victoria West).

同时,沿着维多利亚西和科隆尼之间20公里的中心地球物理磁异常以及拉隆德(位于维多利亚西以北约3公里)的露头进行了野外勘探。

Fall Chipping & Stripping Program at Surimeau (September – October 2021)

苏里莫秋季削皮和剥离计划(2021年9月至10月)

This fall, management plans to further explore the near-surface mineralized system at Victoria West through a chipping/stripping/trenching program. The required permit was granted in September. Initially, chip samples will be extracted from outcrops, after which approximately 9,500 square meters will be stripped (see image below) and cleaned with compressed air to exposed bedrock. The exposed area will then be mapped and sampled. The program is expected to be completed prior to the opening of high-powered rifle hunting season.

今年秋天,管理层计划通过一个项目,进一步探索维多利亚西的近地表矿化系统。切屑/剥离/挖沟程序。所需的许可证是在9月份发放的。最初,将从露头提取芯片样本,之后将剥离约9500平方米(见下图),并用压缩空气将其清理到裸露的基岩上。然后将对暴露区域进行映射和采样。该项目预计将在大功率步枪狩猎季开始前完成。

Drone-enabled Airborne Magnetic Survey

无人机启用的机载磁力测量

In addition, this fall, management plans to conduct a drone-enabled aerial magnetic survey to aid in the planning of the next drilling program at Surimeau. The use of drone-mounted survey equipment is cost-effective method that should be able to provide tighter data (since drones can fly lower than helicopters) to help better define, and potentially discover additional, magnetic anomalies along strike.

此外,今年秋天,管理层计划进行一次无人机航磁测量帮助规划苏里莫的下一次钻探计划。使用无人机安装的探测设备是一种成本效益高的方法,应该能够提供更紧密的数据(因为无人机可以比直升机飞得更低),以帮助更好地定义,并有可能发现沿走向的额外磁异常。

The Nickel Industry

镍工业

The nickel industry is expected to benefit from the global transition to electric vehicles (EVs) as well as from economic growth that is expected to drive increased demand for stainless steel, which is currently the largest end-market for nickel. The transition of the energy source for automobiles from fossil fuels to electricity stored in EV batteries is expected to drive an increased demand for Class I nickel, which, within the next several years, will not be able to be met by the current production capacity of existing mining operations nor by current global nickel processing capacity. Therefore, the increasing demand for EV batteries portends robust demand for nickel.

镍行业预计将受益于全球向电动汽车(EVS)的过渡,以及预计将推动对不锈钢需求增加的经济增长,不锈钢目前是镍的最大终端市场。汽车能源从化石燃料转向电动汽车电池中储存的电力,预计将推动对I类镍的需求增加,在未来几年内,现有采矿作业的现有生产能力或当前的全球镍加工能力将无法满足这一需求。因此,电动汽车电池需求的增加预示着镍需求强劲。

A sampling of the increase in demand being spurred by the mega-trend toward EVs includes:

电动汽车的大趋势刺激了需求的增长,其中一个样本包括:

• To support its EV product lines, Tesla (NASDAQ:TSLA) has built and currently operates three EV battery production facilities, two in the U.S (San Francisco and Sparks, NV) and one in China (Shanghai). Upcoming giga-factories under construction are in Berlin, Germany and Austin, TX.

·支持其电动汽车产品线,特斯拉纳斯达克股票代码:TSLA)已经建造并运营了三个电动汽车电池生产设施,其中两个在美国(旧金山和内华达州斯帕克斯),一个在中国(上海)。即将开工的巨型工厂分别位于德国柏林和德克萨斯州奥斯汀。

• In January 2021, General Motors (NYSE:GM) announced plans to offer only EVs by 2035.

·2021年1月,通用汽车(纽约证券交易所代码:GM)宣布计划到2035年只提供电动汽车。

• In February 2021, Ford (NYSE:F) announced that its spending on EVs and autonomous vehicles (AVs) is planned to more than double to $29 billion by 2025.

·2021年2月,福特(纽约证券交易所股票代码:F)宣布,计划到2025年将电动汽车和自动驾驶汽车(AV)的支出增加一倍以上,达到290亿美元。

• In December 2019, Volkswagen (Xetra:VOW) stated a corporate goal of producing 1,000,000 EVs annually year by 2023 and 1.5 million a year by 2025. Volkswagen is also targeting that 50% of its North America sales will be fully electric vehicles by 2030. In March 2021, Volkswagen announced plans to construct six battery factories in Europe by 2030 to support its EV goals.

·2019年12月,大众(Xetra:VOW)表示,公司的目标是到2023年年产100万辆电动汽车,到2025年年产150万辆电动汽车。大众的目标也是,到2030年,其北美销量的50%将是全电动汽车。2021年3月,大众宣布计划到2030年在欧洲建设6家电池工厂,以支持其电动汽车目标。

• In March 2021, Volvo (STO:VOLV-B) made a commitment to only make and sell all-electric vehicles by 2030.

·2021年3月,沃尔沃(STO:VOLV-B)承诺到2030年只生产和销售全电动汽车。

• In December 2020, the Government of Japan launched the Green Growth, which includes the goal to produce only EVs (i.e. no gasoline-powered cars) by the mid-2030s.

·2020年12月,菲律宾政府日本推出了绿色增长,其中包括到本世纪30年代中期只生产电动汽车(即不生产汽油动力汽车)的目标。

The number of giga-factories has grown rapidly from 17 in 2019 to 70 in 2020 to 142 in mid-2021.

这个千兆工厂数量从2019年的17个迅速增长到2020年的70个到2021年年中增至142.

According to the U.S. Geological Survey (USGS), the vast majority of economic global nickel resources (with an average 1.0% Ni or more) are generally dispersed in two types of ore deposits: laterite (approximately 60% of known deposits) and sulfide (40%) deposits. A variety of techniques are utilized to extract nickel from these ores, but typically, sulfide ores have a higher grade than laterites, and sulfide ores are easier and less expensive to process than laterites.

根据美国地质调查局(USGS)的数据,绝大多数全球经济镍资源(平均含镍1.0%或更高)一般分布在两种类型的矿床中:红土(约占已知矿藏的60%)和硫化物(40%)存款。人们利用各种技术从这些矿石中提取镍,但通常硫化矿石的品位高于红土,而且硫化矿石比红土更容易加工,成本也更低。

Nickel production is most often categorized as high-purity Class I nickel (electrolytic nickel, powders and briquettes) and Class II nickel (nickel pig iron and ferronickel). Nickel is an essential component for the manufacture of cathodes in many types of batteries used for both the Electrical Vehicle and Battery Storage segments of the battery industry; however, the nickel feedstock varies depending technology employed by battery manufacturers. Feedstock options include Class I nickel, Mixed Hydroxide Product (MHP), Mixed Sulphide Precipitate (MHP), Nickel Pig Iron (NIP) and matte intermediates, among others.

镍的生产通常被归类为高纯度。第I类镍(电解镍、粉末和型煤)和第II类镍(镍生铁和镍铁)。镍是电池行业电动汽车和电池存储领域使用的许多类型电池中制造阴极的基本成分;然而,镍原料因电池制造商采用的技术而异。原料选项包括I类镍、混合氢氧化物产品(MHP)、混合硫化物沉淀物(MHP)、镍生铁(NiP)和冰铜中间体等。

Currently, the vast majority of nickel demand is derived from the production of stainless steel and super alloys (65% and 12% of consumption, respectively) due to nickel's physical and chemical properties of a high melting point, an ability of being easily alloyed, its ductility and a resistance to corrosion/oxidation. As a result, nickel-based stainless steels and alloys are used in the pharmaceutical, petrochemical, chemical, aerospace, marine and food & beverage industries.

目前,绝大多数的镍需求派生自不锈钢的生产高温合金这是由于镍的高熔点、易合金化能力、延展性和耐腐蚀性/氧化性等物理和化学性质造成的(分别占消费量的65%和12%)。因此,镍基不锈钢和合金被用于制药、石化、化工、航空航天、船舶和食品饮料行业。

Lithium-ion Battery-related Demand for Nickel

与锂离子电池相关的镍需求

Demand for rechargeable lithium-ion batteries, especially those used to power EVs and to store electric energy, particularly from renewable sources (such as solar panels and wind turbines), is expected to accelerate and become the major driving factor of incremental growth of the nickel market.

二次锂离子电池的需求,尤其是那些用于为电动汽车提供动力和储存电能的能源,特别是来自可再生能源(如太阳能电池板和风力涡轮机)的能源,预计将加速并成为镍市场增量增长的主要推动因素.

In 2021, Benchmark Minerals Intelligence, a leading market intelligence provider, estimates that lithium-ion batteries constitute a $50 billion market in 2021 and expects that market will expand to $200 billion in 2030. Consequently, Benchmark forecasts that this growing demand will increase lithium-ion battery's share of the nickel market from 2.3% in 2020 to 30% in 2030.

2021年,领先的市场情报提供商Benchmark Minerals Intelligence估计,锂离子电池在2021年构成了500亿美元的市场,并预计2030年这一市场将扩大到2000亿美元。因此,Benchmark预测,这一不断增长的需求将使锂离子电池在镍市场的份额从2020年的2.3%增加到2030年的30%。

According to the International Nickel Study Group (INSG), global demand for nickel is expected to increase 12.0% from 2.405 million tonnes in 2019 to 2.673 million tonnes in 2021, driven by robust demand from manufacturers of stainless steel and strong sales of electric-vehicles (EVs).

根据国际镍研究小组(INSG)的说法,全球镍需求在不锈钢制造商强劲需求和电动汽车(EVS)强劲销售的推动下,预计将从2019年的240.5万吨增加到2021年的267.3万吨,增幅为12.0%。

Another indication of the looming shortage of nickel is the actions of producers of EV battery and energy storage batteries to lock in supply. A prominent example is Tesla, which in July 2021 entered into a long-term supply contract with BHP Billiton for Class I nickel. Tesla is also securing additional nickel supply through agreements with Prony Resources and Vale.

镍短缺迫在眉睫的另一个迹象是电动汽车电池和储能电池生产商锁定供应的行动。一个突出的例子是特斯拉,2021年7月与必和必拓签订了I级镍的长期供应合同。特斯拉还通过与普罗尼资源(Prony Resources)和淡水河谷(Vale)达成协议,确保额外的镍供应。

Environmental Sustainability and the Nickel Industry

环境可持续性与镍工业

The environmental impact of nickel mining and refining operations has come to the forefront as countries and the managements of both upstream and downstream companies focus on addressing net-zero emissions targets. Concerns range from the carbon footprint of powering mining and nickel smelting operations to the remediating the clearance of large areas of land during the mining process and sulfuric acid/the emissions of sulfur dioxide in some processes of refining nickel into intermediate products. As ecological and sustainability efforts become an increasingly significant factor in the nickel market, eco-friendly nickel for use in batteries will command a premium.

随着各国和上下游公司的管理层将重点放在实现净零排放目标上,镍开采和精炼作业的环境影响已成为当务之急。令人担忧的问题从碳足迹为采矿和镍冶炼业务提供动力的补救措施采矿过程中大片土地的清理和硫酸/将镍精炼成中间产品的一些过程中二氧化硫的排放。随着生态和可持续性努力成为镍市场上一个越来越重要的因素,用于电池的环保镍将获得溢价。

The Use of Nickel Cathodes for Electric Vehicles

镍阴极在电动汽车上的应用

Rechargeable lithium-ion batteries have become ubiquitous, powering electric vehicles (EVs) and large-scale energy storage systems. The current growth in these applications is being enabled not only by llithium but also by nickel. The expansion of these devices and systems is dependent on several attributes battery technology, namely life span, recharging time, energy capacity and the capability for rapid discharge (enables quick acceleration and rapid recharge).

可充电锂离子电池已经变得无处不在,为电动汽车(EVS)和大规模储能系统提供动力。目前这些应用的增长不仅得益于锂,也得益于镍。这些设备和系统的扩展取决于电池技术的几个属性,即寿命、充电时间、能量容量和快速放电能力(实现快速加速和快速充电)。

Nickel Pricing

镍定价

Nickel metal prices bottomed around $8,300 per tonne in early 2016 as LME stocks peaked slightly above 500,000 tonnes. LME inventories continued to decline to below 200,000 tonnes through September 2019 as some nickel mines were idled, including the Ravensthorpe Mine in Western Australia in 2017, along with reduced mine output from the Philippines. In addition, nickel consumption exceeded nickel mine supply starting in 2016 through 2019.

2016年初,随着LME库存略高于50万吨,镍金属价格跌至每吨8300美元左右的底部。截至2019年9月,LME库存继续下降至20万吨以下由于一些镍矿闲置,包括2017年西澳大利亚州的Ravensthorpe矿,以及菲律宾的矿山产量减少。此外,从2016年开始到2019年,镍消费量超过了镍矿供应。

Nickel prices plummeted from $17,657 per tonne in September 2019 to $11,804 in April 2020 as LME inventories expanded from 157,000 tonnes to roughly 230,000. However, demand for nickel recovered in the second half of 2020 due to rising demand driven to rising EV sales, which drove the price of nickel to $18,500 in February 2021.

随着LME库存从15.7万吨扩大到约23万吨,镍价从2019年9月的每吨17657美元暴跌至2020年4月的11804美元。然而,由于电动汽车销量上升推动需求上升,镍需求在2020年下半年回升,这推动镍价在2021年2月升至18,500美元。

After a brief correction in March, nickel prices have rallied from $16,400 to over $19,100 in August as demand increased for stainless steel and EV nickel-cathode batteries. In addition, LME stock has declined from approximately 261,000 tonnes in April to roughly 189,000 tonnes in August. This increased demand that drove lower inventories is expected to stimulate higher prices of nickel in order to incentivize the development of incremental nickel projects.

在3月份短暂回调后,随着对不锈钢和电动汽车镍阴极电池的需求增加,镍价已从16,400美元上涨至8月份的19,100美元以上。此外,LME库存已从4月份的约26.1万吨降至8月份的约18.9万吨。这种推动库存下降的需求增加,预计将刺激镍价上涨,以激励增量镍项目的发展。

Conclusion

结论

The Parbec Project is on track to have an updated NI 43-101 Mineral Resource Estimate that will significantly increase the company's gold resource. Thereafter, management is highly motivated to monetize the Parbec in order to progress toward proving up the district-scale polymetallic Surimeau Property.

帕贝克项目是NI 43-101矿产资源估算值即将更新这将大幅增加该公司的黄金资源。此后,管理层非常积极地将帕贝克货币化,以便向证明地区尺度的多金属Surimeau财产.

Surimeau is highly significant to Renforth Resources for three reasons. First, this breakthrough discovery could be indicative of a district-scale nickel-copper-zinc project that is geologically similar to the commercially successful Outokumpu deposit in Finland. Second, the nickel mining industry is coming into favor as nickel demand for EV batteries is projected to outstrip supply within the next five years. Importantly, nickel is more easily and much less expensively recovered from nickel sulfide than from nickel laterite ore. And third, there is a significant valuation disparity between gold and nickel sulfide junior mining companies. Any change in the perception that Renforth has transitioned from a junior gold company to a junior nickel sulfide company potentially would close that gap.

Surimeau对伦福斯资源具有重要意义有三个原因。首先,这个突破性发现这可能表明了一个地区性规模的镍铜锌项目,该项目在地质上类似于芬兰商业上成功的乌托昆普(Outokumpu)矿床。第二,镍采矿业正在受到青睐由于电动汽车电池的镍需求预计将在未来五年内超过供应。重要的是,与从红土镍矿中回收镍相比,从硫化镍中回收镍更容易,成本也低得多。第三,还有一个显著的估值差距在黄金和硫化镍初级矿业公司之间。人们认为Renforth已经从一家初级黄金公司转变为一家初级硫化镍公司,这一看法的任何改变都可能缩小这一差距。

SUBSCRIBE TO ZACKS SMALL CAP RESEARCH to receive our articles and reports emailed directly to you each morning. Please visit our website for additional information on Zacks SCR. 

订阅Zacks Small CAP研究收到我们每天早上通过电子邮件直接发送给您的文章和报告。请访问我们的网站有关Zacks SCR的更多信息,请访问。

DISCLOSURE: Zacks SCR has received compensation from the issuer directly, from an investment manager, or from an investor relations consulting firm, engaged by the issuer, for providing research coverage for a period of no less than one year. Research articles, as seen here, are part of the service Zacks provides and Zacks receives quarterly payments totaling a maximum fee of $40,000 annually for these services. Full Disclaimer HERE.

披露:Zacks SCR直接从发行人、从投资经理或从发行人聘请的投资者关系咨询公司获得了为期不少于一年的研究覆盖范围的补偿。研究文章,如图所示,是Zacks提供的服务的一部分,Zacks每季度收到这些服务的最高费用总计4万美元。这里有完整的免责声明。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息