No Data
No Data
Kingenta Ecological Engineering Group (002470.SZ): The subsidiary's iron phosphate battery positive electrode precursor material project has completed project design, and some infrastructure construction.
Gelonghui December 2nd | Kingenta Ecological Engineering Group (002470.SZ) stated on the investor interaction platform that the company's subsidiary, the precursor material project of the positive electrode of iron phosphate battery, has completed project design and some infrastructure construction. It has obtained safety pre-evaluation, energy evaluation, environmental impact assessment, soil and water conservation, land use certificate, land use planning permit, engineering planning permit, construction permit, etc. Currently, the main project under construction is a 35KV substation, which is nearing completion. Although the market situation for iron phosphate is lower than expected, the recent high-voltage actual lithium iron phosphate products have shown an upward trend in prices, reflecting a more positive industry response. The company will act according to.
Kingenta Ecological Engineering Group Co., Ltd. (SZSE:002470) Stock Catapults 27% Though Its Price And Business Still Lag The Industry
Kim Jeong-dae: Report for the third quarter of 2024
Kingenta Ecological Engineering Group (002470.SZ) released its performance for the first three quarters, with a net income of 0.18 billion yuan, a year-on-year increase of 138.72%.
Kingenta Ecological Engineering Group (002470.SZ) released the third quarter report of 2024, in the first three quarters, the company achieved revenue of 6...
Kingenta Ecological Engineering Group Co., Ltd.'s (SZSE:002470) Low P/S No Reason For Excitement
Kingenta Ecological Engineering Group (002470.SZ): Subsidiary holds 80.31 million tons of phosphate ore in Malucao, Weng'an County, Guizhou Province.
On September 13, 2024, Kingenta Ecological Engineering Group (002470.SZ) participated in an investor survey regarding the "phosphate ore resources of its subsidiary, Guizhou Jinxing Mining Co., Ltd." The company stated that its wholly-owned subsidiary, Guizhou Jinxing Mining Co., Ltd., holds the Malucao phosphate mine in Weng'an County, Guizhou Province, with a resource reserve of 80.31 million tons. The mine consists of the a ore layer and the b ore layer, with an average geological grade (P2O5) of 23.76% for the a ore layer and 26.87% for the b ore layer. Most of the ore grades are classified as level II products.
No Data