No Data
No Data
Aton Reports the First Results From Its Diamond Drilling Programme at the Abu Marawat Deposit, Including 8.98 G/t Au, 185 G/t Ag, 0.43% Cu and 6.12% Zn Over an Interval of 3.90 Metres
Aton Resources Secures Loan for Gold Exploration
Aton Announces Bridge Loan
Aton Details Phase 2 Drilling Results at Semna Gold Project in Egypt
Aton Reports New Surface Sampling Results From the Retained Exploration Areas at Abu Marawat, Including 183 G/t Au From Bohlog, 125 G/t Au From Semna, and 67.4 G/t Au From Kab Amira
Aton Announces the Inaugural General Assembly of the New Operating JV Company at the Abu Marawat Exploitation Lease